Safety note

1.The operator must read and grasp the contents of this statement.

2.The operator must Chuanhao overalls, safety shoes, wear a good helmet,
safety gloves.

3.Specification requirements by the end of a good guitar string, can not

access the wrong direction.

4.Must clamp operation of the side openings.

5.The dumping of deduction, it must close the security gate.

6.Dynamic clamp operation shall not be placed within the framework of


other debris.

7.Dynamic clamp operation running, is prohibited Jiang Shoushen part of


the operation.

8.Maintenance and replacement of the jaw plates, teeth, with teeth, such
as block, they should stop or cut off the hydraulic pump source.

9.Pressure is prohibited, the use of ultra-torque force clamp.

10.No one shall be arbitrarily removed or add components.

11.Please use the original accessories.

Safety first standardized operation!

If you can not rule out failure

You may create trouble!


XQ140/20Y Hydraulic Power Tong Manual

Contents

1、Overview
2、Technical parameters
3、Installation
4、Note hydraulic circuit
5、Help
6、Maintenance and lubrication
7、Common Faults and troubleshooting
8、Attached map and schedule of spare parts
a、Main clamp - ZQ
b、Back clamp - BQ
c、I.-pillar - QD, HD
d、Spring hanging tube - TD
XQ140/20Y Hydraulic Power Tong Manual

1、Overview
XQ140/20Y (with XYQ20) of hydraulic power clamp in the oilfield drilling and
workover operations, to the dumping of Φ73-140 within the tubing, small drill pipe
and a small casing thread dynamic clamp larger than the original XYQ12A greater
torque clamp-type power, high-sulphur gas fields, deep ocean oil rigs and when the
necessary tools. The dynamic clamp has the following characteristics:
1、Clamp the first use of surface-card roller climbing tight bodies. All teeth block
equal pressure, cards bear reliable.
2、The main hydraulic clamp back with a combination of supporting clamp clamp, and
the combination of very convenient. Manipulation of the main clamp on the valve
manually, automatically synchronized back clamp clamping simultaneously release the
string, flexible and reliable action.
3、Main clamp and clamp clamp head back cards bear the same institutions, card with
the size of the diameter of dental forceps and teeth, with the main clamp clamp back
the same.
4、Sidang speed and grade differential between the geometric, plus the system
pressure and flow adjustable so that the dynamic clamp torque and speed in a wide
range of adaptation.
5、According to user needs can be reprovisioning of torque control systems,
automatic control to achieve the objective of torque.

2、Technical parameters
1、Main clamp
(1) Adaptation of Φ73-140mm
(2)Rated high-grade torque 2.3 kN.m
Speed 76r/min
(3)Rated, high-end torque 5.5 kN.m
Speed 51r/min
(4) Rated torque, low-grade 11.4 kN.m
Speed 20r/min
(5) Rated low-end torque 20 kN.m
Speed 8.7r/min
(6) Open Size 150mm
(7) The quality of shipments 410kg
2、Back clamp
(1) Adaptation of Φ73-156mm
(2) Open Size 160 mm
(3) The quality of shipments 160kg
(4) Rated torque 20KN.m
3、Portfolio clamp Dimension 1118×631×839 mm
4、Rated pressure system 13MPa
5、Portfolio quality 570kg
6、Rated supply of 120 L/min
Fig1
4
XQ140/20Y Hydraulic Power Tong Manual

3、Installation
1、Hanging. As shown in Figure 1, will hoist drum (YD-1) and the main suspension
clamp-(ZQ-51) associates, the driving force clamp suspended in workover Well shelves.
Hanging from the wellhead point 15 m above. Hanging in a free state, the driving
force for the first clamp clamp from the wellhead center about 0.5 m, suspended high
in back of the card just clamp tubing collar suitable.
2、Leveling. - Adjustment suspension (ZQ-51) on the adjustment screw (ZQ-89), to
maintain the momentum clamp level, before and after adjustment at the top of the
screw I. (QD-6) (HD-6), to clamp back and keep the main clamp Parallel, and its
distance of not less than 40 mm, if not leveling will clamp the first gripping
failure.
3、At the end of rope. Tail rope on one end node in the derrick, the other side
of the junction in the dynamic clamp-seat lead after the Pin (ZQ-30), Mei Sheng La
Force should be able to withstand 2 t load. Usually on the deduction at the end of
the rope, with the tail rope should remain dynamic clamp vertical, as shown in Figure
2. To ensure that manipulation handle on the side of the safety of the operation,
if only the main pair of pliers, tweezers do not have to back, then, the deduction
shall be disposed guitar firmly tail rope, depending on the direction of rope at
the end of withholding or deduction disposal vary.

