You are on page 1of 38

List of Active Engineering Standards Documents Due Date (March 31 2012)

Doc Abbreviation Doc Title


SABP-A-013 Corrosion Control in Amine Units
SABP-A-022 Stainless Steel Fabrication, Testing and Installation
SABP-L-009 Piping Spring Supports Design, Construction, Inspection and Maintenan
SAEP-103 Metric Units of Weights and Measures
SAEP-110 Saudi Aramco Standard Drawings
SAEP-1101 Welding Test Supplement S01 for SMAW, Carbon and Low Alloy Steel Pip
SAEP-1102 Welding Test Supplement S02 for SMAW, Carbon and Low Alloy Steel Pi
SAEP-1103 Welding Test Supplement S03 for SMAW, Stainless Steel, Single Sided
SAEP-1104 Welding Test Supplement S04 for SMAW, Stainless Steel / Nickel, Backi
SAEP-1105 Welding Test Supplement S05 for SMAW, Nickel, Single Sided
SAEP-1106 Welding Test Supplement S06 for GTAW, Aluminum with Backing
SAEP-1107 Welding Test Supplement S07 for GTAW, Carbon, Low Alloy and Stainle
SAEP-1108 Welding Test Supplement S08 for GTAW, Nickel
SAEP-1109 Welding Test Supplement S09 for GTAW, Aluminum, Single Sided
SAEP-1110 Welding Test Supplement S10 for SAW, Carbon and Low Alloy Steel Pip
SAEP-1111 Welding Test Supplement S11 for SAW, Overlay, Carbon and Low Alloy
SAEP-1112 Welding Test Supplement S12 for SMAW, Caron Steel, Small Diameter
SAEP-1113 Welding Test Supplement S13 for FCAW, Caarbon Steel
SAEP-1114 Welding Test Supplement S14 for SMAW, Carbon and Low Alloy Steel P
SAEP-1115 Welding Test Supplement S15 for SMAW, Stainless Steel Lap
SAEP-1116 Welding Test Supplement S16 for SMAW, Nickel Lap
SAEP-1117 Welding Test Supplement S17 for SMAW, Wet Welding
SAEP-1131 Pressure Relief Device Authorization through SAP Workflow
SAEP-1133 Form 3750-ENG, Pressure Relieving Device Test Report
SAEP-1141 Radiation Protection for Industrial Radiography
SAEP-1142 Qualification of Non-Saudi Aramco NDT Personnel
SAEP-1143 Radiographic Examination
SAEP-1144 Magnetic Particle Examination
SAEP-1145 Liquid Penetrant Examination
SAEP-1146 Manual Ultrasonic Thickness Testing
SAEP-1152 Approval Procedure for Ready-Mixed Concrete Mix Design
SAEP-1160 Tracking and Reporting of Welding, NDT and Pressure Testing for Capita
SAEP-122 Project Records
SAEP-127 Security and Control of Saudi Aramco Engineering Data
SAEP-20 Equipment Inspection Schedule
SAEP-302 Instructions for Obtaining a Waiver of a Mandatory Saudi Aramco Engin
SAEP-303 Engineering Reviews of Project Proposal and Detail Design Documentat
SAEP-31 Corporate Equipment and Spare Parts Data Requirements
SAEP-3101 Equipment and Spare Parts Data Requirements for Contractor Procured
SAEP-316 Performance Qualification of Coating Personnel
SAEP-324 Certification Review and Registration of Project Welders
SAEP-325 Inspection Requirements for Pressurized Equipment
SAEP-327 Disposal of Wastewater from Cleaning, Flushing and Dewatering Pipelin
SAEP-334 Retrieval, Certification and Submittal of Saudi Aramco Engineering & V
SAEP-342 Engineering Drawings Emergency Delivery Plan
SAEP-343 Risk-Based Inspection (RBI) for In-Plant Static Equipment and Piping
SAEP-347 Supplying Material from Stockists
SAEP-351 Bolted Flange Joints Assembly
SAEP-352 Welding Procedures Review and Approval
00-SAIP-06 Pressure Test Requirements
00-SAIP-07 Positive Material Identification Requirements
00-SAIP-10 Non-Conformance Reports
00-SAIP-10A Non-Conformance Reports
00-SAIP-13 Project Assessment Procedure
00-SAIP-51 Electrical Inspection
00-SAIP-71 Plant Inspection Index
00-SAIP-72 Inspection Involvement in Management of Change
00-SAIP-73 Inspection Manning Determination Guidelines
00-SAIP-74 Inspection of Corrosion under Insulation and Fireproofing
00-SAIP-75 External Visual Inspection Procedure
00-SAIP-76 Worksheet Control and Tracking Program
00-SAIP-77 Technical Alert Implementation and Tracking Program
00-SAIP-78 Inspection Records/Filing Procedure
00-SAIP-79 Assessment Recommendations Tracking System
00-SAIP-80 Guidelines for Process Equipment Inspection
01-SAIP-01 Small Nipple Inspection Program
01-SAIP-02 Retirement Thickness of In-Plant Piping
01-SAIP-04 Injection Point Inspection Program
01-SAIP-06 Inspection of SSSP Underground Storage Caverns
01-SAMSS-005 Shop Applied, Internal Cement Mortar Lining of Steel Pipe
01-SAMSS-010 Fabricated Steel Piping
01-SAMSS-012 Submarine Pipe Weight Coating
01-SAMSS-016 Qualification of Storage Tanks and Pressured Equipment for Resistance
01-SAMSS-017 Auxiliary Piping for Mechanical Equipment
01-SAMSS-023 Intrusive Online Corrosion Monitoring Qualifications
01-SAMSS-024 Pipe Handling and Nesting
01-SAMSS-025 Specification for Heavy Duty Polytetrafluoroethylene (PTFE) and Perfluo
01-SAMSS-029 RTR (Fiberglass) Sewer Pipe and Fittings for Gravity Flow
01-SAMSS-031 Product Marking for Pipe of Less than Six Inch Nominal Size
01-SAMSS-034 RTR (Fiberglass) Pressure Pipe and Fittings
01-SAMSS-035 API Line Pipe
01-SAMSS-038 Small Quantity Purchase of Pipe from Stockist and Approved Pipe Mills
01-SAMSS-039 Induction and Furnace Hot Pipe Bends
01-SAMSS-041 Specification for Lining of Tanks and Vessels with Elastomeric Materials
01-SAMSS-042 Reinforced Thermoset Resin (RTR) Pipe and Fittings in Water and Hydr
01-SAMSS-043 Carbon Steel Pipes for On-Plot Piping
01-SAMSS-044 CRA Clad Pipe Spools
01-SAMSS-045 Qualification Requirements for Composite Materials used in Lined Carb
01-SAMSS-046 Stainless Steel Pipe
01-SAMSS-047 Manufacturing of Stainless Steel Tubes
01-SAMSS-048 CRA Clad or Lined Steel Pipe
01-SAMSS-049 Reinforced Thermoset Resin (RTR) Pipe, Fittings and Adhesive Packing,
01-SAMSS-091 Oil Field Chemical Injection Skid System
01-SAMSS-333 High Frequency Welded Line Pipe
02-SAIP-01 Inspection of Positive Seal Coupling Systems
02-SAMSS-005 Butt Welding Pipe Fittings
02-SAMSS-006 Hot Tap and Stopple Fittings
02-SAMSS-008 Insulating Joints/Spools for Cathodic Protection
02-SAMSS-009 Design and Fabrication of Scraper Traps
02-SAMSS-010 Flanged Insulating Joints/Spools for Cathodic Protection
02-SAMSS-011 Forged Steel and Alloy Flanges
02-SAMSS-012 Weld Overlayed Fittings, Flanges and Spool Pieces
04-SAMSS-001 Gate Valves
04-SAMSS-002 Globe Valves
04-SAMSS-003 Additional Requirements for Low Temperature Valves
04-SAMSS-005 Check Valves, Swing Type
04-SAMSS-035 General Requirements for Valves
04-SAMSS-041 Expanding Plug Valve
04-SAMSS-042 4-Way Diverter Valve
04-SAMSS-047 Steel High Performance Butterfly Valves (Including Triple-Offset)
04-SAMSS-048 Valve Inspection and Testing Requirements
04-SAMSS-049 Inspection and Testing Requirements for API SPEC 6A, 10000 PSI Valv
04-SAMSS-050 Gate Valves, Through Conduit Type, API SPEC 6D
04-SAMSS-051 Ball Valves, API SPEC 6D
04-SAMSS-052 Ball Valves, API SPEC 6A
04-SAMSS-053 Steel Lubricated Plug Valves - Flanged and Welding End
04-SAMSS-054 General Requirements for Chokes
05-SAMSS-002 Automatic Electric Water Heaters
06-SAMSS-001 Selection and Qualification of Elastomeric Sealing Materials and Manufa
09-SAMSS-002 Pressure Preservative Treatment for Wood Piles, Timbers and Ties
09-SAMSS-021 Qualification Requirements for Alkyd Enamel Coating System (APCS-6)
09-SAMSS-030 Qualification Requirements for Conversion Coating/Alkyd Coating Syst
09-SAMSS-035 Qualification Requirements for Aluminum-Pigmented Alkyd Coating Sys
09-SAMSS-060 Packaging Requirements for Coatings
09-SAMSS-067 Qualification Requirements for Internal Coating Systems Used in Immers
09-SAMSS-068 Qualification Requirements for Coal Tar Epoxy in Buried or Immersion S
09-SAMSS-069 Qualification Requirements for Epoxy Coatings for Atmospheric Service
09-SAMSS-070 Qualification Requirements for Splash Zone Epoxy Compound (APCS-1
09-SAMSS-071 Qualification Requirements for Inorganic Zinc Primer (APCS-17A) and
09-SAMSS-075 Caulking Compound (Joint Sealant)
09-SAMSS-080 Shop-Applied Baked Internal Coatings
09-SAMSS-087 Qualification Requirements for Epoxy Coatings for Application on Damp
09-SAMSS-088 Aggregates for Concrete
09-SAMSS-089 Shop-Applied External Fusion Bonded Epoxy Coating for Steel Line Pipe
09-SAMSS-090 Shop-Applied Extruded P.E. External Coating System for Line Pipe
09-SAMSS-091 Qualification Requirements for Shop-Applied Internal FBE Coatings
09-SAMSS-093 Scaffold Plank
09-SAMSS-095 Hand-Applied, Pressure Sensitive Tapewrap for Temperatures up to 55°
09-SAMSS-096 High-Temperature Heat-Shrink Sleeves
09-SAMSS-097 Ready-Mixed Portland Cement Concrete
09-SAMSS-098 Precast Concrete Fence Posts
09-SAMSS-099 Specialized Coatings Tests
09-SAMSS-101 Qualification Requirements for Stand Alone Self-Priming Epoxy Mastic Co
09-SAMSS-103 Qualification Requirements for High Temperature External Coatings in
09-SAMSS-105 Heat-Shrink Sleeves for Service Temperatures less than 55°C
09-SAMSS-106 Epoxy Coating of Steel Reinforcing Bars
09-SAMSS-107 Qualification Requirements and Application of Composite Fluropolymer/
09-SAMSS-113 The Requirements of External Liquid Coatings for Buried Pipelines and
09-SAMSS-114 Shop-Applied Extruded, Three-Layer Polypropylene External Coatings fo
12-SAIP-50 Use of Metal Studs in Buildings
12-SAMSS-005 Marking of Metal Products
12-SAMSS-007 Fabrication of Structural and Miscellaneous Steel
12-SAMSS-008 Erection of Structural and Miscellaneous Steel
12-SAMSS-014 Pre-Engineered Metal Buildings
12-SAMSS-018 Structural Plates, Rolled Shapes and Tubulars Specification for Fixed Of
12-SAMSS-023 Fiber-Reinforced Plastic (FRP) Grating and FRP Components
12-SAMSS-024 Fiber-Reinforced Plastic (FRP) Manhole and Access Covers with Frame
13-SAMSS-001 Special Purpose Gear Units
13-SAMSS-003 General Purpose Gear Units
14-SAMSS-531 Power Transformers
14-SAMSS-533 Three-Phase Dry-Type Power Transformers
14-SAMSS-534 Overhead-Type Distribution Transformers
14-SAMSS-536 Pad-Mounted, Three Phase Distribution Transformers
14-SAMSS-600 Material, Manufacture and Preservative Treatment of Wood Poles
14-SAMSS-602 Material, Manufacture and Preservative Treatment of Wood Crossarms
14-SAMSS-603 Octagonal Steel Poles for Overhead Distribution Systems - Crossarm Str
