To,
M/s. BIRLA INSTITITUTE OF TECHNOLOGY AND SCIENCE
PILANI
Dear Sir,
Please find enclosed Proforma Invoice of 3rd RA Bill for the above Project. We shall be grateful
for an early payment.
Thanking you,
Yours faithfully
For K N K Nexgen Construction Pvt Ltd
(Ashish Krishnaswamy-Director)
KNK NEXGEN
CONSTRUCTION PVT LTD
Building Trust
TIN No : 30331205330
PAN No : AACCK8057G
Sl. No Description Upto Previous Bill Present Bill Amount Cumulative till date
C Deductions:
Net Amount Payable Against This RA Bill [B-C] #REF! #REF! #REF!
Authorised Signatory
Additional Tax of 0.5% of 40% (Krishi Kalyan Cess) - After Jun'16 0 #REF! #REF! #REF! #REF! #REF!
Cft
767.12
BITS PILANI KK BIRLA GOA CAMPUS - EXPANSION PROJECT
DETAILED MEASUREMENT SHEET FOR BH 09
Sl. BOQ
Description of Work UOM Nos L B D Qty Total Qty
No No
1 1.03 Excavation of Soil & Soft Rock 0.00
0.00
Footing F3 - Grid E52 Cum 1 1 1.600 1.600 0.220 0.56
Footing F2 - Grid G1A Cum 1 1 2.000 1.800 0.200 0.72
Footing F2 - Grid G2 Cum 1 1 2.000 1.800 0.200 0.72
Footing F2 - Grid G3 Cum 1 1 2.000 1.800 0.307 1.11
Footing F1 - Grid H1A Cum 1 1 1.700 1.600 0.264 0.72
Footing F2 - Grid H2 Cum 1 1 2.000 1.800 0.264 0.95
Footing F1 - Grid H4 Cum 1 1 1.700 1.600 0.370 1.01
Footing F1 - Grid H5 Cum 1 1 1.700 1.600 0.100 0.27
Footing F1 - Grid J55 Cum 1 1 1.700 1.600 0.152 0.41
Footing F1 - Grid J2 Cum 1 1 1.600 1.275 0.264 0.54
Footing F2 - Grid J4 Cum 1 1 2.000 1.800 0.370 1.33
Footing F2 - Grid J5 Cum 1 1 2.000 1.800 0.370 1.33
Footing F3 - Grid Y53 Cum 1 1 1.600 1.600 0.275 0.70
Footing F3 - Grid Y55 Cum 1 1 1.600 1.600 0.068 0.17
Footing F3 - Grid X51 Cum 1 1 1.600 1.600 0.145 0.37
Footing F4 - Grid X53 Cum 1 1 1.800 1.600 0.118 0.34
Footing F1 - Grid W55 Cum 1 1 1.700 1.600 0.108 0.29
Footing F3 - Grid K2 Cum 1 1 1.600 1.600 0.110 0.28
Deduction for Overlap Cum -1 1 1.130 0.358 0.110 -0.04
Footing F2 - Grid K4 Cum 1 1 2.000 1.800 0.252 0.91
Footing F2 - Grid K5 Cum 1 1 2.000 1.800 0.252 0.91
Footing F2 - Grid K6 Cum 1 1 2.000 1.800 0.073 0.26
Footing F2 - Grid K7 Cum 1 1 2.000 1.800 0.085 0.31
Footing F3 - Grid K8 Cum 1 1 1.600 1.600 0.085 0.22
Footing F3 - Grid K9 Cum 1 1 1.600 1.600 0.100 0.26
Footing F2 - Grid K10 Cum 1 1 2.000 1.800 0.108 0.39
Footing F2 - Grid K11 Cum 1 1 2.000 1.800 0.108 0.39
Footing F3 - Grid K13 Cum 1 1 1.600 1.600 0.282 0.72
Deduction for Overlap Cum -1 1 1.130 0.360 0.282 -0.11
Footing F1 - Grid W56 Cum 1 1 1.700 1.600 0.282 0.77
Footing F4 - Grid X58 Cum 1 1 1.800 1.600 0.183 0.53
Footing F3 - Grid X59 Cum 1 1 1.600 1.600 0.183 0.47
Footing F3 - Grid Y56 Cum 1 1 1.600 1.600 0.282 0.72
Footing F3 - Grid Y58 Cum 1 1 1.600 1.600 0.182 0.47
Footing F2 - Grid J6 Cum 1 1 2.000 1.800 0.073 0.26
Footing F2 - Grid J7 Cum 1 1 2.000 1.800 0.085 0.31
Footing F1 - Grid J8 Cum 1 1 1.700 1.600 0.085 0.23
Footing F1 - Grid J9 Cum 1 1 1.700 1.600 0.100 0.27
Footing F2 - Grid J10 Cum 1 1 2.000 1.800 0.108 0.39
Footing F2 - Grid J11 Cum 1 1 2.000 1.800 0.108 0.39
Footing F3 - Grid J13 Cum 1 1 1.600 1.600 0.282 0.72
Footing F1 - Grid J56 Cum 1 1 1.700 1.600 0.282 0.77
Deduction for Overlap Cum -1 1 1.600 0.435 0.282 -0.20
Footing F3 - Grid U51 Cum 1 1 1.600 1.600 0.045 0.12
Footing F2 - Grid U54 Cum 1 1 2.000 1.800 0.045 0.16
Footing F2 - Grid U57 Cum 1 1 2.000 1.800 0.282 1.02
Footing F3 - Grid U59 Cum 1 1 1.600 1.600 0.282 0.72
Footing F3 - Grid H1 Cum 1 1 1.600 1.600 0.045 0.12
Deduction for Overlap Cum -1 1 1.390 0.535 0.045 -0.03
Footing F1 - Grid H3 Cum 1 1 1.700 1.600 0.175 0.48
Footing F2 - Grid H6 Cum 1 1 2.000 1.800 0.073 0.26
385.79
C. Backfilling - Inside PB 0.00
(5.7 x 2.8m) Cum 1 22 5.70 2.80 0.15 52.67
(D - E / 51 - 55) - Typ. Cum 1 2 4.50 3.20 0.15 4.32
(F - G / 6 - 7) Cum 1 1 3.20 2.80 0.15 1.34
(U / 1 - 7) Corridor Cum 1 1 27.50 1.50 0.15 6.19
(T / 1 - 6) Corridor Cum 1 1 21.80 1.50 0.15 4.91
(C - H / 2) Corridor (Typ.) Cum 1 1 20.90 1.50 0.15 4.70
74.13
0.00
This Bill Qty Cum 766.46
4 1.06 Soling Works - 200 mm tk 0.00
0.00
(5.7 x 2.8m) Sqm 1 22 5.70 2.80 351.12
(D - E / 51 - 55) - Typ. Sqm 1 2 4.50 3.20 28.80
