GI-18.200 Safety Audit Guide For Ammonia Refrigeration Plants
GI-18.200 Safety Audit Guide For Ammonia Refrigeration Plants
GI-18.200
May 2007
Replaces TM-242.10-1 / October 2005
Copyright The content of this document is a trade secret. It may not be reproduced, distributed or disclosed to
third parties without proper authorisation. All rights belong to Nestec Ltd., CH-1800 Vevey, Switzerland.
©Nestec Ltd. 2007
Table of Contents
Introduction........................................................................................................................... 2
Audit Guidelines.................................................................................................................... 4
The N-ASA Guide Package...................................................................................................8
The N-ASA Guide Workbook.................................................................................................9
How to start the Audit Guide................................................................................................15
Introduction
Purpose of The purpose of the Audit Guide is to ensure that all Nestlé refrigeration plants
the Audit operating with ammonia are designed, built, operated and maintained in a safe
Guide manner, minimising risks to persons, environment, production and goods.
What is new Revision 02 of this Guide is mainly related to the following changes:
in this
version? Corrections of N-ASA Package V1.0 (Excel Workbook and Guidance Notes).
The revised version becomes N-ASA Package V1.0-a and is embedded page
9.
The list of the corrections is included in the "Main corrections V1.0-a"
worksheet located at the end of the Excel Workbook.
Minor corrections have been made to the Guidance Notes and this Guide.
Continued on next page
Target Ammonia refrigeration plants serving Nestlé operations and operated by third
parties must be audited to make sure that:
N-ASA Guide Package can be downloaded from Nestlé Intranet site "Technical
Instructions/Documents" based at the "Technical and Production" site.
Support and Nestec CO-Eng/Serv department will provide support for the use of the
feedback N-ASA Guide Package.
Please contact:
or
http://intranet.nestle.com/EngServ/
Coordination Market corporate engineering will coordinate and follow up the audits. The
and follow up coordinator has the responsibility to ensure that audits are carried out effectively
and efficiently and must:
Pre-Audits Project Engineers should use the N-ASA Guide Package, especially the
(Project Guidance Notes:
Phase)
To ensure completeness of basic concepts, specifications and offers at a
pre-contract stage.
To assist in the review and approval of ammonia flow sheets, piping and
instrumentation diagrams prior construction start.
To assist in the preparation of documentation and safety standards.
To assist in the preparation of the safety concept that should be part of the
control and monitoring system.
To assist in the preparation of the Emergency Response Plan (ERP).
Continued on next page
Periodic In addition to the Safety Audit, Periodic Safety Checkups shall be performed,
Safety preferably on an annual basis, and include, among others, the following items:
Checkups
Review of the progress made on the actions required during the last audit.
Whenever needed the action plan shall be updated with new deadlines and
with the findings made during the safety checkups.
Inspection of calibration / function test records for the safety cut-outs,
ammonia leak sensors and other instruments related to the plant safety.
Review of the emergency response training records.
Inspection of the refrigeration plant (plant room, production, storage)
Testing of the ammonia refrigeration plant room emergency shut down and
emergency ventilation.
This should be done in the manual or automatic mode (ammonia sensors
activation).
Testing of the local, remote visual and audible alarms
Inspection of the protective equipment used for normal interventions in the
system and for emergency situations.
Periodic Safety Checkup reports shall be part of the documentation that should
be reviewed by the auditors during the Audit.
Audit Following actions shall be taken to ensure the effectiveness of the audit:
preparation
The N-ASA Guide Package will be sent well in advance to the factory by the
market coordinator for the audit preparation.
Failure to do the audit preparation will result in delays in the completion of the
audit and waste the time of both the audit team and the factory staff.
Following information shall be prepared and made available to the audit team
during the audit. The factory shall ensure that the required documentation is
available and gathered in a single location to simplify reference.