15-SAIP-50 Inspection Procedure for Conduit and Cable Seals
15-SAIP-51 Inspection Procedure for PVC Coated Rigid Steel Conduit
15-SAMSS-502 Medium Voltage Power Cable 5 kV through 35 kV
15-SAMSS-503 Submarine Power Cable 5 kV through 35 kV
15-SAMSS-504 Submarine Power Cable 69 kV through 230 kV
16-SAIP-11 Medium and High Voltage Oil Switches
16-SAMSS-502 Metal-Enclosed, Metal-Clad Low-Voltage Switchgear Assemblies
16-SAMSS-503 Indoor Controlgear - Low Voltage
16-SAMSS-504 Indoor Metal-Clad Switchgear: 1 to 38 kV
16-SAMSS-506 Indoor Controlgear - High Voltage
16-SAMSS-507 High Voltage Motor Controller - Outdoor
16-SAMSS-508 SF6 Gas Insulated Circuit Breakers, Outdoor - 34.5 kV through 230 kV
16-SAMSS-510 Manually Operated Pad Mounted SF6 Switchgear: 1 kV to 36 kV
16-SAMSS-512 Outdoor Switchrack - Low Voltage
16-SAMSS-513 Power System Automation Components
16-SAMSS-514 Control and Protective Relay Panel - Indoor
16-SAMSS-515 Design and Fabrication of High Resistance Grounding Systems
16-SAMSS-517 Adjustable Frequency Drive System - 1 kV and Above
16-SAMSS-518 Low Voltage Panelboards
16-SAMSS-519 Indoor Switchboard - Low Voltage
16-SAMSS-520 Cablebus
16-SAMSS-521 Indoor Automatic Transfer Switch - Low Voltage
16-SAMSS-522 Retrofit/Replacement Vacuum Circuit Breakers Applied in Indoor Metal-C
16-SAMSS-523 Materials System Specification for Metal Enclosed Isolated Phase Bus ¿
17-SAIP-50 Inspection Coverage of Cathodic Protection Deep Anode Beds
17-SAMSS-004 Conventional (Tap Adjustable) Rectifiers for Cathodic Protection
17-SAMSS-005 Cathodic Protection Phase Controlled Rectifiers
17-SAMSS-006 Galvanic Anodes for Cathodic Protection
17-SAMSS-007 Impressed Current Anodes for Cathodic Protection
17-SAMSS-008 Junction Boxes for Cathodic Protection
17-SAMSS-012 Photovoltaic Power Supply for Cathodic Protection
17-SAMSS-017 Impressed Current Cathodic Protection Cables
17-SAMSS-018 Remote Monitoring System (RMS) for Cathodic Protection Applications
17-SAMSS-502 Form-Wound Induction Motors 250 HP and Above
17-SAMSS-503 Severe-Duty, Totally Enclosed, Squirrel Cage Induction Motors to 500 H
17-SAMSS-510 Form-Wound Synchronous Turbine Generators
17-SAMSS-511 Stationary Storage Batteries
17-SAMSS-514 Battery Rectifier/Charger
17-SAMSS-515 Auxiliary Electrical Systems for Skid-Mounted Equipment
17-SAMSS-516 Uninterruptible Power Supply System
17-SAMSS-518 Diesel Generator Sets
17-SAMSS-520 Form-Wound Brushless Synchronous Motors
17-SAMSS-520B Form-Wound Brushless Synchronous Motors
18-SAMSS-493 Two Part Polyurethane Duct Sealant
18-SAMSS-625 Outside Plant - Fiber Optic Cable Specifications (Single Mode & Multipl
20-SAMSS-001 Welding and Brazing Consumables
21-SAMSS-002 Leather and Fabric Work Gloves
21-SAMSS-008 AFFF Liquid Concentrate
21-SAMSS-009 High Expansion Foam Concentrate
21-SAMSS-010 Fireproofing for Valve Actuator - Box and Blanket System Enclosures
21-SAMSS-011 Fluroprotein Foam Concentrate for MTBE Hydrocarbon Fires
21-SAMSS-012 Plant Emergency Response Team (PERT) Reserve Fire Brigade (RFB) Fir
21-SAMSS-013 Fire Protection Department Protective Clothing
21-SAMSS-014 Intumescent Fireproofing for Valve Actuators
22-SAMSS-003 Oil Suction and Discharge Hoses for Dock Tanker Loading
22-SAMSS-004 Oil Hose for Offshore Tanker Loading
23-SAMSS-010 Distributed Control Systems
23-SAMSS-020 Supervisory Control and Data Acquisition (SCADA) Systems
23-SAMSS-030 Remote Terminal Unit
23-SAMSS-050 Terminal Management Systems
23-SAMSS-060 Applications Integration Middleware
23-SAMSS-070 Laboratory Information Management System (LIMS)
23-SAMSS-071 Data Validation & Reconciliation System
23-SAMSS-072 Data Acquisition and Historization System (DAHS)
23-SAMSS-073 3D Asset Virtualization Tool
23-SAMSS-701 Industrial Ethernet Switch Specifications
26-SAMSS-045 Turbine Oils 32, 46, 68 and 100
26-SAMSS-046 Machinery Oils 150, 320, 460
26-SAMSS-047 Automotive Gear Lube 85W-140
26-SAMSS-048 Gear Lube EP220, EP460 EP1000
26-SAMSS-050 Transmission Oil D-II
26-SAMSS-051 Hydraulic Oil AW 68
26-SAMSS-052 All Purpose Grease EP 1
26-SAMSS-053 All Purpose Grease EP 3
26-SAMSS-054 Ball Bearing Grease 2
26-SAMSS-055 Polyethylene Grease 1
26-SAMSS-056 Diesel Engine Oil CF
26-SAMSS-057 Diesel Engine Oil EMD
26-SAMSS-058 Gas Turbine Oil 32
26-SAMSS-059 Insulating Oil
26-SAMSS-060 Refrigeration Oil - WF68
26-SAMSS-061 Penetrating Oil
26-SAMSS-062 Rust Preventive
26-SAMSS-063 Open Gear and Wire Rope Lubricant
26-SAMSS-064 General Purpose Cutting Oil
26-SAMSS-065 Heavy Duty Cutting Oil
26-SAMSS-066 Soluble Oil
26-SAMSS-067 Honing Oil
26-SAMSS-068 Synthetic Grinding Fluid
26-SAMSS-069 Way Lubricant
26-SAMSS-076 Synthetic Gas Turbine Oil 5
26-SAMSS-077 Rack and Pinion Grease
26-SAMSS-078 Turbine Oil Vapor Space Inhibitor
26-SAMSS-079 Refrigeration Oil HFC-134a Synthetic
26-SAMSS-080 Diesel Engine Oil 15W/40
26-SAMSS-081 Automotive Gear Lube 90
26-SAMSS-082 High Temperature Grease
26-SAMSS-083 Diesel Engine Oil CH-4
26-SAMSS-084 Turbo-Compressor Oils 32, 46
26-SAMSS-085 Kinetic Hydrate Inhibitors
27-SAIP-01 HVAC Inspection Requirements
27-SAMSS-001 Packaged Water Cooled Centrifugal Chillers for Utility Services
27-SAMSS-002 Direct Expansion Air Conditioning Systems for Offshore Facilities
27-SAMSS-003 Field Erected Cooling Towers
27-SAMSS-006 Centrifugal Fluorocarbon Refrigeration Units for Industrial/Process Servi
27-SAMSS-011 Fire, Smoke, and Combination Fire-Smoke Dampers
29-SAMSS-006 Uniform Shirts (White)
29-SAMSS-008 Fire Protection Department Uniform Badges
29-SAMSS-009 Industrial Security Male Short Sleeve Shirt
29-SAMSS-010 Industrial Security Male Long Sleeve Shirt
29-SAMSS-011 Industrial Security Waist Length Outer Wear-Jacket
29-SAMSS-013 Industrial Security Dark Brown Pants
29-SAMSS-014 Fire Protection Department Hip Length Jacket
29-SAMSS-015 Fire Protection Trousers - Navy Blue
30-SAMSS-001 Diesel Engines
31-SAMSS-001 Axial and Centrifugal Compressors and Expander-Compressors
31-SAMSS-002 Packaged Screw Plant and Instrument Air Compressors
31-SAMSS-003 Reciprocating Compressors for Process Air or Gas Service
31-SAMSS-004 Centrifugal Pumps
31-SAMSS-006 Packaged, Integrally Geared Centrifugal Air Compressors
31-SAMSS-009 Positive Displacement Pumps - Controlled Volume
31-SAMSS-010 Submersible Pumps and Motors for Water Well and Offshore Service
31-SAMSS-012 Shaft Sealing Systems for Centrifugal and Rotary Pumps
32-SAIP-11 Inspection of Air-Cooled Heat Exchangers
32-SAMSS-001 Special Purpose Steam Turbines for Generator Sets
32-SAMSS-002 Manufacture of FRP Storage Tanks
32-SAMSS-004 Manufacture of Pressure Vessels
32-SAMSS-005 Manufacture of Atmospheric Tanks
32-SAMSS-006 Manufacture of Low Pressure Tanks
32-SAMSS-007 Manufacture of Shell and Tube Heat Exchangers
32-SAMSS-008 Inlet Air Filtration Systems for Combustion Gas Turbines
32-SAMSS-009 General Purpose Steam Turbines
32-SAMSS-010 Special Purpose Steam Turbines
32-SAMSS-011 Manufacture of Air-Cooled Heat Exchangers
32-SAMSS-013 Lubrication, Shaft Sealing and Control Oil Systems
32-SAMSS-016 Inlet Air Filtration Systems for Air Compressors
32-SAMSS-017 Side-Entry Mixers
32-SAMSS-019 Manufacture of Plate and Frame Heat Exchangers
32-SAMSS-020 Manufacture of Trays and Packing
32-SAMSS-021 Manufacture of Industrial Boilers
32-SAMSS-022 Manufacture of Components for Flare Systems
32-SAMSS-027 Manufacture of Electric Heat Exchangers
32-SAMSS-028 Manufacture of Double Pipe Heat Exchangers
32-SAMSS-029 Manufacture of Fired Heaters
32-SAMSS-030 Manufacture of Small Metallic Atmospheric Storage Tanks
32-SAMSS-031 Manufacture of Clad Vessels and Heat Exchangers
32-SAMSS-033 Reverse Osmosis Systems
32-SAMSS-034 Granular Filtering Materials
32-SAMSS-035 Manufacture of Heat Recovery Steam Generator
32-SAMSS-036 Manufacture of Small Pressure Vessels
32-SAMSS-037 Material Specification for the Manufacture of Fiber Reinforced Plastic (
32-SAMSS-100 Combustion Gas Turbines
34-SAMSS-112 Orifice Meter for Gas Custody Measurement
34-SAMSS-114 Ultrasonic Flow Meter for Gas Custody Measurement
34-SAMSS-117 Turbine Flow Meters in Liquid Service
34-SAMSS-118 Positive Displacement Meters
34-SAMSS-119 Bi-Directional Meter Prover
34-SAMSS-120 Uni-Directional Meter Prover
34-SAMSS-121 Small Volume Prover
34-SAMSS-122 Atmospheric Portable Tank Prover
34-SAMSS-167 Truck Loading Metering Systems
34-SAMSS-168 Truck Unloading Metering Systems
34-SAMSS-318 Automatic Tank Gauging Equipment
34-SAMSS-319 Radar Tank Gauging Equipment
34-SAMSS-321 Radar Tank Gauging Systems for Royalty/Custody Measurement of Hydr
34-SAMSS-511 Chromatographs
34-SAMSS-512 Oxygen Analyzers
34-SAMSS-514 Combustible Gas and Hydrogen Sulfide Monitors
34-SAMSS-515 Moisture Analyzers
34-SAMSS-517 Density Meters
34-SAMSS-525 Automatic Sampling Systems for Crude Oil and Refined Products
34-SAMSS-611 Safety Relief Valves Conventional and Balanced Types
34-SAMSS-612 Safety Relief Valves Pilot Operated Types
34-SAMSS-617 Flame Monitoring Systems
34-SAMSS-619 Burner Management Systems for Watertube Boilers
34-SAMSS-621 ESD Systems - Hard-Wired - Solid-State (Nonprogrammable)
34-SAMSS-622 ESD Systems - Electromagnetic Relay
34-SAMSS-623 Programmable Controller Based ESD Systems
34-SAMSS-624 Wellhead Control, Monitoring and Shutdown Systems
34-SAMSS-625 Machinery Protection Systems
34-SAMSS-634 Local ZV Control Systems
34-SAMSS-711 Control Valves
34-SAMSS-716 Pneumatic Actuators On-Off Service
34-SAMSS-717 Hydraulic Valve Actuators Systems
34-SAMSS-718 Electric Motor Operated Valve Actuators
34-SAMSS-815 Annunciators
34-SAMSS-820 Instrument Control Cabinets - Indoor
34-SAMSS-821 Instrument Control Cabinets - Outdoor
34-SAMSS-830 Programmable Logic Controller
34-SAMSS-831 Instrumentation for Packaged Units
34-SAMSS-841 Flow Computer for Custody Transfer Measurement of Hydrocarbon Liqui
34-SAMSS-846 Flow Computers for Custody Transfer Measurement of Hydrocarbon Ga
34-SAMSS-847 Preset Controller for Truck Loading and unloading Systems
34-SAMSS-851 Metering Supervisory Computer for Custody Transfer Measurement of H