(F - G / 6 - 7) Sqm 1 1 3.20 2.80 8.96
(U / 1 - 7) Corridor Sqm 1 1 27.50 1.50 41.25
(T / 1 - 6) Corridor Sqm 1 1 21.80 1.50 32.70
(C - H / 2) Corridor (Typ.) Sqm 1 1 20.90 1.50 31.35
0.00
For Flooring
(5.7 x 2.8m) Cum 1 22 5.70 2.80 0.10 35.11
(D - E / 51 - 55) - Typ. Cum 1 2 4.50 3.20 0.10 2.88
(F - G / 6 - 7) Cum 1 1 3.20 2.80 0.10 0.90
(U / 1 - 7) Corridor Cum 1 1 27.50 1.50 0.10 4.13
(T / 1 - 6) Corridor Cum 1 1 21.80 1.50 0.10 3.27
(C - H / 2) Corridor (Typ.) Cum 1 1 20.90 1.50 0.10 3.14
0.00
0.00
This Bill Qty Cum 92.17
7 2.03 Latrite Masonry 0.00
0.00
Upto Footing Top Lvl
X-51 Cum 1 2 0.300 0.230 0.350 0.05
U-51 Cum 1 2 0.300 0.230 0.350 0.05
Q-51 Cum 1 2 0.300 0.230 0.350 0.05
T-51 Cum 1 2 0.300 0.230 0.350 0.05
C-52 Cum 1 2 0.300 0.230 0.350 0.05
Y-53 Cum 1 2 0.300 0.230 0.350 0.05
X-53 Cum 1 2 0.300 0.230 0.350 0.05
P-53 Cum 1 2 0.300 0.230 0.350 0.05
Q-53 Cum 1 2 0.300 0.230 0.350 0.05
E Cum 1 2 0.300 0.230 0.350 0.05
D Cum 1 2 0.300 0.230 0.350 0.05
H-1 Cum 1 2 0.300 0.230 0.350 0.05
G-1 Cum 1 2 0.300 0.230 0.450 0.06
E-1 Cum 1 2 0.300 0.230 0.350 0.05
D-1 Cum 1 2 0.300 0.230 0.350 0.05
C-1 Cum 1 2 0.300 0.230 0.350 0.05
U-54 Cum 1 2 0.300 0.230 0.450 0.06
Y-55 Cum 1 2 0.300 0.230 0.350 0.05
NGL to PB Bottom
U/54 - H/1 Cum 1 1 1.100 0.230 0.170 0.04
E/1 - E Cum 1 1 1.300 0.230 0.201 0.06
E-D Cum 1 1 2.800 0.230 0.181 0.12
D - D/1 Cum 1 1 1.500 0.230 0.162 0.06
D/1 TO C/1 Cum 1 1 5.300 0.230 0.185 0.22
C/1 TO C/52 Cum 1 1 1.600 0.230 0.207 0.08
C/52 - T/51 Cum 1 1 1.700 0.230 0.207 0.08
T/51 - Q/51 Cum 1 1 3.800 0.230 0.193 0.17
Q/51 - Q/53 Cum 1 1 1.700 0.230 0.179 0.07
Q/53 - P/53 Cum 1 1 1.900 0.230 0.179 0.08
P/53 - P/55 Cum 1 1 3.800 0.230 0.179 0.16
P/55 - R/55 Cum 1 1 2.300 0.230 0.193 0.10
R/55 - B/55 Cum 1 1 2.950 0.230 0.207 0.14
B/55 - B/2 Cum 1 1 0.900 0.230 0.193 0.04
B/2 - A/2 Cum 1 1 2.350 0.230 0.423 0.23
A/2 - A/4 Cum 1 1 5.375 0.230 0.694 0.86
A/4 - A/5 Cum 1 1 5.450 0.230 0.830 1.04
A/5 - A/6 Cum 1 1 5.324 0.230 0.906 1.11
A/6 - B/6 Cum 1 1 2.800 0.230 0.906 0.58
B/6 - B/7 Cum 1 1 5.700 0.230 0.906 1.19
B/7 - A/7 Cum 1 1 2.550 0.230 0.906 0.53
B/7 - B/7a Cum 1 1 2.550 0.230 0.906 0.53
B/7a - A/7a Cum 1 1 2.600 0.230 0.906 0.54
Y/55 - W/55 Cum 1 1 2.300 0.230 0.202 0.11
W/55 - J/55 Cum 1 1 2.950 0.230 0.216 0.15
J/55 - J/2 Cum 1 1 0.900 0.230 0.232 0.05
J/2 - K/2 Cum 1 1 2.600 0.230 0.163 0.10
K/2 - K/4 Cum 1 1 5.375 0.230 0.168 0.21
K/4 - K/5 Cum 1 1 5.450 0.230 0.483 0.61
K/5 - K/6 Cum 1 1 5.450 0.230 0.783 0.98
K/6 - K/7 Cum 1 1 5.450 0.230 0.912 1.14
K/7 - K/8 Cum 1 1 5.375 0.230 0.499 0.62
K/8 - J/8 Cum 1 1 2.600 0.230 0.594 0.36
J/8 - J/9 Cum 1 1 2.800 0.230 0.589 0.38
J/9 - K/9 Cum 1 1 2.600 0.230 0.618 0.37
K/9 - K/10 Cum 1 1 5.375 0.230 0.670 0.83
K/10 - K/11 Cum 1 1 5.450 0.230 0.791 0.99
K/11 - K/13 Cum 1 1 5.375 0.230 0.961 1.19
K/13 - W/56 Cum 1 1 2.400 0.230 1.047 0.58
W/56 - Y-56 Cum 1 1 0.900 0.230 1.047 0.22
Y/56 - Y/58 Cum 1 1 3.800 0.230 1.116 0.98
Y/58 - X/58 Cum 1 1 1.850 0.230 1.185 0.50
X/58 - X/59 Cum 1 1 1.700 0.230 1.185 0.46
X/59 - U/59 Cum 1 1 3.800 0.230 1.052 0.92
U/59 - U/57 Cum 1 1 3.050 0.230 0.919 0.64
U/57 - H/14 Cum 1 1 1.300 0.230 0.919 0.27
0.00
Remarks
DRAWING REF:-
NUMBER NUMBER WEIGHT (KG)
TOTAL CUTTING
Sl. No DESCRIPTION DIA SHAPE PER OF LENGTH IN M
NOS
MEMBER MEMBER 8mm 10mm 12mm 16mm 20mm 25mm 32mm
1 Footing (F1) - - - - - - -
Longer Bar 10 - 0 - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
1 C20 - - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
Page 62 of 206
Hard Rock Excavation Paid PCC Paid Footing
Sl. No Grid No Footing Column NGL PCC Top Lvl
Top Lvl Bottom Lvl Ex. Lvl Lvl Depth
70 Grid G13a F2 C1 69.241 69.123 68.261 68.361 68.341 68.441 0.45
71 Grid G14 F3 C4 69.241 69.123 68.201 68.301 68.341 68.441 0.35
72 Grid G58a F3 C3 69.241 69.123 68.072 68.172 68.341 68.441 0.35
73 Grid G5a F3 C4 69.792 69.724 68.8 68.9 68.892 68.992 0.35
74 Grid F6a F2 C1 69.792 69.724 68.713 68.813 68.892 68.992 0.45
75 Grid F6B F2 C1 69.792 69.724 68.681 68.781 68.892 68.992 0.45
