You are on page 1of 8

College Of Engineering and Architecture

Civil Engineering Department

CE 500
On the Job Training for CE

Design Of Five-storey Commercial Building

PREPARED BY:
ROY, RENZ ALYSSA
SAJONAS, RALPH CHRISTIAN A.
SATUR, NICO
TORRES, JHEO

CE51FB2

SUBMITTED TO:
ENGR. RHONNIE ESTORES
Instructor
Cost Estimates

Column
CONCRETE
WORKS
COLUMN LENGTH WIDTH HEIGHT QUANTITY VOLUME CEMENT SAND GRAVEL
(m) (m) (m) (m3) (bags) (m) (m)
GROUND
FLOOR
COLUMN 0.4 0.4 3 16 7.68 69.12 3.84 7.68
1

COLUMN LENGTH WIDTH HEIGHT QUANTITY VOLUME CEMENT SAND GRAVEL


(m) (m) (m) (m3) (bags) (m) (m)
SECOND
FLOOR
COLUMN 0.4 0.4 3 16 7.68 69.12 3.84 7.68
1

COLUMN LENGTH WIDTH HEIGHT QUANTITY VOLUME CEMENT SAND GRAVEL


(m) (m) (m) (m3) (bags) (m) (m)
THIRD
FLOOR
COLUMN 0.4 0.4 3 16 7.68 69.12 3.84 7.68
1

COLUMN LENGTH WIDTH HEIGHT QUANTITY VOLUME CEMENT SAND GRAVEL


(m) (m) (m) (m3) (bags) (m) (m)
FOURTH
FLOOR
COLUMN 0.4 0.4 3 16 7.68 69.12 3.84 7.68
1
COLUMN LENGTH WIDTH HEIGHT QUANTITY VOLUME CEMENT SAND GRAVEL
(m) (m) (m) (m3) (bags) (m) (m)
FIFTH
FLOOR
COLUMN 0.4 0.4 3 16 7.68 69.12 3.84 7.68
1

ITEM TOTAL PRICE (Php) TOTAL PRICE LABOR


PRICE
CEMENT 345.6 bags 250 86400 34560

m3
SAND 19.2 50 960 384
m3
GRAVEL 38.4 800 30720 12288
TOTAL PRICE 118080 47232 165312
=

REBAR WORKS

BAR BAR AREA LENGTH WEIGHT


COLUMN Ø QUANTITY
2
(mm) (mm ) (m) (kg)
A1 25 490.8739 3 38 433.69
A2 25 490.8739 3 38 433.69
A3 25 490.8739 3 38 433.69
A4 25 490.8739 3 38 433.69
B1 25 490.8739 3 38 433.69
B2 25 490.8739 3 38 433.69
B3 25 490.8739 3 38 433.69
B4 25 490.8739 3 38 433.69
C1 25 490.8739 3 38 433.69
C2 25 490.8739 3 38 433.69
C3 25 490.8739 3 38 433.69
C4 25 490.8739 3 38 433.69
D1 25 490.8739 3 38 433.69
D2 25 490.8739 3 38 433.69
D3 25 490.8739 3 38 433.69
D4 25 490.8739 3 38 433.69
ITEM TOTAL PRICE (Php) TOTAL PRICE LABOR PRICE

Steel 6938.993 kg 52 360827.6242 144331.0497 505158.7

Beam (Two-Way)

CONCRETE WORKS

LENGTH WIDTH THICKNESS QUANTITY VOLUME CEMENT SAND GRAVEL


BEAM (m) (m) (m) (m3) (bags) (m) (m)

SECOND TO FIFTH FLOOR

B-1 5 0.3 0.5 3 2.25 20.25 1.125 2.25


B-2 5 0.3 0.5 2 1.5 13.5 0.75 1.5
B-3 5 0.3 0.5 4 3 27 1.5 3
B-4 5 0.3 0.5 7 5.25 47.25 2.625 5.25
B-5 5 0.3 0.5 3 2.25 20.25 1.125 2.25
B-6 5 0.3 0.5 2 1.5 13.5 0.75 1.5
B-7 5 0.3 0.5 2 1.5 13.5 0.75 1.5
B-8 5 0.3 0.5 3 2.25 20.25 1.125 2.25
B-9 5 0.3 0.5 1 0.75 6.75 0.375 0.75
B-10 5 0.3 0.5 1 0.75 6.75 0.375 0.75
B-11 5 0.25 0.4 3 1.5 13.5 0.75 1.5
TOTAL= 202.5 11.25 22.5

LENGTH WIDTH THICKNESS QUANTITY VOLUME CEMENT SAND GRAVEL


BEAM (m) (m) (m) (m3) (bags) (m) (m)

ROOF

B-1 5 0.25 0.45 3 1.6875 15.1875 0.84375 1.6875


B-2 5 0.25 0.45 2 1.125 10.125 0.5625 1.125
B-3 5 0.25 0.45 4 2.25 20.25 1.125 2.25
B-4 5 0.25 0.45 7 3.9375 35.4375 1.96875 3.9375
B-5 5 0.25 0.45 3 1.6875 15.1875 0.84375 1.6875
B-6 5 0.25 0.45 2 1.125 10.125 0.5625 1.125
B-7 5 0.25 0.45 2 1.125 10.125 0.5625 1.125
B-8 5 0.25 0.45 3 1.6875 15.1875 0.84375 1.6875
B-9 5 0.25 0.45 1 0.5625 5.0625 0.28125 0.5625
B-10 5 0.25 0.45 1 0.5625 5.0625 0.28125 0.5625
B-11 5 0.25 0.35 3 1.3125 11.8125 0.65625 1.3125
TOTAL= 153.5625 8.53125 17.0625