34-SAMSS-911 Instrument Asset Management Systems (IAMS)
34-SAMSS-913 Instrumentation and Thermocouple Cable
36-SAMSS-001 Co-Generation Train
45-SAMSS-005 Valves and Wellhead Equipment Requirements per API SPEC 6A
45-SAMSS-006 Casing and Tubing Requirements per API SPEC 5CT and API SPEC 5B
45-SAMSS-007 Casing and Tubing - Pup Joints Requirements per API SPEC 5CT and
45-SAMSS-008 Casing, Tubing and Conductor - Crossover Per API SPEC 5CT, API S
45-SAMSS-009 Casing and Tubing - Couplings Requirements per API SPEC 5CT and
45-SAMSS-013 High Frequency Welded Solid Expandable Tubulars (SET)
55-SAMSS-001 ESP Controller Skid - Outdoors
55-SAMSS-002 ESP Controllers
55-SAMSS-003 ESP Transformers - Outdoors
55-SAMSS-004 Modular Building for ESP Equipment
74-SAMSS-001 Pantograph Cables for Marine Loading Arms - Testing and Inspection R
SABP-A-001 Polythionic Acid SCC Mitigation
SABP-A-002 Load Management for Energy Efficiency: Pumps and Compressors
SABP-A-005 Quick Energy Assessment Methodology for Energy Efficiency Optimizati
SABP-A-007 Steam Trap Management for Energy Efficiency
SABP-A-008 Load Management for Energy Efficiency: Heat Transfer Equipment
SABP-A-009 Pinch Technology for Energy Efficiency Optimization
SABP-A-011 Energy Conservation Requirements in Saudi Aramco Engineering Standar
SABP-A-012 New Projects Energy Efficiency Optimization Review Methodology
SABP-A-014 Atmospheric Oil Degassing, Spheroids and Stabilizers Corrosion Control
SABP-A-015 Chemical Injection Systems
SABP-A-016 Crude Unit Corrosion Control
SABP-A-018 GOSP Corrosion Control
SABP-A-019 Pipeline Corrosion Control
SABP-A-020 Corrosion Control in Sulfur Recovery Units
SABP-A-021 Corrosion Control in Desalination Plants
SABP-A-023 In-House Combined Heat and Power Optimization Model
SABP-A-024 Sand Control Methods
SABP-A-025 Corrosion Control in Vacuum Distillation Units
SABP-A-026 Cooling Systems Corrosion Control
SABP-A-028 Optimizing Design and Operation of Reverse Osmosis Plants
SABP-A-029 Corrosion Control in Boilers
SABP-A-030 Energy Assessment for Efficiency Optimization in GOSP
SABP-A-032 Assets Repair History SAP Input
SABP-A-034 Plant Performance and Capacity Testing Procedure for Upstream Crude
SABP-A-036 Corrosion Monitoring Best Practice
SABP-A-037 Chemical Automation System
SABP-C-001 Guidelines for Technical Assessment of Manufacturers of Trays and Pac
SABP-D-001 Guidelines for Technical Assessment of Manufacturers of Pressure Ves
SABP-E-002 Guidelines for Retubing Heat Exchangers
SABP-E-003 Performance Enhancement to Existing Air-Cooled Heat Exchangers
SABP-F-001 Process Heaters Optimizations
SABP-F-002 Guidelines for Conducting Heat Transfer Equipment Manufacturing Facili
SABP-F-004 Sootblowers Operation, Inspection, and Maintenance Guidelines
SABP-G-001 Centrifugal Pumps Dynamic Analysis Factory Acceptance Test
SABP-G-002 General Purpose Steam Turbines Dynamic Analysis Factory Acceptance
SABP-G-003 Special Purpose Steam Turbines Dynamic Analysis Factory Acceptance
SABP-G-005 Synchronous Motors Dynamic Analysis Factory Acceptance Test
SABP-G-006 Induction Motors Dynamic Analysis Factory Acceptance Test
SABP-G-007 Packaged, Integrally Geared Centrifugal Air Compressor Dynamic Analy
SABP-G-008 Field Reliability Unit Guidelines and Procedures
SABP-G-009 Preventive Maintenance Optimization Guidelines and Procedures
SABP-G-009A Preventive Maintenance Optimization Guidelines and Procedures
SABP-G-010 Guidelines for Surveying Manufacturing Facilities of Rotating Equipment
SABP-G-011 Air Cooled Heat Exchangers (Fin-Fans) Reliability Document
SABP-G-012 A User Guide to Root Cause Analysis Guidelines and Procedures
SABP-G-013 Rotating Equipment Piping Strain Diagnosis
SABP-G-014 Procedure for Assessing the Accuracy of Field Data-Collectors and Alli
SABP-G-015 Guidelines for Holset Coupling Setup
SABP-G-016 Guidelines for Identifying and Eliminating The Root Cause of Rotor Parti
SABP-G-017 Equipment Criticality Assessment
SABP-G-018 Torsional Analysis Requirements for Synchronous Motor Driven Compres
SABP-G-019 Rotordynamic Design Review - Lateral Analysis
SABP-H-001 Selection and Application of Reinforced Fiber Glass Lay up System for
SABP-H-003 Guidelines for Surveying Carbon Steel Pipe Coating Applicators and Coa
SABP-H-004 Robotic Coating Application on Internal Girth Welds of Pipe Strings
SABP-J-701 Troubleshooting Control Valve Seat Leakage
SABP-J-711 Selection of Recycle Valves for Salt Water Disposal Pumps
SABP-K-001 Energy-Efficient Buildings
SABP-K-002 Introduction to Industrial Refrigeration Systems Targeting
SABP-K-003 Guidelines for Technical Assessment of HVAC Equipment Manufacturing F
SABP-K-100 Heavy Duty Gas Turbines Inspections
SABP-K-401 Site Performance Testing of Centrifugal Compressors
SABP-L-001 Wall Thickness Selection of Transportation Pipelines
SABP-L-002 Design of Submarine Pipelines
SABP-L-003 Guidelines for Conducting Pipe Mill Survey
SABP-L-004 Guidelines for Surveying Manufacturing Facilities of Reinforced Thermos
SABP-L-005 Piping Vibration Measurements and Assessment
SABP-L-006 Piping Stress Analysis Review
SABP-L-007 Guidelines for Conducting Flanges Manufacturing Facility Technical As
SABP-L-008 Guidelines for Conducting Technical Assessment of Fitting Manufacturing
SABP-L-010 Guidelines for Evaluating Pipe Movement
SABP-L-012 Guidelines for On-Stream Scraping of Pipelines
SABP-M-001 Inspection Guidelines of Offshore Structures
SABP-M-006 Wind Loads on Piperacks and Open Frame Structures
SABP-M-007 Steel Piperack Design
SABP-P-001 Guidelines for the Condition Assessment of Large Electrical Generators
SABP-P-002 Selection and Design of Battery Monitoring System
SABP-P-003 Adjustable Frequency Drives - Selection and Application
SABP-P-004 New Electrical Equipment Plant Assessment
SABP-P-005 Transformer Factory Acceptance Tests
SABP-P-006 Synchronous Generators and Associated Control Equipment Datasheets R
SABP-P-008 Inspection and Maintenance for Wooden Poles
SABP-P-009 Power Transformer Diagnostics
SABP-P-010 Motor Partial Discharge Monitors - Selection and Application
SABP-P-011 Captive Motor-Transformers: Design and Selection
SABP-P-012 Preparation & Application Procedure for High Voltage Insulators Coating
SABP-P-013 Electrical Design in Hazardous (Classified) Areas
SABP-P-014 Guidelines for Designing Excitation Systems
SABP-P-015 Troubleshooting, Repair Procedures, and Up-rating of Large Electrical G
SABP-P-016 Power Transformer Maintenance
SABP-P-017 Grassroots Project Energy Assessment Study Scope of Work
SABP-P-018 Guide on Induction Motors Factory Acceptance Test Procedures
SABP-P-019 Guide on Synchronous Motors Factory Acceptance Test Procedures
SABP-P-020 Transformers Condition Assessment
SABP-P-021 Investigation Process for Power Cable, Joint and Termination Failures
SABP-P-022 Paralleling Mismatched Transformers
SABP-P-023 Guide on Safe Handling of Metal Clad Switchgear
SABP-P-024 Guidelines for Minor and Major Preventive Maintenance (PM) of UPS Sy
SABP-P-024A Appendix A: Minor PM quarterly UPS system in operation
SABP-P-024B Appendix B: Major PM - annual UPS system shutdown
SABP-P-024C Appendix C
SABP-P-035 Guidelines for Motors and Generators Condition Assessment
SABP-P-036 Switchgear and Controlgear Condition Assessment Guidelines
SABP-P-037 Battery Condition Assessment
SABP-P-038 Guidelines for the Condition Assessment of Uninterruptable Power Supp
SABP-P-039 Guidelines for the Condition Assessment of Rectifiers/Battery Chargers
SABP-P-040 Adjustable Frequency Drive, Application Qualification Procedure
SABP-P-041 Guidelines for Conducting Arc Flash Hazard Analysis
SABP-Q-001 Anchor Bolt Design and Installation
SABP-Q-002 Spread Footings Design
SABP-Q-003 Vertical Vessel Foundation Design
SABP-Q-004 Heat Exchanger and Horizontal Vessel Foundation Design
SABP-Q-005 Storage Tank Ringwall Foundation Design
SABP-Q-006 Wind Loads on Pressure Vessels
SABP-Q-007 Deadman Anchor Design Guide
SABP-Q-008 Design of Concrete Masonry Walls/Buildings
SABP-Q-009 Pile Foundation Specifications and Bearing Capacities
SABP-Q-010 Mix Design and Construction of Sulfur Extended Asphalt Concrete
SABP-T-001 Proactive Monitoring and Alerting Solution for Plant Networks and Syste
SABP-W-001 Best Practice for the Welding of Cast Iron
SABP-W-002 Repair of Tube to Tubesheet Welds and Retubing of Sulfur Condensers
SABP-X-001 Cathodic Protection Design Package Preparation
SABP-X-002 Cathodic Protection Rectifier (Tap Adjustable) Factory Acceptance Tests
SABP-X-003 Cathodic Protection Installation Requirements
SABP-X-004 Plants Survey and Technical Assessment of Cathodic Protection Equipm
SABP-Z-001 Plant Information System Data Compression
SABP-Z-002 Functional Specifications for Process Control Systems
SABP-Z-002A Project Specification for PCS Scope of Work
SABP-Z-002B Functional Specification for Process Control Systems (PCS) and Integrat
SABP-Z-002C Functional Specification for Distributed Control Systems (DCS)
SABP-Z-002D Functional Specification for Emergency Shutdown Systems (ESD)
SABP-Z-002E Functional Specification for Compressor Control Systems (CCS)
SABP-Z-002F Functional Specification for Data Acquisition and Historization Systems
SABP-Z-002G Functional Specification for Alarm Management Systems (ALMS)
SABP-Z-002H Functional Specification for System Design Document (SDD)
SABP-Z-002I Functional Specification for Maintenance Training System (MTS)
SABP-Z-002J Functional Specification for Operator Training System (OTS)
SABP-Z-002K Functional Specification for Supervisory Control and Data Acquisition
SABP-Z-002L Functional Specification for Remote Terminal Unit (RTU)
SABP-Z-002M Functional Specification for Leak Detection Systems (LDS)
SABP-Z-002N Functional Specification for Terminal Management System (TMS)
SABP-Z-002S Functional Specification for Production Operation Management (POM)
SABP-Z-002T Functional Specification for Maintenance Operation Management (MnOM
SABP-Z-002U Functional Specification for Quality Operation Management (QOM)