76 Grid F7a F3 C4 69.792 69.724 68.627 68.727 68.892 68.992 0.35
77 Grid F7a' F3 C3 69.792 69.724 68.54 68.64 68.892 68.992 0.35
78 Grid F12 F3 C4 69.241 69.123 68.383 68.483 68.383 68.483 0.35
79 Grid F13 F1 C1 69.241 69.123 68.352 68.452 68.352 68.452 0.35
80 Grid F13a F2 C1 69.241 69.123 68.328 68.428 68.341 68.441 0.45
81 Grid F14 F3 C4 69.241 69.123 68.259 68.359 68.341 68.441 0.35
82 Grid F58' F3 C3 69.241 69.123 68.181 68.281 68.341 68.441 0.35
83 Grid E1 F3 C4 70.479 70.225 69.564 69.664 69.579 69.679 0.35
84 Grid E1a F2 C1 70.479 70.225 69.57 69.67 69.579 69.679 0.45
85 Grid E2 F2 C1 70.479 70.225 69.518 69.618 69.579 69.679 0.45
86 Grid E3 F3 C4 70.479 70.225 69.326 69.426 69.579 69.679 0.35
87 Grid D51a F3 C3 70.518 70.299 69.713 69.813 69.713 69.813 0.35
88 Grid D1 F3 C4 70.518 70.299 69.701 69.801 69.701 69.801 0.35
89 Grid D1a F2 C1 70.518 70.299 69.559 69.659 69.618 69.718 0.45
90 Grid D2 F2 C1 70.518 70.299 69.412 69.512 69.618 69.718 0.45
91 Grid D3 F3 C4 70.518 70.299 69.217 69.317 69.618 69.718 0.35
92 Grid D5a F2 C1 69.811 69.675 68.822 68.922 68.911 69.011 0.45
93 Grid D6a F2 C2 69.811 69.675 68.769 68.869 68.911 69.011 0.45
94 Grid D6b F2 C2 69.811 69.675 68.751 68.851 68.911 69.011 0.45
95 Grid D7a F2 C1 69.811 69.675 68.676 68.776 68.911 69.011 0.45
96 Grid D12 F2 C1 69.414 69.278 68.353 68.453 68.514 68.614 0.45
97 Grid D13 F2 C2 69.414 69.278 68.329 68.429 68.514 68.614 0.45
98 Grid D13a F2 C2 69.414 69.278 68.323 68.423 68.514 68.614 0.45
99 Grid D14 F2 C1 69.414 69.278 68.208 68.308 68.514 68.614 0.45
100 Grid C1-8 F1 C1 69.672 69.597 68.69 68.79 68.772 68.872 0.35
101 Grid C1-9 F2 C1 69.672 69.587 68.623 68.723 68.772 68.872 0.45
102 Grid C1-10 F1 C1 69.624 69.587 68.557 68.657 68.724 68.824 0.35
103 Grid C52 F3 C3 70.473 70.138 69.46 69.56 69.460 69.560 0.35
104 Grid C1 F3 C4 70.473 70.138 69.519 69.619 69.519 69.619 0.35
105 Grid C1a F1 C1 70.473 70.348 69.408 69.508 69.573 69.673 0.35
106 Grid C2 F2 C1 70.473 70.348 69.378 69.478 69.573 69.673 0.45
107 Grid C3 F1 C1 70.473 70.348 69.169 69.269 69.573 69.673 0.35
108 Grid C4 F1 C1 70.042 69.938 69.003 69.103 69.142 69.242 0.35
109 Grid C5 F1 C1 69.93 69.829 68.899 68.999 69.030 69.130 0.35
110 Grid C5a F3 C4 69.774 69.701 68.838 68.938 68.874 68.974 0.35
111 Grid C6a F1 C1 69.774 69.654 68.771 68.871 68.874 68.974 0.35
112 Grid C6b F1 C1 69.774 69.654 68.682 68.782 68.874 68.974 0.35
113 Grid C7a F3 C4 69.774 69.574 68.787 68.887 68.874 68.974 0.35
114 Grid C8 F1 C1 69.672 69.447 68.672 68.772 68.772 68.872 0.35
115 Grid C9 F2 C1 69.672 69.477 68.653 68.753 68.772 68.872 0.45
116 Grid C10 F2 C1 69.672 69.474 68.571 68.671 68.772 68.872 0.45
117 Grid C11 F1 C1 69.626 69.521 68.525 68.625 68.726 68.826 0.35
118 Grid C12 F1 C1 69.626 69.506 68.534 68.634 68.726 68.826 0.35
119 Grid C13 F2 C1 69.565 69.365 68.503 68.603 68.665 68.765 0.45
120 Grid C13a F1 C1 69.565 69.365 68.477 68.577 68.665 68.765 0.35
121 Grid C14 F3 C4 69.413 69.333 68.443 68.543 68.513 68.613 0.35
122 Grid T51 F3 C3 70.473 70.138 69.257 69.357 69.257 69.357 0.35
123 Grid T54 F1 C1 70.473 70.138 69.376 69.476 69.376 69.476 0.35
124 Grid T57 F2 C1 69.413 69.328 68.447 68.547 68.513 68.613 0.45
125 Grid T59 F3 C4 69.413 69.313 68.382 68.482 68.513 68.613 0.35
126 Grid B55 F1 C1 70.473 70.373 69.23 69.33 69.573 69.673 0.35
127 Grid B2 F1 C1 70.473 70.348 69.238 69.338 69.573 69.673 0.35
128 Grid B4 F2 C2 70.042 69.947 69.002 69.102 69.142 69.242 0.45
129 Grid B5 F2 C2 69.93 69.829 68.914 69.014 69.030 69.130 0.45
130 Grid B6 F2 C1 69.774 69.702 68.836 68.936 68.874 68.974 0.45
131 Grid B7 F1 C1 69.774 69.704 68.82 68.92 68.874 68.974 0.35
132 Grid B7a F1 C1 69.774 69.699 68.759 68.859 68.874 68.974 0.35
133 Grid B9 F1 C1 69.672 69.522 68.727 68.827 68.772 68.872 0.35
134 Grid B10 F2 C2 69.624 69.524 68.604 68.704 68.724 68.824 0.45
135 Grid B11 F2 C1 69.626 69.506 68.535 68.635 68.726 68.826 0.45
136 Grid B13 F3 C4 69.565 69.465 68.472 68.572 68.665 68.765 0.35
137 Grid B56 F1 C1 69.565 69.465 68.472 68.572 68.665 68.765 0.35
