Concrete Structure

Item Description Nos Length (m) Width (m) Height (m) Volume (m3) Price
1 Abutment A footing 7.700 2.000 1.000 15.400
2 Abutment B footing 7.700 2.000 1.000 15.400
3 Backwall Abut A 7.700 0.350 1.817 4.897
4 Backwall Abut B 7.700 0.350 1.792 4.829
5 Wingwall Abut A 2.500 0.350 0.900 0.788
6 Wingwall Abut B 2.500 0.350 0.900 0.788
7 Parapet Wall Abut A 1.200 0.350 1.000 0.420
8 Parapet Wall Abut B 1.200 0.350 1.000 0.420
9 Shear Key Abut A 2 0.800 0.315 0.400 0.202
10 Shear Key Abut B 2 0.800 0.315 0.400 0.202
11 Type 25 Girder 12.430
12 Diaphragm Beam 8 1.500 0.350 1.417 5.951
13 Deck slab 25.000 7.700 0.180 34.650
14 Road Kerb 2 25.000 0.350 0.300 5.250
15 Lightning base 2 0.900 0.480 0.400 0.346
16 Approach slab 2 3.000 6.980 0.300 12.564
17 Piled Emb Slab 14.000 5.600 0.200 15.680
18 Transition Slab 3.000 7.000 0.200 4.200

Total 134.415
Reinforcement Quantity
Item Bar Shape Total Length No per 12m Total No Req Total pcs rebar in 12m
Pcs per bundle Weight per bundle (MT)
T10 138 1.022
T12 96 1.023
T16 54 1.024
T20 34 1.008
T25 22 1.016
T32 14 1.06
T40 9 1.065