Professional Documents
Culture Documents
Reference document and Input Data Aside from specifications, additional elements
such as SDTEs, SMTEs, bolt elements and
Verification
weight information are created and referenced
by specifications elements.
Before starting the project all reference
documents/input data are verified. This step
ensures that there is enough information to
Catalogue and Specification testing and
complete the project. Documents may include checking
standards, specifications, datasheets, bolt
length tables and branch tables. This stage also To make sure the catalogues and specifications
verifies that the documents contain information are working properly, TecSurge performs a
necessary for the creation of PDMS/E3D series of quality tests and checks in different
elements, such as dimensional data, weights, modules as each milestone is reached.
density, or any physical properties of a
a. Model of each component from
component.
specification
Any clarifications or missing information will be Verification of geometry
requested from our client in a report format, to b. Isometric (piping only)
permit the commencement of the next stage. Verification of the connections
Verification of the isometric symbols
Catalogue and Template element Checking of the description and
creation material
c. Draft of each modelled component
For every geometric component with unique Level of representation and obstruction
geometric shape, regardless of the standard or
material, there is a corresponding category Ready catalogues and specifications are then
element (CATE) to be created in the CATA delivered along with a project status report.
database using the PARAGON module. For
templates, a corresponding template element
(TMPL) is created in the DESI database using
the Design module.
3D modelling testing, sample output drawings, When is your target completion date, and
reports and consistency checks using standard when do you expect to start?
application functions are all incorporated in the
quality process. Upon successful testing and Why: The responses to these standard project
checking, the handover package is sent for management parameters can have a significant
customer verification. The client then confirms impact on the cost due to the prioritisation of
their acceptance of the catalogues and work and the manpower required.
specifications and provides comments and
feedback. Any issues raised during this stage If this service describes your situation, and
will be resolved prior to final handover and you’re able to provide the engineering inputs
project completion. and answers to the questions listed here,
please contact us today to discuss your options.
Getting Started
Contact us
Typically, our clients have to prepare all the
input data/documents (standard, datasheets, info@tecsurge.com