138 Grid A2 F3 C4 70.501 70.401 69.377 69.477 69.377 69.477 0.35
139 Grid A4 F2 C1 70.042 69.964 68.998 69.098 69.142 69.242 0.45
Page 63 of 206
Hard Rock Excavation Paid PCC Paid Footing
Sl. No Grid No Footing Column NGL PCC Top Lvl
Top Lvl Bottom Lvl Ex. Lvl Lvl Depth
140 Grid A5 F2 C1 69.93 69.829 68.925 69.025 69.030 69.130 0.45
141 Grid A6 F1 C1 69.774 69.702 68.806 68.906 68.874 68.974 0.35
142 Grid A7 F1 C1 69.774 69.024 68.791 68.891 68.874 68.974 0.35
143 Grid A7a F3 C3 69.774 69.024 68.728 68.828 68.874 68.974 0.35
144 Grid A9 F2 C1 69.672 69.522 68.722 68.822 68.772 68.872 0.45
145 Grid A10 F2 C1 69.624 69.497 68.633 68.733 68.724 68.824 0.45
146 Grid A11 F2 C1 69.626 69.526 68.542 68.642 68.726 68.826 0.45
147 Grid A13 F3 C4 69.565 69.44 68.501 68.601 68.665 68.765 0.35
148 Grid R55 F1 C1 70.501 70.401 69.391 69.491 69.391 69.491 0.35
149 Grid R56 F1 C1 69.774 69.674 68.467 68.567 68.874 68.974 0.35
150 Grid Q51 F3 C3 70.501 70.166 69.298 69.398 69.298 69.398 0.35
151 Grid Q53 F4 C5 70.501 70.166 69.299 69.399 69.299 69.399 0.35
152 Grid Q58 F4 C5 69.413 69.313 68.442 68.542 68.513 68.613 0.35
153 Grid Q59 F3 C3 69.413 69.313 68.363 68.463 68.513 68.613 0.35
154 Grid P53 F3 C3 70.501 70.166 69.202 69.302 69.202 69.302 0.35
155 Grid P55 F3 C3 70.501 70.4 69.383 69.483 69.383 69.483 0.35
156 Grid P56 F3 C3 69.565 69.465 68.468 68.568 68.665 68.765 0.35
157 Grid P58 F3 C3 69.413 69.313 68.399 68.499 68.513 68.613 0.35
Page 64 of 206
BOQ
AS PER BOQ
Sl. No. ITEM DESCRIPTION
UNIT RATE Qty AMOUNT
General Excavation by mechanical means in all types of soil including dense soil, disintegrated/ weathered/
soft rock including necessary manual excavation for dressing the edges & levelling, all leads and lifts. Rate
to include disposing the excess earth and spreading in layers to the required levels within the site wherever
1.01 specified, carting away outside the site to the designated areas identified by the local authorities, removal of
slurry generated while excavation and keeping the area free of water, excavating loose pockets and
compacting the same. Note:Authorised working space shall be considered as per IS 1200 (Provision of
slopes if required for execution shall not be paid separately).
Supply and filling in foundations and the area whereever specified with approved good quality filling
materials in plinths, area development etc. wherever specified in layers of not exceeding 150 mm thick
including breaking clods,storing,transportation ,double handling, watering, compacting each layer with
vibratory compactor and at unaccessible places with wooden/steel rammers to achieve 95% proctor density
1.05
at optimum moisture content, all leads and lifts, bailing/ pumping out of water to keep site dry while
backfilling; cost shall include conveyance of all materials, labour, machinery etc. complete as directed.The
rate to includes loading,unloading, hire and fuel charges for tools and plants and other incidental charges
etc., complete.
a With excavated earth stored and available at site Cum 264.00 7.84 2,069.76
Providing and laying in position 200mm thick soling with excavated/available laterite rock The cost
includes preparation of Base,breaking of available laterite to required size,packing with hand broken
1.06
Laterite /metal/ Rubble and smaller pebbles for void filling, moorum for binding and Mechanical vibratory
Sqm 386.00 52.27 20,176.22
compaction as directed by the Engineer-in-charge including watering,packing, compaction etc.
AS PER BOQ
Sl. No. ITEM DESCRIPTION
UNIT RATE Qty AMOUNT
Providing Anti termite treatment in accordance with stipulations laid down by IS 6313 - part II by approved
agency with min of 10 years of guarantee including the cost of chemical,precautionary measures
2.00
etc.complete along retaining walls only for a width of one meter or as specified by consultants ( agency shall
Sqm 65.00 61.26 3,981.90
be approved by consultants/project managers) Plinth area will be considered for the measurement .
