You are on page 1of 4
ques ciljUb6 & Dubai Airports MEMORANIL Director- AR & EP iy Director of Monitoring LM/HJCR/4412/09/2017 on _ 2 pars Wednesday, Sept 06, 2017 SUBJECT: Comments on Work Notification, JCR Ref # 01/2208/JCR, for the demolition of smoking lounge at Con B -East side near to Zen Garden. With reference to the above subject please be informed that we have ‘No Objection’ to proceed with the works detailed in the work notification subject to compliance to our below comments: General Comment 1. In case of any emergencies at work, immediately call JCR at +97145045000 or 050 4575009. 2. Contractor staff shall mandatorily undergo Safety Induction Program before commencing project work in Airport Premises of DI 3. Obtain approval from all relevant Departments/Authorities before the commencement of work, 4. PTW approval indicating the date and time of work shall be obtained from JCR before the commencement of work. 5. Before start/finish of the work activity, contact the concemed Shift Duty Engineer for document verification / Safety compliance of the work activity that to be performed. Contact details given below as per location for reference, ee: Teas ines (Terminal 1, Con D) | Serco — Duty Manager | 0543062233 Cargo and Ancillary Buildings Serco Duty Manager | 0543062234 | Concourse B, Terminal 3 Duty Engineer 050-1076678 ‘Concourse A Duty Engineer (050-2811067 ] ‘Concourse C Duty Engineer 050-5889906 6. Local Area access permits shall be obtained from Shift Duty Engineer if the scope / location of work require access to AL&SS (Airport Logistics and Special Systems), AU (Airport Utilities) Facilities. For further information on LOCAL AREA ACCESS PERMIT, call THD# 0097145055099. Dit! gene © verrasoasaue san govteree Conta tereaat © Poa t625,Ovoa 5 len ddaaws sworn vs BS Ue ab rates dinnaipors a ubslorpors.ce = taal ot wus ciljlbo 3 Dubai Airports LMV/HJCR/4412/09/2017 Page 2 of 6 EM Electrical Comments : 1, Electrical room and substation access, Switching operation and disconnection of power liaise with FM shift engineer 0505889906/0501076678/05028 1 1067/0501078036 2, Do not cause any hindrance to the live operational electrical system 3. Do not work on any live electrical DB, SMDB, and MCC etc. If required separate work notification shall be submitted with detail method statement and risk assessment. 4, All Electrical works should be carried out under proper supervision by the contractor. 5. Design, quality and safety at work is sole responsibility of contractor, consultant and DAEP. 6. Contractor has to coordinate with relevant sections in DA for the above works. 7. Separate WN shall be submitted to work on live electrical Distribution panels (SMDB, MCC and DB Etc.) 1, Contractor should liaise with FM Civil Supervisor for any civil related matters 2. Contractor to barricade the working area with proper hoardings/barriers and sign boards 3. No alteration or modification to the building structure is permitted without approval from SME Civil Section 4. For any damage in the existing structure or elements the requester is responsible to rectify up to the satisfactory level of Dubai Airport - ES Technical Division, 5. Ensure all constraints on airport operations have been identified and precautions are taken 6. All existing works to be checked according to as built drawing layout details recorded for relocation 7. Only experienced and skilled operatives shall be engages in carrying out the demolition work 8. Safe access scaffold and work platform will be provided for the block, lintel and column demolition 9. Amange all necessary PPE and services as required for the demolition work 10. For overhead area, the existing block work shall be removed layer by layer from the top level 11. Breaking the block wall and RCC lintels and columns will be carried out by grinders and concrete