- As-built NH3 Piping & Instrumentation Diagrams (PIDs)
- As-built electrical diagrams
- Operating and Maintenance manuals
- Certification documents for compressors, pressure vessels and heat
exchangers
- Emergency Response Plan
- Updated action plan (from last audit) and periodic safety checkup reports.
- Other documents relevant for the assessment of the NH3 plant safety in
the factory and its environment
The as-built ammonia PIDs shall be sent to the audit team for familiarisation
at least 2 weeks prior the audit start.
This will also be a confirmation that the preparation has been completed.
The factory shall allocate their representatives for the audit team and ensure
that sufficient technical and clerical support will be available for the whole
duration of the audit.
Continued on next page
Consultants should be used with caution and only if necessary. They should
not be leader and must have clearly defined roles.
Stage Description
1. Review the factory layout, hazardous areas and R-Plant PIDs
2. Perform a brief inspection to gain an overview of the main areas and
R-Plant components.
3. Audit in detail the R-Plant components such as compressors, vessels,
heat exchangers and pipe work.
It is recommended to audit (i.e. inspect, answer the questionnaire and
assign SIRs) each type of equipment, e.g. compressors, after
performing an inspection of all similar units on site.
In some cases the audit team may be divided in groups to perform the
detailed inspection of a given type of equipment.
4. Audit the hazardous areas such as plant rooms, production areas,
and cold rooms. In some cases the audit team may be divided in
groups to perform the detailed inspection of a given hazardous area.
5. Audit of the organisational aspects like training, emergency response
etc. Recommended after the detailed hardware inspection to allow
the audit team to first become familiar with the plant.
6. Consolidate the Action Plan and add the name(s) of the responsible in
charge of the action and expected completion dates.
7. Based on the content of the Action Plan, recommend a schedule for the
next audit and periodic safety checkups.
8. Present and discuss the audit results and required actions to the factory
management, including whenever possible a cost estimate for the main
required actions.
SIR Definition
"E" = Emergency The defect is so severe that there is immediate danger to
the plant e.g. extended corrosion or organisational defects
that will lead to rapid deterioration of the plant. Or the
inability to safely deal with an incident e.g. lack of
competent staff, no emergency response plan, inadequate
safety equipment etc.
The audit team should ensure that an action is
committed to rectify the defect before leaving the site.
"U" = Urgent The deficiency represents a serious hazard, which may not
be immediately dangerous to life or property and would not
expose the company to any immediate legal action.
A firm deadline should be set to correct the deficiency.
"I" = Improvement Improvement is required, and can be achieved by the factory
through regular channels of maintenance and capital
investment.
Improvements should not be underestimated. It is good
practice to undertake the required corrective actions
latest till the end of the calendar year following the safety
audit.
"N" = Normal No action considered necessary. Where appropriate, the
audit team should include notes explaining why no action is
considered necessary.
No action is required. The audited section is of
acceptable or above normal standard.
Content The original N-ASA Guide (Nestlé - Ammonia Safety Audit) comes as a zipped
"Package" (approx. 280 kB / 1.5 MB unzipped) and includes:
01 Excel 2003 Workbook "N-ASA 2005 V1.0-a March 2007"
11 Guidance Notes (Word 2003)
N-ASA
Package N-ASA package
V1.0-a V1.0-a.zip
The original name of Excel Workbook, N-ASA 2005 V1.0-a (March 2007),
can be changed to any preferred name, including the factory name etc.
The name of the Guidance Notes should not be modified unless the hyperlink
in the corresponding Worksheet is also updated.
Access to Each Worksheet can be accessed by clicking on the bottom tab in the Workbook.
worksheets
Example: "A13 Emergency Response" Worksheet appears when clicking on this
tab.
For more details see "How to start the Audit Guide/Adding and Deleting Worksheets".
Continued on next page
Summary Content
Worksheets The Summary Worksheets shows key data that may be helpful to the factory in
general. The illustrations below show the total number of "I", "U", "E" SIRs
assigned to a given plant item.