Fig 2

4、Connected to hydraulic source. Connection from the source of high-pressure


hydraulic hose, the oil supply hose to the upper manual valve oil mouth, back to
the oil hose to the valve manually lower oil mouth, not to the wrong location.
5、Torque-installed. For torque with a portable device, subject to the following
method of installation:
Portable computers will be installed in the car, mechanical shock and avoid the
sun, the rain. Through the installation of communications cables and hydraulic power
in the torque clamp on display connected. Communications cable to choose the
alignment of open space and prevent damage to cables. Torque sensors installed in
the rear clamp back in control surface on the other side. Electromagnetic relief
valve installed in motor Lianjie Ban and manual valve between. All connector link
should be reliable, power earthing grounding reliable, confirmed by connecting the
power supply is 180 V ~ 250V AC AC, confirmed after the power connected.
5
XQ140/20Y Hydraulic Power Tong Manual

1、It portable tubing clamp torque control recording devices installed


in the pipeline clamp the layman plans.

2、Will be portable computers

3、Power, signal converters, 4、Torque monitors installed in the


communications cables pipeline clamp the layman plans

5、Torque sensors installed in the 6、Control valve installed in the


pipeline clamp the layman plans pipeline clamp the layman plans

7、Upload control assembly installed in the pipeline clamp the layman plans

6
XQ140/20Y Hydraulic Power Tong Manual

4、Note hydraulic circuit


The dynamic clamp hydraulic circuit as shown in Figure 3:

Fig 3

Back clamp fuel tank (2) through two quick joints (4) and the main clamp motor (1)
of the parallel, manual valve (3) linkage control the main clamp Motor (1) and clamp
back the fuel tank (2). Clamp the main motor (1) through the transmission driven
clamp the first round of rotation, the fuel tank of the clamp back rack gear driven
by a pair of back-plate clamp jaw rotation angle. As drive back clamp resistance
than the main resistance to clamp drive many small, operating in the linkage, always
back to the main clamp tight clamp card or release the string.
The pressure gauge (6) of the road to a seismic joint (5), so as to reduce the
Circuit of the hydraulic shocks, pressure gauges to extend the service life.
XQ140/20Y hydraulic power clamp pressure and torque response, shown in Figure 4,
Chart A low-end torque for value, Chart B for the low-end torque value, Chart C for
the high-end torque values , Chart D for high-end torque values.

7
XQ140/20Y Hydraulic Power Tong Manual

Mpa D C B A

KN.m

Fig 4

5、Help
1、For the jaw
The dynamic clamp, the main clamp only a jaw plate, there are two back clamp jaw
plates, one of the cards used to bear Φ140 mm casing collar Φ156 mm, another card
to bear the remaining string size, collar or joints . Main clamp and clamp need to
back out jaw plate (ZQ-111), (BQ-28), the first rotation clamp head, jaw-plate
(ZQ-104), (BQ-5) on the limit Luo nails (ZQ -115) (BQ-24)from the first clamp opening
is exposed, from spacing Luo nails, tohejawplatefrom the first central hole clamp
removed or installed.

Main board-jaw

Limit screw

Hexagonal
wrenches,

Back-jaw plate
Back-jaw plate

Limit screw
Hexagonal
wrenches,

Fig 5(Note: the installation process and the demolition process contrary)

8
XQ140/20Y Hydraulic Power Tong Manual

2、Huanya Block and dental forceps


This type of clamp force to replace the teeth on different specifications to meet
the different sizes of cards string tight. Main clamp and clamp clamp back cards
bear the same size diameter, the teeth at GM. Replacement teeth Block, the first
release limit Luo nails (ZQ-115) (BQ-24), from teeth to clamp on the first hole Center
Removed or packed up, for the first clamp, the first clamp head out on teeth, loosened
teeth at one end of the nail block Luo Pin (ZQ-109) (BQ-31) can be removed or packed
clamp teeth. There are three dental forceps arc, small curved teeth to clamp diameter
cards 73-78, in the arc of teeth to clamp cards bear 89-114 diameter, large curved
teeth to clamp more than 114 cards diameter. Reference to the back teeth of the
forceps symbol word choice. Figure 6:

Screw block sale


Dental Block

Dental block

Screwdriver

Fig 6
3、Block list of specifications teeth

No. Procurement code Parts name Tag (steel hyphen) Remarks


1 ZQ-107.1 Dental Block(1) 143-138
2 ZQ-107.2 Dental Block(2) 132.5-128
3 ZQ-107.3 Dental Block(3) 127-122
4 ZQ-107.4 Dental Block(4) 121-116
5 ZQ-107.5 Dental Block(5) 114-109
6 ZQ-107.6 Dental Block(6) 107-102
7 ZQ-107.7 Dental Block(7) 93-86
8 ZQ-107.8 Dental Block(8) 73-70
9 ZQ-107.9 Dental Block(9) 78
10 ZQ-107.10 Dental Block(10) 60
11 BQ-29 Dental Block 156-151 Back clamp dedicated
4、Dental block specifications list
9
XQ140/20Y Hydraulic Power Tong Manual

No
Procurement code Parts name Tag (steel hyphen) Remarks
.
1 ZQ-110.1 Dental block(1) 73-78

2 ZQ-110.2 Dental block(2) 89-114

3 ZQ-110.3 Dental block(3) 121-156

5、Shift operation

Grade title Low-grade The low-grade The high-grade High-grade

The maximum
8.7 20 51 76
speed
Handle
position

Note: This pipeline is the lower and upper clamp shift handle, according to
different combinations can be made into a geometric progression followed by the four
and four speed torque. Grades of the handle of the location see map, shift, the
operation of tubing clamp Ji Man in the speed, so as to avoid injuring gear.

