You are on page 1of 28

S i n c e 1 9 8 4

Energy , an y pow e r , a n y p l a c e , a n y ti m e!
The Horus Energia company has been operating since 1984 and is
now one of the largest and the most reputable companies on Polish
power generation market. We offer complex support in everything
regarding generator sets, starting from the selection phase
through the preparation of necessary designs and approvals,
delivery, complete and special installation, start-up, ending
on warranty and after-warranty service.

We pay great attention to top quality of our products,


which is confirmed by an ISO 9001:2008 certificate.

Our devices can work on a 24/7 basis, as an emergency, prime


or continous Electrical Power or Combined Heat and Power source.
Now you can have electric and heating power at any level,
in any place, any time you want.

Jan Koblak

President of the Management Board

2
The company’s headquarters in Sulejówek near Warsaw

power generators
diesel, gas, biogas, eco-fuels
cogeneration
containerised power plants
low-voltage distribution cabinets, automatic
backup power supply
New production hall II IT network power supply
design
installation
service
rental

The Horus-Energia power generator is a perfect


solution in situations when:
you cannot afford to take the risk of interruptions
Production hall I in the power supply caused by the grid failure,
forces of nature, etc.
the operating range of the power distribution
company does not cover a given location
electric power and/or heat are needed immediately
electric power and/or heat are needed only
for a specific period of time
you have to increase, temporary or permanent,
the consumption of electric power and/or heat
above the capacity of the existing grid
Loading of the finished power generator

3
Full range of products

FG Wilson diesel power generator sets with power ranging Containerised reserve power stations
from 9.5 kVA to 2.5 MVA

Biogas generator sets Natural gas generator sets

CHP generator sets Other power technologies

4
Technical department
The team of Horus-Energia engineers has developed
innovative design solutions in various technological aspects
of mechanics, electrotechnics, acoustics, electronics and
thermodynamics. Our engineers technical know-how was
awarded many times for innovativeness and environmentally
friendly solutions.

Layout of a CHP generator set, with 2 MW of electrical power,


together with installations in genset room.

Successive design stages for a CHP generator set in a container


with 0.5 MW of electrical power

5
Comprehensive services
We offer everything that is connected with ensuring
a continuous supply of electric power:
free of charge consulting and selection of solutions
free of charge on-site inspection
preparation of all necessary designs together with
approvals for OHS, fire safety and power distribution
plant regulations
construction and delivery of devices
complex, specialistic installation and launch,
also “turnkey” projects
training in the operation of devices for employees
warranty and post-warranty service 24 hours a day
all year round
if necessary, a reserve generator set can be delivered
for the time of repair or service
inclusion of delivered generator sets in the on-line
monitoring system

Installation
under any conditions:
The delivery and installation
of the ordered devices at the
place indicated by the client
is an indispensable task of
our company. The generator
sets can be placed outside
the building, sometimes
they are installed on roofs
or inside rooms which are
Our devices can operate in any climate from a very cold one difficult to access. We can
(Mongolia – above) to extremely hot and humid (Nigeria – below). handle any problems.

6
Our clients
We boast of the longest reference list in the sector in
Poland, which includes of 1500 facilities with a total power
of 300 000 kVA, 80% of listed projects involved specialist
installation.

The largest organisations have put their trust in us, including:


Polish and foreign companies (e.g.: Orlen, Motorola,
Elektrobudowa, Elektroskandia, Pol-Aqua, Budimex,
GAZ-SYSTEM)
telecommunications companies (Orange, Netia, PTC)
state administration, the army, the police, the border guard
institutions providing services for communities (e.g. hospitals
and medical facilities, wastewater treatment plants, landfill sites,
heating plants)
hypermarkets (e.g.: MetroAG, Carrefour, Castorama, IKEA)

We offer many variants of products and services cut out


to our clients’ needs. Our power systems can be delivered
nearly anywhere in the world. Our solutions have been
implemented in the following countries: Mongolia, Russia,
Ukraine, Moldova, Ireland, Estonia, Latvia, Israel, Nigeria,
Mali, Turkmenistan, Uzbekistan.