SABP-Z-002V Functional Specification for Inventory Operation Management (IOM)
SABP-Z-030 Wireless Process Remote Monitoring and Control Using SMS
SABP-Z-031 Wash Water Injection Facilities for Hydroprocessing Units
SAEP-1020 Capital Program Planning
SAEP-1021 Surveying Services Division Project Control
SAEP-1024 Chemical Cleaning of New Steam Generating Equipment
SAEP-1025 Chemical Cleaning of Boilers
SAEP-1026 Boilers Lay-Up Procedures
SAEP-1027 Pressure Relief Valve Conventional and Balanced Types
SAEP-1028 Chemical Cleaning and Flushing of Lube/Seal Oil and Fluid Power Syst
SAEP-1050 Guideline for Disaster Recovery Plan Development for Process Automat
SAEP-1125 Brazing Test Supplement S25 with TB, Copper and Copper Alloy Tubing
SAEP-1132 Instructions for Using the Relief Valve Test Stand
SAEP-1134 Relief Valve Technician Certification
SAEP-1135 On-Stream Inspection Administration
SAEP-1140 Qualification of Saudi Aramco NDT Personnel
SAEP-1150 Inspection Coverage on Projects
SAEP-1154 Guidelines for Contractor's Quality Plan
SAEP-1161 Testing and Inspection (T&I) Reporting Procedure
SAEP-119 Preparation of Saudi Aramco Materials System Specifications
SAEP-12 Project Execution Plan
SAEP-120 Security Drawings for Saudi Aramco Facilities
SAEP-1200 Process Flow Requirements for Qualification Procedures of Industrial Co
SAEP-121 Operating Instructions for New Facilities
SAEP-125 Preparation of Saudi Aramco Engineering Standards
SAEP-13 Project Environmental Impact Assessments
SAEP-133 Instructions for the Development of "Regulated Vendors List" Engineeri
SAEP-134 Preparation of Saudi Aramco Engineering Procedures
SAEP-135 Saudi Aramco Process Automation System (PAS) Obsolescence Progra
SAEP-1350 Design Basis Scoping Paper (DBSP) Preparation and Revision Procedur
SAEP-136 Saudi Aramco Management of Electric Equipment Obsolescence Progr
SAEP-14 Project Proposal
SAEP-140 Project Training Impact Assessment
SAEP-15 Preparation of Restricted Vendor Lists for Process Automation Systems
SAEP-1510 Process Automation RVL Management Procedure
SAEP-16 Project Execution Guide for Process Automation Systems
SAEP-1610 Preparation of Functional Specification Documents
SAEP-1622 Preparation of technical Bid Evaluation Plan Document for Process Aut
SAEP-1624 Preparation of System Design Documents
SAEP-1626 Configuration and Graphics Guidelines
SAEP-1628 Preparation of Integration Specifications Document
SAEP-1630 Preparation of Integration Test Procedure Document
SAEP-1634 Factory Acceptance Test
SAEP-1636 Installation and Checkout Plan
SAEP-1638 Site Acceptance Test Plan
SAEP-1650 Main Automation Contractor
SAEP-1652 Process Automation Technology Focus Team (PATFTT) Technology Selec
SAEP-1661 Waste Minimization Opportunity Assessments
SAEP-1662 Cleaning of Heat Exchangers and Unfired Plant Equipment
SAEP-1663 Design Guidelines for Gas Oil Separation Plant (GOSP)
SAEP-1664 Design Guidelines for Crude Oil Stabilizer
SAEP-201 Saudi Aramco Engineering Reports
SAEP-21 Project Execution Requirements for Saudi Aramco Royalty/Custody Met
SAEP-22 Tank Calibration Requirements
SAEP-25 Estimate Preparation Guidelines
SAEP-250 Safety Integrity Level Assignment & Verification
SAEP-26 Capital Project Benchmarking Guidelines
SAEP-27 Pipelines/Piping Hydraulic Surge Analysis
SAEP-28 Radar Tank Gauging Equipment Verification Requirements
SAEP-29 General Instructions and Guidelines for Online Valve Preventive Mainte
SAEP-301 Instructions for Establishing and Maintaining Mandatory Saudi Aramco
SAEP-302A Attachment A of SAEP-302
SAEP-302B Attachment B of SAEP-302
SAEP-305 Saudi Aramco Library Drawings
SAEP-306 Assessment of the Remaining Strength of Corroded Pipes
SAEP-306A Assessment of the Remaining Strength of Corroded Pipes
SAEP-308 Operations Inspection Unit Reviews
SAEP-309 Inspection of Community and Operations Support Facilities
SAEP-310 Piping and Pipeline Repair
SAEP-3101A Appendix A - Glossary of Terms
SAEP-3101B Appendix B - Spare Parts Data Package Status Report (SPDPSR) Requi
SAEP-3101C Appendix C - Instructions to Suppliers for Providing Spare Parts and O
SAEP-3101D Appendix D - Spare Parts Data Package (SPDP) Checklists
SAEP-3101E Appendix E - SPDP Waiver Procedure
SAEP-3102 Equipment and Spare Parts Data Requirements for SAPMT Originated Re
SAEP-3102A Appendix A - Glossary of Terms
SAEP-3102B Appendix B - Spare Parts Data Package Status Report (SPDPSR) Requi
SAEP-3102C Appendix C - Instructions to Suppliers for Providing Spare Parts and O
SAEP-3102D Appendix D - Spare Parts Data Package (SPDP) Checklists
SAEP-3102E Appendix E - SPDP Waiver Procedure
SAEP-3103 Equipment and Spare Parts Data Requirements for Proponent/MRO Origi
SAEP-3103A Appendix A - Glossary of Terms
SAEP-3103B Appendix B - Spare Parts Data Package Status Report (SPDPSR) Requi
SAEP-3103C Appendix C - Instructions to Suppliers for Providing Spare Parts and O
SAEP-3103D Appendix D - Spare Parts Data Package (SPDP) Checklists
SAEP-3103E Appendix E - SPDP Waiver Procedure
SAEP-311 Installation of Hot Tapped and Stopple Connections
SAEP-317 Testing and Inspection (T&I) of Shell and Tube Heat Exchangers
SAEP-318 Pressure Relief Valve Program Authorization for Installation, Deletion
SAEP-319 Pressure Relief Valves - Routine Test, Inspection, Quality Assurance an
SAEP-319A Pressure Relief Valves - Routine Test, Inspection, Quality Assurance an
SAEP-32 Environmental Performance Assessment (EPA) Program
SAEP-321 Performance Qualification Testing and Certification of Saudi Aramco We
SAEP-322 Performance Qualification Testing And Certification of Saudi Aramco Bra
SAEP-323 Performance Qualification Testing of Contract Welders and Brazers
SAEP-329 Project Close-Out Report
SAEP-329A1 Project Close-Out Report
SAEP-329A2 Project Close-Out Report
SAEP-329A3 Project Close-Out Report
SAEP-332 Cathodic Protection Commissioning
SAEP-332A Cathodic Protection Commissioning
SAEP-333 Cathodic Protection Monitoring
SAEP-333A Cathodic Protection Monitoring
SAEP-335 Boiler Condition Assessment
SAEP-339 Marine Dredging and Landfilling Approval and Permitting
SAEP-340 Air Quality Impact Analysis and Assessment
SAEP-341 Equipment Life Cycle Cost Procedure
SAEP-345 Composite Non-Metallic Repair Systems for Pipelines and Pipework
SAEP-348 Chemical Cleaning, Disinfection, Post Treatment and Storage of Reve
SAEP-349 Advanced Process Control (APC) Systems
SAEP-35 Valves Handling, Hauling, Receipt Tests and Storage
SAEP-350 Regular Maintenance and Testing for Industrial Stationary Batteries
SAEP-354 High Integrity Protective Systems Design Requirements
SAEP-355 Field Metallography and Hardness Testing
SAEP-357 Fiber Reinforced Plastic Grating Installation Guide
SAEP-358 Management of Technologically Enhanced Naturally Occurring Radioact
SAEP-36 Proving Systems Calibration Requirements
SAEP-360 Project Planning Guidelines
SAEP-361 Storage, Handling and Installation of Weight-Coated Pipe
SAEP-363 Pipeline Simulation Model Development and Support
SAEP-364 Process Simulation Model Development and Support
SAEP-365 Pump Spare Parts Reverse Engineering
SAEP-366 Roles & Responsibilities of Company Organizations for Seismic Risk A
SAEP-367 Value Improvement Practice Requirements
SAEP-368 Alarm System Management
SAEP-37 Pipelines Residual Magnetism Removal
SAEP-370 Transportation of Radioactive Material
SAEP-371 Hearing Conservation Program (HCP)
SAEP-372 Inspection Performance Index for Operating Facilities
SAEP-373 High Integrity Protection Systems - Tracking Program
SAEP-374 High Integrity Protection Systems - Periodic Functional Testing Require
SAEP-375 High Integrity Protection Systems - SAP Tracking System Workflows
SAEP-376 High Integrity Protection Systems - Testing & Maintenance Reporting Re
SAEP-377 High Integrity Protection Systems - Personnel Training & Qualifications
SAEP-380 Equipment Deficiency Report
SAEP-381 Project Quality Issues Escalation Process
SAEP-390 Radiation Protection Assessment (RPA) Program
SAEP-400 Guidelines for Facility Flaring Minimization Plan
SAEP-400A Appendix 10 - Real-Time Flare Monitoring System (FMS)
SAEP-50 Project Execution Requirements for Third Party Royalty/Custody Meteri
SAEP-500 Guidelines for Screening and Qualification of Chemicals for Hydrate and
SAEP-501 Drag Reducing Agent (DRA) Chemicals
SAEP-701 Plant Ethernet Network Test Procedure
SAEP-707 Risk Assessement Procedure for Plants Networks and Systems
SAEP-717 Saudi Aramco Information Technology System Obsolescence Program
SAEP-744 Preventive Maintenance and Condition Assessment for Communication
SAEP-746 Lifecycle Management Procedures for Process Automation Systems
SAEP-99 Process Automation Networks and Systems Security
SAES-A-004 General Requirements for Pressure Testing
SAES-A-005 Safety Instruction Sheet
SAES-A-007 Hydrostatic Testing Fluids and Lay-Up Procedures
SAES-A-020 Equipment Specific P&ID Templates (ESPT)
SAES-A-100 Survey Coordinates, Datum's and Data Formats
SAES-A-102 Ambient Air Quality and Source Emissions Standards
SAES-A-103 Discharges to the Marine Environment
SAES-A-104 Wastewater Treatment, Reuse and Disposal
SAES-A-105 Noise Control
SAES-A-109 Site Planning for Prayer Shelters
SAES-A-111 Borrow Pit Requirements
SAES-A-112 Meteorological and Seismic Design Data
SAES-A-113 Geotechnical Engineering Requirements
SAES-A-114 Excavation and Backfill
SAES-A-115 Groundwater Monitoring Well Design, Installation, and Decommissioning
SAES-A-202 Saudi Aramco Engineering Drawing Preparation
SAES-A-204 Preparation of Structural Calculations
SAES-A-205 Oilfield Chemicals
SAES-A-206 Positive Material Identification
SAES-A-207 Catalyst and Desiccant Selection and Replacement
SAES-A-208 Water Treatment Chemicals
SAES-A-210 Management of Pyrophoric Wastes
SAES-A-302 Aviation Fuel Quality Assurance Design Requirement
SAES-A-400 Industrial Drainage Systems
SAES-A-401 Closed Drain Systems (CDS)
SAES-A-403 Offshore Platform Drainage Systems
SAES-B-005 Spacing and Diking for Atmospheric and Low-Pressure Tanks.