Hilti 12. Identify and tag any doors, joineries and windows with the room number and reference prior to removal 13, Proper care to be taken to avoid damage to doors, joinery and windows and proper storage is required 14, Handing over all removed and reusable items to DA Central store through the proper channel. Out Construction Job No: 1135749 ( WN 136223) Comments 1. Contractor to coordinate with DA Development-Fitout Construction (FOC) team before starting the work at site. The DA Fitout coordinator for this job is (Mr. TAUQUIR : phone: 050-3474665: Email: Tauquir. Khan@dubaiairports.ae 2. Site Kick-off meeting (with DA Fitout Team) is essential before starting any works at site. Cont'd Page 3 of 6 re saci som snare ae Bete ae 2 meet See eee Recetas, Se eon: fected ee [ Reference % o/1726&, eR ‘Work Notification SESS 1.0 Permit Request Details 22 AUG 2017 Department/Organisation (neues! DARWISH ALUMINIUM AND GLASS ProjecContract reference: _#135749 Project Title: _Demolition of Smoking lounge Project Seope [New TH veade/ update [z] Modineaion —— ] Toul Makeover Project Exact Location: _Concourse 8 ~ East Side near to the Zen Garden ‘Project location's exsagciginalcondiions are absolutly own? CX] YES. Co StringDue: _30/0/2017 suring Tine: 0600 Ending Das: 30/21/2017 ening Tine: _384 1.1 Permit Work Type(s) Welling cntoed ery [7] calework [x] Dismatig Mal inding [7] neg cnt Cane vintes [] ws Foalitepersoe [| Eine wats "| Pating conning Dealing Crnecpemon [a] Diag Ceang “rmspin Sed & ALU work Deroomeon [] Daiagwats [3] Deotn sore ‘Agta ws movronct [i] caters [] Siomortines |] Swrtes tenon Beco wots Consrton Others rl astmens [5] 3bcad/ Contact [x] Method samen Layootérewing ee over 2210872017 22/08/2017 Manager Signature Date Projet Satay Manager Sena Date CContat Number 0365045916 Contaet Number 0565045908 Final Authorization (Police /DA Permit controller) 7 Please submit Permit Fequest wad attachments va mall personally to the Joint Control Room working davs) for approvals processing and/or feed ba conditions relevant to your projet’ scope prior to sendiag this request, inorder toa please eal-04S0 48238 or Emails ptm jera du 2.0 Permit Review & Authorisation After reviewing the request, work details, documentations and physically inspecting the site! locaton; the following work precautions are required ~ 2.1 Permit Precautions & Requirements sey ae Inwonouced Fane aresor Speci gags [] font! Scprwionrgsid [Pe Trmiereqies [] Fin wah ese Wit mis Tox ‘Shey cone rezres [| Brenting ppt Fececingesects |] Grp ep Arg ipso reget Uiting soon remred [] FincadAnttwce- [] Sip conor Sey sone tetanus Spettoalepeed| [| Cotetlenet emt [—] Depts cnt ot Sate ccarinetind [| War ear eoon Freed cos io co Wound Fiat comaieqsed [] Netcmol maued [] Wet coal Now coral Wase coo Tene estes eae ceed Centetee quiet [7] ung conet Faden ‘Shekeseolrequred [—] Eating eres Savon fueron leet Viscous WaniegSiperesed |] Specifies |] Stesoragcoarts [tata coma Beg ped Enpesine cont Stent Wise Seiler ‘nsec! Neburemen soars [] Tanpeng eoot barsatng Nocree Spin comet Scum Sia rcturs [] Tne Comte ewe (Others: (ath) Afler reviewing the permit and its attachments, AREF have ao objection to authorise this permit subject to, NY Note chia Y2reeg/T Me 0 After reviewing the permit and its attachments, DA Engineer have no objection to authorise this permit subject to: ‘After reviewing the permit and its ttachments, OHSE Ensincer have no objection to authorise ths permit subject to: After reviewing the permit and its attachments, Airport Duty Manager have no objection to authorise this permit subject to; Must Cachnate with 6 7eos Concourse masogeArSireh. approcl. 20 ASE rules tebe Abdiared Ahh Foie z Qra rh recevee tert thebte pln tr fil rex Z paced. DA Engineers Signature Date HSE Engineer's Signature Date

You might also like