Abstract—Power crisis is one of the foremost concerning Each and every year power from new power plants is added
problem in Bangladesh. The gap between demand and to the national grid. Many power plants are still under
production is increasing day by day. System loss, transmission construction. But the total power is transmitted and distributed
loss and established connection to grid without upcoming load through existing infrastructure with some old rating
plan are main issues regarding this crisis. It is possible to transformer, conductors and other equipments. The
control this crisis by taking some necessary steps such as overloading of lines and transformers causes system loss,
system loss reduction, establishing efficient interconnection, transmission and conduction loss take place which in turn
assembling necessary substation etc. Priority should be given causes load shedding or power shortage. [3][4]
to transmission and distribution of electrical energy through
the proper way. This paper represents a case study and Though this paper has analyzed the key problems of
analysis to find out the key problems of existing power system existing power system in Chittagong region, we have aslo
including generating station, interconnected grid system and observed that almost same conditions are found for the every
substations of Chittagong. Existing generating station with important city of this country.
their generating capacity, transmission lines with their length
as well as conductor grade and substation with its load are II. POWER SECTORS SCENARIO OF CHITTAGONG
studied to figure out the major problems and finally it offers
smoe probable solutions of these problems. In 1960, the first power plant of Chittagong (as well as
Bangladesh) was built at Siddhirganj with a capacity of only
10 MW. At that time Kaptai dam was under construction.
Keywords— Interconnection, power scenario, Power Grid, The unit size of Kaptai was 40 MW, which for that time was
Chittagong. considered to be a large power plant. Necessary steps were
taken to construct the side by side 132 KV Dhaka-
I. INTRODUCTION
Chittagong transmission line. Construction of Kaptai dam
and commissioning of Dhaka-Chittagong 132 KV
During the early years small local generating Stations transmission took place in 1962 which was a very important
supplied power to respective local loads. Each generating milestone of power development of Bangladesh.[5]
station needed enough installed capacity to feed the local peak
loads. Problem arises when load becomes greater than the
generating capacity. Interconnection system was considered as Chittagong has become very important city for its port and
a solution for this problem. The interconnected system is very a large number of industries from small size to heavy. Around
efficient and very reliable in transmission and distribution of 40% of the heavy industrial activities of the country is located
electric power if the modeling and designing is properly done. in this city and neighboring areas, which include dry dock,
[1] Dock Yards, Oil Refinery, Steel Mills, Power Plant, Cement
clinker factory, automobile industries, pharmaceutical plants,
chemical plants, cable manufacturing, textiles mills, jute mills,
Energy is the fundamental resource for economic
urea fertilizer factory along with other private sector medium
development of a country. In this modern world, the
size industrial developments and activities. So electricity
dependence on electricity is greater so that it has become a
demand is increasing day by day in Chittagong.
part of our life. The over-increasing uses of electric power for
domestic, commercial and Industrial purposes necessities to
provide bulk electrical power economically. This achieves Presently, there are ten private and public power stations in
with the help of suitable power producing units known as Chittagong. Among them five power plants run by gas,
power plants or electric power generating station. [2] another four power plants run by diesel and one is hydro-
electric power plant. Karnafuli hydro-electric power plant is
the only hydro-electric power plant of the country which
As an underdeveloped country, the socio-economic
produces 230 MW power.
structure of Bangladesh is gradually increasing. So the
demand of power is extending day by day hence the
importance of Transmission and Distribution are becoming
more complicated.
Table-01 shows the list of power plant and total power 230 KV transmission line is 175 Km (Double circuit) and the
production in Chittagong. total length of 132 KV transmission line is 630 Km ACSR
(Aluminum conductor steel reinforced) conductor having
Table -01: List of Power plant in Chittagong Capacity of 600A for both case.
Name of Power Plant Generation From the analysis of existing interconnection system of
Capacity Chittagong, it is found that two 230 KV transmission lines are
(MW) used to connect 230/132 KV grid substation with Raojan and
Comilla. Other substations are interconnected through 132 KV
Karnafuli hydro-electric power plant 230
transmission line. Almost all sub-stations use double circuit
Raojan gas power plant 210 line.
Shikalbaha steam power plant 60
According to transmission voltage level there are two types
Shikalbaha diesel power plant 150 of substation in Chittagong. They are 230/132 KV and 132/33
KV sub-station. A substation of 230/132 KV is placed in
Shikalbaha peaking power station 55 Hathazari having power capacity of 600 MVA. There are
Regent gas power plant 22 sixteen 132/33 KV gird sub-station with a power capacity of
1502 MVA which are situated at Kaptai, Chandraghona,
Malancho diesel power plant 44 Hathazari, Madunaghat, Sikalbaha, Dohazari, Cox‘s bazaar,
Dohazari diesel power plant 100 Halishahar, Khulshi, Baraulia, Julda, Bakalia, Shamirpur, T.K
Chamical Complex, Modern Steel A.K Steel in Chittagong .
Hathazari gas power plant 100
Julda diesel power plant 100
IV. PROBLEMS AND PROBABLE SOLUTIONS FOR EXISTING
Total generation Capacity 1071 GRID INTERCONNECTED SYSTEM IN CHITTAGONG
As a royal city, more and more industries are being A. Incompetent Grid Connection
established in Chittagong. So electricity demand is increasing
at a decreasing rate.Table-02 shows the demand statistics of Dhaka-Chittagong national grid system is interconnected
power in Chittagong. The total generation of Chittagong by Hathazari grid substation with Hathazari-Comilla by
including all public and private power plants is about 1071 230KV transmission line and Hathazari-Feni by 132KV
MW in 2013 and the total load is 1150 MW. transmission line (Both line are double circuited). In case of
any major fault (such as Busbar or line protection failure) at
Table -02: Demand Statistics of Chittagong. Hathazari grid substation, the total interconnected grid system
of Chittagong will be disconnected from the national grid. [6]
Year Load(MW)
Solution:
2005 460
2006 512 This problem will be effectively solved if a 230 KV
2007 563 transmission line is established from Raojan to Madunaghat
and Madunaghat- to Sikalbaha substation. Because the Raojan
2008 625 420MW power station is linked only with Hathazari Sub-
station.
2009 687
2010 755
2011 945
2012 1035
2013 1150
Solution
C. Transformer Overload