7
Our implemented solutions
Diesel generator sets Gas generator sets Biogas generator sets

2 x 1650 kVA. DELL factory in Łódź 2x1400 kW. Zespół Elektrociepłowni 3x252 kW. Wastewater treatment plant
Wrocławskich Kogeneracja S.A. (Wrocław in Biała Podlaska
Combined Heat and Power Plant Complex)

4 x 800 kVA. GTS Energis data centre 1540 kW. Gas compressor station 2x250 kW. Wastewater treatment plant
Piaseczno in Hołowczyce in Zawiercie

3x700 kVA. Copper mine in Mongolia. 13x1750 kW. Nigeria 999 kW. Farming Biogas Plant in Upałty
Dust-resistant containers

500 kVA. Residence of the President of the 405 kW with CO2 recovery. Horticulture 250 kW and 190 kW. Wastewater treatment
Russian Federation, Kaliningrad farm in Janów near Karczew plant in Otwock

8
Power generator in genset Truck mounted generator sets Trailer mounted generator sets
rooms

1250 kVA. Bródno Hospital in Warsaw 250 kVA. Telewizja Polska SA 40 kVA in the military version

125 kW and 2x190 kW. Water treatment 600 kVA. Stoen Warszawa One-phase 14 kVA generator set. Geofizyka
plant in Ełk Kraków

630 kVA. Mondi Świecie 100 kVA. Artlite Ukraine 10 kVA generator set with a telecom power
system Telekomunikacja Polska SA

730 kVA. LIDL Legnica 350 kVA. GonzoService. 160 kVA and 250 kVA generator sets Power
Extra silent generator set Distribution Plant Rzeszów

9
ENGINE
MAN, Perkins, Cummins, MTU, Liebherr
modern

GAS with high efficiency


four-stroke
with spark ignition

GENERATOR turbocharged
with very high durability
with liquid cooling

SETS operating at 150 rpm

ELECTRIC GENERATOR
Leroy-Somer, Stamford, Marelli
synchronous
with high efficiency
brushless
self-excited
self-regulated
with internal silencing systems

AVAILABLE VERSIONS
open (with no housing)
container housing with sound attenuation,
weather-resistant
compact housing with sound attenuation for
installation inside building
“turnkey” system

OPERATION MODES
continuous
in a storage power station mode
back-up
parallel with the power grid
island-like operation

ENVIRONMENTAL PROTECTION
the generator sets comply with emission standards
for harmful
We offer generator sets powered • compounds in exhaust fumes
when a heat recovery module is added, the generator
set becomes a combined source of power and heat
by natural gas with power ranging after appropriate adjustments generator sets
• can be powered by bio-gases
from 44 kWe to 2145 kWe.
PROTECTION SYSTEMS
explosion protection
Complete installations may consist fire protection
electric shock protection
of up to 32 units operating full monitoring of the gas power plant

in a parallel synchronisation mode.

10
gas
generator
sets

Gas generator set


with an electric power
of 1540 kW
during load tests

Gas cogeneration unit


with an electric power
of 405 kW with CO2.
Recovery.
During the design stage
and as installed
at the client’s site

Two generator sets


with an electric power
of 1750 kW before
being shipped
to the client

11
ENGINE
MAN, Perkins, Cummins, MTU, Liebherr
modern

BIOGAS with high efficiency


four-stroke
with spark ignition

GENERATOR turbocharged
with very high durability
with liquid cooling

SETS operating at 150 rpm

ELECTRIC GENERATOR
Leroy-Somer, Stamford, Marelli
synchronous
with high efficiency
brushless
self-excited
self-regulated
with internal silencing systems

AVAILABLE VERSIONS
open (with no housing)
container housing with sound attenuation,
weather-resistant
compact housing with sound attenuation for
installation inside building
“turnkey” system