SAES-B-006 Fireproofing for Plants
SAES-B-008 Restrictions to Use of Cellars, Pits, and Trenches
SAES-B-009 Fire Protection and Safety Requirements for Offshore Production Faciliti
SAES-B-014 Safety Requirements for Plant and Operations Support Buildings
SAES-B-017 Fire Water System Design
SAES-B-018 Foam Systems
SAES-B-019 Portable, Mobile and Special Fixed Firefighting Equipment
SAES-B-053 Machine and Equipment Safety Guarding, Elevators, Escalators, and Co
SAES-B-054 Access, Egress, and Materials Handling for Plant Facilities
SAES-B-055 Plant Layout
SAES-B-057 Safety Requirements: Refrigerated and Pressure Storage Tanks and Ves
SAES-B-058 Emergency Shutdown, Isolation, and Depressuring
SAES-B-060 Fire Protection for Piers, Wharves and Sea Islands
SAES-B-061 Protective Shields for High Health Hazard Piping and Equipment
SAES-B-062 Onshore Wellsite Safety
SAES-B-063 Aviation Obstruction Marking and Lighting
SAES-B-064 Onshore and Nearshore Pipeline Safety
SAES-B-067 Safety Identification and Safety Colors
SAES-B-068 Electrical Area Classification
SAES-B-069 Emergency Eyewashes and Showers
SAES-B-070 Fire and Safety Requirements for Bulk Plants, Air Fueling Terminals and S
SAES-C-001 Process Design of Trays and Packing
SAES-D-001 Design Criteria for Pressure Vessels
SAES-D-008 Repairs, Alterations, and Re-rating of Process Equipment
SAES-D-100 Design Criteria of Atmospheric and Low-Pressure Tanks
SAES-D-101 Regulated Vendors List for Pressure Vessels and Tanks
SAES-D-108 Repair, Alteration and Reconstruction of Storage Tanks
SAES-D-109 Design of Small Metallic Storage Tanks
SAES-D-110 Design of Fiberglass-Reinforced Plastic (FRP) Storage Tanks
SAES-D-116 Underground Storage Tank System
SAES-E-004 Design Criteria of Shell and Tube Heat Exchangers
SAES-E-006 Design Criteria of Double Pipe Heat Exchangers
SAES-E-007 Design Criteria of Air-Cooled Heat Exchangers
SAES-E-014 Design Criteria of Plate and Frame Heat Exchangers
SAES-E-015 Design Criteria of Electric Heat Exchangers
SAES-E-101 Regulated Vendors List for Heat Transfer Equipment
SAES-F-001 Design Criteria of Fired Heaters
SAES-F-007 System Design Criteria of Flares
SAES-G-005 Centrifugal Pumps
SAES-G-006 Positive Displacement Pumps - Controlled Volume
SAES-G-007 Submersible Pumps and Motors for Water Well and Offshore Service
SAES-G-101 Regulated Vendors List for Pumps and Mechanical Seals
SAES-G-115 Lubrication, Shaft Sealing and Control Oil Systems
SAES-G-116 Cleanliness Standard for Lube/Seal Oil and Fluid Power Systems
SAES-H-001 Coating Selection and Application Requirements for Industrial Plants a
SAES-H-002 Internal and External Coatings for Steel Pipelines and Piping
SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatin
SAES-H-003 Protective Coatings for Industrial Concrete Structures
SAES-H-004 Protective Coating Selection and Application Requirements for Offshore S
SAES-H-101V Approved Saudi Aramco Data Sheets - Paints and Coatings
SAES-H-102 Safety Requirements for Coating Applications
SAES-H-200 Storage, Handling and Installation of Externally Coated Pipe
SAES-H-201 General Specifications for Over-the-Ditch External and Internal FBE Coat
SAES-H-204 General Specifications and Application Procedures of Heat-Shrink Sleev
SAES-I-001 ESP System - Design and Procurement
SAES-I-002 ESP System - Supplier Integration
SAES-J-001 Instrumentation Index
SAES-J-002 Technically Acceptable Instrument Manufacturers
SAES-J-003 Instrumentation - Basic Design Criteria
SAES-J-004 Instrumentation Symbols and Identification
SAES-J-005 Instrumentation Drawings and Forms
SAES-J-100 Process Flow Metering
SAES-J-200 Pressure
SAES-J-300 Level
SAES-J-400 Temperature
SAES-J-502 Analyzer Shelters
SAES-J-504 Sample Conditioning Systems for Process Analyzers
SAES-J-505 Combustible Gas and Hydrogen Sulfide in Air Detection Systems
SAES-J-600 Pressure Relief Devices
SAES-J-601 Emergency Shutdown and Isolation Systems
SAES-J-602 Burner Management, Combustion and Waterside Control Systems for Wat
SAES-J-603 Process Heaters Safety Systems
SAES-J-604 Protective and Condition Monitoring Equipment for Rotating Machinery
SAES-J-605 Surge Relief Protection Systems
SAES-J-607 Burner Management Systems for SRU Trains
SAES-J-700 Control Valves
SAES-J-801 Control Buildings
SAES-J-901 Instrument Air Supply Systems
SAES-J-902 Electrical Systems for Instrumentation
SAES-J-903 Intrinsically Safe Systems
SAES-J-904 FOUNDATION TM Fieldbus (FF) Systems
SAES-J-905 Instrument Asset Management Systems (IAMS)
SAES-K-001 Design and Installation of Heating, Ventilating and Air Conditioning Syst
SAES-K-002 Air Conditioning Systems for Essential Operating Facilities
SAES-K-003 Air Conditioning Systems for Communications Buildings
SAES-K-011 Building Management System
SAES-K-100 Saudi Aramco Mechanical (HVAC) Code
SAES-K-101 Regulated Vendors List for Heating, Ventilating and Air Conditioning (
SAES-K-110 Regulated Vendors List for Compressors, Expanders, Gears and Steam
SAES-K-115 Regulated Vendors List for Combustion Gas Turbines
SAES-K-400 Basic Selection of Compressors
SAES-K-402 Centrifugal Compressors
SAES-K-403 Reciprocating Compressors
SAES-K-501 Steam Turbines
SAES-K-502 Combustion Gas Turbines
SAES-K-511 Diesel Engines
SAES-K-600 Side-Entry Mixers
SAES-L-100 Applicable Codes and Standards for Pressure Piping Systems
SAES-L-101 Regulated Vendors List for Pipes and Fittings
SAES-L-102 Regulated Vendors List for Valves
SAES-L-105 Piping Material Specifications
SAES-L-108 Selection of Valves
SAES-L-109 Selection of Flanges, Stud Bolts and Gaskets
SAES-L-110 Limitations on Pipe Joints and Components
SAES-L-120 Piping Flexibility Analysis
SAES-L-125 Safety Instruction Sheet for Piping and Pipelines
SAES-L-131 Fracture Control of Line Pipe
SAES-L-132 Material Selection for Piping Systems
SAES-L-133 Corrosion Protection Requirements for Pipelines, Piping and Process E
SAES-L-136 Pipe, Flange and Fitting Material Requirements
SAES-L-140 Thermal Expansion Relief in Piping
SAES-L-150 Pressure Testing of Plant Piping and Pipelines
SAES-L-310 Design of Plant Piping
SAES-L-350 Construction of Plant Piping
SAES-L-410 Design of Pipelines
SAES-L-420 Scraper Trap Station and Appurtenances
SAES-L-440 Anchors for Buried Pipelines
SAES-L-450 Construction of On-Land and Near-Shore Pipelines
SAES-L-460 Pipeline Crossings Under Roads and Railroads
SAES-L-610 Nonmetallic Piping in Oily Water Services
SAES-L-620 Design of Nonmetallic Piping in Hydrocarbon and Water injection System
SAES-L-650 Construction of Nonmetallic Piping in Hydrocarbon and Water Injection
SAES-L-810 Design of Piping on Offshore Structures
SAES-L-850 Design of Submarine Pipelines and Risers
SAES-M-001 Structural Design Criteria for Non-Building Structures
SAES-M-005 Design and Construction of Fixed Offshore Platforms
SAES-M-006 Saudi Aramco Security and General Purpose Fencing
SAES-M-009 Design Criteria for Blast Resistant Buildings
SAES-M-100 Saudi Aramco Building Code
SAES-N-001 Basic Criteria, Industrial Insulation
SAES-N-004 Design and Installation of Building Thermal Insulation
SAES-N-100 Refractory Systems
SAES-N-110 Installation Requirements - Castable Refractories
SAES-N-120 Installation Requirements - Extreme Erosion Resistant Refractories
SAES-N-130 Installation Requirements - Fireclay Bricks
SAES-N-140 Installation Requirements - Refractory Ceramic Fiber
SAES-O-201 Application of Security Directives
SAES-O-202 Security Fencing
SAES-O-203 Security Gate
SAES-O-204 Security Lighting
SAES-O-205 Integrated Security System
SAES-O-206 Security Devices
SAES-O-207 Power Supply for Security Systems
SAES-O-208 Communications for Security Systems
SAES-O-209 Security Doors
SAES-O-210 Security Locks
SAES-O-211 Identification Cards
SAES-O-212 Security Information Protection
SAES-P-100 Basic Power System Design Criteria
SAES-P-101 Regulated Vendors List for Electrical Equipment
SAES-P-103 UPS and DC Systems
SAES-P-104 Wiring Methods and Materials
SAES-P-107 Overhead Distribution Systems
SAES-P-111 Grounding
SAES-P-113 Motors and Generators
SAES-P-114 Power System and Equipment Protection
SAES-P-116 Switchgear and Control Equipment
SAES-P-119 Onshore Substations
SAES-P-121 Transformers and Reactors
SAES-P-123 Lighting
SAES-P-126 Power System Automation
SAES-Q-001 Criteria for Design and Construction of Concrete Structures
SAES-Q-004 Installation of Piles and Conductors for Offshore Structures
SAES-Q-005 Concrete Foundations
SAES-Q-006 Asphalt and Sulfur Extended Asphalt Concrete Paving
SAES-Q-007 Foundations and Supporting Structures for Heavy Machinery
SAES-Q-009 Concrete Retaining Walls
SAES-Q-010 Cement Based, Non-Shrink Grout for Structural and Equipment Grouting
SAES-Q-011 Epoxy Grout for Machinery Support
SAES-Q-012 Criteria for Design and Construction of Precast and Prestressed Concret
SAES-R-004 Building Architectural Finishes Requirements
SAES-R-004A Appendix A - Architectural Interior Finishes Requirements
SAES-R-004B Appendix B - Architectural Interior Requirements/Healthcare Facilities
SAES-R-004C Appendix C - Architectural Exterior Finishes Requirements
SAES-S-007 Solid Waste Landfill Requirements
SAES-S-010 Sanitary Sewers
SAES-S-020 Oily Water Drainage Systems
SAES-S-030 Storm Water Drainage Systems
SAES-S-040 Saudi Aramco Water Systems
SAES-S-050 Sprinkler and Standpipe Systems in Buildings
SAES-S-060 Saudi Aramco Plumbing Code
SAES-S-070 Installation of Utility Piping Systems
SAES-T-000 Telecommunications Standards Introduction and Indices
SAES-T-018 Telecommunications - Symbols, Abbreviations and Definitions
SAES-T-101 Regulated Vendors List for Communications Equipments and Materials
SAES-T-151 D.C. Power Systems
SAES-T-360 Synchronous Digital Hierarchy Transmission Systems
SAES-T-481 In-Plant Voice Paging System
SAES-T-492 VHF/UHF Land-Mobile and Fixed Radio Communication
SAES-T-493 Digital Trunked Radio System
SAES-T-494 Very Small Aperture Terminal (VSAT) Network Design
SAES-T-500 Central Office (CO) Digital Telephone Switching Systems
SAES-T-521 Circuit Measuring Techniques
SAES-T-555 IP Based Closed-Circuit Television (CCTV)
SAES-T-556 Circuit Quality and Performance
SAES-T-570 Design Residential Telecommunications Infrastructure
