Location:
Description of Task/Activity/Area/Premises etc.:
STEP-3
STEP-4
Control Measure
STEP-1 STEP-2
(Refer to Hierarchy of Control)
RISK RATING What further action, if any, is necessary, RESIDUAL RISKS
SN if so what Action is to be taken by
whom and by when? ACTIONS & IMPLEMENTATION
Probability
Probability
Action
Severity
Severity
(P X S)
(P X S)
Rating
Rating
Who might be
(P)
(S)
(P)
(S)
Hazard Action by Whom By Done
at risks
When
STEP-3
STEP-4
Control Measure
STEP-1 STEP-2
(Refer to Hierarchy of Control)
RISK RATING What further action, if any, is necessary, RESIDUAL RISKS
SN if so what Action is to be taken by
whom and by when? ACTIONS & IMPLEMENTATION
Probability
Probability
Action
Severity
Severity
(P X S)
(P X S)
Rating
Rating
Who might be
(P)
(S)
(P)
(S)
Hazard Action by Whom By Done
at risks
When
STEP-3
STEP-4
Control Measure
STEP-1 STEP-2
(Refer to Hierarchy of Control)
RISK RATING What further action, if any, is necessary, RESIDUAL RISKS
SN if so what Action is to be taken by
whom and by when? ACTIONS & IMPLEMENTATION
Probability
Probability
Action
Severity
Severity
(P X S)
(P X S)
Rating
Rating
Who might be
(P)
(S)
(P)
(S)
Hazard Action by Whom By Done
at risks
When
STEP-3
STEP-4
Control Measure
STEP-1 STEP-2
(Refer to Hierarchy of Control)
RISK RATING What further action, if any, is necessary, RESIDUAL RISKS
SN if so what Action is to be taken by
whom and by when? ACTIONS & IMPLEMENTATION
Probability
Probability
Action
Severity
Severity
(P X S)
(P X S)
Rating
Rating
Who might be
(P)
(S)
(P)
(S)
Hazard Action by Whom By Done
at risks
When
Secured Ladders
No removal of guardrails unless other
safeguards against falling first
provided.
Ladder access gaps in platforms
staggered and protected with guardrail
and self closing gate etc.
Guardrails at least 950mm above all
platforms.
Use of a Scaffolding No gaps in guardrail over 470mm
Falls of persons wide at any side of platform.
Falls of materials Check scaffold boards for defects
Collapse of structure Operative & Co-
regularly for significant damage –
5 Unauthorized use Workers & 3 5 15 1 3 3
cracks, cuts, notches, rot etc.
Lightening strike/overhead cables Public
Access to incomplete areas prevented.
Scaffolds to be erected altered or
dismantled under direct supervision of
CISRS qualified scaffolder.
Handover certificate required before
the use of any part of the scaffold.
Scaffold checked after bad weather
damage etc.
Local authority licence for scaffold in
public road.
Statutory inspection and reports.
Security of site.
Risk Assessment for Scaffolding
Location:
Description of Task/Activity/Area/Premises etc.:
STEP-3
STEP-4
Control Measure
STEP-1 STEP-2 (Refer to Hierarchy of Control)
RISK RATING What further action, if any, is necessary, RESIDUAL RISKS
if so what Action is to be taken by
SN
whom and by when? ACTIONS & IMPLEMENTATION
Probability
Probability
Action
Severity
Severity
(P X S)
(P X S)
Rating
Rating
Who might be (P)
(S)
(P)
(S)
Hazard Action by Whom By Done
at risks
When
STEP-3
STEP-4
Control Measure
STEP-1 STEP-2
(Refer to Hierarchy of Control)
RISK RATING What further action, if any, is necessary, RESIDUAL RISKS
SN if so what Action is to be taken by
whom and by when? ACTIONS & IMPLEMENTATION
Probability
Probability
Action
Severity
Severity
(P X S)
(P X S)
Rating
Rating
Who might be
(P)
(S)
(P)
(S)
Hazard Action by Whom By Done
at risks
When
Do not work on fragile material.
Make work area safe and secure by
either installing protective covers or
cordon off areas/fragile materials
Barriers and signs will be placed
below work area.
Safe access to work area will be
Working on Fragile roofs provided by the use of roof ladders,
Falls of persons crawling boards, scaffolding or
Operative & Co-
Falls of materials and equipment staging
8 Workers & 3 2 6 1 3 3
Access/Egress across fragile Where access to adjacent to fragile
Public
material materials, these are to be protected by
boards etc up to 2m from the access
route (Clients responsibility)
When safety harnesses and fall
restraint system are used, the
equipment is to be checked by a
competent person before work
commences to ensure the equipment
is serviceable for the purpose
Probability
Action
Severity
Severity
(P X S)
(P X S)
Rating
Rating
Who might be
(P)
(S)
(P)
(S)
Hazard Action by Whom By Done
at risks
When
Unacceptably High- Activity or industry should be modified to include remedial planning and action and be
8-12 High Risk
subject to detailed HSE assessment
Acceptable but must be managed at “As Low As Reasonably Practicable” (ALARP). Activity or industry
4-6 Moderate Risk
can operate subject to management and / or modification
1-3 Low Risk Acceptable without required further action. No action required unless escalation of risk is possible
Risk Assessment Date: 19/06/2019 Reviewed & Approved By: Eng. Hasan Al Omar
Risk Assessed By: Tariq Radwan Signature: