Summary:
Prosthetic 2.0.prd NOTE: Differences of less than 20% are not usually significant. Page 1 / 10
See notes on precision and data sources. Monday, December 14, 2020
Eco Audit Report
Energy (MJ/year)
Equivalent annual environmental burden (averaged over 5 year product life): 243
Material: Summary
Prosthetic 2.0.prd Report generated by GRANTA EduPack 2020 (C) Granta Design Page 2 / 10
Ltd. Monday, December 14, 2020
Manufacture: Summary
Energy
Component Process % Removed Amount processed %
(MJ)
Connector Casting - 0.45 kg 5.9 10.3
Connector Fine machining 2 0.009 kg 0.19 0.3
Shin Metal powder forming - 1.1 kg 28 47.9
Shin Cutting and trimming 1 0.011 kg 0.0032 0.0
Coil Casting - 1 kg 11 19.3
Coil Cutting and trimming 2 0.02 kg 0.006 0.0
Foot Shell Metal powder forming - 0.48 kg 12 20.1
Foot Shell Fine machining 1 0.0048 kg 0.12 0.2
Socket Compression molding - 0.32 kg 1.1 1.9
Socket Cutting and trimming 1 0.0032 kg 0.00095 0.0
Total 58 100
Transport: Summary
Breakdown by components
Mass Energy
Component %
(kg) (MJ)
Connector 0.44 1.7 13.4
Shin 1.1 4.1 32.6
Coil 0.98 3.7 29.8
Foot Shell 0.48 1.8 14.6
Socket 0.31 1.2 9.6
Total 3.3 13 100
Use: Summary
Prosthetic 2.0.prd Report generated by GRANTA EduPack 2020 (C) Granta Design Page 3 / 10
Ltd. Monday, December 14, 2020
Disposal: Summary
EoL potential:
End of life Energy
Component % recovered %
option (MJ)
Connector Recycle 100.0 -2.6e+02 25.4
Shin Reuse 100.0 -2.1e+02 20.0
Coil Recycle 100.0 -2.6e+02 25.3
Foot Shell Recycle 100.0 -75 7.2
Socket Reuse 100.0 -2.3e+02 22.1
Total -1e+03 100
Notes: Summary
Prosthetic 2.0.prd Report generated by GRANTA EduPack 2020 (C) Granta Design Page 4 / 10
Ltd. Monday, December 14, 2020
Eco Audit Report
CO2 (kg/year)
Equivalent annual environmental burden (averaged over 5 year product life): 20.2
Material: Summary
Prosthetic 2.0.prd Report generated by GRANTA EduPack 2020 (C) Granta Design Page 5 / 10
Ltd. Monday, December 14, 2020
Manufacture: Summary
CO2
Component Process % Removed Amount processed footprint %
(kg)
Connector Casting - 0.45 kg 0.45 10.0
Connector Fine machining 2 0.009 kg 0.014 0.3
Shin Metal powder forming - 1.1 kg 2.2 49.4
Shin Cutting and trimming 1 0.011 kg 0.00025 0.0
Coil Casting - 1 kg 0.83 18.6
Coil Cutting and trimming 2 0.02 kg 0.00046 0.0
Foot Shell Metal powder forming - 0.48 kg 0.87 19.4
Foot Shell Fine machining 1 0.0048 kg 0.0092 0.2
Socket Compression molding - 0.32 kg 0.089 2.0
Socket Cutting and trimming 1 0.0032 kg 7.3e-05 0.0
Total 4.5 100
Transport: Summary
Breakdown by components
Mass CO2 footprint
Component %
(kg) (kg)
Connector 0.44 0.12 13.4
Shin 1.1 0.29 32.6
Coil 0.98 0.27 29.8
Foot Shell 0.48 0.13 14.6
Socket 0.31 0.086 9.6
Total 3.3 0.9 100
Use: Summary
Prosthetic 2.0.prd Report generated by GRANTA EduPack 2020 (C) Granta Design Page 6 / 10
Ltd. Monday, December 14, 2020
Disposal: Summary
CO2
End of life
Component % recovered footprint %
option
(kg)
Connector Recycle 100.0 0.022 19.2
Shin Reuse 100.0 0.015 13.3
Coil Recycle 100.0 0.048 42.6
Foot Shell Recycle 100.0 0.024 20.9
Socket Reuse 100.0 0.0044 3.9
Total 0.11 100
EoL potential:
CO2
End of life
Component % recovered footprint %
option
(kg)
Connector Recycle 100.0 -15 16.9
Shin Reuse 100.0 -12 13.7
Coil Recycle 100.0 -40 45.5
Foot Shell Recycle 100.0 -5 5.7
Socket Reuse 100.0 -16 18.1
Total -87 100
Notes: Summary
Prosthetic 2.0.prd Report generated by GRANTA EduPack 2020 (C) Granta Design Page 7 / 10
Ltd. Monday, December 14, 2020
Eco Audit Report
Cost (USD/year)
Equivalent annual environmental burden (averaged over 5 year product life): 571
Material: Summary
Prosthetic 2.0.prd Report generated by GRANTA EduPack 2020 (C) Granta Design Page 8 / 10
Ltd. Monday, December 14, 2020
Manufacture: Summary
Cost
Component Process Length (m) % Removed Amount processed %
(USD)
Connector Casting - - 0.45 kg 7.6 17.3
Connector Fine machining - 2 0.009 kg 0.032 0.1
Metal powder
Shin - - 1.1 kg 11 26.0
forming
Cutting and
Shin - 1 0.011 kg 1.8e-05 0.0
trimming
Coil Casting - - 1 kg 9.9 22.8
Cutting and
Coil - 2 0.02 kg 3.3e-05 0.0
trimming
Metal powder
Foot Shell - - 0.48 kg 8.5 19.4
forming
Foot Shell Fine machining - 1 0.0048 kg 0.017 0.0
Compression
Socket - - 0.32 kg 6.3 14.4
molding
Cutting and
Socket - 1 0.0032 kg 5.2e-06 0.0
trimming
Total 44 100
Transport: Summary
Package dimensions
Height (m) Width (m) Depth (m)
1 0.5 0.5
Breakdown by components
Mass Cost
Component %
(kg) (USD)
Connector 0.44 0.52 13.4
Shin 1.1 1.3 32.6
Coil 0.98 1.2 29.8
Foot Shell 0.48 0.57 14.6
Socket 0.31 0.37 9.6
Total 3.3 3.9 100
Prosthetic 2.0.prd Report generated by GRANTA EduPack 2020 (C) Granta Design Page 9 / 10
Ltd. Monday, December 14, 2020
Use: Summary
Disposal: Summary
Notes: Summary
Prosthetic 2.0.prd Report generated by GRANTA EduPack 2020 (C) Granta Design Page 10 /
Ltd. 10
Monday, December 14, 2020