SAES-T-603 Telecommunications - Safeguards and Warning Devices
SAES-T-624 Telecommunications Outside Plant - Fiber Optics
SAES-T-625 Inter and Intra Building Fiber Optic Communication Cables
SAES-T-628 Telecommunications - Underground Cable
SAES-T-629 Telecommunications Buried Cable and Wire
SAES-T-631 Communications Cable Terminals
SAES-T-632 Communications Cable Splicing
SAES-T-633 Communications Splice Closures
SAES-T-634 Telecommunications - Cable Testing and Acceptance
SAES-T-744 Design Criteria and Installation of Communication Towers
SAES-T-795 Communications Facility Grounding Systems
SAES-T-820 Narrow-band Videoconferencing Systems
SAES-T-830 Voice Frequency Loop Transmission Objectives
SAES-T-883 Telecommunications - Inductive Coordination
SAES-T-887 Telecommunications: Electrical Coordination - Protection at Power Plant
SAES-T-903 Outside Plant Electrical Protection and Grounding
SAES-T-906 Telecommunications - Structural Coordination
SAES-T-911 Telecommunication Conduit System Design
SAES-T-912 Communications Feeder Cable
SAES-T-914 Comunications Distribution Cable
SAES-T-916 Communications Building Cable
SAES-T-919 Submarine Fiber Optic Cable
SAES-T-920 Telecommunications Cable Information
SAES-T-928 Telecommunications - OSP Buried Plant
SAES-T-938 Telecommunications: Outside Plant Systems - Design
SAES-W-010 Welding Requirements for Pressure Vessels
SAES-W-011 Welding Requirements for On-Plot Piping
SAES-W-012 Welding Requirements for Pipelines
SAES-W-013 Welding Requirements for Offshore Structures
SAES-W-014 Weld Overlays and Welding of Clad Materials
SAES-W-015 Strip Lining Application
SAES-W-016 Welding of Special Corrosion-Resistant Materials
SAES-W-017 Welding Requirements for API Tanks
SAES-W-019 Girth Welding Requirements for Clad Pipes
SAES-X-300 Cathodic Protection of Marine Structures
SAES-X-400 Cathodic Protection of Buried Pipelines
SAES-X-500 Cathodic Protection of Vessel and Tank Internals
SAES-X-600 Cathodic Protection of Plant Facilities
SAES-X-700 Cathodic Protection of Onshore Well Casings
SAES-X-800 Cathodic Protection for Existing Reinforced Concrete Structures
SAES-Y-100 Regulated Vendors List for Custody Measurement Equipment
SAES-Y-101 Custody Metering of Hydrocarbon Gases
SAES-Y-103 Royalty/Custody Metering of Hydrocarbon Liquids
SAES-Y-301 Royalty/Custody Measurement of Hydrocarbon Liquids using Radar Tan
SAES-Y-501 Dynamic Sampling of Hydrocarbon Liquids for Royalty/Custody Transfer
SAES-Z-000 Process Control Standards Index
SAES-Z-001 Process Control Systems
SAES-Z-002 Technically Accepted Process Automation Systems
SAES-Z-003 Pipelines Leak Detection Systems
SAES-Z-004 Supervisory Control and Data Acquisition (SCADA) System
SAES-Z-010 Process Automation Networks
SAES-Z-020 Design and Installation of Fiber Optic Cable Systems for Process Contro
ments Due Date (March 31 2012)

Committee Title Issue Date


Materials and Corrosion Cont 11-APR-07
Materials and Corrosion Cont 25-AUG-08
Piping 08-AUG-10
Standards Coordination 19-JAN-10
Engineering Knowledge & Res 17-FEB-10
Inspection Engineering 21-APR-09
Inspection Engineering 22-APR-09
Inspection Engineering 22-APR-09
Inspection Engineering 14-JUN-09
Inspection Engineering 26-APR-09
Inspection Engineering 26-APR-09
Inspection Engineering 27-APR-09
Inspection Engineering 27-APR-09
Inspection Engineering 06-JUN-09
Inspection Engineering 06-JUN-09
Inspection Engineering 06-JUN-09
Inspection Engineering 06-JUN-09
Inspection Engineering 06-JUN-09
Inspection Engineering 06-JUN-09
Inspection Engineering 06-JUN-09
Inspection Engineering 06-JUN-09
Inspection Engineering 06-JUN-09
Inspection Engineering 31-JUL-10
Inspection Engineering 04-JUL-10
Environmental 08-DEC-10
Non-Destructive Testing 19-MAY-09
Non-Destructive Testing 19-MAY-09
Non-Destructive Testing 08-MAY-11
Non-Destructive Testing 08-MAY-11
Non-Destructive Testing 20-SEP-08
Inspection Engineering 02-AUG-09
Inspection Engineering 10-JUL-11
Project Management Office D 21-MAR-12
Engineering Knowledge & Res 17-FEB-10
Inspection Engineering 07-SEP-11
Standards Coordination 08-MAY-11
Consulting Services Dept. 13-DEC-11
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Inspection Engineering 04-AUG-08
Inspection Engineering 27-SEP-09
Inspection Engineering 29-JUL-09
Environmental 10-MAR-10
Engineering Knowledge & Res 12-APR-10
Engineering Knowledge & Res 17-FEB-10
Inspection Engineering 02-AUG-09
Inspection Engineering 10-SEP-11
Piping 07-NOV-06
Welding 20-OCT-09
Inspection Engineering 18-AUG-09
Inspection Engineering 19-AUG-09
Inspection Engineering 19-AUG-09
Inspection Engineering 01-NOV-98
Inspection Engineering 19-AUG-09
Inspection Engineering 18-APR-09
Inspection Engineering 05-OCT-08
Inspection Engineering 10-JUN-09
Inspection Engineering 17-JAN-11
Inspection Engineering 01-AUG-09
Inspection Engineering 25-JUL-09
Inspection Engineering 10-JUN-09
Inspection Engineering 10-JUN-09
Inspection Engineering 25-JUL-09
Inspection Engineering 03-DEC-03
Inspection Engineering 26-NOV-07
Inspection Engineering 19-AUG-09
Inspection Engineering 10-JUN-09
Inspection Engineering 25-JUL-09
Inspection Engineering 18-AUG-09
Paints and Coatings 07-MAY-11
Piping 25-MAY-11
Offshore Structures 21-AUG-10
Materials and Corrosion Cont 20-MAR-12
Piping 13-OCT-10
Materials and Corrosion Cont 10-MAY-11
Piping 21-JUN-11
Materials and Corrosion Cont 19-FEB-11
Materials and Corrosion Cont 24-APR-11
Piping 21-JUN-11
Materials and Corrosion Cont 24-APR-11
Materials and Corrosion Cont 04-MAY-11
Materials and Corrosion Cont 06-FEB-12
Materials and Corrosion Cont 13-DEC-11
Materials and Corrosion Cont 21-JUN-11
Materials and Corrosion Cont 21-JUN-11
Materials and Corrosion Cont 29-OCT-11
Materials and Corrosion Cont 13-DEC-11
Materials and Corrosion Cont 21-JUN-11
Materials and Corrosion Cont 17-JUL-10
Materials and Corrosion Cont 13-DEC-11
Materials and Corrosion Cont 01-MAR-11
Piping 21-FEB-12
Materials and Corrosion Cont 21-JUN-11
Materials and Corrosion Cont 10-MAY-11
Inspection Engineering 02-AUG-09
Materials and Corrosion Cont 20-FEB-12
Materials and Corrosion Cont 06-SEP-11
Piping 13-FEB-12
Piping 01-FEB-12
Piping 09-AUG-11
Materials and Corrosion Cont 21-JUN-11
Materials and Corrosion Cont 20-NOV-11
Valves 11-OCT-10
Valves 11-OCT-10
Valves 11-OCT-10
Valves 11-OCT-10
Valves 20-FEB-12
Valves 11-OCT-10
Valves 11-OCT-10
Valves 11-OCT-10
Valves 17-MAY-11
Valves 11-OCT-10
Valves 11-OCT-10
Valves 11-OCT-10
Valves 11-OCT-10
Valves 11-OCT-10
Valves 11-OCT-10
Plumbing and Utilities 21-JUN-11
Materials and Corrosion Cont 11-SEP-11
Onshore Structures 21-JUN-11
Paints and Coatings 22-JUN-11
Paints and Coatings 22-JUN-11
Paints and Coatings 22-JUN-11
Paints and Coatings 12-JUL-11
Paints and Coatings 13-JUL-11
Paints and Coatings 13-JUL-11
Paints and Coatings 21-MAR-12
Paints and Coatings 16-JUL-11
Paints and Coatings 16-JUL-11
Onshore Structures 16-JUL-11
Paints and Coatings 17-JUL-11
Paints and Coatings 27-MAR-12
Civil 19-DEC-10
Paints and Coatings 25-OCT-11
Paints and Coatings 27-MAR-12
Paints and Coatings 15-OCT-11
Onshore Structures 15-MAR-11
Paints and Coatings 01-OCT-11
Paints and Coatings 04-OCT-11
Civil 19-DEC-10
Civil 11-OCT-11
Paints and Coatings 11-OCT-11
Paints and Coatings 11-OCT-11
Paints and Coatings 22-MAY-11
Paints and Coatings 21-MAY-11
Paints and Coatings 27-MAR-12
Paints and Coatings 22-MAY-11
Paints and Coatings 11-JUN-11
Paints and Coatings 22-MAY-11
Inspection Engineering 18-APR-09
Materials and Corrosion Cont 07-MAY-11
Onshore Structures 17-MAY-11
Onshore Structures 09-MAY-11
Onshore Structures 10-MAY-11
Materials and Corrosion Cont 14-MAY-11
Materials and Corrosion Cont 15-MAY-11
Materials and Corrosion Cont 16-MAY-11
Compressors, Gears and Ste 16-MAY-07
Compressors, Gears and Ste 09-SEP-06
Electrical Substations Equip 22-SEP-08
Electrical Substations Equip 31-JUL-10
Electrical Substations Equip 22-SEP-08
Electrical Substations Equip 11-OCT-08
Electrical Systems Designs 20-OCT-08
Electrical Systems Designs 19-OCT-08
Electrical Systems Designs 19-OCT-08
Inspection Engineering 18-APR-09
Inspection Engineering 18-APR-09
Electrical Systems Designs 19-OCT-08
Electrical Systems Designs 25-MAR-12
Electrical Systems Designs 25-MAR-12
Inspection Engineering 18-APR-09
Electrical Substations Equip 08-AUG-10
Electrical Substations Equip 19-OCT-08
Electrical Substations Equip 18-OCT-09
Electrical Substations Equip 27-SEP-11
Electrical Substations Equip 21-FEB-11
Electrical Substations Equip 31-JUL-10
Electrical Substations Equip 14-OCT-08
Electrical Substations Equip 29-NOV-11
Electrical Systems Designs 06-FEB-11
Electrical Systems Designs 23-DEC-09
Electrical Substations Equip 14-OCT-08
Motors and Generators 01-NOV-08
Electrical Substations Equip 01-OCT-11
Electrical Substations Equip 14-OCT-08
Electrical Systems Designs 19-OCT-08
Electrical Substations Equip 12-NOV-08
Electrical Substations Equip 10-APR-11
Electrical Substations Equip 10-OCT-11
Inspection Engineering 18-APR-09
Cathodic Protection 30-MAR-05
Cathodic Protection 28-DEC-11
Cathodic Protection 28-FEB-10
Cathodic Protection 31-DEC-11
Cathodic Protection 31-MAR-08
Cathodic Protection 13-DEC-11
Cathodic Protection 06-SEP-11
Cathodic Protection 28-DEC-11
Motors and Generators 10-MAR-12
Motors and Generators 27-FEB-11
Motors and Generators 10-MAR-12
UPS, DC Systems and Power 20-OCT-08
UPS, DC Systems and Power 20-OCT-08
Electrical Substations Equip 14-OCT-08
UPS, DC Systems and Power 20-OCT-08
Motors and Generators 23-FEB-11
Motors and Generators 10-MAR-12
Motors and Generators 28-SEP-05
Communications 06-NOV-10
Communications 23-JAN-11
Welding 13-FEB-12
Loss Prevention 02-SEP-09
Fire Protection Dept. 21-NOV-11
Fire Protection Dept. 28-NOV-11
Loss Prevention 15-APR-09
Fire Protection Dept. 28-NOV-11
Fire Protection Dept. 15-NOV-06
Fire Protection Dept. 15-NOV-06
Loss Prevention 15-APR-09
Materials and Corrosion Cont 05-DEC-11
Materials and Corrosion Cont 05-DEC-11
Process Control 19-OCT-10
Process Control 24-OCT-09
Process Control 10-SEP-11
Process Control 24-OCT-09
Process Control 24-OCT-09
Process Control 24-OCT-09
Process Control 14-SEP-09
Process Control 24-OCT-09
Process Control 20-DEC-09