6、Adjustment of the main clamp and clamp back pitch


When the drill pipe on the dumping of small, must carry the main clamp and clamp
the two should be from top to bottom cards in the drill pipe joints, or to be adjusted,
the main clamp and clamp back the pitch to meet and adjust pitch just before and
after the adjustment of the guide pole Luo nails (QD-6) (HD-6) can be.

7、Deduction on the disposal operation


On the deduction at the main clamp and clamp clamp head back alignment gap state,
respectively, will be reset Xuanniu (ZQ-59), (BQ-12) moved upward direction of
deduction, would string power to clamp, for manual manipulation To the valve (ZQ-77)
along the main clamp on the direction of rotation deduction, the deduction. On the
deduction completed manually controlled valve (ZQ-77) to the main clamp transferred
to the main anti-clamp, the first back clamp clamp respectively alignment of the
gap, and then force the withdrawal string clamp, which completed a deduction on the
operation, the dumping of deduction , Its operations and the contrary. -- Figure7

10
XQ140/20Y Hydraulic Power Tong Manual

Xuanniu instructions
direction

Reset Xuanniu

Shirking deduction direction On the deduction direction

Fig 7
8、Main clamp and clamp back on teeth, dental block recommended selection table

Teeth on (steel) Dental block (steel)


String type Diameter mm(in) Main Back Main Back
clamp clamp clamp clamp
7
Tubing 73(2 /8") 70-73 93-86 73-78 89-114
1
Tubing 89(3 /2") 93-86 107-102 89-114 89-114
Tubing 102(4") 107-102 121-116 89-114 89-114
1
Tubing 114(4 /2") 132.5-1
114-109 89-114 121-156
28
7
Tubing(thickening) 73(2 /8") 73-70 93-86 73-78 89-114
1
Tubing(thickening) 89(3 /2") 93-86 114-109 89-114 89-114
Tubing(thickening) 102(4") 107-102 127-122 89-114 121-156
1
Tubing(thickening) 114(4 /2") 132.5-1
114-109 89-114 121-156
28
1
Casing 114(4 /2") 132.5-1
114-109 89-114 121-156
28
Casing 127(5") 127-122 143-138 121-156 121-156
1
Casing 140(5 /2") 143-138 156-151 121-156 121-156
Drill pipe 2 7 /8"(outside) 105(internal flush tool
107-102 107-102 89-114 89-114
joint)
Drill pipe 2 7 /8"(outside) 108(full hole joint) 107-102 107-102 89-114 89-114
Drill pipe 3 1 / 2 "(inside) 108(regular tool joint) 107-102 107-102 89-114 89-114
Drill pipe 3 1 / 2 "(inside) 118(full hole joint) 121-116 121-116 121-156 121-156
Drill pipe 3 1 / 2 "(inside) 121(internal flush tool
121-116 121-116 121-156 121-156
joint)
1、Tubing, casing that both body diameter, on the dumping of deduction, the main clamp body, back
clamping collar;
2、Folder drill pipe joints are drill pipe, drill pipe diameter in the table refers to joint
diameter;
3、With longer lead-back clamp body, according to the actual diameter selected gripping teeth
and tooth Block block;
4、Does not apply to ≧ 340 HB surface hardness of the string;

11
XQ140/20Y Hydraulic Power Tong Manual

5、Special specifications on the teeth, dental block can be customized.

(Note: Before based on the operating table a good choice for the jaw plates, teeth, with teeth clamp)
9、Rack installation plunger
Back clamp open dumping site (BQ-1), double-Gear (BQ-9), cylinder head (BQ-39),
introduced rack plunger, from both ends into Yx Abduction Case-ring, installed Rack
after the plunger to push the middle of the cylinder, in the jaw-plate (BQ-5) and
the main alignment clamp back at the opening, and then into double-gear such as the
unloading of parts. Chart 8

Rack plunger

Fig 8
10、Failure of the swap file maintenance
When a swap file failure, it is necessary for maintenance. Maintenance of:
unloading at a location (ZQ-39) or Tailstock (ZQ-29), in the positioning or at the
end of carts out positioning block (ZQ-38) and Spring, the replacement of a new spring.
Temporary location in the spring and at the appropriate combination of the plus-one
of the pads, can be reassembled, Note: pads can not be thick, thick file will have
difficulty or can not be linked to the phenomenon of shifting . Figure 9

