Professional Documents
Culture Documents
THE TOUGHEST
THINWALL DRIPLINE
EVER MADE
NOW CONTAINS
RECYCLED DRIPLINE
INSTALLATION
RETRIEVAL
UP TO 15 LATERALS
AT ONCE
LABOR
LABOR SAVINGS
REDUCTION
FAST COLLECTION
WITH MEGABINDER FROM 40 2 TO
HOURS
PER 15 ACRES
20%
INSTALLATION
MORE FOOTAGE IN SHOP DURING DURING
WITH PER REELS INSTALLATION TRANSPORTATION STREAMLINE X REGEN™
ON THE MACHINE CAN BE RECYCLED
(888) 638-2346
www.netafimusa.com