You are on page 1of 10
€y A ous Gijlac Ry Jubal Airports eae Director- AR & EP wey e ) Director of Monitoring LM/HJCR/4882/10/2017 aE ex hare Tuesday, Oct 03, 2017 °F SUBJECT: Comments on Work Notification, JCR Ref # 08/2409/JCR, for the MEP containment works for Hero Project at Con B east side. With reference to the above subject please be informed that we have ‘No Objection’ to proceed with the works detailed in the work notification subject to compliance to our below comments: General Comments: 1. Incase of any emergencies at work, immediately call JCR at +97145045000 or 050 4575009. 2. Contractor staff shall mandatorily undergo Safety Induction Program before commencing project work in Airport Premises of DI. Obtain approval from all relevant Departments/Authorities before the commencement of work. 4, PTW approval indicating the date and time of work shall be obtained from JCR before the ‘commencement of work. 5, Before start/finish of the work activity, contact the concemed Shift Duty Engineer for document verification / Safety compliance of the work activity that to be performed. Contact details given below as per location for reference. ion fey Other Airlines (Terminal 1,Con D) | Serco ~ Duty Manager 0543062233 | Cargo and Ancillary Buildings Serco — Duty Manager | 0543062234 Concourse B, Terminal 3 Duty Engineer 050-1076678 Concourse A Duty Engineer 050-2811067 [Concourse Cc Duty Engineer 050-5889906 6. Local Area access permits shall be obtained from Shift Duty Engineer if the scope / location of work require access to AL&SS (Airport Logistics and Special Systems), AU (Airport Utilities) Facilities, For further information on LOCAL AREA ACCESS PERMIT, call THD# (0097145055099, st Apr + um aseegnee aa cocteree Cont'd Page g,0f 5 Pao SEE ost t tmnddeasr sanrray wo BBwes United rob Eras Sh ditainipors dubalarpots.2e > tans aol TT Gus Ciijle> bai Airports LM/HJCR/4882/10/2017 Page 3 of 5 Fit Out Construction Job. 137786 ( WI 13, Any modifications to the Fire Fighting and Fire Alarm systems will require approved drawings and Testing & Commissioning reports approved by DA-FM in charge engineer. 14, Contractor/and Client’s coordinator to ensure that any of the existing services and airport operations are not to be affected 15, Working timing to be as per JCR Permit To Work. 16. Contractor to use suitable lifting machines in case required, and to use proper equipment’s and tools. 17. Contactor shall use the designated service lifis and routes, and shall not interact with passenger's ways. 18. Contractor shall arrange to cart away all the debris and unwanted materials out from the Airport premises. 19. Contractor to submit Completion Certificate along with the As-Built drawings and Operations & Maintenance Manuals (In Hard & Soft Copy) on job completion, EM Mee ments: 1. The contractor shall coordinate with the Concerned DA-ES FM Duty Engineer or M/S, Serco Duty Engineer as per the location before commencing the works. 2. The contractor shall get approval of DA-ES FM-Civil section for any associated works before commencing the job. 3. The contractor shall ensure that adequate sized access panels are provided for all MEP services and equipment above the ceiling for safe maintenance access. 4, The contractor shall ensure that the existing operating services are not damaged as part of the job and any damages caused shall be repaired at his own expense. Any hot-work shall follow the Hot Work Permit system approved by the Airport Fire Service (AFS). 6. Any live work on power distribution networks shall be carried out sirictly after approval of the relevant DA-ES sections along with valid entry permits to the electrical rooms / sub-stations. 7. The contractor shall get permission from other DA authorities especially Airside Operations before commencing the job. 8. All jobs to be carried out with the presence of Proper supervision. 9, Allelectrical works to be carried out after disconnecting the power to the circuits, 10. Proper drainage system to be installed for the package A/C. 11. Water supply shall be provided at roof top for servicing the Package A/C. on Roof top. 12. A thorough Testing and commissioning has to be carried out on completion of all works as per the method statement. Safety Comments 1, Safety Supervision and General Supervision at worksite shall be responsibility of contractor and shall be adhered throughout the activity. Cont'd Page 4 of 5 see pos y varpaspacaue 8) goessree 9 chile PO bon 3 ust Fler 2aosaos aayerrerel ve ioe Unies Wa Emeates Se Gian ce ubaaepors.ae 2 sana apa Uus iliac 8) dubai Airports LM/HJCR/4882/10/2017 Page 5 of 5 Safetv Comments Cont'd. 19. If the subject work involves usage of electrical energy /equipment’s, then Electrical Lock ouTag out systems must be followed from DA Authorized Person, 20. If the nature of work involves working on Scaffold, a DM approved, certified, trained and ‘competent staff shall install, inspect and modify as per the requirement. Relevant scaff-tag shall be ‘maintained on the Scaffold with standard details such as Last Inspected, Due Date, and Status. 