OPERATION MODES
continuous
parallel with the power grid
island-like operation

ENVIRONMENTAL PROTECTION
the generator sets comply with emission standards
for harmful compounds in exhaust fumes for partial
loads as well as over the entire variability spectrum of
the fuel gas.
when a heat recovery module is added, the generator
We offer generator sets powered set becomes a combined source of power and heat
after appropriate adjustments, generator sets
by biogas with power ranging can also be powered by natural gas

from 64 kWe to 1948 kWe. PROTECTION SYSTEMS


explosion protection
fire protection
electric shock protection
Complete installations may consist full monitoring of the biogas power plant

of up to 32 units operating
in a parallel synchronisation mode.

12
biogas
generator
sets

Biogas
CHP generator set
with an electric power
of 999kW
at the agricultural
biogas plant in Upałty

Biogas generator sets


during the production
process

Biogas CHP generator


unit with an electric
power of 480 kW
at the wastewater
treatment plant
in Białystok

13
FUEL
natural gas
biogas

CHP waste gas


diesel fuel
vegetable oil

GENERATOR Various options of transfer medium


for recovered heat:
SETS hot water
saturated steam
hot air
thermal oil

The estimated total operation time of the system


is 120,000 hours.

The amount of unit investment expenditures mostly


depends on the power of the system and the composition
and cleanliness of the fuel and the methods of
transferring the heat power.

Potential applications of a CHP system: any place with


a simultaneous demand for electric power and heat

Potential places where a CHP system can be installed


include:
sports facilities
hospitals
A CHP generator set is constructed food processing plants
apparel manufacturing plants
from a power generator set with chemical plants
greenhouses
an added heat recovery module. breweries
modern water treatment plants
heating plants, local and industrial heat and power plants
farming biogas plants
The scope of power of offered CHP
COGENERATION
generator sets: 8 kWe and 10 kWt (the CHP system – Combined Heat and Power)
to 2.2 MWe and 2.5 MWt. it involves simultaneous generation of electric power
and heat. Our company offers systems powered by gas
fuels, diesel fuelor vegetable oil . The main elements
of our power installations include: gas or Diesel
Complete systems may consist combustion engine, power generator, heat exchanger
of up to 32 CHP generator sets system and automatic regulation and control system.
Electric power is generated by generator driven by
operating for one power grid internal combustion engine.

and one hot water collector.

14
CHP
generator
sets
Advantages of the CHP system
Combustion engines, on the basis of which our
installations are built, are characterised by an
efficiency of transforming the energy contained in
the fuel into mechanical energy by a few percentage
points, as compared to gas or steam turbines.
Further on, in the generator, mechanical energy
is transformed into electrical energy. For example,
the efficiency of a combustion engine ranges from Biogas container CHP
37% to over 41%, while the efficiency of gas plant awarded with
turbines does not exceed 35%. the Gold Medal
at the Poleko Fair
The rated power of the combustion engine, in 2008
as compared to a gas turbine, is definitely less
sensitive to ambient temperature changes.
High operating flexibility, i.e. our systems can
work at variable loads ranging from 60 to 100%,
with a reduction in the electrical efficiency only
by 1 to 2% percentage points.
It should be emphasised that heat delivered
by our systems is “for free”. This means that an
appropriate amount of fuel must be provided to
the engine to obtain a specific amount of electri-
cal energy. Heat in the engine is generated,
regardless of the fact whether it is recovered
and used or released and dispersed. For example,
under normal conditions, an engine, while
generating 100 kW of mechanical power on
a flywheel, also generates approx. 150 kW of heat
power, out of which approx. 130 kW can be used.
Our systems allow to recover the generated heat
and used it without increasing fuel consumption
Gas container CHP plant
in any way. with an electric power
of 1166 kW and heat
power of 1150 kW
with a saturated
steam generator

Gas cogeneration set


with an electric power
of 1400 kW and heat
power of 1560 kW,
connected with
absorption chillers

