Part I.

Geometric Design

I. Cross Section

Design Traffic; AADT = 2,100


(From DPWH – Desirable Design Standards for Philippine Highways, 2004)
Pavement Width (m) = 3.5 (per lane)
Shoulder Width (m) = 1.5 (per lane)
Road Right of Way (m) = 60
Normal Crown, nc (%) = 2
Shoulder Slope (%) = 3
Relative Slope, S (m/m) = 0.0066

II. Design of Horizontal Curve

II. A. Horizontal Curve 1

Actual Deflection Angle, I = 60°


Desired Speed at Curve, Vd = 80 kph
Vd = 22.22 m/s
Desired Radius of the curve = 335 m

0.004 𝑉𝑑 2
Superelevation, e =
𝑅
0.004 (80)2
e=
335

e = 0.0764 < 8% ok!


A.1 Required Radius of the Curve

A1.1 To satisfy Skidding:

(𝑉𝑑)2
Rsk =
127 (𝑒+ 𝑓𝑠 )
(80)2
Rsk =
127 (0.0764+ 0.16)

Rsk = 213.1713 < R actual ok!

Where:
fs = side friction
= 0.16 for Vd ≤ 100 kph
= 0.14 for Vd > 100 kph

A.1.2 To satisfy Stopping Sight Distance

𝑆𝑆𝐷2
Rsd =
8𝑚
(160)2
Rsd =
8(15.4444)

Rsd = 207.1948 m < Ractual ok!

Where:
m = 0.278tV (from DPWH – Road Safety Manual, 2004)
1
m =0.278 (25) (80 x 1,000 x )
3600
m = 15. 4444 m
SSD = 85 m (from DPWH – Road Safety Manual, 2004)

Therefore, use R = 335 m


COMPUTATIONS:

𝟎.𝟎𝟎𝟒 𝑽𝒅𝟐
➢ e=
𝑹
0.004 (80)2
e=
335

e = 0.0764

𝒘 (𝒏𝒄 +𝒆)
➢ Ls =
𝑺
3.5(0.02+0.08)
Ls =
0.0066

Ls = 53. 0303 m

𝑳𝒔 (𝟏𝟖𝟎)
➢ θs =
𝟐𝑹 (𝝅)

53.0303 (180)
θs =
2 (335)(𝜋)

θs = 4.5349 °

𝑳𝒔𝟐
➢ Yc =
𝟔𝑹

(53.0303)2
Yc =
6(335)

Yc = 1.3991 m

𝑳𝒔𝟐
➢ Xc = Ls -
𝟒𝟎𝑹𝟐
(53.0303)2
Xc = 53.0303 -
40(335)2

Xc = 53.0297 m
𝑳𝒔 𝒀𝒄 𝑰
➢ Ts = + [ (R + ) tan ( ) ]
𝟐 𝟒 𝟐
53.0303 1.3991 60
Ts = + [ (335 + ) tan ( ) ]
2 4 2

Ts = 220.1294 m

➢ Ic = I - 2θs
Ic = 60 – 2 (4.5349 °)
Ic = 50.9302°

𝝅
➢ Lc = IcR ( )
𝟏𝟖𝟎
𝜋
Lc = 50.9302°(335) ( )
180

Lc = 297.7814 m

➢ k = Xc - Rsin θs
k = 53.0297 – (335) sin (4.5349 °)
k = 26.5425 m

𝑳𝒔𝟐
➢ p=
𝟐𝟒𝑹
(53.0303)2
p=
24(335)

p = 0.3498 m
A.2 Summary: Elements of Spiral Easement Curve I

Design Speed = 80 kph


Deflection Angle, I = 60°
Radius of the Curve, R = 335 m
Superelevation, e = 0.08 m/m
Carriageway Width = 3.5 m
Length of Spiral (Ls) = 53.0303 m
θs = 4.5349 °
Yc = 1.3991 m
Xc = 53.0297 m
Ts = 220.1294 m
p = 0.3498 m
k = 26.5425 m
Ic = 50.9302°
Lc = 297.7814 m
II. B. Horizontal Curve 2

Actual Deflection Angle, I = 30°


Desired Speed at Curve, Vd = 80 kph
Vd = 22.22 m/s
Desired Radius of the curve = 335 m

0.004 𝑉𝑑 2
Super Elevation, e =
𝑅
0.004 (80)2
e=
335

e = 0.0764 < 8% ok!

B.1 Required Radius of the Curve

B1.1 To satisfy Skidding:

(𝑉𝑑)2
Rsk =
127 (𝑒+ 𝑓𝑠 )
(80)2
Rsk =
127 (0.0764+ 0.16)

Rsk = 213.1713 < R actual ok!

Where:
fs = side friction
= 0.16 for Vd ≤ 100 kph
= 0.14 for Vd > 100 kph

B.1.2 To satisfy Stopping Sight Distance


𝑆𝑆𝐷2
Rsd =
8𝑚
(160)2
Rsd =
8(15.4444)

Rsd = 207.1948 m < Ractual ok!


Where:
m = 0.278tV (from DPWH – Road Safety Manual, 2004)
1
m =0.278 (25) (80 x 1,000 x )
3600
m = 15. 4444 m
SSD = 85 m (from DPWH – Road Safety Manual, 2004)

Therefore, use R = 335 m

COMPUTATIONS:

𝒘 (𝒏𝒄 +𝒆)
➢ Ls =
𝑺
3.5(0.02+0.08)
Ls =
0.0066

Ls = 53. 0303 m

𝑳𝒔 (𝟏𝟖𝟎)
➢ θs =
𝟐𝑹 (𝝅)

53.0303 (180)
θs =
2 (335)(𝜋)

θs = 4.5349 °

𝑳𝒔𝟐
➢ Yc =
𝟔𝑹

(53.0303)2
Yc =
6(335)

Yc = 1.3991 m

𝑳𝒔𝟐
➢ Xc = Ls -
𝟒𝟎𝑹𝟐
(53.0303)2
Xc = 53.0303 -
40(335)2
Xc = 53.0297 m

𝑳𝒔 𝒀𝒄 𝑰
➢ Ts = + [ (R + ) tan ( ) ]
𝟐 𝟒 𝟐
53.0303 1.3991 30
Ts = + [ (335 + ) tan ( ) ]
2 4 2

Ts = 116.3718 m

➢ Ic = I - 2θs
Ic = 30 – 2 (4.5349 °)
Ic = 20.9302°

𝝅
➢ Lc = IcR ( )
𝟏𝟖𝟎
𝜋
Lc = 20.9302°(335) ( )
180

Lc = 122.3758 m

➢ k = Xc - Rsin θs
k = 53.0297 – (335) sin (4.5349 °)
k = 26.5425 m

𝑳𝒔𝟐
➢ p=
𝟐𝟒𝑹
(53.0303)2
p=
24(335)

p = 0.3498 m
B.2 Summary: Elements of Spiral Easement Curve 2

Design Speed = 80 kph


Deflection Angle, I = 30°
Radius of the Curve, R = 335 m
Superelevation, e = 0.08 m/m
Carriageway Width = 3.5 m
Length of Spiral (Ls) = 53.0303 m
θs = 4.5349 °
Yc = 1.3991 m
Xc = 53.0297 m
Ts = 116. 3718 m
p = 0.3498 m
k = 26.5425 m
Ic = 20.9302°
Lc = 122.3758 m