Concrete Finishing
Ceilings 790 m^2 285
Floors 811 m^2 285
Toppings 678 m^2 285
Others
Allowance For Concrete works
Material Cost Labor Cost Unit Cost Total
92910
Subtotal 6515014.5
Material/Work Item Quantity Unit Material Cost
Metal Framing System
Roof Framing 14500 kg 74.1
4x4 Metal Frame 4288 kg 74.1
Metal Stairs 10 set 8075
Stair Haindrails 10 m 1425
Others
Allowance For Metal works
Material Cost Labor Cost Unit Cost Total
98150
Subtotal 6688782.6
Material/Work Item Quantity Unit Material Cost
Site Clearing Si
Excavation/Fill (Lot Area) 500 m^2 0
Level Reduction (2m Max) 150 m^3 0
Trenches (2m Max) 132 m^3 0
Retaining Wall Sides Trimming 124 m^2 0
Excavation Backfilling (0.3m Thick) 154 m^3 0
Excavated Material Disposal 200 m^3 0
Surface Treatments 300 m^2 0
Slab Grade 16 m^3 2500
Footing 8 m^3 2500
RW Footing 4 m^3 2500
Cistern & Septic Tank 2 m^3 2500
Allowance For Earthworks
Material Cost Labor Cost Unit Cost Total
Subtotal 1550615
Material/Work Item Quantity Unit
Temporary Facilities
Electrical Power Supply 1 lot
Telephone & Internet Connections 1 lot
Water Supply 1 lot
Office/Equipment/Supplies 1 lot
Site Offices & Materials Warehouse 1 lot
Site Access & Road Permits 1 lot
Quality Assurance/Control
Materials Testing & Commisioning 1 lot
Contract Documentation
Drawing Submittals & As-built Plans 1 lot
Progress Photos 1 lot
Others
Housekeeping 1 lot
Contractor's Tax 1 lot
Final Cleaning & Turn-over 1 lot
Site Supervision & Management 1 lot
Environmental & Safety Provisions 1 lot
Site Survey/Setting Out 1 lot
Deliveries & Others 1 lot
Material Cost Labor Cost Unit Cost Total
81350
50000
67500
22500
62490
45000
50000
37500
187500
90000
112500
27500
51150
43900
65250
50450
75000
75000
43500
56250
71000
80000
375000
75000
90000
187500