Positioning Block

Tailstock

Positioning block
12
XQ140/20Y Hydraulic Power Tong Manual

Fig 9

6、Maintenance
1、Maintenance date
a、To the body axis and referred axle, double-gear axis of butter mouth
of the Notes grease about 25 ml (see Figure Youzui position 10, Figure
11)

Youzui

Fig 10 Fig 11
b、To the rotation pin, friction films, Fuzheng roller, the jaw-wheel,
etc. Note the oil about 25 ml.
c、Or when the class filled up with wire Shuashua addition to clamp teeth
on the stuffing.
d、Removal of internal clamp of stagnant water, oil sludge, and other
stolen goods.
e、Check all parts (including the jaw plates, teeth, with dental forceps,
the slope plate, etc.) and found that excessive wear, obviously damaged,
rusty or leaking, and replace or processing.
2、On Maintenance
a、Each used a well after cleaning with kerosene or diesel main dorsal
clamp clamp head (including the slope board, roller, the jaw plate, the
jaw board planes, open gear, etc.) and the spring hanging tube, cleaned
rabbit, a Tu Grease.
b、Pliers to open, remove oil pollution, sediment and other Zangwu, the
replacement of excessive wear and damage to parts of the rotation of the
sliding surface and add the oil or grease, and carefully assembled.
3、Hydraulic oil temperature can not exceed 65 ℃, overheating will seal
the hydraulic system failure.
4、Handling, storage and after-sales service
5.1 Handling
a、Hydraulic Power clamp removal, should be a smooth handling, to ensure
that not exposed to moisture, not inverted and not touch loss.
b、Lifting hydraulic power clamp, the application of Φ12 mm over a
13
XQ140/20Y Hydraulic Power Tong Manual

lifting rope, and pay attention to maintaining balance of forceps.


c、Do not over-lifting power tilt swing clamp, pliers in order to avoid
collision, the damaged power clamp.

5.2 Store

a、XYQ20 hydraulic power clamp should be stored in the shade, rain and
moisture, good ventilation, temperature no higher than 45 ℃ places.
b、Shall not be in the muddy ground or open storage.
c、During the storage of oil should protect access to the mouth to prevent
pollutants entering.
d、The new hydraulic power clamp effectively stored for the period from
the date of the factory since 2001, extended, in accordance with specific
circumstances replace some or all of seals and hoses.

5.3 Opening
After the opening of hydraulic power clamp should check the appearance
of the situation, and "packing list" inspection and check.

14
XQ140/20Y Hydraulic Power Tong Manual

5.5Vulnerability of the list (recommended for a pliers use of the reserve, in


accordance with the procurement cycle and the need to buy pieces to change)
Recommended
No. Fig, or standard, Name and specifications Use storage
capacity
1 XQ20.Z-05 Fuzheng roller shaft 20
2 XQ20.Z-36 friction plate 2
3 XQ20.Z-03 Fuzheng Roller 20
4 XQ20.Z-01.02A The main block sale 10
GB1235 For the main valve and clamp
o-seal ring O Φ22× manually connect the transition
5 10
2.4 Lianjie Ban and the main hose
clamp back the ball joints
For the main clamp hydraulic
o-seal ring O Φ32×
6 GB1235 motors and the transition Lianjie 6
3.5
Ban
o-seal ring O Φ36× For the main clamp on the valve
7 6
3.5 manually
o-seal ring O Φ50× For the main cast clamp-round
8 GB1235 6
3.5 waterproof
o-seal ring O Φ56× Clamp rack for the back ends of the
9 GB1235 6
3.5 fuel tank with a plunger
Used to clamp back on the rack
10 JB/ZQ4264 Yx seal ringD45 4
plunger
11 XYQ3C.Z-21 Brake spring 30
Reset the main
12 XQ20.Z-39A 5 sets
assembly Xuanniu
Back reset Xuanniu
13 XQ20.B-02 5 sets
assembly
14 XQ20.Z-01.06 Wheel 20
15 XQ20.Z-01.08 Wheel-axis 20
16 XQ20.Z-01.07B The main slope plate 20
17 XQ20.B-09A Back slope plate 20
Dental block(73-78、
18 XQ20.Z-01.12A The 300
89-114、121-156)
19 Dental Block(1-10) The10
20 Rack plunger assembly 4sets
21 XQ20.Z-01.04A Main board-jaw 2
22 XQ20.B-04 Back-jaw plate 2
23 XQ20.B-03 Back block sale 10
7、Common Faults and troubleshooting
15
XQ140/20Y Hydraulic Power Tong Manual