Providing and laying P.C.C. 1:3:6(M 10) of specified thick wherever specified using manufactured sand ,
2.01 20mm and downsize metal including base preparation, compaction, levelling, under footings, steps, walls, Cum 6,550.00 14.32 93,796.00
platform etc. all leads and lifts, curing and shuttering if necessary etc., Complete
Providing, batching, mixing, transporting through transit mixers, pumping and laying controlled Reinforced
Cement Concrete of specified grade at all levels and heights specified below using ordinary Portland cement
of grade 53 from approved manufacturer, river sand, 20mm and down size coarse aggregates, necessary
admixtures approved by Consultants (elkem and Conplast SP 430SRV from Fosroc or equivalent), including -
all leads and lifts, pumping using line pump or boom placer, vibrating/ compaction, scaffolding wherever
necessary, curing as directed, excluding cost of shuttering and reinforcement works.
2.05.01 Columns -
M25 Grade -
Providing, fabricating and erecting form work at all levels and places wherever needed/specified as per
drawing including striking with 12mm Plastic coated, marine resistant waterproof ply/Smooth finished MS
plates with adjustable steel props of acceptable Staging and with sufficient bracing as approved by
consultant. Cost to include designing of proper form work and staging system to suit the
requirements,Submission of design calculations a nd shop drawings for approval,sealing the joints with
heavy duty brown self adhesive tape, aligning to line and levels including M.S. Ties, PVC Spacer, Providing
openings/ cutouts/ pockets, applying deshuttering chemical, Deshuttering as approved by the consultant etc.,
complete at all levels, double/tripple heights and profiles
AS PER BOQ
Sl. No. ITEM DESCRIPTION
UNIT RATE Qty AMOUNT
1) plywood shuttering shall be considered for all vertical elements,beam sides and
soffit,corewalls,stairs,ramps,tanks,RCCpedestals Etc.,
3.08 RCC Brackets/Fins/Ledges at all levels ( with Plywood) Sqm 860.00 3.83 3,293.80
Sl.
Description of Work UOM Nos L B D Qty Total Qty Remarks
No
1 Excavation Upto NGL
Main Beam
(A/1 - A/2) & (B/1 - B/2) Cum 1 2 4.427 0.380 0.100 0.34 4.567+0.23+0.23-0.45-0.45
(C/1a - C/2) Cum 1 1 6.660 0.380 0.100 0.25 6.8+0.23+0.23-0.45-0.45
(B/1 - B/1a) Cum 1 1 1.993 0.380 0.100 0.08 2.115-0.115-0.225
Cross Beam
(A/1 - B/1) & (A/2 - B/2) Cum 1 2 4.000 0.380 1.000 3.04
(B/2 - C/2) & (B/1a - C/1a) Cum 1 2 5.000 0.380 1.000 3.80
Main Beam
(A/1 - A/2) & (B/1 - B/2) Cum 1 2 4.427 0.230 0.450 0.92
(C/1a - C/2) Cum 1 1 6.660 0.230 0.450 0.69
(B/1 - B/1a) Cum 1 1 1.993 0.230 0.450 0.21
Cross Beam
(A/1 - B/1) & (A/2 - B/2) Cum 1 2 4.000 0.230 0.450 0.83
70/206
Sl.
Description of Work UOM Nos L B D Qty Total Qty Remarks
No
(B/2 - C/2) & (B/1a - C/1a) Cum 1 2 5.000 0.230 0.450 1.04
Main Beam
(A/1 - A/2) & (B/1 - B/2) Cum 1 2 4.427 0.230 0.375 0.76
(C/1a - C/2) Cum 1 1 6.660 0.230 0.375 0.57
(B/1 - B/1a) Cum 1 1 1.993 0.230 0.375 0.17
Cross Beam
(A/1 - B/1) & (A/2 - B/2) Cum 1 2 4.000 0.230 0.375 0.69
(B/2 - C/2) & (B/1a - C/1a) Cum 1 2 5.000 0.230 0.375 0.86
Main Beam
(A/1 - A/2) & (B/1 - B/2) Sqm 1 2 4.127 0.900 7.43
(C/1a - C/2) Sqm 1 1 6.360 0.900 5.72
(B/1 - B/1a) Sqm 1 1 1.775 0.900 1.60
Cross Beam
(A/1 - B/1) & (A/2 - B/2) Sqm 1 2 3.650 0.900 6.57
(B/2 - C/2) & (B/1a - C/1a) Sqm 1 2 5.000 0.900 9.00
Main Beam
71/206
Sl.
Description of Work UOM Nos L B D Qty Total Qty Remarks
No
(A/1 - A/2) & (B/1 - B/2) Sqm 1 2 4.127 1.130 9.33
(C/1a - C/2) Sqm 1 1 6.360 1.130 7.19
(B/1 - B/1a) Sqm 1 1 1.775 1.130 2.01
Cross Beam
(A/1 - B/1) & (A/2 - B/2) Sqm 1 2 3.650 1.130 8.25
(B/2 - C/2) & (B/1a - C/1a) Sqm 1 2 5.000 1.130 11.30
Main Wall
(A/1 - A/2) & (B/1 - B/2) Sqm 1 2 4.127 2.750 22.70
(C/1a - C/2) Sqm 1 1 6.360 2.750 17.49
(B/1 - B/1a) Sqm 1 1 1.775 2.750 4.88
Cross Wall
(A/1 - B/1) & (A/2 - B/2) Sqm 1 2 3.650 2.750 20.08
(B/2 - C/2) & (B/1a - C/1a) Sqm 1 2 5.000 2.750 27.50
Parapet Wall
0.23+3.65+0.23+5+0.23+6.8+0.23+
Sqm 1 1 32.277 0.600 19.37
5+0.23+2+0.23+3.65+0.23+4.567
Deductions
Door - D Sqm -1 2 1.100 2.100 -4.62
Window - W Sqm -1 2 1.200 1.200 -2.88
Window - W1 Sqm -1 2 1.600 1.200 -3.84
Window - W2 Sqm -1 1 1.400 1.200 -1.68
Main Wall
(A/1 - A/2) & (B/1 - B/2) Sqm 1 2 4.567 2.750 25.12
(C/1a - C/2) & (B21 - B/1a) Sqm 1 2 6.800 2.750 37.40
Cross Wall
(A/1 - B/1) & (A/2 - B/2) Sqm 1 2 3.650 2.750 20.08
(B/2 - C/2) & (B/1a - C/1a) Sqm 1 2 5.000 2.750 27.50
Deductions
Door - D Sqm -0.5 2 1.100 2.100 -2.31
Area of the opening is 0.5
Window - W Sqm -0.5 2 1.200 1.200 -1.44 Sqm = No Deduction, 0.5 to 3
Sqm = Half deduction, Above 3
Window - W1 Sqm -0.5 2 1.600 1.200 -1.92 Sqm = Full deduction with Jam
Quantity
Window - W2 Sqm -0.5 1 1.400 1.200 -0.84
Main Wall
(A/2 - C/2) Sqm 1 1 9.340 4.250 39.70
72/206
Sl.