Communications 19-OCT-09
Lubrication Systems and Lubr 17-MAR-09
Lubrication Systems and Lubr 17-MAR-09
Lubrication Systems and Lubr 17-MAR-09
Lubrication Systems and Lubr 17-MAR-09
Lubrication Systems and Lubr 17-MAR-09
Lubrication Systems and Lubr 17-MAR-09
Lubrication Systems and Lubr 17-MAR-09
Lubrication Systems and Lubr 17-MAR-09
Lubrication Systems and Lubr 17-MAR-09
Lubrication Systems and Lubr 17-MAR-09
Lubrication Systems and Lubr 16-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 31-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 28-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 28-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Lubrication Systems and Lubr 25-MAR-09
Flow Assurance 28-JUN-10
Inspection Engineering 22-AUG-09
HVAC 27-DEC-06
HVAC 27-MAY-06
HVAC 27-MAR-12
HVAC 18-APR-10
HVAC 14-MAY-11
Fire Protection Dept. 28-NOV-11
Fire Protection Dept. 30-NOV-04
Industrial Security 24-AUG-09
Industrial Security 24-AUG-09
Industrial Security 21-MAR-07
Industrial Security 25-AUG-09
Fire Protection Dept. 28-NOV-11
Fire Protection Dept. 28-NOV-11
Gas Turbines and Diesel Eng 10-JUL-11
Compressors, Gears and Ste 09-AUG-09
Compressors, Gears and Ste 30-SEP-09
Compressors, Gears and Ste 18-OCT-09
Pumps, Seals and Mixers 26-JUL-09
Compressors, Gears and Ste 10-APR-11
Pumps, Seals and Mixers 30-NOV-08
Pumps, Seals and Mixers 13-OCT-08
Pumps, Seals and Mixers 01-DEC-08
Inspection Engineering 18-APR-09
Compressors, Gears and Ste 16-MAY-07
Vessels 13-DEC-11
Vessels 15-JAN-12
Vessels 26-JAN-11
Vessels 16-SEP-08
Heat Transfer Equipment 23-JUN-10
Gas Turbines and Diesel Eng 12-MAY-08
Compressors, Gears and Ste 26-JAN-09
Compressors, Gears and Ste 23-DEC-09
Heat Transfer Equipment 23-JUN-10
Lubrication Systems and Lubr 02-JUL-08
Compressors, Gears and Ste 10-APR-11
Pumps, Seals and Mixers 09-JUN-10
Heat Transfer Equipment 06-SEP-08
Trays and Packing Process D 14-NOV-09
Heat Transfer Equipment 27-JAN-10
Flare Systems Design 18-FEB-12
Heat Transfer Equipment 06-SEP-08
Heat Transfer Equipment 23-JUN-10
Heat Transfer Equipment 19-DEC-09
Vessels 13-DEC-11
Vessels 02-NOV-11
Materials and Corrosion Cont 06-SEP-08
Materials and Corrosion Cont 23-MAY-09
Heat Transfer Equipment 26-DEC-09
Vessels 15-JAN-12
Materials and Corrosion Cont 01-NOV-11
Gas Turbines and Diesel Eng 01-DEC-07
Custody Measurement 14-OCT-09
Custody Measurement 17-SEP-07
Instrumentation 21-JUN-09
Instrumentation 29-JAN-12
Custody Measurement 21-DEC-11
Custody Measurement 28-NOV-10
Custody Measurement 28-JAN-12
Custody Measurement 02-MAY-09
Custody Measurement 10-APR-11
Custody Measurement 17-APR-11
Instrumentation 04-MAR-12
Instrumentation 14-DEC-11
Custody Measurement 27-MAR-12
Instrumentation 28-JUN-10
Instrumentation 06-JUN-11
Instrumentation 26-JAN-09
Instrumentation 13-DEC-11
Instrumentation 13-DEC-11
Custody Measurement 28-NOV-10
Instrumentation 09-AUG-09
Instrumentation 27-APR-11
Instrumentation 04-MAR-12
Instrumentation 25-OCT-11
Instrumentation 01-DEC-10
Instrumentation 06-JAN-09
Instrumentation 27-DEC-08
Instrumentation 18-AUG-09
Instrumentation 28-JUN-10
Instrumentation 24-AUG-11
Instrumentation 04-JAN-12
Instrumentation 13-DEC-11
Instrumentation 01-JAN-12
Instrumentation 23-JAN-12
Instrumentation 05-MAR-12
Instrumentation 06-SEP-11
Instrumentation 01-NOV-10
Instrumentation 21-JUN-09
Instrumentation 06-FEB-12
Custody Measurement 02-MAY-09
Custody Measurement 19-OCT-09
Custody Measurement 02-MAY-09
Custody Measurement 03-MAY-09
Instrumentation 22-MAY-10
Instrumentation 24-JAN-12
Energy Optimization & Cogen 30-SEP-02
Drilling Workover Wellhead a 29-JAN-11
Drilling Workover Wellhead a 23-JAN-12
Drilling and Workover Engine 23-JAN-12
Drilling Workover Wellhead a 23-JAN-12
Drilling Workover Wellhead a 23-JAN-12
Drilling Workover Wellhead a 11-MAR-12
Electric Submersible Pump 26-APR-11
Electric Submersible Pump 26-APR-11
Electric Submersible Pump 26-APR-11
Electric Submersible Pump 27-APR-11
Offshore Structures 23-MAY-11
Materials and Corrosion Cont 31-JUL-05
Process and Control Systems 12-MAR-11
Process and Control Systems 06-MAR-11
Process and Control Systems 12-MAR-11
Process and Control Systems 12-MAR-11
Process and Control Systems 12-MAR-11
Process and Control Systems 16-MAR-11
Process and Control Systems 16-MAR-11
Materials and Corrosion Cont 08-SEP-09
Materials and Corrosion Cont 01-JUL-07
Materials and Corrosion Cont 25-JUN-07
Materials and Corrosion Cont 27-APR-08
Materials and Corrosion Cont 08-MAR-10
Materials and Corrosion Cont 12-MAR-08
Materials and Corrosion Cont 06-SEP-08
Energy Optimization & Cogen 12-MAR-11
Civil 28-FEB-09
Materials and Corrosion Cont 06-JAN-09
Materials and Corrosion Cont 17-JUL-10
Materials and Corrosion Cont 14-SEP-09
Materials and Corrosion Cont 27-JAN-10
Process and Control Systems 12-MAR-11
Other 05-JUL-10
Process and Control Systems 18-SEP-11
Materials and Corrosion Cont 04-DEC-11
Other 12-FEB-12
Trays and Packing Process D 29-JUN-11
Vessels 27-MAR-08
Heat Transfer Equipment 23-NOV-10
Heat Transfer Equipment 20-APR-10
Consulting Services Dept. 07-FEB-07
Heat Transfer Equipment 05-OCT-08
Heat Transfer Equipment 14-NOV-10
Pumps, Seals and Mixers 25-JUL-09
Consulting Services Dept. 31-OCT-04
Consulting Services Dept. 31-OCT-04
Consulting Services Dept. 29-DEC-04
Consulting Services Dept. 22-AUG-10
Consulting Services Dept. 30-MAR-05
Consulting Services Dept. 31-JUL-05
Consulting Services Dept. 31-JAN-06
Consulting Services Dept. 31-JAN-06
Gas Turbines and Diesel Eng 14-APR-07
Lubrication Systems and Lubr 19-JUL-08
Pumps, Seals and Mixers 01-JUL-07
Pumps, Seals and Mixers 08-OCT-07
Consulting Services Dept. 08-JUN-08
Pumps, Seals and Mixers 16-NOV-08
Pumps, Seals and Mixers 20-OCT-09
Pumps, Seals and Mixers 11-MAY-10
Compressors, Gears and Ste 25-OCT-10
Consulting Services Dept. 18-OCT-10
Paints and Coatings 24-JUN-09
Paints and Coatings 21-MAR-10
Paints and Coatings 20-FEB-11
Instrumentation 30-JAN-11
Instrumentation 05-JUN-11
HVAC 17-MAY-09
Consulting Services Dept. 11-JUL-07
HVAC 01-APR-09
Gas Turbines and Diesel Eng 11-NOV-07
Compressors, Gears and Ste 07-MAY-11
Piping 28-JAN-07
Piping 19-MAY-07
Materials and Corrosion Cont 09-JAN-10
Materials and Corrosion Cont 09-JAN-10
Piping 05-SEP-09
Piping 31-JAN-10
Materials and Corrosion Cont 29-MAR-10
Materials and Corrosion Cont 29-MAR-10
Piping 01-NOV-11
Piping 18-FEB-12
Offshore Structures 11-MAY-08
Onshore Structures 31-MAY-05
Onshore Structures 11-NOV-06
Consulting Services Dept. 31-MAY-06
Consulting Services Dept. 05-JUN-06
Consulting Services Dept. 30-JUN-06
Electrical Substations Equip 03-APR-10
Consulting Services Dept. 28-OCT-06
Consulting Services Dept. 08-OCT-06
Consulting Services Dept. 21-JAN-07
Electrical Substations Equip 15-JAN-07
Motors and Generators 03-JAN-09
Electrical Substations Equip 07-JAN-08
Electrical Systems Designs 11-DEC-07
Electrical Substations Equip 13-JAN-08
Motors and Generators 10-JUN-08
Motors and Generators 07-JAN-08
Electrical Substations Equip 12-MAY-08
Process and Control Systems 12-MAR-11
Motors and Generators 22-NOV-09
Motors and Generators 03-JAN-09
Electrical Substations Equip 15-FEB-11
Electrical Systems Designs 06-DEC-09
Electrical Substations Equip 15-FEB-10
Electrical Substations Equip 09-MAR-10
UPS, DC Systems and Power 23-FEB-10
UPS, DC Systems and Power 23-FEB-10
UPS, DC Systems and Power 23-FEB-10
UPS, DC Systems and Power 23-FEB-10
Electrical Substations Equip 11-JUN-11
Electrical Substations Equip 26-MAR-11
UPS, DC Systems and Power 29-MAY-11
UPS, DC Systems and Power 28-MAY-11
UPS, DC Systems and Power 28-MAY-11
Motors and Generators 31-DEC-11
Electrical Systems Designs 06-SEP-11
Onshore Structures 24-MAY-09
Onshore Structures 31-JAN-05
Onshore Structures 30-APR-05
Onshore Structures 06-NOV-07
Onshore Structures 26-MAR-08
Consulting Services Dept. 02-OCT-06
Onshore Structures 30-JUL-08
Onshore Structures 28-FEB-05
Onshore Structures 20-SEP-10
Civil 15-SEP-10
Communications 29-NOV-11
Welding 31-MAR-08
Welding 11-Dec-11
Cathodic Protection 24-SEP-07
Cathodic Protection 26-NOV-07
Cathodic Protection 01-APR-12
Cathodic Protection 25-AUG-10
Process Control 02-JAN-12
Process Control 09-MAR-10
Process Control 17-NOV-07
Process Control 17-NOV-07
Process Control 17-NOV-07
Process Control 17-NOV-07
Process Control 17-NOV-07
Process Control 17-NOV-07
Process Control 17-NOV-07
Process Control 17-NOV-07
Process Control 17-NOV-07
Process Control 17-NOV-07
Process Control 17-NOV-07
Process Control 17-NOV-07
Process Control 11-JAN-09
Process Control 24-OCT-09
Process Control 09-MAR-10
Process Control 09-MAR-10
Process Control 09-MAR-10
Process Control 09-MAR-10
Process and Control Systems 21-NOV-06
Process Control 23-OCT-11
Facilities Planning Dept. 30-JUN-04
Project Management Office D 30-APR-07
Materials and Corrosion Cont 02-AUG-11
Materials and Corrosion Cont 23-AUG-11
Materials and Corrosion Cont 01-NOV-11
Instrumentation 19-AUG-08
Materials and Corrosion Cont 12-JAN-09
Process Control 02-OCT-10
Inspection Engineering 14-JUN-09
Inspection Engineering 01-JUL-08
Inspection Engineering 01-JUL-08
Inspection Engineering 26-APR-09
Non-Destructive Testing 21-AUG-11
Inspection Engineering 02-AUG-09
Inspection Engineering 02-AUG-09
Inspection Engineering 15-MAR-10
Standards Coordination 15-OCT-08
Project Management Office D 19-JUN-11
Safety and Security 16-SEP-08
Paints and Coatings 04-SEP-11
Project Management Office D 06-FEB-11
Standards Coordination 15-OCT-08
Environmental 03-MAR-09
Consulting Services Dept. 04-JAN-06
Standards Coordination 04-MAR-09
Process Control 09-OCT-10
Facilities Planning Dept. 15-NOV-11
Electrical Substations Equip 31-MAY-11
Project Management Office D 13-FEB-11
Training and Development 27-AUG-11
Process and Control Systems 15-MAY-10
Process Control 15-MAY-10
Process Control 24-OCT-09
Process Control 24-OCT-09
Process Control 18-JAN-12
Process Control 16-SEP-09
Process Control 16-SEP-09
Process Control 16-SEP-09
Process Control 16-SEP-09
Process Control 16-SEP-09
Process Control 16-SEP-09
Process Control 14-SEP-09
Process Control 31-JUL-11
Process and Control Systems 12-JUL-10
Environmental 31-DEC-08
Materials and Corrosion Cont 23-AUG-11