Common Faults Reason Elimination of

1、Selection of improper teeth Block Replacement of a


corresponding application
of the teeth Block (ZQ-107),
(BQ-29)
2、Clamp teeth hard debris filling the Clear clamp teeth debris in
trench the trench
3、Clamp teeth excessive wear Replacement of the new
Clamp teeth skid dental forceps
4、Clamp the first braking torque too Appropriate for tight brake
small spring (ZQ-32)
5、Clamp the level of non Leveling clamp body (the
main clamp and clamp back)
6、Block sales (ZQ-101), (BQ-4) for Moved to reset Xuanniu
the reduction Xuanniu axis is not (ZQ-59), (BQ-12) 180 degrees
inclusive reset
Main clamp or head Back-to-jaw pliers and the main clamp Switching back two hose
back to clamp clamp to the contrary clamp (BQ-44) position
missing open
Locking force too small Canada pad adjustment,
Not firmly linked to
increase appropriate spring
files, e-shedding
(ZQ-32) the pressure
1、Back then the main anti-hose clamp Re-connected
2、Clamp Circuit blocked the main Circuit filter and clean
dorsal
3、Rack-Fonseca death Polished or replaced
Slipping back clamp 4、Dorsal and tail clamp cylinder Clamp the end of the
or no teeth connecting the damaged clamp replacement cylinder, using
Tailstock the same specifications
teeth Block
5、The aforementioned six reasons for See
the skid
1、Reset Xuanniu wrong direction 180-degree twist to reset
Xuanniu further reduction
2、Panels have been deformed jaw or Repair or replacement of the
Main clamp clamp on
broke mill broke
the back or missing
open
3、Reset pin blocked off Reset block the replacement
sales, not super-torque
operation
Common Fauts Reason Elimination Of

16
XQ140/20Y Hydraulic Power Tong Manual

Lord Bao Si clamp 1、Wheel climb over the first ltra-torque on the dumping
clamp or back-do not of non-deduction; choose the
open appropriate teeth Block
2、Jaw plate, plate-jaw, or wheel Grinding or qualified
shaft sloping panels and other damage replacement parts, not the
use of ultra-torque
3、The first clamp-force too small see
4、Jaw-wheel card death Cleaning, polishing or
replacing wheel and wheel
shaft
5、Main clamp clamp on both sides or Selection of the appropriate
back with a different tooth or teeth teeth or dental Block Block
block Block
6、Main clamp clamp clamp back teeth Proper operation
or only some of Yaozhu string

8、Attached map and schedule of spare parts

17
XQ140/20Y Hydraulic Power Tong Manual

Fig 12 Security doors

Security door components parts Schedule

Procurement
No. Code Name and specifications Amount
code

1 ZQ-94 18 bike Lahuang Lahuang (diameter Φ17, long 95) 1

2 ZQ-96 XQ20.Z-55 Door-axis 2

3 ZQ-95 GB71-85 Slotted cone-bear set Luo nail M8 × 15 2

4 ZQ-93 XQ20.Z-51.00A Security doors 1

18
XQ140/20Y Hydraulic Power Tong Manual

Fig 13 Shell
Shell component parts Schedule
NO
Procurement code Code Name and specifications Amount
.
2.60 within the cylinder head Luo
1 ZQ-76 GB70-85 8
nail M12 × 25
2 ZQ-79 GB93-87 Spring washers M12 8
3 ZQ-98 XQ20.Z-59 Before bearing 2
4 ZQ-1 XQ20-02 Shell 1
2.60 within the cylinder head Luo
5 ZQ-91 GB70-85 4
nail M10×20
6 ZQ-92 XQ20.Z-34 After handlebar 2
7 ZQ-85 XQ20.Z-46 Block orifice (2) 2
Luo slotted cylinder head nails M6
8 ZQ-82 GB68-85 12
× 10
9 ZQ-267 XQ20.Z-61A Torque corresponding licence 1
10 ZQ-268 XQ20.Z-56A Products Tag 1
11 ZQ-38 XQ20.Z-21 Positioning block 1
12 ZQ-32 XQ20.Z-6 Brake spring 1
13 ZQ-30 XQ20.Z-62 Pin tail rope 1
14 ZQ-31 GB91-86 Open Pin 5 × 35 1
15 ZQ-29 XQ20.Z-54 Tailstock 1
2.60 within the cylinder head Luo
16 ZQ-28 GB70-85 4
nail M12×40
17 ZQ-34 XQ20.Z-58 flat key 2
Shen Luo slotted the first nail M5
18 ZQ-26 GB68-85 2
× 16
19 ZQ-24 XQ20.Z-20 bottom cover 1
2.60 within the cylinder head Luo
20 ZQ-25 GB70-85 6
nail M8×20
21 ZQ-20 XQ20.Z-17 end cover 1
22 ZQ-23 GB70-85 2.60 within the cylinder head Luo 4