Description of Work UOM Nos L B D Qty Total Qty Remarks
No
(A/2 - C/1a) Sqm 1 1 7.260 4.250 30.86
(B/1a - C/1a) Sqm 1 1 5.246 4.250 22.30
(B/1a - B/1) Sqm 1 1 2.230 4.250 9.48
(A/1 - B/1) Sqm 1 1 3.880 4.250 16.49
(A/1 - A/2) Sqm 1 1 5.027 4.250 21.36
Deductions
Main Wall
(A/1 - A/2) & (B/1 - B/2) Sqm 1 2 4.567 2.750 25.12
(C/1a - C/2) & (B21 - B/1a) Sqm 1 2 6.800 2.750 37.40
Cross Wall
(A/1 - B/1) & (A/2 - B/2) Sqm 1 2 3.650 2.750 20.08
(B/2 - C/2) & (B/1a - C/1a) Sqm 1 2 5.000 2.750 27.50
Deductions
Door - D Sqm -0.5 2 1.100 2.100 -2.31
Window - W Sqm -0.5 2 1.200 1.200 -1.44
Window - W1 Sqm -0.5 2 1.600 1.200 -1.92
Window - W2 Sqm -0.5 1 1.400 1.200 -0.84
Main Wall
(A/2 - C/2) Sqm 1 1 9.340 4.250 39.70
(A/2 - C/1a) Sqm 1 1 7.260 4.250 30.86 6.8+0.23+0.23
(B/1a - C/1a) Sqm 1 1 5.246 4.250 22.30 0.23+5+0.23
(B/1a - B/1) Sqm 1 1 2.230 4.250 9.48 2+0.23
(A/1 - B/1) Sqm 1 1 3.880 4.250 16.49 3.65+0.23
(A/1 - A/2) Sqm 1 1 5.027 4.250 21.36 4.567+0.23+0.23
Deductions
Door - D Sqm -0.5 2 1.100 2.100 -2.31
Window - W Sqm -0.5 2 1.200 1.200 -1.44
Window - W1 Sqm -0.5 2 1.600 1.200 -1.92
Window - W2 Sqm -0.5 1 1.400 1.200 -0.84
73/206
RAB 02
12
BOTTOM BAR 12 1 2 2 21.740 - - 38.610 - - - -
9.74
20 PB 23 (200 X 450) - - - - - -
-
12 4 1 2 2 4.000 - - 7.104 - - - -
12
BOTTOM BAR 12 9.74 1 2 2 21.740 - - 38.610 - - - -
12 4 1 2 2 4.000 - - 7.104 - - - -
12 4 1 12 12 4.000 - - 42.624 - - - -
52 PB 75, 77, 81 - - - - - -
-
12
BOTTOM BAR 12 9.74 1 2 2 21.740 - - 38.610 - - - -
11
TOP BAR 12 0.225 10.74 0.225 1 2 2 22.154 - - 39.346 - - - -
85 PB 97 - GRID (T57) - - - - - -
-
91 PB 103 - GRID (F - G) - - - - - -
-
- - - - - -
0.147 -
- - - - - -
0.147 -
5 B10 & 11(200 X 450) - GRID (G/1 - G1/a & G/2 - G/3) - - - - - -
-
B50 (200 X 300) (GRID A/4 - B/4, A/5 - B/5, A/9 - B/9,
54 A/10 - B/10, A/11 - B/11, J/4 - K/4, J/5 - K/5, J/6 - - - - - - -
K/6, J/7 - K/7, J/10 - K/10, J/11 - K/11)
-
56 B58, B/61 (200 X 300) (GRID C/8 - C1/8, H/8 - G1/8 & - - - - - -
H - G1)
-
ROOF BEAM -
1 SPACER - - - - - - -
12 0.17
1 286 286 0.170 - - 43 - - - -
SLAB - CHAIRS 12 0.078 0.5 0.35
2 1 196 196 1.356 - - 236 - - - -
8 0.053 0.4 0.3
1 335 335 1.106 146 - - - - - -
- - - - - -
0.147 -
- - - - - -
0.147 -
23.760
BOTTOM BAR (DISTRIBUTOR) 8 2 15 30 23.760 281.556 - - - - -
0.400
LAP 8 2 30 60 0.400 9.480 - - - - -
1.980
8 2 130 260 1.980 203.346 - - - - -
3.900
8 2 45 90 3.900 138.645 - - - - -
1.575
8 2 132 264 1.575 164.241 - - - - -
2.800
TOP BAR (DISTRIBUTOR) 8 2 76 152 2.800 168.112 - - - - -
5.700
8 2 48 96 5.700 216.144 - - - - -
24.160
CHAJJA - DISTRIBUTOR 8 2 6 12 24.160 114.518 - - - - -
0.400
8 2 12 24 0.400 3.792 - - - - -
21.260
BOTTOM BAR (DISTRIBUTOR) 8 1 15 15 21.260 125.966 - - - - -
0.400
LAP 8 1 30 30 0.400 4.740 - - - - -
2.850
8 1 15 15 2.850 16.886 - - - - -
2.975
8 1 15 15 2.975 17.627 - - - - -
3.075
8 1 15 15 3.075 18.219 - - - - -
2.525
8 1 15 15 2.525 14.961 - - - - -
1.525
8 1 104 104 1.525 62.647 - - - - -
2.800
TOP BAR (DISTRIBUTOR) 8 1 76 76 2.800 84.056 - - - - -
5.700
8 1 36 36 5.700 81.054 - - - - -
3.200
8 1 12 12 3.200 15.168 - - - - -
11.960
BOTTOM BAR (DISTRIBUTOR) 8 1 15 15 11.960 70.863 - - - - -
0.400
LAP 8 1 15 15 0.400 2.370 - - - - -
1.550
8 1 60 60 1.550 36.735 - - - - -
3.900
8 1 15 15 3.900 23.108 - - - - -
2.850
8 1 15 15 2.850 16.886 - - - - -
2.800
TOP BAR (DISTRIBUTOR) 8 1 35 35 2.800 38.710 - - - - -