15
GENERATOR SET
The devices we offer are equipped with engines with the
following characteristics:

DIESEL turbocharged
with very high durability
with liquid cooling

GENERATOR operating at 150 rpm


with an electric generator
• synchronous

SETS • with high efficiency


• brushless
• self-excited
• self-regulated
• with internal silencing systems

AVAILABLE VERSIONS
open (with no housing)
in a housing protected from weather conditions
container housing with sound attenuation,
weather-resistant
in a housing adapted for installation on a rolling
chassis
in a housing allowing for silent operation,
which is required at some places, e.g. film sets
together with complete equipment of power generator
rooms, including ventilation systems, tanking
systems, etc.
“turnkey” system

OPERATION MODES
continuous
in a storage power station mode
reserve
parallel with the power grid
island-like operation

PROTECTION SYSTEMS
explosion protection
fire protection
We offer generator sets powered electric shock protection
full monitoring of generator set operation is possible
by diesel fuel with power ranging
from 9.5 kWe to 2500 kWe.

Complete installations may consist


of up to 32 units operating
in a parallel synchronisation mode.

16
diesel
generator
sets

One-phase 1250 kVA


generator set. Mali

250 kVA and 2x700 kVA


Poznań Supercomputer-
Networking Centre,
Bioorganic Chemistry
Institute, Polish
Academy of Sciences

455 kVA.
Elektrownia Pątnów I SA

500kVA. Residence
of the President
of the Russian
Federation,
Kaliningrad

17
Trigeneration with piston engine
in cooling and refrigeration

OTHER Function:
production of chilled water
Energy sources:

POWER hot water 82-140°C


exhaust fumes
Cooling output:
from several dozen kWch to several MWch

TECHNOLOGIES Trigeneration with piston engine


for greenhouses
Function:
production – recovery of CO2
electric power
heat
Sources of CO2:
exhaust fumes
Output of CO2:
from 200 kg CO2/h to 1000 kg CO2/h

High-temperature heat recovery systems


Function:
generation of high-temperature heat
heat carrier – thermal oil or steam
Energy sources:
exhaust fumes
Heat output:
from 200 kWt to 1000 kWt

In a very wide spectrum of applications for CHP generator


Adaptation of cogeneration sets sets, there appears a group of clients who, apart from
heat and electric power, also need energy transferred
with additional installations via other carriers or other products. These media can
which allow optimal use be generated during the operation of the CHP module.
Appropriate modification or extension of the CHP
of the application based generator set allows improving the degree of efficiency
of the installation.
on the CHP module.
In our climate zone, the demand for heat for heating
purposes (e.g. heating of buildings) is present for
Developingpolygeneration approx. six months. In the remaining period, only
warm tap water is needed. A perfect solution, allowing
installations allows better to avoid the necessity of dissipating heat during
operation of the set into the atmosphere, is the
adaptation of our products application of absorption chiller or ADsorption chillers.

to diverse needs of our clients. By means of these devices, using heat collected from
operating CHP generator set, chilled water can be
produced.

18
other
power
technologies
Conceptual diagram and
example of application
of trigeneration with
piston engine powered
by natural gas
in greenhouse for
generating electric
power, heat and carbon
dioxide production.
The solution was used
to increase yield
per hectare

This medium can be used for the air-conditioning


system for rooms in office, apartment or public utility
buildings.

For clients, who need temperatures higher than the


standard 90/70oC in their technological processes,
we can modernise system of heat recovery from exhaust Steam generator.
A sample installation by
fumes,to obtain saturated steam at temperatures up the company Hering AG
to 220°C or thermal oil at temperatures up to 240°C.

There’s also a possibility of obtaining pure carbon dioxide


using system based on various catalysts. Exhaust fumes
purified in this way are free from carbon monoxide,
sulphur compounds and other toxic products, which
can be produced during natural gas combustion. In this
way, we obtain a perfect source of CO2, which can be
used in various technological process, including the Adsorption chiller,
factor increasing yields in greenhouses or carbon a sample product from
the offer of the company
dioxide for saturating mineral waters or soda drinks. Zechik Sp. z o.o.

