Professional Documents
Culture Documents
Approval
Amendment Record
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
Table of Contents
1 Purpose .............................................................................................................................. 3
2 Scope ................................................................................................................................. 3
4 Definitions .......................................................................................................................... 4
5 Responsibilities ................................................................................................................. 6
6 Background ....................................................................................................................... 6
7 References ......................................................................................................................... 6
12 Appendices ...................................................................................................................... 14
Appendix A – Example Axle Counter Reset Panel Layout .....................................................15
Appendix B – Example Supervisor Section Arrangements ....................................................16
Appendix C – Example Point Supervisor Section Arrangements ...........................................17
Appendix D – Example Supervisor Arrangement at End of Track ..........................................20
Appendix E – Example Boundary Supervisor Arrangement ...................................................21
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 2 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
1 Purpose
The purpose of this Technical Note is to provide the Axle Counter Reset requirements and
the requirements for the associated Axle Counter Reset Panels located within the
equipment housings.
This Technical Note supersedes all previous Axle Counter Reset requirements within
Technical Notes, Design Practice Notes and Standards.
2 Scope
This document defines MTM’s requirements in relation to Resetting Axle Counters,
replacing the requirements specified in L1-CHE-STD-067 (formerly VRIOGS 12.0.3).
This Technical Note applies to new Axle Counter Systems and to modifications or
upgrades to existing Axle Counter Systems.
This document shall be read in conjunction with the MTM Type Approval conditions for the
Product and the Manufacturer’s specifications for the Product.
This document contains information affecting Axle Counter Operating Procedures and
Maintenance Work Instructions.
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 3 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
4 Definitions
For the purpose of this Technical Note, the following terms are defined as follows:
Authorised Person Is a SMT, OIC, or Signal Supervisor who is authorised by
MTM and deemed competent to Reset Axle Counter Track
Section(s) by the Head of Engineering - Signalling as
described within L1-CHE-WOI-002.
Axle Counter The Axle Counter Evaluator is located within the indoor
Evaluator housing, consisting of a configured backplane,
communication card(s), and power supply card and
connects via cable to the trackside located Axle Counter
Heads. It also connects the single Axle Counter Evaluator
into the Axle Counter Track Configuration Network.
Axle Counter Head The trackside interface of the Axle Counter System,
mounted on the rail. The locations of the Axle Counter
Heads define the physical extent of Axle Counter Track
Sections.
Axle Counter Head
Symbol for an Axle Counter Head on a single line diagram.
Symbol
The filled in square defines which rail the Axle Counter Head
is attached.
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 4 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
Direct Reset Reset executed when the request is received by the Axle
Counter System which is independent of any other
conditions.
Overlay Axle Counter Axle Counter Track Section(s) that are overlaid over existing
System track circuits.
Main Line A track, other than a Siding, which is used for running rail
traffic through and between locations.
Manual Reset Is when the Authorised Person either performs a Next Train
or Occupation Reset, by operating the keyswitch and
pushbutton to reset an Axle Counter Track Section(s).
Next Train Reset with A configurable Reset method that requires that the last
Condition movement was out of the Axle Counter Track Section and that
there has been a successful passage of a train through the
Axle Counter Track Section.
Occupation Reset The use of Direct Reset to expedite Reset of large sections
of track following works, such as powering up the Axle
Counter System after or during occupation works.
Occupancy Status The failsafe, vital output of the Axle Counter System for each
Axle Counter Track Section; either Clear or Occupied.
Occupied The state of an Axle Counter Track Section when the Axle
Counter System determines that there is a rail vehicle within
the Axle Counter Track Section or if there is a fault or error
with the equipment.
Parallel Interface Individual outputs from each Axle Counter Track Section for
Track Occupancy status to an interlocking.
Point Fouling Axle An Axle Counter Track Section within the Clearance Point of
Counter Track points that is used within the interlocking for the purpose of
Section. dead locking the points.
Point Supervisor An Axle Counter Track Section comprising of three or more
Section Axle Counter Heads that provides Supervisor Reset
functionality to Point Fouling and adjacent Axle Counter
Track Sections.
Primary Configuration A configuration where the Axle Counter System is the only
mechanism used to detect rail vehicles.
Road Rail Vehicle A works vehicle that can be placed on track mid-section of
(RRV) an Axle Counter Track Section.
Reset Axle Counter Track Section count is set to zero and the
Track Section Occupancy Status is returned to Clear.
Reset Configurations The types of permissible Axle Counter System Reset types
within MTM areas.
