Problem Analysis and Probable Solution of Existing Interconnected Grid System


of Chittagong Region

Conference Paper · December 2015


DOI: 10.1109/ICAEE.2015.7506860

CITATIONS READS
0 761

3 authors:

Md Khurshedul Islam Md. Mizanur Rahman


Mississippi State University University of Alberta
17 PUBLICATIONS   36 CITATIONS    28 PUBLICATIONS   121 CITATIONS   

SEE PROFILE SEE PROFILE

Md Fazle Rabbi
Daffodil International University
12 PUBLICATIONS   27 CITATIONS   

SEE PROFILE

Some of the authors of this publication are also working on these related projects:

Power converter View project

TLM METHOD View project

All content following this page was uploaded by Md Khurshedul Islam on 14 September 2017.

The user has requested enhancement of the downloaded file.


Problem Analysis and Probable Solution of Existing Interconnected
Grid System of Chittagong Region
Md. Khurshedul Islam1, Md. Mizanur Rahman2, Md. Fazle Rabbi3
1 2
Lecturer, Department of Electrical & Electronic Engineering Department of Electrical Engineering
1 2
International Islamic University Chittagong (IIUC) Lakehead University, Thunder Bay, Canada
Chittagong, Bangladesh 3
Department of Electrical & Electronic Engineering
E-mail: khurshedeeeiiuc@gmail.com 3
International Islamic University Chittagong (IIUC)
E-mails: mrahman8@lakeheadu.ca
frrazu.bd@gmail.com

Abstract—Power crisis is one of the foremost concerning Each and every year power from new power plants is added
problem in Bangladesh. The gap between demand and to the national grid. Many power plants are still under
production is increasing day by day. System loss, transmission construction. But the total power is transmitted and distributed
loss and established connection to grid without upcoming load through existing infrastructure with some old rating
plan are main issues regarding this crisis. It is possible to transformer, conductors and other equipments. The
control this crisis by taking some necessary steps such as overloading of lines and transformers causes system loss,
system loss reduction, establishing efficient interconnection, transmission and conduction loss take place which in turn
assembling necessary substation etc. Priority should be given causes load shedding or power shortage. [3][4]
to transmission and distribution of electrical energy through
the proper way. This paper represents a case study and Though this paper has analyzed the key problems of
analysis to find out the key problems of existing power system existing power system in Chittagong region, we have aslo
including generating station, interconnected grid system and observed that almost same conditions are found for the every
substations of Chittagong. Existing generating station with important city of this country.
their generating capacity, transmission lines with their length
as well as conductor grade and substation with its load are II. POWER SECTORS SCENARIO OF CHITTAGONG
studied to figure out the major problems and finally it offers
smoe probable solutions of these problems. In 1960, the first power plant of Chittagong (as well as
Bangladesh) was built at Siddhirganj with a capacity of only
10 MW. At that time Kaptai dam was under construction.
Keywords— Interconnection, power scenario, Power Grid, The unit size of Kaptai was 40 MW, which for that time was
Chittagong. considered to be a large power plant. Necessary steps were
taken to construct the side by side 132 KV Dhaka-
I. INTRODUCTION
Chittagong transmission line. Construction of Kaptai dam
and commissioning of Dhaka-Chittagong 132 KV
During the early years small local generating Stations transmission took place in 1962 which was a very important
supplied power to respective local loads. Each generating milestone of power development of Bangladesh.[5]
station needed enough installed capacity to feed the local peak
loads. Problem arises when load becomes greater than the
generating capacity. Interconnection system was considered as Chittagong has become very important city for its port and
a solution for this problem. The interconnected system is very a large number of industries from small size to heavy. Around
efficient and very reliable in transmission and distribution of 40% of the heavy industrial activities of the country is located
electric power if the modeling and designing is properly done. in this city and neighboring areas, which include dry dock,
[1] Dock Yards, Oil Refinery, Steel Mills, Power Plant, Cement
clinker factory, automobile industries, pharmaceutical plants,
chemical plants, cable manufacturing, textiles mills, jute mills,
Energy is the fundamental resource for economic
urea fertilizer factory along with other private sector medium
development of a country. In this modern world, the
size industrial developments and activities. So electricity
dependence on electricity is greater so that it has become a
demand is increasing day by day in Chittagong.
part of our life. The over-increasing uses of electric power for
domestic, commercial and Industrial purposes necessities to
provide bulk electrical power economically. This achieves Presently, there are ten private and public power stations in
with the help of suitable power producing units known as Chittagong. Among them five power plants run by gas,
power plants or electric power generating station. [2] another four power plants run by diesel and one is hydro-
electric power plant. Karnafuli hydro-electric power plant is
the only hydro-electric power plant of the country which
As an underdeveloped country, the socio-economic
produces 230 MW power.
structure of Bangladesh is gradually increasing. So the
demand of power is extending day by day hence the
importance of Transmission and Distribution are becoming
more complicated.
Table-01 shows the list of power plant and total power 230 KV transmission line is 175 Km (Double circuit) and the
production in Chittagong. total length of 132 KV transmission line is 630 Km ACSR
(Aluminum conductor steel reinforced) conductor having
Table -01: List of Power plant in Chittagong Capacity of 600A for both case.