5.700
8 1 24 24 5.700 54.036 - - - - -
6.060
BOTTOM BAR (DISTRIBUTOR) 8 1 15 15 6.060 35.906 - - - - -
1.550
8 1 30 30 1.550 18.368 - - - - -
2.525
8 1 15 15 2.525 14.961 - - - - -
5.700
8 1 12 12 5.700 27.018 - - - - -
6.060
BOTTOM BAR (DISTRIBUTOR) 8 1 15 15 6.060 35.906 - - - - -
6.260
CHAJJA - BOTTOM BAR (DISTRIBUTOR) 8 1 6 6 6.260 14.836 - - - - -
1.550
8 1 27 27 1.550 16.531 - - - - -
2.850
8 1 14 14 2.850 15.761 - - - - -
1.980
8 1 28 28 1.980 21.899 - - - - -
2.800
TOP BAR (DISTRIBUTOR) 8 1 15 15 2.800 16.590 - - - - -
5.700
8 1 12 12 5.700 27.018 - - - - -
6.060
CHAJJA - TOP BAR (DISTRIBUTOR) 8 1 6 6 6.060 14.362 - - - - -
6.060
BOTTOM BAR (DISTRIBUTOR) 8 1 15 15 6.060 35.906 - - - - -
2.850
8 1 15 15 2.850 16.886 - - - - -
1.550
8 1 27 27 1.550 16.531 - - - - -
2.800
TOP BAR (DISTRIBUTOR) 8 1 15 15 2.800 16.590 - - - - -
5.700
8 1 9 9 5.700 20.264 - - - - -
11.960
BOTTOM BAR (DISTRIBUTOR) 8 1 15 15 11.960 70.863 - - - - -
12.160
CHAJJA - BOTTOM BAR (DISTRIBUTOR) 8 1 6 6 12.160 28.819 - - - - -
1.980
8 1 56 56 1.980 43.798 - - - - -
1.550
8 1 56 56 1.550 34.286 - - - - -
3.900
8 1 15 15 3.900 23.108 - - - - -
2.450
8 1 14 14 2.450 13.549 - - - - -
2.800
TOP BAR (DISTRIBUTOR) 8 1 35 35 2.800 38.710 - - - - -
5.700
8 1 24 24 5.700 54.036 - - - - -
11.960
CHAJJA - TOP BAR (DISTRIBUTOR) 8 1 6 6 11.960 28.345 - - - - -
11.960
BOTTOM BAR (DISTRIBUTOR) 8 1 15 15 11.960 70.863 - - - - -
1.550
8 1 28 28 1.550 17.143 - - - - -
3.900
8 1 15 15 3.900 23.108 - - - - -
2.450
8 1 15 15 2.450 14.516 - - - - -
2.800
TOP BAR (DISTRIBUTOR) 8 1 35 35 2.800 38.710 - - - - -
5.700
8 1 18 18 5.700 40.527 - - - - -
30.060
CHAJJA - BOTTOM BAR (DISTRIBUTOR) 8 1 6 6 30.060 71.242 - - - - -
1.980
8 1 145 145 1.980 113.405 - - - - -
1.575
8 1 145 145 1.575 90.208 - - - - -
3.900
8 1 60 60 3.900 92.430 - - - - -
2.800
TOP BAR (DISTRIBUTOR) 8 1 90 90 2.800 99.540 - - - - -
5.700
8 1 60 60 5.700 135.090 - - - - -
30.060
CHAJJA - TOP BAR (DISTRIBUTOR) 8 1 6 6 30.060 71.242 - - - - -
3.560
BOTTOM BAR (DISTRIBUTOR) (1) 8 4 15 60 3.560 84.372 - - - - -
2.860
BOTTOM BAR (MAIN) (2) 8 4 22 88 2.860 99.414 - - - - -
2.860
BOTTOM BAR (DISTRIBUTOR) (2) 8 4 15 60 2.860 67.782 - - - - -
2.460
BOTTOM BAR (MAIN) (3) 8 4 22 88 2.460 85.510 - - - - -
4.560
BOTTOM BAR (DISTRIBUTOR) (3) 8 4 12 48 4.560 86.458 - - - - -
1.560
BOTTOM BAR (MAIN) (4) 8 4 14 56 1.560 34.507 - - - - -
2.960
BOTTOM BAR (DISTRIBUTOR) (4) 8 4 8 32 2.960 37.414 - - - - -
TOP BAR
1.725
8 4 15 60 1.725 40.883 - - - - -
1.500
8 4 11 44 1.500 26.070 - - - - -
2.050
8 4 15 60 2.050 48.585 - - - - -
2.800
TOP BAR (DISTRIBUTOR) (1) 8 4 12 48 2.800 53.088 - - - - -
3.200
8 4 9 36 3.200 45.504 - - - - -
0.930
8 4 8 32 0.930 11.755 - - - - -
2.500
TOP BAR (DISTRIBUTOR) (2) 8 4 8 32 2.500 31.600 - - - - -
4.200
8 4 8 32 4.200 53.088 - - - - -
1.265
8 4 16 64 1.265 31.979 - - - - -
2.100
TOP BAR (DISTRIBUTOR) (3) 8 4 8 32 2.100 26.544 - - - - -
4.200
8 4 7 28 4.200 46.452 - - - - -
1.200
TOP BAR (DISTRIBUTOR) (4) 8 4 6 24 1.200 11.376 - - - - -
2.600
8 4 6 24 2.600 24.648 - - - - -
21.260
BOTTOM BAR (DISTRIBUTOR) 8 3 9 27 21.260 226.738 - - - - -
0.400
LAP 8 3 9 27 0.400 4.266 - - - - -
20.900
TOP BAR (DISTRIBUTOR) (4) 8 3 6 18 20.900 148.599 - - - - -
58.560
BOTTOM BAR (DISTRIBUTOR) 8 1 9 9 58.560 208.181 - - - - -
2.360
