You are on page 1of 3

Jl. Cempaka Raya.RT No 22.KMnp.

Mekarsari.KeI.

FCO
CORPORATE
No Re 016 /rco/ RRP-NIE/GCV ADB 5.500-5.300/V/2019
Date, 21th May 2019
TO NARADA INTERNATIONAL ENERGY
Mr . JUSRAN .

With Respect
PT. ».MA REZZEKI PERKASA, the seller miner with full legal and
corporate responsibilities confirm that we are ready, willing and able to
offer for sale the following commodity in accordance with the terms and
conditions set out as follows:
Commodi t y Steam coal In Bulk

Or i gin all Mining Sout South Indones ia


Kalimantan,
Quantity delivery 50.000-100.000 MT /Mount

Specification As Per Attached Below


Rejection
E ar 5 .500—S. 3ütJ Kcal,' Kg
ame er s (S . 30ÜKca1,'Kg
ccv
Total Moisture (ARA) 33 *
Inherent Moistures (ADB)

Ash (ALB) max

Volatile Matter (ADB) 388-40*


Total Sulphur (ADB) O, Max

Fixed Carbon (ADA) By Diff

AGI 60 APPROX

Size (0-50) mm

Price Per MT Rp $55.00 (EiZty—Zive united States Dollars)

You are satisfied, we are very happy


Jl. Cempaka Raya.RT No 22.KMnp.
Mekarsari.KeI.

Mother vessel (W) cost Mather vessel CAOTTOGRAM Port is the


destination Of Bangladesh (CA)
Payment Term By Cash perpropgres

Contract Period 12 months, subject to successful performance in first


shipment 50.000—100.000 MT

Loading Port
Jetty PT . Talenta Bumi , Marabahan
position 2 059' 14" South 114047' 6
"East Capasity of garge 300ft 320ft
Facility of Jetty Comveyour
Loading rate 100 to 1500MT /Hours

Jeeey KPP/Hasnur HJU ,sei putting


Position 02—56—10 South 114—53—14 East
Capasi ty of Barge 300ft 32 Oft
Facility of Jetty Comveyour
Loading rate 1000 MT to 1500 MT /Hours

Capasity of Barge 300ft 320ft

Jetty Tapin Coal Terminal , Margasari Tapin


Position 2 0 55'6"South 114 0 55 '2"East
Capasity of Barge 300ft 320ft
Facility of Jetty Comveyour
Loading rate 1500 to 2 000 MT /Hours

0 0
Jetty DTBS, Asam agam Tanah Laue position 3 57' 35"S 115
8'17" Capasi t y of Barge300ft 320ft
Facility of Jetty Comveyour
Loading rate 1000 to 1500 MT / Hours

The position of anchoring mother vessel


Taboneo Anchor age (03 40 oo "S / 114 24 OO "E)vessel

The distance fron the jetty to the position of mother


Between ± 22 mil. To ± 25 mil

Loading rate 7 .500 8000 MT PWWD SHINC

You are satisfied, we are very happy


Jl. Cempaka Raya.RT No 22.KMnp.
Mekarsari.KeI.

Estimated shipment : June 2019


Surveyor :

. GEOSERVICE/SUCOEINDO/PT . ANINDYA , ET. CARSURIN,


SGS , ccxc, sccr . INSPEKTORATE (IOL, PT. TRIYASA PIRSA UTAMA

Validity of Offer;
Within 7 (Seven) working days from issuing date

we are waiting for your positive response reply, for your attention
and cooperation, we thank you

Please sign and if you agree on the


For and on Behalf of available fields

/2019
RAMA REZZEKI PERKASA NARADA INTERNATIONAL ENERGY

Name Mr.JUSRAN
TITLE : Operational Director Title . President Director

TO proceed the above subject matter as plan and schedule

1. Buyer shall approve the FCO, signing and endorse.


2. Buyer shall submit Draft Contract to our company within 3 (days) days
after signing and approve the FCO.
3. Seller review draft of contract.
4. Seller Buyer signing Electronic draft contract
5. Buyer make site (Mine/ stockpile/Jetty) if require.
6. Satisfied with the visit and coal quality, Buye: and seize: sign hard
copy draft of Contract based on electronic contract agreed.

You are satisfied, we are very happy

You might also like