SetarIMABEY & JOHNSON LTD Jculenr: PWD, SARAWAK [Job Ret.
Jricrl Mle Twyford RG10 950 England, [CONTRACT Nor PWOMOTSONTTIOGS
jerneeamctroqouaFac(rr39 sm x27
[receaeennsert TRUSS TYPE: DSHRIH COMPACT 200 aTe: Sheet No
Dar] ROADWAY: 332m TIMBER DECK
7 OR ea ‘SPAN: 396m (120) 27
er LOADING: HA to BS5400)
IVE LOAD ANALYSIS
Ccaniageway with, W = 3.32m
Hence number of Design Lanes, N= 1.107
‘Span, = 39624
Hence UDL * 2660 tones per metre
KEL = 122220065
Live Load Bending Moment (LLEM):
tuo = MeUOboL Meth
183. m usm
END REACTION AND SHEAR.
In Atabey Compact panel bdaing, shear force cared bythe dagonal members
‘tthe panes Lood is ransmted frm the decking othe russes through the
{ranaome (oor beams) 35 shown below:
Bearing
‘ue tothe nature of he Mabey Compact brig, the maximum shar force the
{russes oss than the end reaction a os passing dectly to the Bearings does»
‘use any shea oad in the panels
|A: withthe los in position “A. above he bearings) the maximum end
Teaction fs atveved but he shear fre in tho panes that form the
nus is vero a alo the oad passes direc nto the Beacgs,[MABEY & JOHNSON LTD [cuenT. PWD, SARAWAK
Feral mie Twyford RG10 880 England, [CONTRACT Nor PWOROISOATTTORS
Facheteg rons Fac ote ne
[dob Ret
[eeroucionnsert TRUSS TYPE: DSHRIH COMPACT 200
Ba] ROADWAY: 332m TIMBER DECK
7
OFS aes SPAN: 306m (1308)
[eecuey
LOADING: HA (to BS5400)
x20
[Cale: Sheet Ne-
aot
1B: with he load in postion 3". onthe dking between the ast wo
tTansoms) the load is shared between these two tansoms and so part
ofthe load passes dct to he berngs,
(C: with the loadin postion" (Le. above the penultimate ransom) al of
the load taken by ne bearings passes twough he panels 35 shear
force in the diagonal members. Therefore this the postion for
‘maximum shear.
Live Load End Reaction (LLER):
“The maximum Live Load End Reaction occurs wih the KEL postioned drecty
over the bearings andthe UDL onthe whole span 3s shown
teen = NAUDLEL ya kee
= mat
End Bay Live Load shear Force (LLSFi
“The maximum ve load shear ore therefoe occurs wit the KEL positioned
‘onthe penultimate ransom and the UDL on he whle span as shown:
Uy
NekEL NUL «(t-2048)?
t Bt
usr,
|. Ni 3.048 UL
a04e)
Lise:[MABEY & JOHNSON LTD Jcuent: PWD, SARAWAK _
rior tle Twyfow RG10 960 England. [CONTRACT NOT PHDROSOS1I195
Jacresip rsp rax ro 0s04
[Job Ret.
[truss TYPE: OsHa:H COMPACT 200
Ga] "ROADWAY: 332m TIMBER DECK
[pexerer
OFS TsiGaae SPAN; 396m (120f1)
LOADING: HA to 885400)
x25
ale Sheet No.
sot?
[Bene
Penultimate Bay Live Load Shear Force (LLSF)
“The maximum shear force in the penne bay ofthe bridge ocurs when the
EELiz postioned on the transom between the second and rd bays ofthe Bidoe
Sid the UDL son the whole span wih the exception of te end Bay as shown
Note thatthe UOL used to calle te shear force ia the penultimate bays thst
forthe loaded fnath ofthe span, | where = L=9.048 metres,
36578 m
Hence UOl2 = 2784 tonnes per metre
use, = N2XGLe (L096) | NxUDL, (L-6006)"
a
Nx 3048 xUDL, « (t-8096)+(L-a048))
_—
NxUDL, «3.048
—
‘Third Bay Live Load Shear Force (LLSFS):
“The maximum sheat force inthe thi bay ofthe bridge occurs when the KEL Is
postioned on the transom between the hie and fou bays ofthe brkge an the
{Got ison he whale span wth the excpton ofthe end two bays as shown:
"Noe thatthe UDL used fo calculate the shear fre inthe tied bay is that forthe
loaded length ofthe span, where = L-6.036 mete.Hee RAN PERI SONZIN REE [CLIENT WU, SAKAWAK —__|Job Ref.
} rst ato tytn 10510950 Eng, CONTRACT Nar PROMOSOATTSGE
ae ir v4 TRUSS TYPE: OSHRIH COMPACT 200,
Taz] ROADWAY: 332m TIMBER DECK
7 OFS FEE SPAN; 386m (12071)
Scat LOADING: HA to 885400)
b= 2520 m
ence UDL: = 2.902 tones per metre
NxKEL <(t-9.144) | N