WATER COOLER - BOTTOM BAR (DISTRIBUTOR) 8 1 7 7 2.360 6.525 - - - - -
58.560
TOP BAR (DISTRIBUTOR) (4) 8 1 6 6 58.560 138.787 - - - - -
LAP 8 0.400
1 30 30 0.400 4.740 - - - - -
3.980
WATER COOLER - TOP BAR (MAIN) 8 1 48 48 3.980 75.461 - - - - -
2.360
WATER COOLER - TOP BAR (DISTRIBUTOR) 8 1 25 25 2.360 23.305 - - - - -
58.560
BOTTOM BAR (DISTRIBUTOR) 8 1 9 9 58.560 208.181 - - - - -
0.400
LAP 8 1 54 54 0.400 8.532 - - - - -
3.060
WATER COOLER - BOTTOM BAR (MAIN) 8 1 32 32 3.060 38.678 - - - - -
2.360
WATER COOLER - BOTTOM BAR (DISTRIBUTOR) 8 1 7 7 2.360 6.525 - - - - -
58.560
TOP BAR (DISTRIBUTOR) (4) 8 1 6 6 58.560 138.787 - - - - -
0.400
LAP 8 1 30 30 0.400 4.740 - - - - -
3.980
WATER COOLER - TOP BAR (MAIN) 8 1 48 48 3.980 75.461 - - - - -
2.360
WATER COOLER - TOP BAR (DISTRIBUTOR) 8 1 25 25 2.360 23.305 - - - - -
9.060
BOTTOM BAR (DISTRIBUTOR) 8 2 15 30 9.060 107.361 - - - - -
30.060
CHAJJA - BOTTOM BAR (DISTRIBUTOR) 8 2 6 12 30.060 142.484 - - - - -
1.575
8 2 42 84 1.575 52.259 - - - - -
2.950
8 2 15 30 2.950 34.958 - - - - -
1.980
8 2 42 84 1.980 65.696 - - - - -
2.800
TOP BAR (DISTRIBUTOR) 8 2 24 48 2.800 53.088 - - - - -
2.800
8 2 12 24 2.800 26.544 - - - - -
5.700
8 2 12 24 5.700 54.036 - - - - -
9.060
CHAJJA - TOP BAR (DISTRIBUTOR) 8 2 6 12 9.060 42.944 - - - - -
11.960
BOTTOM BAR (DISTRIBUTOR) 8 2 15 30 11.960 141.726 - - - - -
12.160
CHAJJA - BOTTOM BAR (DISTRIBUTOR) 8 2 6 12 12.160 57.638 - - - - -
1.980
8 2 56 112 1.980 87.595 - - - - -
1.550
8 2 56 112 1.550 68.572 - - - - -
3.900
8 2 15 30 3.900 46.215 - - - - -
2.525
8 2 14 28 2.525 27.927 - - - - -
2.800
TOP BAR (DISTRIBUTOR) 8 2 35 70 2.800 77.420 - - - - -
5.700
8 2 24 48 5.700 108.072 - - - - -
11.960
CHAJJA - TOP BAR (DISTRIBUTOR) 8 2 6 12 11.960 56.690 - - - - -
6.060
BOTTOM BAR (DISTRIBUTOR) 8 1 15 15 6.060 35.906 - - - - -
1.550
8 1 28 28 1.550 17.143 - - - - -
2.525
8 1 14 14 2.525 13.963 - - - - -
1.980
8 1 28 28 1.980 21.899 - - - - -
2.800
TOP BAR (DISTRIBUTOR) 8 1 15 15 2.800 16.590 - - - - -
5.700
8 1 12 12 5.700 27.018 - - - - -
6.060
CHAJJA - TOP BAR (DISTRIBUTOR) 8 1 6 6 6.060 14.362 - - - - -
17.860
BOTTOM BAR (DISTRIBUTOR) 8 1 15 15 17.860 105.821 - - - - -
18.260
CHAJJA - BOTTOM BAR (DISTRIBUTOR) 8 1 6 6 18.260 43.276 - - - - -
1.575
8 1 84 84 1.575 52.259 - - - - -
1.980
8 1 84 84 1.980 65.696 - - - - -
3.930
8 1 30 30 3.930 46.571 - - - - -
5.700
8 1 36 36 5.700 81.054 - - - - -
17.860
CHAJJA - TOP BAR (DISTRIBUTOR) 8 1 6 6 17.860 42.328 - - - - -
WEIGHT (KG)
32mm
WEIGHT (KG)
32mm
WEIGHT (KG)
32mm
WEIGHT (KG)
32mm
WEIGHT (KG)
32mm
WEIGHT (KG)
32mm
WEIGHT (KG)
32mm
WEIGHT (KG)
32mm
WEIGHT (KG)
32mm
WEIGHT (KG)
32mm
0.000
10830.163
0.4 1.3
FIRST FLOOR BEAM TO MID LANDING 16 3 16 48 1.826 - - - 138.396 - - -
0.15
0.4 1.15
16 3 16 48 1.676 - - - 127.027 - - -
0.15
MID LANDING TO FIRST FLOOR - MAIN BAR 16 1.690 3.7 0.48 3 16 48 5.846 - - - 443.080 - - -
DETAILS: CHAJJA - SF
1 CHAJJA - - - - - -
WEIGHT (KG)
32mm
0.000
61.500
Dowels in Plinth Beam 16 0.15 0.2 4.750 1.150 1 2 2 0.15 0.2 4.750 1.150- - - #VALUE! - -
BOTTOM BAR 16 0.15 0.2 4.750 1.150 1 2 2 0.15 0.2 4.750 1.150- - - #VALUE! - -
BOTTOM BAR 16 0.15 0.2 4.750 1.150 1 2 2 0.15 0.2 4.750 1.150- - - #VALUE! - -
BOTTOM BAR 16 0.15 0.2 4.750 1.150 1 2 2 0.15 0.2 4.750 1.150- - - #VALUE! - -
BOTTOM BAR 16 0.15 0.2 4.750 1.150 1 2 2 0.15 0.2 4.750 1.150- - - #VALUE! - -
WEIGHT (KG)
32mm