21. The area of work must be cleared off any debris before, while and after completion of work Proper housekeeping practices must be followed onsite, with the principle of “A Proper place for everything and everything in its proper place”. 22, Waste generated from the activity at site shall be disposed complying with Waste Management Procedures & Asset disposal process of Dubai Airport. 23, Adequate fire extinguishers and firefighting systems and necessary first aid facilities shall be available for the work being carried out at site. Regards, Lal Mathew Director- Assets Reliability & Engineering Performance ENGINEERING SERVICES UNIT DUBAI AIRPORTS Attachment: Original Work Notification SATN Dubs’ Arpors 1 serrespassce ov) govaarez ep lle PO Bon 2625, Data Eten aaa sen savanna ya toa Uta are Eman Sy Sibanpene eubaiceporsae 1s sas a LT RECEIVED [ Reference # Ioyoa]see Work Notification B}os/ 2409). ae 24 SEP 20h7 1.0 Permit Request Details DARWISH ALUMINIUM AND GLASS CO. LLC. Project/Contract reference: 137786 Project Title: _MEP_ Containment Works for Hero Project Department! Organisation owes Projet Scope: [7] New [) Uperade/ Update [3] Modificaion (Total Makeover Project Exact Location: _Concourse B East Side Project leation’s existingorignlcondions are absolutely known?) YES TJ x0 Stange: _ 30/08/2017 surg Tine: _9600, nding Daw: _30/32/2017_ Exding Tine: _18:00, 1.1 Permit Work Type(s) Wettig Contact cnry [7] cases Disoanting —[X] Mauettming [] Dep Gen | caning grinding | | Woskatheight ork operation | | Erection works Painting Commisining Dry walling ‘Scaffolding ‘Crane operation | * | Drilling *) Cleaning Transporting Stel & ALU work |] Maintenance Decompression Draining woris [T] emotion |] Storage ‘attr worts [| Rand works seneicmeren [| Searles TH signmatings || Surtees Eseaaton Litating [C] dettag — [] Blecet wore J] tesingwens [Z] contra Other: U ole’ Zelloe/tsiF anainens [x] Jobeard/ Contact [x] Mettod statement Layouraning, (LJ and SE Pen others ject Manager Signature Date Prsject Safety Manager Signature Date oa of 240972017, A— 241092017 i Contact Number: 0565045916 Contact Number: 0565045908 Final Authorization (Police / DA Permit controller) Fiease tubal Permit Pequest and attachments va email] personally To the ovat Control Room — Terminal 5 and Modi allow auceks working dass) for approvats processing andor feed back, Please ensure that you are flly aware of ll the existing arrangements / conditions relevant to sour project's scope prior to sending this request, in order to avoid delays. For further assistance and/or follow-up, please call: (0450 4523s or Email pv jerd@idubalarports.ae in 4 2.0 Permit Review & Authorisation After reviewing the request, work deta precautions are required: 2.1 Permit Precautions & Requirements , documentations and physically inspecting the ste /ocaton; the flowing work Safety wach Inala rege ame sete Special earequipment [7] Pest sett Supers cue PPE Traningreyired [7] Fae wc aed Wawa Tov Seley convreyoret [7] Breingapneans Frcccngimensdet [] Grpsuppen Aap et Ingen eae iting sppereqsred [] Fist Abele Sipcomo! Seen ont olson equiee Speckcimclreqed [—] Connie mat cose! [| Das proeson eninten cone Sasccooet ered [] Wear erent Procure col ibn ene ‘ewer sense Fashcomolrepued [7] Netccatlreqara [T] Waghteeor! ‘ne con ‘ase cone! ‘Tesing requ sree ened Confessor reine [J Moxag como! Rate onl Sieekcomolereqated |] Een ranted Bumcoor Flares Lega cont Vista como Warang Someegeied [Spec ramplopss into Cols fs coal dong ees penn el Shor sso ‘Nile coe! Spel yer “Fale cont Menaceoet corms [7] Tenpenng coool Barcading NOC eure! Spite ene is Gude Lie ‘Sear Prcedaes Tries Commit el Others: anach) After reviewing the permit and its attachments, AREE have no objection to authorise this permit subject to: Biu_objrebis 2ycqf dor ‘After reviewing the permit and its attachments, OHSE Engineer have no objection to authorise this permit subject to: “After reviewing jhe permit and its attachments, Airport Duty Manager have yo objection t authorise this permit subject tos 2 Obj\ec 0+ Cordisale ‘LL A DA Enginear's Signature Date GHSE Engineer's Signature Date Fro we DIR-DLV/HOTD/QTN/S&D/17-1036 gare Monday, September 18, 2017 Director of Development - Delivery qyus ond Dubai Airports Head — Terminal Delivery Pac { SUBJECT: Job # 137786 MEP Containment Works for Hero Project YOUR Ref: E-mail from Mr. Wail Abdullah dated 12" September 2017 We refer to the above project and submit our Quotation along with Grand Cost as follows: Scope of Work: PuAwAeN Supply and installation of custom made heavy duty Gi floor box 600mm x 600mm x 434mm (6mm thick) with