19
XQ140/20Y Hydraulic Power Tong Manual

nailM6×15

Fig 14 Main clamp clamp head


The main component parts clamp clamp the first schedule

Procurement
No. Code Name and specifications Amount
code
2.60 within the cylinder head
1 ZQ-105 GB70-85 17
Luo nail M10×45
2 ZQ-103 XQ20.Z-01.01A Openings covered gear 1
3 ZQ-115 XQ20.B-10 Luo nail positioning 2
4 ZQ-104 XQ20.Z-01.04A Jaw-plate 1
5 ZQ-106 XQ20.Z-01.05A Open Gear 1
6 ZQ-101 XQ20.Z-01.02A Block sale 1
ZQ-110.1 Dental block(1) 4
7 ZQ-110.2 XQ20.Z-01.12A Dental block(2) 4
ZQ-110.3 Dental block(3) 4
ZQ-107.1 Dental block(1) 2
8 ZQ-107.2 XQ20.Z-01.10 Dental Block(2) 2
ZQ-107.3 Dental Block(3) 2
20
XQ140/20Y Hydraulic Power Tong Manual

ZQ-107.4 Dental Block(4) 2

Procurement
No. Code Name and specifications Amount
code
ZQ-107.5 Dental Block(5) 2
ZQ-107.6 Dental Block(6) 2
ZQ-107.7 Dental Block(7) 2
8 XQ20.Z-01.10
ZQ-107.8 Dental Block(8) 2
ZQ-107.9 Dental Block(9) 2
ZQ-107.10 Dental Block(10) 2
9 ZQ-109 XQ20.Z-01.11 Luo nail block sale 8
10 ZQ-112 XQ20.Z-01.08 Wheel-axis 2
Slotted cone-bear set Luo nail
11 ZQ-113 GB71-85 4
M8 × 12
12 ZQ-114 XQ20.Z-01.06 Wheel 2
13 ZQ-111 XQ20.Z-01.09 gnathostegite 2
14 ZQ-108 GB119-86 Cylindrical pin M6 × 18 4
15 ZQ-116 XQ20.Z-01.07B Ramp 4
2.60 within the cylinder head
16 ZQ-91 GB70-85 12
Luo nail M10×35

21
XQ140/20Y Hydraulic Power Tong Manual

Fig 15 Fuzheng agencies

Fuzheng body parts Parts Schedule

Procurement
NO. Code Name and specifications Amount
code
1 ZQ-63 XQ20.Z-05 Fuzheng roller shaft 20

2 ZQ-61 XQ20.Z-03 Fuzheng Roller 20

3 ZQ-119 XQ20.Z-48 Roller 18

4 ZQ-120 XQ20-04 Roller Bearing 2

5 ZQ-121 GB91-86 Open sales M3 × 20 18

6 ZQ-118 XQ20.Z-49 Pin 18


Shen Luo slotted the first nail M6
7 ZQ-55 GB68-85 20
× 15
8 ZQ-65 XQ20.Z-06 Washer 10

9 ZQ-64 GB5781-86 2.60 bolt head Luo M10 × 15 10


22
XQ140/20Y Hydraulic Power Tong Manual

Fig 16 Brake、reset agencies

23
XQ140/20Y Hydraulic Power Tong Manual

Brake、 reset body parts Parts Schedule

Procurement
NO. Code Name and specifications Amount
code
1 ZQ-58 GB119-86 Cylindrical pin 5 × 20 1

2 ZQ-59 XQ20.Z.1-7 Reset knob 1

3 ZQ-53 XQ20.Z-35 Brake disc 1

4 ZQ-54 XQ20.Z-36 friction plate 2


2.60 within the cylinder head Luo
5 ZQ-25 GB70-85 8
nail M8×20
6 ZQ-57 XQ20.Z-38 Brake steel 1

7 ZQ-60 XQ20.Z-37A Connection board 1


Shen Luo slotted the first nail M10
8 ZQ-55 GB70-85 7
×20
9 ZQ-52 XQ20.Z-33A Clamp Tougai 1
2.60 within the cylinder head Luo
10 ZQ-91 GB70-85 4
nail M10×20
11 ZQ-92 XQ20.Z-34 Beforehandlebar 2

12 ZQ-66 GB5781-86 2.60 bolt head Luo M10 × 45 10

13 ZQ-32 XQ20.Z-6 Brake spring 10

14 ZQ-67 XQ20.Z-34 Back cap 10


Shen Luo slotted the first nail M5
15 ZQ-56 GB68-85 7
×6
16 ZQ-68 XQ20.Z.1-21 Spring 2

17 ZQ-69 GB308-89 Ball S5 2

18 ZQ-70 XQ20.Z-39A Reset knob axis 1


2.60 within the cylinder head Luo
19 ZQ-90 GB70-85 16
nail M10×25

24
XQ140/20Y Hydraulic Power Tong Manual

Fig 17 Idle gear axle

Idle gear axle components schedule

Procurement Amoun
NO. Code Name and specifications
code t
1 ZQ-84 XQ20.Z-45 locating plate 2
2 ZQ-122 XQ20.Z-53 Axle 2
3 ZQ-123 XQ20.Z-42 bushing block 2
4 ZQ-125 XQ20-41 Waterproof enclosures 2
5 ZQ-124 GB1235-76 o-seal ring O 50×3.5 2
6 ZQ-127 GB893.1-86 Hole flexibility Dangquan 100 4
7 ZQ-129 XQ20.Z-43 idle gear 2
Cylindrical roller bearings
8 ZQ-126 GB283-87 4
42309
9 ZQ-128 XQ20.Z-52 Supporting film 2

