DATE ISSUE
EXTERIOR ELEVATIONS 2
3
06/05/2020
2020/08/07
SD 50%
Concept MP Redesign 1
9 2020/09/11 Concept MP Redesign 4.1
A LETTERED KEY NOTES DO NOT IMPLY SEQUENCE. 20 2020/10/23 Schematic Design Rev 11
CONTRACTOR TO PERFORM WORK AS REQUIRED PER WORK
SEQUENCE. 23 2020/11/06 Schematic Design Rev 12
WTS-21B
WTS-11
WTS-03A RS-05
SEAL
WTS-02A
WTS-03A
WTS-30 N
WTS-32 RS-03
WTS-50 RS-05
WTS-02A
KEY PLAN
Owner:
WTS-01
ALUMINUM PANEL, RAINSCREEN, INSULATED
CAVITY WALL SYSTEM (SEE G-002)
SIMULATED WOOD COMPOSITE, RAINSCREEN
Landscape:
WTS-02 INSULATED
CAVITY WALL SYSTEM (SEE G-002)
WTS-03
CERAMIC TILE WALL ON BLOCK WALL (SEE
G-002)
Structural:
ALUMINUM PANEL, STEEL FRAME,
WTS-21A RAINSCREEN, INSULATED CAVITY WALL
SYSTEM (SEE G-002)
GLASS & ALUMINUM CURTAINWALL SYSTEM
WITH INTEGRATED VERTICAL SIMULATED MEP:
WTS-30 "PATINA COPPER" ALUMINUM SUN
SCREENSHUTTER
WALL (SEE G-002)
GLASS & ALUMINUM CURTAINWALL SYSTEM
WTS-31
WITH INTEGRATED HORIZONTAL, SIMULATED
"PATINA COPPER" ALUMINUM SUN SHADES PROJECT TITLE:
(SEE G-002)
GLASS & ALUMINUM CURTAINWALL SYSTEM
RS-06
WTS-32
WITH INTEGRATED BIFOLD SIMULATED
"PATINA COPPER" SCREEN PANELS (SEE
ECOPARK DAESUNG
G-002)
GLASS & ALUMINUM CURTAINWALL SYSTEM
INTERNATIONAL
SCHOOL
WTS-33
WITH INTEGRATED VERTICAL FINS (SEE G-002)
HANOI, VIETNAM
WTS-50 STOREFRONT SYSTEM (SEE G-002)
P.A. / SPORTS
RS-01
PMR SYSTEM WITH EXTENSIVE GREEN ROOF
(SEE G-002)
BUILDING AXONS
82630_ARCH_2020_detached.rvt
A-230
RS-03
ADJUSTABLE PEDESTALS (SEE G-002)
P.A. / SPORTS BUILDING SW AXON P.A. / SPORTS BUILDING SE AXON
11/6/2020 8:03:48 PM
02 01 RS-04
GLASS AND ALUMINUM SKYLIGHT SYSTEM
(SEE G-002)
ALUMINUM PANELS AT CANOPY ON
RS-05 CONCRETE
SLAB (SEE G-002) SCHEMATIC DESIGN
RS-06
COATED ALUMINUM STRUCTURAL STANDING
SEAM ROOF (SEE G-002) 2020.11.06