Process and Control Systems 07-JUL-09
Process and Control Systems 12-OCT-10
Technical Information Center 12-APR-10
Custody Measurement 28-APR-09
Custody Measurement 22-MAY-11
Project Management Office D 15-AUG-06
Process Control 24-OCT-09
Project Management Office D 22-APR-07
Process and Control Systems 19-JUL-09
Custody Measurement 07-SEP-11
Valves 24-NOV-10
Standards Coordination 16-FEB-08
Standards Coordination 04-JAN-09
Standards Coordination 04-JAN-09
Engineering Knowledge & Res 17-FEB-10
Piping 29-JUN-05
Piping 29-JUN-05
Inspection Engineering 10-APR-11
Inspection Engineering 18-JAN-11
Piping 14-MAR-12
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Project & Strategic Purchasin 19-NOV-08
Piping 13-SEP-09
Inspection Engineering 04-AUG-08
Inspection Engineering 09-JUN-10
Inspection Engineering 04-AUG-08
Inspection Engineering 13-MAY-07
Environmental 14-FEB-11
Inspection Engineering 01-JUL-08
Inspection Engineering 01-JUL-08
Inspection Engineering 01-JUL-08
Project Management Office D 27-APR-11
Project Management Office D 23-NOV-05
Project Management Office D 23-NOV-05
Project Management Office D 23-NOV-05
Cathodic Protection 25-DEC-11
Cathodic Protection 25-DEC-11
Cathodic Protection 13-DEC-11
Cathodic Protection 31-JUL-04
Heat Transfer Equipment 10-MAR-09
Environmental 11-MAY-10
Environmental 05-JUN-10
Pumps, Seals and Mixers 26-JUL-09
Materials and Corrosion Cont 23-JAN-12
Materials and Corrosion Cont 23-JUL-11
Process Control 24-OCT-09
Valves 02-DEC-10
UPS, DC Systems and Power 12-SEP-09
High Integrity Protective Sys 09-OCT-10
Materials and Corrosion Cont 11-APR-09
Materials and Corrosion Cont 12-JUL-11
Environmental 08-DEC-10
Custody Measurement 02-JAN-12
Facilities Planning Dept. 25-JUN-11
Paints and Coatings 31-MAY-05
Process and Control Systems 23-DEC-09
Process and Control Systems 01-DEC-09
Pumps, Seals and Mixers 06-SEP-11
Onshore Structures 10-MAR-09
Project Management Office D 24-APR-11
Process Control 15-JAN-11
Welding 22-OCT-11
Environmental 16-MAR-09
Environmental 17-MAY-11
Inspection Engineering 10-SEP-11
Inspection Engineering 06-SEP-11
Inspection Engineering 06-SEP-11
Inspection Engineering 06-SEP-11
Inspection Engineering 28-NOV-11
Inspection Engineering 06-SEP-11
Inspection Engineering 10-APR-11
Inspection Engineering 28-JAN-12
Environmental 28-JAN-12
Process and Control Systems 30-NOV-11
Process and Control Systems 30-NOV-11
Custody Measurement 15-MAR-10
Flow Assurance 13-JUN-10
Flow Assurance 26-JUN-10
Communications 06-SEP-11
Communications 15-MAY-10
Communications 06-SEP-11
Communications 01-JUN-08
Process Control 25-MAR-12
Communications 06-NOV-10
Inspection Engineering 30-JAN-11
Standards Coordination 21-MAR-10
Materials and Corrosion Cont 27-SEP-11
Equipment Specific P&ID Te 06-APR-08
Project Management Office D 30-APR-07
Environmental 10-MAR-10
Environmental 06-SEP-11
Environmental 28-DEC-11
Environmental 19-APR-10
Onshore Structures 28-SEP-08
Environmental 20-NOV-07
Environmental 07-DEC-11
Onshore Structures 11-MAY-09
Onshore Structures 23-FEB-10
Environmental 20-NOV-07
Engineering Knowledge & Res 09-JUN-10
Onshore Structures 28-APR-09
Materials and Corrosion Cont 10-MAR-12
Materials and Corrosion Cont 30-APR-11
Process and Control Systems 18-FEB-08
Materials and Corrosion Cont 17-NOV-08
Environmental 12-APR-11
Terminal Dept. 12-OCT-09
Industrial Drainage 23-JAN-11
Industrial Drainage 15-MAY-11
Industrial Drainage 30-JUN-10
Loss Prevention 14-JUN-11
Loss Prevention 20-NOV-11
Loss Prevention 15-APR-09
Loss Prevention 15-MAR-06
Loss Prevention 29-FEB-04
Loss Prevention 15-MAR-06
Loss Prevention 17-MAY-11
Loss Prevention 14-MAY-11
Loss Prevention 20-SEP-08
Loss Prevention 29-AUG-10
Loss Prevention 25-MAR-12
Loss Prevention 29-AUG-10
Loss Prevention 29-AUG-10
Loss Prevention 23-JAN-12
Loss Prevention 22-JUN-08
Loss Prevention 23-JUL-09
Loss Prevention 29-AUG-10
Loss Prevention 11-MAY-11
Loss Prevention 17-FEB-10
Loss Prevention 28-APR-09
Loss Prevention 23-JAN-12
Loss Prevention 06-FEB-12
Trays and Packing Process D 14-NOV-09
Vessels 13-DEC-11
Vessels 17-MAY-11
Vessels 29-JAN-11
Vessels 27-SEP-11
Vessels 29-JAN-11
Vessels 13-DEC-11
Vessels 13-DEC-11
Environmental 12-APR-10
Heat Transfer Equipment 30-MAR-05
Heat Transfer Equipment 18-MAY-09
Heat Transfer Equipment 31-MAY-05
Heat Transfer Equipment 18-MAY-09
Heat Transfer Equipment 18-MAY-09
Heat Transfer Equipment 08-NOV-06
Heat Transfer Equipment 29-JUN-10
Flare Systems Design 10-JUL-11
Pumps, Seals and Mixers 28-JUL-09
Pumps, Seals and Mixers 30-NOV-08
Pumps, Seals and Mixers 13-OCT-08
Pumps, Seals and Mixers 11-OCT-09
Lubrication Systems and Lubr 28-JUL-09
Lubrication Systems and Lubr 17-MAR-09
Paints and Coatings 10-APR-11
Paints and Coatings 08-MAY-11
Paints and Coatings 13-DEC-11
Paints and Coatings 12-OCT-05
Paints and Coatings 07-JUL-10
Paints and Coatings 19-APR-09
Paints and Coatings 11-AUG-07
Paints and Coatings 24-OCT-11
Paints and Coatings 16-NOV-11
Paints and Coatings 25-OCT-11
Electric Submersible Pump 26-APR-11
Electric Submersible Pump 26-APR-11
Instrumentation 10-DEC-11
Instrumentation 08-JAN-12
Instrumentation 25-MAR-12
Instrumentation 10-DEC-11
Instrumentation 27-FEB-12
Instrumentation 22-JAN-12
Instrumentation 08-OCT-08
Instrumentation 25-DEC-11
Instrumentation 10-OCT-11
Instrumentation 04-MAY-11
Instrumentation 17-JAN-12
Instrumentation 26-JAN-09
Instrumentation 22-SEP-10
Instrumentation 08-FEB-09
Instrumentation 29-FEB-12
Instrumentation 28-JUN-10
Instrumentation 15-OCT-11
Instrumentation 06-SEP-08
Instrumentation 04-MAR-12
Instrumentation 06-SEP-11
Instrumentation 26-DEC-10
Instrumentation 29-JUN-09
Instrumentation 06-SEP-11
Instrumentation 26-JAN-10
Instrumentation 22-SEP-10
Instrumentation 31-MAY-11
HVAC 10-MAR-12
HVAC 31-MAY-04
HVAC 19-DEC-10
HVAC 27-MAR-12
HVAC 31-MAY-04
HVAC 13-DEC-11
Compressors, Gears and Ste 15-JUN-11
Gas Turbines and Diesel Eng 21-NOV-09
Compressors, Gears and Ste 13-NOV-10
Compressors, Gears and Ste 11-AUG-09
Compressors, Gears and Ste 21-NOV-09
Compressors, Gears and Ste 19-DEC-10
Gas Turbines and Diesel Eng 18-FEB-08
Gas Turbines and Diesel Eng 19-DEC-09
Pumps, Seals and Mixers 09-JUN-10
Piping 20-FEB-12
Materials and Corrosion Cont 05-MAR-11
Valves 18-FEB-12
Piping 22-AUG-11
Valves 11-OCT-10
Piping 28-APR-09
Piping 05-JAN-11
Piping 29-JUN-10
Piping 22-FEB-12
Materials and Corrosion Cont 23-JUL-11
Materials and Corrosion Cont 10-MAY-11
Materials and Corrosion Cont 23-JAN-12
Materials and Corrosion Cont 19-DEC-11
Piping 16-MAR-11
Piping 25-APR-10
Piping 29-APR-07
Piping 22-APR-09
Piping 05-JUN-10
Piping 02-NOV-08
Onshore Structures 27-SEP-09
Piping 31-DEC-11
Piping 06-MAY-09
Piping 08-FEB-09
Piping 21-MAR-10
Piping 10-FEB-09
Piping 16-MAY-07
Offshore Structures 23-MAY-11
Onshore Structures 19-DEC-10
Offshore Structures 11-MAY-11
Civil 04-JUL-10
Onshore Structures 19-OCT-05
Onshore Structures 06-SEP-11
Heat Transfer Equipment 06-SEP-08
Onshore Structures 07-OCT-08
Heat Transfer Equipment 30-JAN-07
Heat Transfer Equipment 30-JAN-07
Heat Transfer Equipment 30-JAN-07
Heat Transfer Equipment 30-JAN-07
Heat Transfer Equipment 30-JAN-07
Safety and Security 10-MAR-12
Safety and Security 10-MAR-12
Safety and Security 10-MAR-12
Safety and Security 10-MAR-12
Safety and Security 10-MAR-12
Safety and Security 10-MAR-12
Safety and Security 10-MAR-12
Safety and Security 10-MAR-12
Safety and Security 10-MAR-12
Safety and Security 10-MAR-12
Safety and Security 10-MAR-12
Safety and Security 10-MAR-12
Electrical Systems Designs 01-MAR-11
Electrical Substations Equip 16-SEP-08
UPS, DC Systems and Power 20-OCT-08
Electrical Systems Designs 08-AUG-10
Electrical Systems Designs 19-OCT-08
Electrical Systems Designs 02-MAR-11
Motors and Generators 21-NOV-09
Electrical Systems Designs 19-OCT-08
Electrical Substations Equip 05-OCT-09
Electrical Substations Equip 05-OCT-09
Electrical Substations Equip 22-SEP-08
Electrical Systems Designs 02-MAR-11
Electrical Systems Designs 25-JAN-11
Civil 15-MAY-10
Offshore Structures 05-JUL-10
Onshore Structures 28-JUN-09
Civil 23-FEB-11
Onshore Structures 04-APR-09
Onshore Structures 28-SEP-08
Civil 22-AUG-09
Civil 22-AUG-09
Civil 11-JUL-06
Architectural Engineering 02-JUN-09
Architectural Engineering 02-JUN-09
Architectural Engineering 02-JUN-09
Architectural Engineering 02-JUN-09
Environmental 01-AUG-09
Plumbing and Utilities 21-NOV-09
Plumbing and Utilities 13-MAR-11
Civil 16-MAR-11
Plumbing and Utilities 10-MAR-12
Plumbing and Utilities 27-JAN-07
Plumbing and Utilities 28-JAN-04
Plumbing and Utilities 09-FEB-11
Communications 23-MAR-10
Communications 09-JUN-10
Communications 03-NOV-09
Communications 05-JUN-11
Communications 08-JUN-11
Communications 12-JUN-11
Communications 08-MAR-09
Communications 13-DEC-11
Communications 20-MAR-10
Communications 25-MAR-09
Communications 05-JUN-11
Communications 30-NOV-11
Communications 12-JUN-10
Communications 13-APR-11
Communications 13-JUN-10
Communications 03-NOV-09
Communications 02-JUN-09
Communications 10-OCT-11
Communications 11-MAY-09
Communications 04-MAY-09
Communications 06-SEP-09
Communications 07-JUN-11
Communications 21-FEB-11
Communications 10-SEP-11
Communications 27-JAN-09
Communications 18-JAN-09
Communications 04-JAN-09
Communications 15-JUN-10
Communications 12-JUN-11
Communications 12-JUN-11
Communications 07-JUN-11
Communications 15-JAN-11
Communications 08-JUN-11
Communications 16-JUN-10
Communications 12-JUN-11
Communications 31-JAN-10
Communications 14-FEB-09
Communications 20-MAY-09
Communications 10-MAR-09
Welding 04-OCT-09
Welding 04-OCT-09
Welding 05-OCT-09
Welding 15-DEC-09
Welding 13-DEC-11
Welding 13-DEC-11
Welding 04-OCT-09
Welding 13-DEC-11
Welding 10-OCT-11
Cathodic Protection 02-SEP-09
Cathodic Protection 13-DEC-11
Cathodic Protection 02-SEP-09
Cathodic Protection 02-SEP-09
Cathodic Protection 07-OCT-09
Cathodic Protection 02-SEP-09
Custody Measurement 18-JAN-12
Custody Measurement 31-MAY-11
Custody Measurement 02-MAY-09
Custody Measurement 06-SEP-11
Custody Measurement 02-MAY-09
Process Control 24-OCT-09
Process Control 25-OCT-10
Process Control 23-JAN-12
Process Control 24-OCT-09
Process Control 25-OCT-10
Process Control 10-SEP-11
Process Control 24-OCT-09

You might also like