25
XQ140/20Y Hydraulic Power Tong Manual

Fig 18 suspension pole

polecomponents schedule
Suspension pole

Procurement
NO. Code Name and specifications Amount
code
1 ZQ-51 XQ20.Z-32.00 suspension pole 1
2 ZQ-89 XQ20.Z-65 Top wire 4
2.60 within the cylinder head
3 ZQ-90 GB70-85 8
Luo nail M10×25
4 ZQ-86 XQ20.Z-47 Hanging Block 2
5 ZQ-99 GB1152-89 Grease Nipple M6×1 2
6 ZQ-87 GB91-86 Open sales M4 × 30 2
7 ZQ-88 XQ20.Z-63 Suspension Pivot 2

26
XQ140/20Y Hydraulic Power Tong Manual

Fig 19 Duplex Gear (upper)

(upper)components schedule
Duplex Gear (upper)

Procurement Amoun
NO. Code Name and specifications
code t
1 ZQ-8 GB1152-89 Grease NippleM10×1 1
2 ZQ-48 XQ20.Z-27 Support Central (2) 2
3 ZQ-5 GB308-89 Ball S6 58
4 ZQ-16 Roller Φ10 × 24.8 28
5 ZQ-47 XQ20.Z-29 At Central 1
6 ZQ-49 XQ20.Z-30 Duplex Gear (upper) 1
7 ZQ-46 XQ20.Z-47 Mandrel 1

27
XQ140/20Y Hydraulic Power Tong Manual

Fig 20 Duplex Gear (Lower)

(Lower)components schedule
Duplex Gear (Lower)

Procurement
NO. Code Name and specifications Amount
code
1 ZQ-7 XQ20.Z-10 Mandrel 1

2 ZQ-5 GB308-89 Ball S6 68

3 ZQ-6 XQ20.Z-09 Support Central (1) 2

4 ZQ-3 XQ20.Z-08 Duplex Gear (Lower) 1

5 ZQ-4 Roller Φ10×30 34

6 ZQ-2 XQ20.Z-07 At Central 1

28
XQ140/20Y Hydraulic Power Tong Manual

Fig 21 Hydraulic motors

Hydraulic motors components schedule

Procurement
NO. Code Name and specifications Amount
code
1 ZQ-73 Hydraulic motors 1

2 ZQ-71 GB70-85 2.60 bolt head Luo M16×45 4

3 ZQ-72 GB93-87 Spring washers 16 4

4 ZQ-80 XQ20.Z-50 Connection board transition 1

5 ZQ-43 XQ20.Z-26 Spline shaft 1

6 ZQ-50 XQ20.Z-31A Box 1

29
XQ140/20Y Hydraulic Power Tong Manual

Fig 22 Manual valve

Manual valve components schedule

Procurement
NO. Code Name and specifications Amount
code
1 ZQ-200 XQ20.Z-5-1 Valve 1
2 ZQ-201 GB1235-76 o-seal ring O 36×3.5 2
3 ZQ-202 XQ20.Z-5.1 Portfolio spool 1
4 ZQ-203 XQ20.Z.5-7 Bearing Block 1
2.60 within the cylinder head Luo
5 ZQ-204 GB70-85 4
nail M6×16
6 ZQ-205 XQ20.Z.5-8 Bocha 1
7 ZQ-206 GB91-86 Open sell 3.2 × 20 2
8 ZQ-207 GB882-86 Pin B10 × 40 1
9 ZQ-208 GB882-86 Pin B12×45 1
10 ZQ-27 GB93-87 Spring washers 12 1
11 ZQ-210 GB6170-86 2.60 M12 head Luo mother 1
12 ZQ-211 XQ20.Z.5-9 Joystick 1
13 ZQ-212 XQ20.Z.5-10 Spherical handle 1

30
XQ140/20Y Hydraulic Power Tong Manual

Procurement
NO. Code Name and specifications Amount
code
14 ZQ-213 XQ20.Z.5-12 Plug 1
15 ZQ-214 Copper gasket 14 × 2 1
2.60 within the cylinder head Luo
16 ZQ-215 GB70-85 4
nail M12×35
17 ZQ-216 GB1235-76 o-seal ring O 26×2.4 2
ZQ-217.1 XQ20.Z-24 Mei joints (1) R 3 / 4
18
ZQ-217.2 Mei joints(2)M36×2 2
19 ZQ-218 XQ20.Z.5-2 Valve Tailstock 1
20 ZQ-219 XQ20.Z.5-6 Card 1
21 ZQ-220 XQ20.Z.5-5 Spring Block (2) 1
22 ZQ-221 XQ20.Z.5-4 Spring 1
23 ZQ-222 XQ20.Z.5-3 Spring Block(1) 1
ZQ-269 Valve manually (without Diao Yafa)
ZQ-270 Valve manually (with Diao Yafa)

