SUBGRADE / PAVEMENT COURSE PREPARATION DIPPING FORM

Project : CADANGAN MEMBINA DAN MENYIAPKAN PROJEK JALAN SONG - KAPIT,


JAMBATAN KEDUA SG. YONG, KAPIT, SARAWAK
Client : Jabatan Kerja Raya Sarawak
Contractor : DINASTI QUAWIY SDN BHD
Course Layer :
Location :

LHS CENTRE RHS PAVEMENT


Chainage
0.5PW* 0.25PW* 0m 0.25PW* 0.5PW* WIDTH (PW)

Remarks:

Surveyed by: Checked / Witnessed by:

Contractor / Surveyor Resident Engineer


Name: Name:
Date: Date:

1. PW* : Proposed pavement width


2. Tolerance: 1. Subgrade +10 mm / -30 mm
2. Roadbase +0 mm / -20 mm
3. Edge of Pavement +50 mm / -0 mm ( From the centre-line )
Peg 1
Peg 2

You might also like