Name of Power Plant Generation From the analysis of existing interconnection system of
Capacity Chittagong, it is found that two 230 KV transmission lines are
(MW) used to connect 230/132 KV grid substation with Raojan and
Comilla. Other substations are interconnected through 132 KV
Karnafuli hydro-electric power plant 230
transmission line. Almost all sub-stations use double circuit
Raojan gas power plant 210 line.
Shikalbaha steam power plant 60
According to transmission voltage level there are two types
Shikalbaha diesel power plant 150 of substation in Chittagong. They are 230/132 KV and 132/33
KV sub-station. A substation of 230/132 KV is placed in
Shikalbaha peaking power station 55 Hathazari having power capacity of 600 MVA. There are
Regent gas power plant 22 sixteen 132/33 KV gird sub-station with a power capacity of
1502 MVA which are situated at Kaptai, Chandraghona,
Malancho diesel power plant 44 Hathazari, Madunaghat, Sikalbaha, Dohazari, Cox‘s bazaar,
Dohazari diesel power plant 100 Halishahar, Khulshi, Baraulia, Julda, Bakalia, Shamirpur, T.K
Chamical Complex, Modern Steel A.K Steel in Chittagong .
Hathazari gas power plant 100
Julda diesel power plant 100
IV. PROBLEMS AND PROBABLE SOLUTIONS FOR EXISTING
Total generation Capacity 1071 GRID INTERCONNECTED SYSTEM IN CHITTAGONG

As a royal city, more and more industries are being A. Incompetent Grid Connection
established in Chittagong. So electricity demand is increasing
at a decreasing rate.Table-02 shows the demand statistics of Dhaka-Chittagong national grid system is interconnected
power in Chittagong. The total generation of Chittagong by Hathazari grid substation with Hathazari-Comilla by
including all public and private power plants is about 1071 230KV transmission line and Hathazari-Feni by 132KV
MW in 2013 and the total load is 1150 MW. transmission line (Both line are double circuited). In case of
any major fault (such as Busbar or line protection failure) at
Table -02: Demand Statistics of Chittagong. Hathazari grid substation, the total interconnected grid system
of Chittagong will be disconnected from the national grid. [6]
Year Load(MW)
Solution:
2005 460
2006 512 This problem will be effectively solved if a 230 KV
2007 563 transmission line is established from Raojan to Madunaghat
and Madunaghat- to Sikalbaha substation. Because the Raojan
2008 625 420MW power station is linked only with Hathazari Sub-
station.
2009 687
2010 755
2011 945
2012 1035
2013 1150

III. EXISTING POWER SYSTEM IN CHITTAGONG

In Chittagong grid system, mainly two types of


transmission line are used according to voltage level. They are Figure 1: Proposed Dhaka-Chittagong Grid interconnection.
230KV and 132KV AC transmission line. The total length of
B. Conductor overload transformer trips by any cause then another one will trip due to
over current. On the other hand Khulshi grid substation has no
The double circuit transmission lines from Hathazari to enough space to install another transformer and expansion the
Madunaghat and from Hathazari to Baraulia use ACSR 132KV Bus bar. So regularly Khulshi substation faces
(Aluminum conductor steel reinforced) conductor having overload problem.
Capacity 600A. Both lines are so old and they can‘t carry the
full load. Hence, overload is occurred in these lines which in Solution:
turn cause load shedding. If the Generation of Chittagong fails
due to shortage of gas and water, then all loads will come from A 132KV substation can be installed at Agrabad area. As
Dhaka through Hathazari grid Sub-Station and both lines will Khulshi-Halishahar 132KV transmission lines pass through
be overloaded. [7] Agrabad area, it eliminates the installation of more 132KV
transmission line. Hence the solution is reasonable.
Solution:
E. Transmission loss
To solve this problem first we have to increase the power
generation of Chittagong. And the line conductor which is
used for the power transmission should be changed by AAAC The load of hill area (i.e Rangamati, Khagrachhri,
(All Aluminium Alloy Conductor) or Finch conductor. If the Bandarban) of greater Chittagong is supplied from the
weight of AAAC or Finch conductor do not support by Hathazari and Chandroghona grid substation by 33KV line.
existing tower then a new 132 KV parallel transmission line Due to the low voltage level and long line length this line has
have to be installed. high line loss and voltage drop. So the consumer of this area
cannot operate electric load properly due to low voltage
problem. [9]

Solution

132/33KV grid substation should be installed at


Rangamati, Khagrachhri and Bandarban area. This substation
will be able to draw power from Chandraghona grid
substation. 132KV supply form Kaptai substation will be
economic. But Kaptai substation is operated by BPDB and
there is no facility to expand the existing 132KV bus bar.