ITEM TOTAL PRICE (Php) TOTAL PRICE LABOR PRICE

CEMEN 356.0625 bags 250 89015.625 35606.25


T
m3
SAND 19.78125 50 989.0625 395.625
m3
GRAVEL 39.5625 800 31650 12660
TOTAL PRICE 121654.6875 48661.875 170316.6
=
REBAR WORKS

COLUMN BAR Ø BAR AREA LENGTH QUANTITY WEIGHT


(mm) (mm2) (m)
B-1 20 314.159 5 15 182.605073
3
B-2 20 314.159 5 10 121.7367153
3
B-3 20 314.159 5 20 243.4734307
3
B-4 20 314.159 5 35 426.0785036
3
B-5 20 314.159 5 15 182.605073
3
B-6 20 314.159 5 10 121.7367153
3
B-7 20 314.159 5 10 121.7367153
3
B-8 20 314.159 5 15 182.605073
3
B-9 20 314.159 5 5 60.86835766
3
B-10 20 314.159 5 5 60.86835766
3
B-11 20 314.159 5 15 182.605073
3
ITEM TOTAL PRICE TOTAL PRICE LABOR PRICE
(Php)
Steel 1886.91 kg 52 98119.7925 39247.91702 137367.709
9 5 6
Beam (One-Way)
CONCRETE WORKS

LENGTH WIDTH THICKNESS QUANTITY VOLUME CEMENT SAND GRAVEL


BEAM (m3)
(m) (m) (m) (bags) (m) (m)
SECOND TO FIFTH FLOOR

B-1 5 0.3 0.5 3 2.25 20.25 1.125 2.25


B-2 5 0.3 0.5 5 3.75 33.75 1.875 3.75
B-3 5 0.3 0.5 4 3 27 1.5 3
B-4 5 0.3 0.5 7 5.25 47.25 2.625 5.25
B-5 5 0.3 0.5 5 3.75 33.75 1.875 3.75
B-6 5 0.3 0.5 4 3 27 1.5 3
B-7 5 0.3 0.5 3 2.25 20.25 1.125 2.25
B-8 5 0.3 0.5 3 2.25 20.25 1.125 2.25
B-9 5 0.3 0.5 3 2.25 20.25 1.125 2.25
B-10 5 0.3 0.5 2 1.5 13.5 0.75 1.5
B-11 5 0.25 0.4 9 4.5 40.5 2.25 4.5
TOTAL= 303.75 16.875 33.75

LENGTH WIDTH THICKNESS QUANTITY VOLUME CEMENT SAND GRAVEL


BEAM (m3)
(m) (m) (m) (bags) (m) (m)
ROOF

B-1 5 0.25 0.45 3 1.6875 15.1875 0.84375 1.6875


B-2 5 0.25 0.45 5 2.8125 25.3125 1.40625 2.8125
B-3 5 0.25 0.45 4 2.25 20.25 1.125 2.25
B-4 5 0.25 0.45 7 3.9375 35.4375 1.96875 3.9375
B-5 5 0.25 0.45 5 2.8125 25.3125 1.40625 2.8125
B-6 5 0.25 0.45 4 2.25 20.25 1.125 2.25
B-7 5 0.25 0.45 3 1.6875 15.1875 0.84375 1.6875
B-8 5 0.25 0.45 3 1.6875 15.1875 0.84375 1.6875
B-9 5 0.25 0.45 3 1.6875 15.1875 0.84375 1.6875
B-10 5 0.25 0.45 2 1.125 10.125 0.5625 1.125
B-11 5 0.25 0.35 9 3.9375 35.4375 1.96875 3.9375
TOTAL= 232.875 12.9375 25.875

ITEM TOTAL PRICE (Php) TOTAL PRICE LABOR PRICE

CEMENT 536.625 bags 250 134156.25 53662.5

m3
SAND 29.8125 50 1490.625 596.25
m3
GRAVEL 59.625 800 47700 19080
TOTAL PRICE = 183346.875 73338.75 256685.6
REBAR WORKS

BAR Ø BAR AREA LENGTH


COLUMN QUANTITY WEIGHT
(mm) (mm2) (m)
B-1 20 314.1593 5 15 182.6051
B-2 20 314.1593 5 25 304.3418
B-3 20 314.1593 5 20 243.4734
B-4 20 314.1593 5 35 426.0785
B-5 20 314.1593 5 25 304.3418
B-6 20 314.1593 5 20 243.4734
B-7 20 314.1593 5 15 182.6051
B-8 20 314.1593 5 15 182.6051
B-9 20 314.1593 5 15 182.6051
B-10 20 314.1593 5 10 121.7367
B-11 20 314.1593 5 45 547.8152
ITEM TOTAL PRICE (Php )TOTAL PRICE LABOR PRICE

Steel 2921.681 kg 52 151927.4207 60770.96829 212698.389