19
The necessity to take care of natural environment
and depleting oil supplies stimulate the search for new
and alternative sources of supply. The application of

RESEARCH. so-called biofuels is one of the solutions. A new trend


in research involves the use of streams of energy,
which are currently regarded as waste or the use of

NEW SOLUTIONS energy contained in waste.

We offer generator sets powered by:


vegetable oils
fuels from depolymerisation of plastics
pyrolysis oil obtained from processing of waste tyres
hydrogen and other waste post-processing gases
from chemical plants.

We are carring advanced implementation works on:


powering generator sets by coke-oven gas
the use of low-calorie synthesis gases, including
wood gas.

From the current regulations point of view on waste


management, implementation works for generator sets
powered with fuels produced while processing plastic
waste and tyres, excellently reflect waste to energy actions.

Appropriately carried processes of depolymerisation of


polyolefin plastics and pyrolysis of rubber parts of tyres
combined with the technology we have developed
allow for energy-efficient use of such waste.
It should be emphasised that, as opposed to many
other methods, in which simple combustion occurs,
i.e. generation of heat, the use of generator sets allows
for obtaining the most refined type of energy – electric
energy.

Following trends in the world,


which are aimed at limiting human
impact on the environment,
we have included in our offer
generator sets powered by
vegetable oils and alternative fuels,
also one produced from waste. Fuel is obtained during depolymerisation
from polyethylene and polypropylene waste.
We can use it for powering adapted generator sets

20
research.
new solutions
Solutions used in offered gas generator sets powered
by alternative fuels allow for use of gases with methane
number amounting to zero (hydrogen). This allows
for an energy-efficient use of post-processing gases,
which are usually combusted in industrial flares in
an unproductive way.

While developing our generator sets powered by alterna-


tive fuels, we always aim at minimising operational
costs and ensuring maximum reliability at the same time.

All generator sets, regardless of the type of the fuel used,


can be offered with types of housings described for “tradi-
tional aggregates”. They can also be constructed as CHP
generator sets in accordance with the description presented
in the “Cogeneration” tab.

During the implementation of reaserch and development


280 kWe power
projects, we cooperate with the Cracow University generator powered
of Technology, the Warsaw University of Technology, by animal fat
research and development institutes and highly during load tests
specialised engineering companies.

While developing unique products on a European or even


global scale – owing to our involvement and sensitivity
to our Clients’ needs – we keep Polish prices.

A generator set
adapted to be
powered by hydrogen

3 x 500 kWe
and 3 x 700 kWt
CHP plant powered
by rapeseed oil
during the assembly
process

21
The advantages of Service Department include:
long-term experience of the personnel in the area of
compression-ignition and gas engines and automatisation

SERVICE/ systems
regular employee training carried by manufacturers
of engines and generator sets, including: MTU, MAN,

MONITORING FG Wilson, Perkins, Cummins


a wide range of units which we can service: FG Wilson,
Cummins, Iveco Aifo, Deutz, MAN, MTU, Caterpillar,
Volvo-Penta, John Deere, etc.
fully equipped service vans
a large and well-stocked spare part warehouse for
generator sets under permanent service care.

For several years, we have been running the Service


Centre, which was established during the development
of the manufacturing and servicing complex in Sulejówek.
The Service Centre consists of a modern engine test bench,
overhaul stations, monitoring centre and a control room.

The engine test bench is adapted for inspections and


load test of generator sets. Tests using electric induction,
resistance and heat loads can be carried out, which allows
for simulating conditions, in which generator sets will
operate at final installation site. The carbon dioxide
station allows to carrytests not only for diesel and
natural gas generator sets, but also generator sets
powered by biogas.

