You are on page 1of 11
SN we F us Gijlac yubai Airports or MEMORANDUM 3S toy Director- AR & EP “ jy Director of Monitoring “ LM/HJCR/4973/10/2017 2ubai Airports DEVELOPMENT DELIVERY SECTION FIT OUT CONSTRUCTION }-09-2017 Job No. 138043 ‘Client |Head- Terminal Delivery Description Enabling works removal of kidney-Hero project phase-3 S/No. Description of works. ‘Amount 1 Gull Works 432,007.00 2 Furniture Work 3 MEP & Civil Works 4 Blectrical 5s ELV. 6 Mechanical (Plumbing) 7 Mechanical (HVAC) 8 Others (Photo copier Machines) 8 Others (Annual Leasing Charges) 432,007.00 |DA-IPROC No. Amounts Shown are based on attached detailed BOQs /Attachments i= Scope of Work BOQ Drawings Others FOC Manager's Comments :~ Signature Few Director of Development - Delivery Gus Giljla0 Dubai Airports Head - Terminal Delivery * we gx PIR-DLV/MOTDIQTN/S&D/17-1060 5 car: Wednesday, September 20, 2017 gu [ SUBJECT: Job # 138043 Enabling Works Removal of Kidney - Hero Project Phase 3 YOUR Ref: E-mail from Mr. Azar Ulhaq dated 13% September 2017 We refer to the above project and submit our Quotation along with Grand Cost as follows: Scope of Work: ‘Survey of kidney shape using the total station equipment. Travelator and Zen Garden: ‘Demolition of existing floor finished up to the screed level, site cleaning and carting away debris (LIFE STYLE 1). 2, Demolition of existing screed up to the concrete slab level, site cleaning and carting away debris and dumping in municipality dumping area (LIFE STYLE 1). 13, Demolition of existing floor finished up to the conerete slab level, site cleaning and carting away debris (LIFE STYLE 2). 4, Demolition of existing scrced up to the concrete slab level, site cleaning and carting eway debris and dumping in municipality dumping area (LIFE STYLE 1). 5. Demolition of existing floor finished up to the concrete slab level, site cleaning and carting away debris (BAR / FOOD3). 6. Demolition of existing screed up to the concrete slab level, site cleaning and carting away debris and ‘dumping in municipality dumping area (BAR / FOOD 3). 7. Demolition of existing floor finished up to the concrete slab level, site cleaning and carting away debris: (BAR/ FOODS). 8. Demolition of existing sereed up to the concrete slab level, site cleaning and carting away debris and dumping in municipality dumping area (BAR / FOOD 4). 9. Demolition of existing floor finished up to the concrete slab level, site cleaning and carting away debris, (FX-1. 10, Demolition of existing screed up to the concrete slab level, site cleaning and carting away debris and dumping in municipality dumping arca (FX -1). 11. Demolition of existing floor finished up to the concrete slab level, site cleaning and carting away debris for conduits for floor box 3. 12, Demolition of existing sereed up to the concrete slab level, site cleaning and carting away debris and dumping in municipality dumping area for box — 3. 13, Demolition of existing floor finished up to the concrete slab level, site cleaning and carting away debris for conduits for floor box 2A, 2B, 2C. 14, Demolition of existing screed up to the concrete slab level, site cleaning and carting away debris and dumping in municipality dumping area for floor box 2A, 2B, 2C. una pons eo a « ep ote za som oo Bios snc us ois Dubai Airports 15. Demolition of existing floor finished up to the concrete slab level, site cleaning and carting away debris for conduits for tile under Rossovivo area. 16, Installation of panafragula marble tiles cut to size to match the existing joints and finished completed with tle joint grout under Rossovivo area. Contingency Fees 15 % Grand Cost: The cost of the above job amounts to Dhs. 496, 808.00 (Dirhams Four Hundred Ninety-Six Thousand Eight Hundred & Eight Only), You are kindly requested to settle the financial part by transferring the amount to S&D Fit Out account. (Form Attached), re ‘This price is valid for a period of 30 days from the date of issue. Request becomes automatically eancelled if no response is received within this period. Note: ‘We request vou to kindly arrange for clarification mecting for this job along with vous formal approval to enable us to proceed with execution. For any queries please contact the Fit-Out Design Office, on Tel 5044356 (Ms. Laila Lanjawi). ‘Yours faithfully, _ \ Lawrence Vincent-Edwards | Director of Development - Delivery & ORAT * Client Approval Ee Development | Dubai Airports *DCA Financial Appeovat — Attachment: BTR Form nolit der LUB/Im a FERS seep 8 Tle Sally AoW Gigs AS @SS0E) DARWISH ALUMINIUM & GLASS CO L.L.C. METHOD STATEMENT FOR Enabling works for Hero Project Project: #138043 Enabling works removal of Kidney-Hero Project Phase 3 CONTENTS 1.0 Scope 2.0 References 3.0 Responsi 4,0 Inspection and Records 5,0 Health and Safety 1.0 Scope Enabling works removal of flooring tiles in kidney shaped at Concourse B East side Zen garden ® Demolition of existing floor finished up screed level. © Demolition of existing screed up to the concrete slab level. 2.0 References DA-ES Standards 3.0 Responsibilities 3.1 Project manager Tel : 06-7646270, 06-7646269, Fax : 06-7663430, P.O. Box: 7270, UAG, UAE Email: info@darwishglass.com, Website : www.darwishglass.com PET

You might also like