Case Study

Date :27-March-2019

Customer information:

The customer is a competitive and


dynamic player in oil & Gas production
known as the biggest oil producer in Libya
operating about 13 oil & gas location.

Client: Arabian Gulf oil company AGOCO


Statues: Ongoing

Equipment data:

OEM / Type HOS6


Rated compressor 800-1200
power
Speed: 750 RPM
Lube: Yes
Driver: Ruston-Gas engine
Year of MFC 1995-2002

Process information:
Gas service: Gas lift cooperation
station
Process: Reciprocating
compressor
Location: CPS-Nafoora field

Customer requirements:
 Major Overhaul to keep this
facility running.
 Upgrade the control system.
Case Study

CONTANGO solution:

 Complete overhaul of gas compressor


systems (4 reciprocating gas
compressors

 Pre-defined maintenance schedule with


scope and objectives

 immediate set-up of expert manpower


and local project management

 Supervision and coordination of


compressor overhaul.

 Perform day by day maintenance


support.

 Provide special tools and spars.

 Commission of LCP for 4 gas


compressors and upgrade control
software from Microgurd to SMATIC-7

 Provide technical data sheets.

 Set up Operations and maintenance


procedures.

Customer benefit:

 A 24/7 insight look into the compressor


makes planning of maintenance more
efficient, saves downtime and therefore
enhances profitability during the critical
storage period.

 Standby special tools for Major overhaul


and mandatory repairs.

 Keep the facility running 24/7 for constant


gas compression for gas lift production
well.