Figure 2: solution for Conductor overload

C. Transformer Overload

A 40 MVA transformer is used in Madunaghat substation


to feed the load, where the total load of this substation is 33
MW to 40 MW. So this old existing transformer cannot full
fill the demand properly and the substation is not reliable
with this single transformer. If the overload or any major
fault occurs in this transformer the people under Madunaghat Figure 3: Transmission loss overcome.
substation will suffer by load shedding. [8]

Solution: V. PROPOSED INTERCONNECTION SYSTEM FOR


CHITTAGONG
This problem can be solved by installing another
transformer of 40 MVA parallel with the existing one. It is The best solution for Chittagong is to increase power
very essential to enhance the reliability of Madunaghat grid generation. The power generation of Chittagong should be
substation. increased up to 1600MW in 2020 and new power station
should be installed except Gas. Because the existing 420MW
D. Substation Overload thermal power station and Sikalbaha (60+150=210) MW
thermal power station cannot continue due to shortage of gas
The present capacity of Khulshi grid substation is [10]. In this situation it will great be a mistake to install gas
126MVA and the maximum load capacity is 110MW where dependent power station. If we install heavy farness oil power
the total load on this substation is more than 155 MW. If one station then per unit generation cost will be increased.
Therefore, Chittagong region should think about nuclear or Forecasting”, In-ternational Journal of Forecasting,
coal power station. If we are able to install that type of power Vol. 26, No. 4, 2010.
station in Chittagong, the power generation & transmission [3] R.F. Engle, C. Mustafa and J. Rice, “Modeling Peak
problem will be solved and then load shedding in Chittagong Electricity Demand”, Journal of
will be negligible. Forecasting, Vol-11:241–251, 1992.
[4] R. L. Sullivan, “Power System Planning, McGraw-
For better performance and reliability, 400 KV double Hill International Book Company”, New York, 1997.
circuit grid interconnection lines from Sikalbaha substation to [5] Debasish Das and Md. Mizanur Rahman, “Prospects
Comilla (north) substation and another 230KV grid ring of Grid Interconnected Power System between
should be established in Chittagong. Also, it is the best time to Bangladesh and Bhutan” International J. Eng. Tech
give our attention on Renewable energy. 8(4):820-826, December 2011.
[6] “Regional cooperation & integration energy:
Figure-4 shows the proposed interconnection system for opportunity for trade ”, South Asia, The World
Chittagong which solves the major problems of existing Bank,
interconnection system. August, 2012.
[7] T. H. M. Sumon Rashid, Md. Rabiul Islam,
VI. CONCLUSION “Prospects of Renewable energy Resources and
Regional Grid Integration for Future Energy Security
This paper shows an analysis of problems and probable and Development in SAARC countries ”,
solutions for existing interconnection system of Chittagong. It International Journal of Research in Engineering and
requires infrastructural changes for higher efficiency, Technology, Volume: 2 Issue: 1, JAN 2013.
reliability and performance. Finally a complete power system [8] Nahid-ur-Rahman Chowdhury, Syed Enam Reza,
interconnection is proposed to meet the demands and can be TofaeelAhamedNitol, Abd-Al-Fattah-IbneMahabub,“
considered as a milestone for this region. Present Scenario and prospect of Chittagong power
system”, International Journal of Renewable Energy
As a part of future work, the problems and all probable Research, Vol.2, No.2, 2012.
solutions will be analyzed for the total interconnected system [9] Noel Alter and ShabibHaider Syed, “Electricity
of Bangladesh. Finally, a unique power system design will be Demand and Supply in Bangladesh” John F.
proposed for the whole country with details cost analysis. Kennedy School of Government, Harvard University,
December 2012.
REFERENCES 10] Khizir Mahmud & A.K.M. MahmudulHaque,
“Power Scenario of Bangladesh and Schemes of
[1] Principle of Power System’ by V.K Mehta &Rohit Sustainable Optimal Reduction in the Power System
Mehta. Loss”, Global Journal of Researches in Engineering
[2] A.Goia, C. May and G. Fusai, “Functional Electrical and Electronics Engineering, Volume 12