➢ C9 ➢ C13 ➢ C17 Notes: o C9 - was repaired/poured last Feb 5, 2021 at 8 in the evening o C13 - was repaired/poured last Feb 6, 2021 at 10 in the morning o C17 – not yet poured, done replacing rebars Date Extracted: Feb 5, 2021 ➢ C5 • Bundle, 2-20mm diameter Notes: o C5 - not yet poured, done replacing rebars