The Service Department offers:

warranty and post-warranty periodic inspections


of generator sets
permanent servicing of generator sets
repairs of all types of generator sets
major overhauls of engines, including petrol, diesel,
natural gas and biogas engines
load testing ensuring own loads up to 800 kWe
Service Department provides service a warehouse of original spare parts
care within warranty and post-warranty the shortest response time in the sector
remote monitoring of generator set operation together
period for generator sets operating with automatic notifications about emergencies
24-hour hotline
in stand-by mode or as a prime automation of older types of generator sets
warranty for services provided
or continous source of power supply.
Offer also includes engine overhauls.

22
service/
monitoring

The 24-hour centre


for monitoring
the operation
of generator sets
ensures continuous
supervision of
installed devices

To meet the Clients’ expectations and needs con-


cerning the shortest possible response time, we
opened Service branch located south of Poland near
Kraków. In the nearest future, we are planning on
opening new branches to be closer to our clients
in western and northern parts of Poland.

Gdańsk

Poznań
The company’s headquarters
Sulejówek k. Warszawy

Krzeszowice near Kraków The team of qualified


employees from
Service Department
carring works both in
l operating
the area of ongoing
l and planned branches of Horus Energia servicing and repairs
of generator sets

The test bench for


performing tests
of the produced
device

23
Our company offers the rental of generator sets from
20 kVA to 1000 kVA. Some of our generator sets are
adapted to parallel operation, which allows for obtaining

RENTAL 3000 kVA. We deliver generator sets to any place in


Poland with or without servicing. The newly opened
Southern Branch situated in Krzeszowice allows for

OF GENRATOR reducing the response time and get to our clients in


southern Poland quickly.

SETS The generator sets, which we offer, are intended for


continuous or temporary operation as main or reserve
source of electrical power. All rental generator sets are
equipped with sound attenuated canopies or containers
allowing open-air operation even in difficult conditions.
Our offer also includes mobile generator sets with power
values ranging from 20 to 110 kVA on wheeled chassis
with Polish certification.

Generator sets are maintained on an ongoing basis,


we perform servicing inspections free of charge during
use (together with replacement of consumables) in
cooperation with the person supervising the generator
set on the Client’s side. The rented equipment is covered
by supervision on a 24/7 basis, all answers and guide-
lines concerning the operation of the generator set are
provided on the phone.

Our generator sets are a perfect solution if:


you cannot afford any interruptions in electric power
supply
offer of the power distribution company does not
cover a given location
electric power is needed immediately or for some time
you have to increase the consumption of electric
power above the capacity of the existing grid on
a temporary basis.

Some of our rental services include:

• Power supply during open-air events, concerts


• Power supply for TVN Style outside broadcast vans –
Since 1984, our company has been mobile generator set 100 kVA
• Power supply for mobile Euro 2012 Fan Zones –
operating all over Poland in the 10 generator sets with power values ranging from
60 kVA to 275 kVA
area of reserve electric power sources. • Power supply for TVP outside broadcast vans in
Biłgoraj – mobile generator set 110 kVA
Since 1998, we have been • Power supply for outside broadcast vans for various
shows, such as: “Dancing with the Stars”, “Talk Shows”
conducting professional rental and “HD productions”
• Power supply for outside broadcast vans on New Year’s
of industrial generator sets. Eve 2011/2012 and the Festival in Płock, Polsat Tele
vision – generator sets in housing on trucks with

24
rental
of generator
sets
Generator sets
in super sound
attenuated canopies
are commonly used
at places,
where a quite
source of power
is needed...

...during renovation of
the power supply system
at the St. Sophie Hospital
in Warsaw ul. Żelazna