Restricted Reset A configurable feature of the Axle Counter System that
requires additional conditions to be satisfied prior to the Axle
Counter System accepting the Reset request.
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 5 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
5 Responsibilities
Project Managers shall ensure requirements of this Technical Note are incorporated into
project scope of works and that appropriate processes are implemented to monitor and
control the works during Design, Construction, Installation, Testing and Commissioning to
ensure that the requirements are adhered to. This includes ensuring staff and contractors
are appropriately trained and competent to perform the works.
6 Background
This document provides the requirements for Resetting Axle Counter Track Section(s)
after a fault event or following completion of Commissioning or Infrastructure Maintenance
activities which have disturbed the Axle Counter Track Section(s).
The designer of the Axle Counter system configuration is responsible to ensure the
location specific application of Resets is safe, SFAIRP.
7 References
Document No. Document Title
L1-CHE-STD-067 Signalling Principles, Axle Counters
L1-OPS-PRO-025 General Operating Procedures
L1-CHE-WOI-002 Axle Counter Reset Work Instruction
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 6 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 7 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
9 Operational Procedures
Prior to Axle Counter Track Sections being Reset, the Authorised Person shall
communicate with the Signaller in accordance with L1-OPS-PRO-025 – ‘General
Operating Procedures’.
Supervisor Sections shall be provided for all plain line Axle Counter Track Sections.
If a Supervisor Section is Clear, but one or more of the Axle Counter Track Sections
contained within the Supervisor Section are occupied, then the Occupied Axle Counter
Track Sections shall be automatically Reset (Top-Down).
If the individual Axle Counter Track Sections contained within the Supervisor Section are
Clear but the Supervisor Section is Occupied, then the Supervisor Section shall be
automatically Reset (Bottom-Up).
Supervisor Sections shall not be evaluated within the same hardware as the Axle Counter
Head they supervise, such that a failure of any item of equipment associated with an Axle
Counter Head shall not result in failure of the corresponding Supervisor Section.
At points and crossings, the Axle Counter Heads shall be positioned at Clearance Point,
or less than Clearance Point.
Rationale
By placing the Axle Counter Heads at Clearance point (or less than at Clearance Point)
ensures that the passage of the ‘Next Train’ confirms that there are no obstructions on the
Axle Counter Track Section being Reset.
Point Supervisor Sections shall be provided for all Point Fouling Axle Counter Track
Sections and the Axle Counter Track Sections immediately adjacent in order to provide
Supervisor Reset functionality for Point Fouling Axle Counter Track Sections, as per
Section 10.1.
Supervisor Reset of Point Fouling Axle Counter Track Sections and the Axle Counter Track
Sections immediately adjacent shall be configured as a Restricted Reset such that the
Reset is rejected if the last count was into the Axle Counter Track Section being Reset.
Supervisor Reset of Point Fouling Axle Counter Track Sections and the Axle Counter Track
Section immediately adjacent shall be configured as a Direct Reset if the last count was
out of the Axle Counter Track Section (No restriction).
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 8 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
Each Point Supervisor Section shall be provided with an Occupancy Status output (Point
Supervisor Output) to the Interlocking as follows:
a) The Point Supervisor Output is high when the Point Supervisor Section is Clear.
b) The Point Supervisor Output can either be provided through a vital output card and
MTM approved relay or through an approved Serial Interface.
c) The Interlocking shall release point locking when the Point Fouling Track Section is
Occupied when the corresponding Point Supervisor Section is Clear.
Rationale
The release of point locking when the Point Supervisor Section is Clear allows points to
be moved and trains to be operated (in a degraded mode) despite an Axle Counter failure
over the points.
At the interface between Track Circuits and Axle Counter Track Sections, an additional
Axle Counter Track Section (Boundary Supervisor) shall be provided to allow Supervisor
Reset of the first Axle Counter Track Section at the boundary.
Referring to the example in Appendix E – Example , the Axle Counter Track Section
configuration at the boundary shall be as follows:
i. 1AT consists of Axle Counter Heads -/1A & 1/2
ii. 1T consists of Axle Counter Heads -/1 & 1/2.
iii. The dual Axle Counter Heads at the boundary (-/1 and -/1A) shall be installed directly
opposite each other. (SAB reference FAdC100_93)
iv. 1AT shall be configured as the Supervisor Section for 1T.
v. 1T shall be configured as the Supervisor Section for 1AT.
vi. Axle Counter Head -/1A shall not be configured with Counting Head Control.
The Boundary Supervisor Section shall not be indicated on the Signal Control Panel;
however an alarm shall still be generated in the monitoring control centre if the Boundary
Supervisor Section fails.
The Boundary Supervisor Section shall not be shown on the Axle Counter Reset Panel.
Guidance
Refer to Appendix E – Example for an example of the Boundary Supervisor Section
layout and configuration.
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 9 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
Where there is a dead-end track and the Axle Counter Track Section consists of only one
(1) Axle Counter Head, the following requirements shall apply:
a) The Reset shall be configured to Next Train Reset with Condition as per a normal.
b) A Supervisor Reset or Point Supervisor Reset shall be provided using the previous
head as the Supervisor Section.
Guidance
Refer to Appendix D – Example Supervisor Arrangement at End of Track for an example
of the Supervisor Reset Arrangement for an End of Track.
All Axle Counter Track Sections shall be provided with a Next Train Reset with Condition.
The Next Train Reset shall be configured with a restriction such that the Reset is rejected
if the last count was into the Axle Counter Track Section being Reset.
Next Train Reset with Condition shall be used when the Supervisor Reset is unavailable
and a manual Axle Counter Reset is required.
The Next Train Reset with Condition functionality of the Axle Counter System shall be
triggered by the Authorised Person operating the Next Train Reset Keyswitch and the
corresponding Axle Counter Track Section Reset Pushbutton at the same time (refer to
Figure 1).
Occupation Reset
All Axle Counter Track Sections shall be provided with an Occupation Reset.
The operation of the Occupation Reset Keyswitch and the corresponding Axle Counter
Track Section Reset Pushbutton by the Authorised Person shall provide a command to
the Axle Counter System to immediately Reset the Axle Counter Track Section (refer to
Figure 1).
Guidance
Refer to L1-CHE-PRO-037 – ‘Axle Counter Occupation Key procedure’ for additional
controls for this form of Reset.
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 10 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
Reset Keyswitch
Next
Train
R Reset
Occupation Keyswitch
Occupation
Reset
R
Figure 1: Example of Reset Inputs to the Parallel Axle Counter System for Manual
Axle Counter Resets
An Axle Counter Reset Panel shall be provided at each Axle Counter Evaluator Location,
unless otherwise agreed with the Head of Engineering - Signalling.
The Axle Counter Reset Panel shall have a blue background with the detail embossed or
engraved in white.
The Axle Counter Reset Panel shall have a Keyswitch for each type of Manual Axle
Counter Reset (Next Train Reset and Occupation Reset) and a Pushbutton for each Axle
Counter Track Section, except for the Boundary Supervisor Sections at the interfaces with
adjacent track vacancy detection system.
To reduce the risk of human error, the Axle Counter Reset Panel shall show the track
layout, signals, stations, bridges and level crossings in accordance with the Axle Counter
Overview Plan with the physical placement of the Axle Counter Reset Panel within the
SER/Zone Box to be aligned geographically so far as practical.
Reset Pushbuttons shall be arranged with respect to the track layout as per the example
in Appendix A – Example Axle Counter Reset Panel Layout.
Where the Axle Counter Heads that form an Axle Counter Track Section are connected to
different Axle Counter Evaluator locations, the Track Section shall be shown and a Reset
Pushbutton shall be provided on the Axle Counter Reset Panel at both locations.
At each end of the Axle Counter Reset Panel, the adjacent Track Circuit shall be shown
as a hollow outline along with the name and type of Rail Vehicle Detection System.
A maximum of six (6) Pushbuttons shall be provided per line per 19 inch Axle Counter
Reset Panel. Additional Axle Counter Reset Panels shall be provided where required to
satisfy this requirement.
Engraved labels shall be provided to clearly identify the functionality of each Keyswitch
and Pushbutton.
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 11 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
Axle Counter Reset Panels shall be enclosed within a secure housing to prevent tampering
of the Keyswitches, Pushbuttons or inputs. Under no circumstances shall an Axle Counter
System be commissioned with the Axle Counter Reset Panel uncovered.
Keyswitch
A Keyswitch shall be provided for a Next Train Reset and another provided for the
Occupation Reset. Each Keyswitch shall have a green LED indication when the key is
turned fully to the Reverse position.
Only one Keyswitch shall be operated at any one time along with the Axle Counter Track
Section Reset Pushbutton. The Keyswitch provides protection against accidental or
unauthorised Axle Counter Reset(s), as well as selecting the type of Reset to be
performed.
Reset Pushbutton
A Pushbutton shall be provided for each Axle Counter Track Section that is formed by Axle
Counter Heads connected to the Axle Counter Evaluator location.
The Pushbutton and the Keyswitch held reverse shall provide an input to the Axle Counter
Evaluator to execute the applicable Reset for each Axle Counter Track Section.
The designer shall provide a method to protect the system from unintentional Axle Counter
Track Section reset due to a push button becoming stuck, or contact failing, in the closed
position.
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 12 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
No light (LED extinguished) Axle Counter Track Section is Clear (warning: could
also be due to a failed LED).
Steady red light Axle Counter Track Section is Occupied or has
Failed.
Flashing red light Next Train Reset command received and accepted
(Reset acknowledgment) by the Axle Counter System
and is waiting for the next train to traverse section.
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 13 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
The Pushbutton LED indications shall be supplied by type approved power supplies or
directly from the CBI.
Where a Parallel Interface is used, the Next Train Reset Acknowledgment Indication is
provided by an output from the Axle Counter Evaluator.
Where a Serial Interface is used, the Next Train Reset Acknowledgement Indication shall
be provided by either an output of the Axle Counter Evaluator or an output of the CBI.
The Axle Counter Track Section Occupancy Status output shall only be provided via a
failsafe output of the Axle Counter Evaluator (Parallel Interface) or via the CBI (Serial
Interface).
Each Point Supervisor Output shall drive an approved failsafe DC-biased miniature relay.
I/O Card
B
Failsafe Track
xxx T Section Output
N
B Next Train
Reset
xxx RA Availability
N
xxx T xxx RA
FB
12 Appendices
Appendix A – Example Axle Counter Reset Panel Layout
Appendix B – Example Supervisor Section Arrangements
Appendix D – Example Supervisor Arrangement at End of Track
Appendix E – Example Supervisor Arrangement
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 14 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
16mm
15mm (MIN)
15mm (MIN)
11mm
###
5T 7T ...
PLATFORM 2
TO MELBOURNE 12pt TO (END OF LINE)
55mm
PLATFORM 1
###
1T 18pt 2T 22mm 33 DEG 3T 4T 6T ...
100T (CSEE)
1PB 2PB 3PB 4PB 6PB ...PB
5mm
### 65mm (nominal) ###
10mm
PANEL OUTLINE
PLATFORM 2
PLATFORM 1
(1AT)
TITLE DESIGNED
NOTES
SIGNALLING D MARTIN
D MARTIN
DRAWN
1. TRACK LAYOUT DIAGRAM PROVIDED FOR REFERENCE PURPOSES ONLY.
2. PUSHBUTTON TYPE ARLIN GQ2222R-RD-12V OR APPROVED EQUIVALENT. APPENDIX A D MARTIN
3. GREEN LED TYPE RS-PRO, STOCK CODE 838-5586. EXAMPLE AXLE COUNTER RESET PANEL CHECK ED
4. KEYSWITCH TYPE ASN SWITCHGEAR WS2/12TA-12 J WARWICK
5. RESET PANEL TO BE BLUE BACKGROUND WITH DETAILS IN WHITE. APPROVED
6. INTERFACE TRACK CIRCUITS AND AXLE COUNTER TRACK SECTIONS, NOT WITHIN THE LOCATION (ENCLOSURE) SHALL BE SHOWN AS L CHARNOCK
AN OUTLINE ONLY. SCALE SHEET DRAWING NUMBER REVISION
7. TRACK CIRCUITS AND AXLE COUNTER TRACK SECTIONS THAT ARE NOT SHOWN IN ENTIRETY SHALL TERMINATE WITH A SQUARE END.
NTS 1 OF 1 TC030415-08 D
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 15 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
S7/9
S5/7
S3/5
S4/6
S6/8
S8/10
L CHARNOCK
5T/7T 6T/8T
S7/9 7T & 9T S8/10 8T & 10T SCALE SHEET DRAWING NUMBER REVISION
9T/11T 10T/12T NTS 1 OF 1 TC030415-06 D
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 16 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
1. PLAIN LINE SUPERVISOR SECTIONS HAVE BEEN OMITTED FROM THIS DIAGRAM FOR CLARITY.
2. POINT AND PLAIN LINE SUPERVISOR SECTIONS SHALL NOT BE EVALUATED WITHIN THE SAME AEB BOARD THAT POWERS THE AXLE
COUNTER HEAD THAT THEY SUPERVISE.
3. POINT FOULING AXLE COUNTER TRACK SECTIONS AND THE ADJACENT AXLE COUNTER TRACK SECTIONS SHALL BE CONFIGURED WITH
RESTRICTED RESET. IN THIS EXAMPLE LAYOUT, THIS REQUIREMENT APPLIES TO 2T, 3T, 4T & 5T.
4. DUAL AXLE COUNTER HEADS AT THE BOUNDARY SHALL BE MOUNTED DIRECTLY OPPOSITE EACH OTHER. IN THIS EXAMPLE LAYOUT,
THIS REQUIREMENT APPLIES TO AXLE COUNTER HEADS -/1A AND -/1 .
WS3/5
#4, #4
(1AT)
WS2/3 WS3/4
AXLE COUNTER
AXLE AUTOMATICALLY
TRACK SECTION /
COUNTER RESET BY TRACK
SUPERVISOR
HEADS SECTION CLEAR
SECTION
-/1AT
1AT 1T
1T/2T
-/1T
1T 1AT or S1/2
1T/2T
-/1T
S1/2 1T & 2T
2T/3T
1T/2T
2T S1/2 or WS2/3
2T/3T
2T/3T
WS2/3 or WS3/4
3T 3T/4T
or WS3/5
3T/5T AXLE COUNTER
AXLE AUTOMATICALLY
3T/5T TRACK SECTION /
5T WS3/5 or S5/7 COUNTER RESET BY TRACK
5T/7T SUPERVISOR
HEADS SECTION CLEAR
3T/4T SECTION TITLE DESIGNED
4T WS3/4 or S4/6
4T/6T 1T/2T SIGNALLING D MARTIN
D MARTIN
3T/4T WS2/3 3T/4T 2T & 3T DRAWN
S4/6 4T & 6T
6T/8T 3T/5T APPENDIX C D MARTIN
5T/7T 2T/3T EXAMPLE POINT SUPERVISOR ARRANGEMENT CHECK ED
7T S5/7 or S7/9
7T/9 WS3/5 3T/4T 3T & 5T TURNOUT J WARWICK
3T/5T 5T/7T APPROVED
S5/7 5T & 7T
7T/9T 2T/3T L CHARNOCK
4T/6T WS3/4 3T/5T 3T & 4T SCALE SHEET DRAWING NUMBER REVISION
6T S4/6 or S6/8T
6T/8T 4T/6T NTS 1 OF 1 TC030415-01 J
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 17 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
NOTES
1. PLAIN LINE SUPERVISOR SECTIONS HAVE BEEN OMITTED FROM THIS DIAGRAM FOR CLARITY.
2. POINT SUPERVISOR SECTIONS AND PLAIN LINE SUPERVISOR SECTIONS SHALL NOT BE EVALUATED WITHIN THE SAME AEB BOARD
THAT POWERS THE AXLE COUNTER HEAD THAT THEY SUPERVISE.
3. POINT FOULING AXLE COUNTER TRACK SECTIONS AND THE ADJACENT AXLE COUNTER TRACK SECTIONS SHALL BE CONFIGURED WITH
RESTRICTED RESET. IN THIS EXAMPLE LAYOUT, THIS REQUIREMENT APPLIES TO 3T, 4T, 5T, 6T, 7T & 8T.
4. DOUBLE-HEADS IN THE CROSSOVER SHALL BE POSITIONED ON OPPOSITE RAILS AND SHALL BE DIRECTLY OPPOSITE EACH OTHER OR
OVERLAP SUCH THAT THERE IS NO ‘DEAD-SECTION’ BETWEEN THE HEADS. [ 5T/6T (1) & 5T/6T (2)].
WS5/6
WS3/5 WS5/7
5T/6T (1)
5T/6T (2)
AXLE COUNTER
AXLE AUTOMATICALLY
TRACK SECTION /
COUNTER RESET BY TRACK
SUPERVISOR
HEADS SECTION CLEAR
SECTION
1T/3T
WS4/6 WS6/8
3T S1/3 or WS3/5
3T/5T
.../1T
S1/3 1T & 3T
3T/5T AXLE COUNTER
AXLE AUTOMATICALLY
TRACK SECTION /
3T/5T COUNTER RESET BY TRACK
SUPERVISOR
WS3/5 or WS5/7 HEADS SECTION CLEAR
5T 5T/7T SECTION
or WS5/6
5T/6T(1) 1T/3T
5T/7T WS3/5 5T/7T 3T & 5T
7T WS5/7 or S7/9
7T/9T 5T/6T(1)
5T/7T 3T/5T
S7/9 7T & 9T
9T/... WS5/7 7T/9T 5T & 7T
2T/4T 5T/6T(1)
4T S2/4 or WS4/6
2T/6T 3T/5T
…/2T 4T/6T
S2/4 2T & 4T WS5/6 5T & 6T
4T/6T 5T/7T
TITLE DESIGNED
4T/6T 6T/8T SIGNALLING D MARTIN
D MARTIN
WS4/6 or WS6/8 DRAWN
6T 6T/8T 2T/4T
or WS5/6
APPENDIX C D MARTIN
5T/6T(2) WS4/6 6T/8T 4T & 6T
EXAMPLE POINT SUPERVISOR CHECK ED
6T/8T 5T/6T(2) ARRANGEMENTCROSSOVER J WARWICK
8T WS6/8 or S8/10
8T/10T 4T/6T APPROVED
L CHARNOCK
6T/8T WS6/8 8T/10T 6T & 8T
S8/10 8T & 10T SCALE SHEET DRAWING NUMBER REVISION
10T/... 5T/6T(2) NTS 1 OF 1 TC030415-02 E
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 18 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
NOTES
1. PLAIN LINE SUPERVISOR SECTIONS HAVE BEEN OMITTED FROM THIS DIAGRAM FOR CLARITY.
2. POINT SUPERVISOR SECTIONS AND PLAIN LINEL SUPERVISOR SECTIONS SHALL NOT BE EVALUATED WITHIN THE SAME AEB BOARD
THAT POWERS THE AXLE COUNTER HEAD THAT THEY SUPERVISE. WS20/31 WS20/41
3. POINT FOULING TRACK SECTIONS AND THE ADJACENT AXLE COUNTER TRACK SECTIONS SHALL BE CONFIGURED WITH RESTRICTED
RESET. IN THIS EXAMPLE LAYOUT, THIS REQUIREMENT APPLIES TO 2T, 3T, 4T, 11T, 20T, 21T, 31T & 41T.
WS3/20 WS20/21
20T/41T
41T 41T/42T
42T
20T/31T
31T 31T/32T
32T
WS2/3
20T/21T
21T 21T/22T
22T
L CHARNOCK
42T 41T/42T S41/42 3T/20T, 20T/21T,
WS20/41 20T & 41T SCALE SHEET DRAWING NUMBER REVISION
S41/42 20T/41T 41T & 42T 20T/31T, 41T/42T
NTS 1 OF 1 TC030415-03 E
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 19 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
S3/5 S5/7
1T/3T 1T or 3T
3T S1/3 or S3/5
3T/5T 3T or 5T
3T/5T 3T or 5T
5T S3/5 or S5/7 S4/6 S6/8
5T/7T 5T or 7T
7T 5T/7T 5T or 7T S5/7
1T/3T
S3/5 - 3T & 5T
5T/7T
S5/7 3T/5T - 5T & 7T
2T/4T 2T or 4T
4T S2/4 or S4/6
4T/6T 4T or 6T
4T/6T 4T or 6T
6T S4/6 or S6/8
6T/8T 6T or 8T TITLE DESIGNED
SIGNALLING D MARTIN
D MARTIN
8T 6T/8T 6T or 8T S6/8 DRAWN
APPENDIX D D MARTIN
2T/4T STANDARD PLAN CHECKED
L CHARNOCK
S6/8 4T/6T - 6T & 8T SCALE SHEET DRAWING NUMBER REVISION
NTS 1 OF 1 TC030415-05 C
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 20 of 21
TECHNICAL NOTE
AXLE COUNTER RESET
L1-CHE-INS-024 Version: 4 Effective from: 10th December 2018
-/1AT 100T or 1T
1AT 1T
1T/2T 1T or 2T
-/1T
S1/2 - 1T & 2T
2T/3T
-/1T 100T or 1T
1T 1AT or S1/2
1T/2T 1T or 2T
1T/2T 1T or 2T
2T S1/2 or S2/3
2T/3T 2T or 3T
1AT
-/1AT (1AT)
S1/2
TITLE DESIGNED
SIGNALLING D MARTIN
D MARTIN
DRAWN
APPENDIX E D MARTIN
STANDARD PLAN CHECKED
L CHARNOCK
SCALE SHEET DRAWING NUMBER REVISION
NTS 1 OF 1 TC030415-04 B
Approving Manager: Chief Engineer Approval Date: 10/12/2018 Next Review Date: 10/12/2020
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 21 of 21