BRIEFING ON BIM COURSE

PROFESSIONAL CERTIFICATE FOR BUILDING INFORMATION MODELLING (BIM) MANAGER


ALICE LI
5 FEBRUARY 2021
COURSE DETAILS

 Organized by Hong Kong Institute of Construction


 Mode of Attendance – Full-time day course (5 classes)
Part-time evening course (13 classes)
 Admission Requirements – 2 years working experience in relevant fields, holders of
degree in construction related disciplines, eligible for registration as a CIC-certified
BIM Manager
 Recognition – one of the criteria for registration as a CIC-certified BIM Manager
COURSE OUTLINE

1. BIM Initiation
2. BIM Software and Technology Trend
3. BIM Uses and Processes
4. Digital Information Management, Collaboration and Integration
5. Commercial and Contractual Aspects
1. BIM INITIATION CONCEPT

What is BIM?

Building information modeling (BIM) is a


process involving the generation and
management of digital representations of
physical and functional characteristics of
places.
‘Rehearsal – putting real work objects into
virtual world, test before you build.’
1. BIM INITIATION CAD VS BIM

CAD BIM
Variety of Industries Exclusively for Building
2D Lines 3D Components
Text/ Labels as Information Built-in as
Information Parameters
Separate Drawings Drawings Generated
from Same Source

True BIM – Single Source of Truth (SSOT)


1. BIM INITIATION VALUE AND BENEFITS OF ADOPTING BIM

Improve
Scheduling
Sustainable
Why BIM?
Effective Building
Maintenance Design

 3D – 3D Model
Benefits  4D – Scheduling
of BIM
Effective Better  5D – Quantity Take Off (QTO)
Cost Coordination
Estimation  6D – Sustainability
 7D – Facility Management

Visualize Lower
Risk
1. BIM INITIATION VALUE OF BIM FOR FM

 Asset Management
information derived by BIM of rooms

 Preventive Maintenance Scheduling


maintenance, repair, and replacement

 Reconstruction & Renovation


detailed and accurate data of existing
condition
1. BIM INITIATION VALUE OF BIM FOR FM
1. BIM INITIATION LOCAL & GLOBAL CONTEXT, BIM STANDARDS AND GUIDELINES

 Local Government
DEVB

Development Bureau
Technical Circular (Works) No. 12/2020
‘Capital works projects with project estimates
more than $30 Million shall use BIM
technology.’
1. BIM INITIATION LOCAL & GLOBAL CONTEXT, BIM STANDARDS AND GUIDELINES

 CIC
 Global
2. BIM SOFTWARE AND TECHNOLOGY TREND BIM SOFTWARE

 Autodesk Revit
 Gaphisoft ArchiCAD
 Tekla Structures
 Fuzor
 …

Interoperability across industry leading


BIM software
Industry Foundation Classes (IFC)
2. BIM SOFTWARE AND TECHNOLOGY TREND TECHNOLOGY TREND

 VR  Digital Works Supervision System


(DWSS)
3. BIM USES AND PROCESSES CLIENT BIM STRATEGIC STAGE

STAGE CLIENT’S DETERMINATION

Level of integration of digital


information into asset & facility
management

LOIN (Level of Information Need)


Strategic 100,200,300,400,500

CDE (Common Data Environment)


strategy
3. BIM USES AND PROCESSES CLIENT BIM STRATEGIC STAGE

STAGE CLIENT’S DETERMINATION

Level of integration of digital


information into asset & facility
management

LOIN (Level of Information Need)


Strategic 100,200,300,400,500

CDE (Common Data Environment)


strategy
LOIN
3. BIM USES AND PROCESSES CLIENT PRE-TENDER PROJECT STAGE
STAGE CLIENT’S
DETERMINATION

Employers Information
Requirements (EIR)

Contract & consultancy


Pre-Tender requirement

BIM enabled consultancy


Assessment on capability and
capacity (Tender Assessment)
3. BIM USES AND PROCESSES DEFINITION & DESIGN STAGE

STAGE CONSULTANT BIM


MANAGER’S ROLE
Pre-contract BIM Execution Plan
(BEP)
Coordinate and collaborate with
the appointed parties
Ensure deliverables issued on
Design time

Audit and manage the federated


Information Model
Clash detection analysis BEP Model Division
3. BIM USES AND PROCESSES CONSTRUCTION STAGE
STAGE BIM MANAGER’S ROLE
CONTRACTOR CONSULTANT
Post-contract BIM
Execution Plan (BEP)
Manage CDE Supervise on Contractor
BIM Manager
Responsible for BIM
deliverables
Construction Consolidate/ Federate
submissions, manage
quality assurance and Provide quality assurance to
submit to Consultant BIM deliverables and submit to
Manager Client
Carry out clash analysis
4D simulation and review of site progress
3. BIM USES AND PROCESSES HANDOVER, OPERATION & MAINTENANCE STAGE

STAGE BIM MANAGER’S ROLE CLIENT


CONTRACTOR CONSULTANT

Update Asset
Information Model (AIM)

Verify as-built information submitted


Handover, by the Main Contractor
Operation &
Maintenance Post occupancy
evaluation – to be
reviewed from time to
time
4. DIGITAL INFORMATION MANAGEMENT COMMON DATA ENVIRONMENT (CDE)

Traditional Information Sharing CDE


4. DIGITAL INFORMATION MANAGEMENT COMMON DATA ENVIRONMENT (CDE)

 CLIENT SHARE AREA


 WIP (Work in progress) store
unapproved information
 SHARED approved for sharing
with other organizations
 PUBLISH information for all
discipline to review
 ARCHIVE history from design to
completion of project

 SSOT with record of date and


author
4. DIGITAL INFORMATION MANAGEMENT COMMON DATA ENVIRONMENT (CDE)

ADVANTAGES:
 Change can be recorded
with time and author
 Markup can be recorded
on CDE
 Different devices can
access
 Submission Tracking
4. DIGITAL INFORMATION MANAGEMENT DATA QUALITY CONTROL

Quality Assurance
 Model Audit
- Project data
- Standard conformity
- Consultant’s input
- Software Versions, File Size
- Clash Detection
 Audit Reporting
- Feedback to Appointing
party at regular interval
5. COMMERCIAL AND CONTRACTUAL ASPECTS CHALLENGES

CHALLENGES:
 BIM strategy in organization level
- Passive vs Active approach
 Investment/Lack resources
- Software, hardware, staff and manpower,
protocols, etc
- Productivity loss for re-establishing new
system
- Different strategy in allocation of
resources
5. COMMERCIAL AND CONTRACTUAL ASPECTS CONTRACT ISSUE

 Intellectual property right


- The copyright of all data and information shall be the property of the Employer.

 Responsibility for information and liability


- Liability for the errors contained?
5. COMMERCIAL AND CONTRACTUAL ASPECTS CONTRACT ISSUE

 Definition of responsibilities,
liabilities and limitations
 incorporated into professional
services appointments or
construction contracts
 UK - Construction Industry
Council BIM Protocol
 HK - the HKIS BIM Contract
Conditions
4. COMMERCIAL AND CONTRACTUAL ASPECTS CONTRACT ISSUE

 2 Editable Appendices
 Appendix 1 – Model Delivery
Table
 Appendix 2 - Employer’s
Information Requirements
ASSESSMENT

 Written
 Short and Long Questions

 Technical
 Setup of CDE
 CDE/ Model Audit
 Open BIM Collaboration
 Drawings Production

 Final Assessment
 1.5 hrs, MC +Written + Technical
ASSESSMENT SETUP OF CDE – A360
ASSESSMENT CDE/ MODEL AUDIT
ASSESSMENT ARCHICAD > IFC > REVIT > DRAWINGS PRODUCTION
ASSESSMENT ARCHICAD > IFC > REVIT > DRAWINGS PRODUCTION