Number of Worksheets
The macros for the Summary Worksheets allow for the consolidation of a given
maximum number of Worksheets. These predefined numbers for the various
plant items are listed in the table below.
General General Worksheets refer mainly to worksheets that do not need to be multiplied
Worksheets as a function of the number of plant items like rooms and equipment.
If a SIR different than "N" has been assigned, the Plant Reference, Question
and SIR will be shown even if no specific action has been required; sometimes
the action required can be obvious without additional comment.
N-ASA Cover The Audit Cover Sheet provides an overview of key data such as:
Sheet Factory reference
Audit number and date
Audit Team
Periodic Safety Checkups summary
Safety Index Ratings for the current audit and the previous one.
Ammonia incidents summary
Refrigerant charge modifications and average losses % calculation
System alterations such as major plant extensions, plant items replacement etc.
Guidance ASA Guidance Notes (ASA GN) have been developed to help the auditors
Notes answering the questionnaires. In many cases recommendations, suggestions or
examples, often based on EU Regulations, are provided.
ASA GNs can be modified/updated to reflect the local Regulations, Codes and
practices in force, but the essence of the GNs must be maintained.
The relevant GN can be open through a "blue link" in the Worksheet:
Drop-down Many questions can be answered with the help of a drop-down list.
Lists To display the drop-down list, click on the grey button that appears after having
selected the light blue coloured cell.
Example:
Annex 3: Question A3.1.5: Compressor type?
A list of the most of the most commonly used compressor types, such as "Single
Screw", "Reciprocating" will appear.
Safety Index Ratings (SIRs) and YES/NO answers are selected in the same way.
Formatting of cells
Cells where text can be written (=not locked) have a light yellow background.
These cells are formatted for "wrap text". This means that at the end of a line the
text will continue on the next line, and the row height will automatically be
adjusted to make the whole text visible.
If this should not work, Unprotect the Worksheet, select the whole Worksheet
and go to: Format ==> Row ==> AutoFit
After that Protect again the Worksheet.
Important:
Do not modify row heights manually in unprotected mode. This may lock the
automatic row height adjustment!
In all Worksheets write information in cells with a light yellow background only!
Continued on next page
Starting the Open the N-ASA Workbook in Excel and "Enable Macros" from the message:
Worksheet
To be able to choose whether or not to run macros while starting the Workbook,
change the Security level from High to Medium as follows:
Go to: Tools ==> Macro ==> Security ==> Security Level = Medium
Filling in the Fill in the information required in the N-ASA Cover Sheet such as participants,
Cover Sheet refrigerant charge, SIRs from previous audits etc.
Besides the total number of Is and Us assigned to the system, auditors can
define (optionally) a number of typical findings affected to identical components
(items) for the same reason(s).
Example:
Missing "Auto-Start" sign at 05 compressors ==> the auditors may define this as
01 typical finding.
Some cells, marked with a red triangle in the corner, have in-built comments:
Preparing the As mentioned previously the preparation work is a very important step for the
Worksheets successful completion of a safety audit.
When a Worksheet is added, the tab name will automatically have the next
Index Number. This Index Number is a mere sequence number! It is not the
"Plant Reference", which is an information added in the Worksheet
(As explained in the "Guidance Notes" linked to the Workbook)
Deleting Worksheets
Worksheets should be deleted starting with the one with the last Index Number. If
this is not respected, the Index Number given automatically to Worksheets added
subsequently will not follow the sequence anymore and will have to be corrected
manually. (Also the Index Number in Cell B2 of each Worksheet)
Exchange of Worksheets
Worksheets should not be exchanged between Workbooks unless the correct
link to the macros is restored.
Example: Copy "A3 Compressor 1" or "Compressors Summary" from Workbook
"Factory A" to Workbook "Factory B".
Continued on next page
Updating a Once all Worksheets for a given Annex, have been completed with the required
Summary data, the Summary Worksheets is updated using the button "Update Plant
Worksheet items Summary" in the corresponding "Plant Items Summary" Worksheet.