You are on page 1of 12

PT.

MONTALAT JAYA UTAMA


South Barito, Central Kalimantan

EXECUTIVE SUMMARY
Le g a l i t i e s
Company Name P T. M o n t a l a t J a y a U t a m a
Address
Company Name Jl.PSimpang
T. M o n Pembangunan
t a l a t J a y a No.
Ut a53
m Banjarmasin,
a Kalimantan Selatan
Address Jl. Simpang Pembangunan No. 53 Banjarmasin, Kalimantan
Jl.Selatan
Dr. Sutomo No. 10A, Buntok, Kalimantan Tengah.
Jl. Dr. Sutomo No. 10A, Buntok, Kalimantan Tengah.
Location Desa Rampa Mea, Kec. Dusun Utara,
Location Desa Ra mpa
Kabupaten Mea,Selatan,
Barito K e c . Dusun Utara, Tengah
Kalimantan
Kabupaten Barito Selatan, Kalimantan Tengah
Wide Wide 2.575
2.575Ha
Ha
PermitPermit
TypeType IUP
IUPOperation
OperationProduction (IUPOP)
Production(IUP OP)
SK.Bupati Issued 478 Tahun 2009, 7 November 2009
SK. Bupati Issued 478 Tahun 2009, 7 November 2009
Validation Period 19 Years (Until 9 January 2028)
Validation Period 19 Years (until 9 January 2028)
IPPKH Issued SK.431/Menhut-II/2013, 12 June 2013
IPPKHClean
Issued
and Clear Issued SK.431/Menhut-II/2013,
CNCStage IX 12 June 2013
Clean and Clear Issued CNC Stage IX
Te c h n i c a l I n f o rma t i o n
Coal Bearing Formation Montalat and Berai Formation
Outcrops Number 68 outcrops
Coal Bearing
Drill Holes NumberFormation Montalat
120 holes and Berai Formation
Outcrops Number 68 outcrops
Avg. Depth per holes 45 m
Drill Holes Number 120 holes
Thickness 0.3 – 3.50 m
Avg. Depth per holes 45 m
Average Dips 8 – 15 degree
Thickness 0.3 – 3.50 m
Number of Seam 19 seams
Average Dips 8 – 15 degree
Main Seams Seam D, F, Q and M (Exploration Report)
Number of Seam 19 seams
Avg. Thickness : 0.8 – 2.7 m
Main Seams Seam D, F, Q and M (Exploration Report)
Coal Deposits Measured : 13,432,500 MT
Avg. Thickness : 0.8 – 2.7 m
Indicated : 26,582,500 MT
Coal Deposits Measured : 13,432,500 MT
Inferred : 34,650,000 MT
Indicated : 26,582,500 MT
Stripping Ratio (SR) 1 : 10
Inferred : 34,650,000 MT
Mineable reserves : 4,037,980 MT, Area Width: 214 Ha
Co a l Spe c i f i c a t i o n
Parameters Percent (%)
Parameters Percent
Quality – CV (ADB) 5,546 – 5,840 %
5,300 – 5,546
Quality–CV(ADB)
5,840 – 6,000
Sulphur 0.17 - 0.26 %
Sulphur 0.17 - 0.26 %
Total Moisture
Total Moisture 32.4- 36.3
32.4 - 36.3
%%
Inherent Moisture 14.8 - 18.2 %
Inherent Moisture 14.8 - 18.2 %
Volatile Matter 37.8 - 42.7 %
Volatile Matter
Fixed Carbon 37.8
40 - 42.7
- 41.8 %%
Ash 2.1 - 3.5 %
Fixed Carbon 40 - 41.8 %
HGI 49
Ash 2.1 - 3.5 %

HGI 49
O t h e rs I n f o r m a t i o n
Road Hauling Sindo Lumber Road
Road Hauling Eks Inhutani/Kismi Road
Distance 40 – 60 Km
Distance 42 Km to jetty
Stockpile Location
Stockpile Location Pendang Jetty oratHasnur
Gunung Rantau, Jetty, at Barito River
Barito River
Stockpile
Stockpile Capacity
Capacity 50.000–– 100.000
50.000 100.000 MT
MT at
at Gunung
Hasnur Rantau
Port Port
River Wide 250 – 300 m
River Wide 250 – 300 m
River Depth 8 – 10 m
River Barges
Depth Size and Capacity – 10– m
8300 320 ft, Vol ume 8,000 – 10,000 M T
Anchorage Location Muara Taboneo Ancho rage, South Kalimantan
Barges Size and Capacity 300 ft, Volume 8,000 MT
Distance to Anchorage 217 M iles
Anchorage Location Muara Taboneo, South Kalimantan

Distance to Anchorage 217 Miles


Map–IPPKHArea

Coal Quality Block


H a u l i n g R o a d Ac c e s s
Coal Outcrops
Drilling Res ult
Clean and Clear
S K Bu p at i dan S K Menhut

You might also like