Professional Documents
Culture Documents
02/
B FA
5‐Sep‐16 5‐Sep‐16 5‐Sep‐16 UIP KAL BAGTIM/2016
SMS ART SAK
A ORIGINAL ISSUE FA
26‐Aug‐16 26‐Aug‐16 26‐Aug‐16
ESTABLISHED CHECKED APPROVED
REV MODIFICATIONS STATUS
DATE DATE DATE
PT. PLN (PERSERO)
UNIT INDUK PEMBANGUNAN KALBAGTIM
CONTRACT No. 02.PJ/133/APLN/UIP X/2015
PEMBANGUNAN GARDU INDUK 150 KV NEW SAMARINDA
CONTRACTOR KONSORSIUM
PT. BINTANG REJEKI CEMERLANG ‐ PT. NUGRAHA CITRA MAS
PT. TRIMULTI SARANA TEHNIK
SUPPLIER
TITLE
GI 150kV NEW SAMARINDA
DATE NAME SIGN. GROUNDING GRID
CALCULATION
ESTABLISHED 05/09/2016 SMS
B
PEMBANGUNAN GARDU INDUK
150kV NEW SAMARINDA
A. CALCULATION REFERENCE
This Calculation base on the IEEE Guide for Safety in AC Substation Grounding, by The
substation committee of the IEEE Power Engineering Sociaty, Approved by American National
Standard Institute on July 21, 1985 and issued as applied standard no. IEEE 80, 1986
nab na nb
Lc length na width nb
Lr n l2
L Lc Lr
1 1 1
Rg r 1
L 20 A 20
1 h
A
1 1 1
Rg r 1
L 20 A 20
1 h
A
𝑅𝑔1 ∗ 𝑅𝑔2
𝑅𝑚 =
𝑅𝑔1 + 𝑅𝑔2
E. CONCLUSION
Meet the requirement, Rm = 0.144 W ( Less than 1.0 W )