power values ranging from 650 kVA to 400 kVA


• Power supply for server rooms, generator sets with
power values of 350 kVA, 650 kVA and 1000 kVA
• Power supply for the Andrea Bocelli concert –
Gwardia Warszawa stadium – generator sets with
a total power of 1365 KVA
• Przystanek Woodstock 2012 – generator sets
with a total power of 1300 kVA
• Power supply for gas pumping in Wronowo
...during outdoor concerts
and Hołowczyce – a total power of 880 kVA
• Power supply for drill sites in Poland – a total
power of over 1000 kVA
• WARBUD SA – the construction of the Menolly
building – Nowe Powiśle Warsaw, a generator set
with a total power of 200 kVA
• Power supply for a concrete production plant in
Gliwice, a generator set with a power of 605 kVA
• Keller Polska Sp. z o.o. power supply for
construction sites, generator sets with power
values from 100 kVA to 350 kVA
• Power supply for water supply and sewage systems,
Biała Podlaska, a generator set with a power of
160 kVA
• Power supply for the Warsaw Metro 2013 –
2 generator sets with a power of 500 kVA each
• Power supply for the Kostrzyn Factory – 11 genera-
tor sets with power values ranging from 40 kVA
to 500 kVA
• Power supply for a concert in Płock – 2 generator
sets with a power of 275 kVA and 35 kVA and
many others
…while watching
matches during the
EURO 2012
Football Championship

25
Diplomas, awards, certificates
Our generator sets have been present it received the bronze medal awarded by PGE Energia
Odnawialna. It was our second distinction at the ENERGETAB
on the market for thirty years. fair as two years earlier, in 2010, we were awarded
During this time, their continuous the gold medal of PGE Energia Odnawialna for our CHP
generator set with an electrical power of 1400 kW, type
development and implementation HE-EC-1400/1560-CG1400-GZ, which had been ordered
of new technologies allowed us to by ZEW KOGENERACJA S.A.

collect a lot of tokens of appreciations The awards in the form of medals confirm the high
both from our clients and numerous quality of our products. To ensure it our products, services
and customer service, we have been using a certified
competition jury panels deciding and implemented quality management system according
on awarding prizes during exhibitions to the standard ISO 9001:2008 since 2008 (it was
renewed for a subsequent period in 2011).
and fair events.
In Autumn 2012, we received an awardin the “Market
In the years 2008-2012, our products received the Gold Quality 2012” competition in the CHP generator set
Medal of the Poznań International Fair awarded during category.
the POLEKO fair. In 2008, our HE-KEC-480/510-PG480-B
CHP generator set won a medal – the competition jury The high quality of our products and services helps
emphasised the fact of using Polish technology in the the company’s dynamic development – this fact was
presented device. In 2009, our CHP generator set based appreciated by the Forbes Magazine in 2013 by awarding
on a high-pressure engine, which can be powered by to us the “Forbes Diamonds 2013” distinction.
a fuel from renewable sources, i.e. vegetable oil.
In 2012, we presented a container biogas CHP set, type All awards received from various institutions and organi-
HE-EC-99/129-MG99-B with an electric power of 99 kW sations bring us a lot of satisfaction. The appreciation
at a fair event, which was also appreciated by the jury of our clients and the growing group of regular clients
and awarded with the gold medal. This solution is are the best evidence of the fact that we are going in
intended for small agricultural biogas plants and it was the right direction.
also recognized during the 25th edition of the ENERGETAB
International Energy Fair in Bielsko Biała in 2012, where

“Forbes Diamond” 2013 “Transparent Company” Certificate ISO 9001:2008 Certificate

26
1st prize in „Klucz Sukcesu” European Medal for CHP units Gold Medal Poleko 2009
(Key to Success) competition

Gold Medal Poleko 2009 European Medal for genset Distinction – Remarkable exporter
maintenance services of 2008, 2011, 2012

Gold Medal from PGE Renewable Bronze Medal from PGE Renewable Gold Medal Poleko 2012
Energy on Energetab 2010 Energy on Energetab 2012

27
PPUH HORUS-ENERGIA Sp. z o.o.
05-070 Sulejówek, ul. Drobiarska 43
Tel.: (+48) 22 33 15 300
Commercial Department: (+48) 22 33 15,331
Service (+48) 22 33 15,322
Rental: (+48) 22 33 15,330
Fax: (+48) 22 33 15 323
poczta@horus-energia.pl
EN

www. hor u s-e ne r g ia .p l

You might also like