cable arrangement system made of Imm GI sheet. Supply and installation of custom made heavy duty GI floor box 400mm x 400mm x 100mm (6mm thick) Supply and installation of C30 OPC for containment encasement. Supply and installation of 48 x 250 x NN GT double cabinet trunking including all necessary fittings. Supply and installation of 150 mm dia HDPE pipe including necessary fittings. Supply and installation of 50mm dia GI pipe including necessary fittings. Fabrication of custom made heavy duty GI floor box 600mm x 600mm x 500mm (6mm thick). Contingency Fees 15 % Grand Cost: The cost of the above job amounts to Dhs. 642, 643,00 For any queries please contact the Fit-Out Design Office, on Tele: 5044356 (Ms. Lai Yours faithfully, Lawrence Vincent-Edwards Director of Development - Delivery & ORAT Development Dubai Airports Attachment: BTR Form LUBItes (Dirhams Six Hundred Forty-Two Thousand Six Hundred Forty-Three Only). You are kindly requested to settle the financial part by transferring the amount to S&D Fit Out account. (Form Attached). ‘This price is valid for a period of 30 days from the date of issue. Request becomes automatically cancelled if no response is received within this period. We request you to kindly arrange for clarification meeting fo approval to enable us to proceed with execution, this job along with your forma Lanjawi). eo | | =Dcarimnciat Approve — crus > Dubai Airports DEVELOPMENT DELIVERY SECTION FIT OUT CONSTRUCTION Work Order (DARWISH) Date:19-09-2017 |Job No. 137786 Client Head- Terminal Delivery Description MEP Containment Works for Hero Project S/No. Description of works | Amount: 1 Gwil Works 2 Furniture Work 3 MEP& Civil Works 558,820.00 4 Electrical 5 ELV. 6 Mechanical (Plumbing) 7 Mechanical (HVAC) 8 Others (Phota copier Machines) 9 Others (Annual Leasing Charges) Total |___ 558,820.00 |DA-IPROC No. Amounts Shown are based on attached detailed BOQs [Attachments :- Scope of Work BOQ Drawings Others FOC Manager's Comments :~ Sy cae ek cL es pet Gites ASS oom _DARWISH ALUMINIUM & GLASS co L.L.C. METHOD STATEMENT FOR Containment Works for Hero Project Project: #137786 - MEP Containment works for Hero Project CONTENTS 1.0 Scope 2.0 References 3.0 Responsibilities. 4.0 _ Inspection and Records 5.0 Health and Safety 1.0 Scope Supply and installation of heavy Gl floor box. Supply and installation of containment encasement. Supply and installation of cabinet trunking. Supply and installation of GI pipe. 2.0 References DA-ES Standards 3.0 Responsibilities 3.1 Project manager The Project Manager shall have the overall responsibility for controlling the implementation of the finishing activities and ensure that the work 6-7646270, 06-7646269, Fax : 06-7663420, P.O. Box: 7270, UAQ, UAE Email : info@darwishglass.com, Website : www.darwishglass.com LEER) AP The le AoW tgs AS (QSSE DARWISH ALUMINIUM @& GLASS CO L.L.C SS procedures are applied in a proper way and that the requirements of this procedure are fully implemented achieving the specified standard. 3.2 Site Engineer He will be responsible for planning, organizing and monitoring progress of the subject work. He will ensure that all safety procedure has been followed according to project safety plan. He will liaise with the Foreman to enable him to carry out his work efficiently. He will ensure that the below explained procedure is followed exactly according to specifications. He will ensure that all requirements of inspection and test plan are prior to commencement of each item of the work. 3.3 Safety officer He will ensure that all safety procedure has been followed according to project safety plan, observe works in progress, investigating health and safety complains and coordinate with main contractor for implementation. 3.4 QA/QC Manager He will ensure that work done according to project quality plan, specification, and method statement. 3.5 Site Supervisor He shall be responsible for the day to day activity and monitoring progress for the work of his section. He will liaise with the subcontractor to enable him to carry out his duties according to method statement. Tel : 06-7646270, 04-7646269, Fax : 06-7443430, P.O. Box : 7270, UAQ, UAE Email : info@darwishglass.com, Website : www.darwishglass.com TS Ad The Tg AEM gs AS (ESE DARWISH ALUMINIUM & GLASS CO L.L.C. 4.0 Inspection and Records The usual records of inspections and testing procedures will be taken. 5.0 Health and Safety All workers will be provided with complete PPE. All workers will be provided with proper tools and equipment to execute the work safely. Barrier and hazard tape will be displayed where required. Safety signs will be displayed where required. Safe access will be installed at the work area. Tel : 06-7846270, 06-7646269, Fax : 06-7663430, P.O. Box : 7270, UAG, U Email : info@darwishglass.com, Website : www.darwishglass.com

You might also like