31
XQ140/20Y Hydraulic Power Tong Manual

Fig 23 Box

Box components schedule

Procurement
NO. Code Name and specifications Amount
code
1 ZQ-50 XQ20.Z-31A Box 1

2 ZQ-83 GB5781-86 2.60 bolt head Luo M12×30 4

3 ZQ-27 GB93-87 Spring washers12 4

4 ZQ-85 XQ20.Z-46 Block orifice (2) 2


Luo slotted cylinder head nails M6
5 ZQ-82 GB68-85 8
× 10
6 ZQ-262 XQ20.Z-57 Grade Tag 1
2.60 within the cylinder head Luo
7 ZQ-37 GB70-85 2
nail M8×15
8 ZQ-39 XQ20.Z-60 Positioning Block 1

9 ZQ-32 XQ20.Z-6 Brake spring 1

10 ZQ-38 XQ20.Z-21 Positioning block 1

11 ZQ-263 XQ20.Z-61A Certification 1

32
XQ140/20Y Hydraulic Power Tong Manual

Fig 24 Spindle
33
XQ140/20Y Hydraulic Power Tong Manual

Spindle components schedule

Procurement
NO. Code Name and specifications Amount
code
1 ZQ-42 XQ20.Z-23A Gasket 1

2 ZQ-45 GB276-89 Deep groove ball bearings 217 1

3 ZQ-43 XQ20.Z-26 Spline shaft 1

4 ZQ-44 XQ20.Z-25 The spline gear (1) 1

5 ZQ-41 GB276-89 Deep groove ball bearings208 1

6 ZQ-40 XQ20.Z-24 Spindle gear 1

7 ZQ-35 GB276-89 Deep groove ball bearings216 1

8 ZQ-36 GB895.2-86 Shaft flexibility Dangquan 80 1

9 ZQ-10 GB895.2-86 Dang Quan steel shaft 60 1

10 ZQ-11 GB309-84 Needle Φ4 × 25.8 50

11 ZQ-9 XQ20.Z-11 Linked to stall gear 1

12 ZQ-18 XQ20.Z-16 Spindle 1

13 ZQ-14 XQ20.Z-14 The spline gear (2) 1

14 ZQ-12 XQ20.Z-12 The sets of teeth 1

15 ZQ-13 XQ20.Z-13 Clutch Gear 1

16 ZQ-16 RollerΦ10×24.8 16

17 ZQ-21 XQ20.Z-18 Supporting film 1

18 ZQ-17 GB276-89 Deep groove ball bearings307 1


Shen Luo slotted the first nail M8
19 ZQ-19 GB68-85 1
× 10

34
XQ140/20Y Hydraulic Power Tong Manual

Fig 25 Institutions linked to stall assembly (1)

Institutions linked to stall assembly (1)components schedule

Procurement
NO. Code Name and specifications Amount
code
1 ZQ-131 XQ20.Z-22.02 Fork 1

2 ZQ-138 XQ20.Z-22.03 Stubbs Central 1

3 ZQ-137 XQ20.Z.6-7 Fork-axis 1

4 ZQ-212 XQ20.Z.5-10 Spherical handle 1

5 ZQ-130 XQ20.Z-22.01 Bushings 2

6 ZQ-133 XQ20.Z.6-4 Roller-axis 1

7 ZQ-134 GB91-86 Open Pin 2 × 10 1

8 ZQ-132 XQ20.Z.6-3 Roller 1

9 ZQ-135 XQ20.Z.6-5 Roller Bearings 1

10 ZQ-136 XQ20.Z.6-6 straight key 1

35
XQ140/20Y Hydraulic Power Tong Manual

Fig 26 Institutions linked to stall assembly (2)

Institutions linked to stall assembly (2)components schedule

Procurement
NO. Code Name and specifications Amount
code
1 ZQ-145 XQ20.Z-19.04 Luo bolt shaft 2

2 ZQ-143 GB276-89 100 ball bearing 2

3 ZQ-144 GB848-85 Gaskets 10-200 HV 2

4 ZQ-140 XQ20.Z-19.02 Fork 1

5 ZQ-146 GB93-87 Spring washers 10 2

6 ZQ-147 GB6170-86 Luo mother M10 2

7 ZQ-142 XQ20.Z-19.03 Fork-axis 1

8 ZQ-212 XQ20.Z.5-10 Spherical handle 1

9 ZQ-139 XQ20.Z-19.01 Bushings 2

10 ZQ-133 XQ20.Z.6-4 Roller-axis 1

11 ZQ-134 GB91-86 Open Pin 2 × 10 1

12 ZQ-132 XQ20.Z.6-3 Roller 1

13 ZQ-135 XQ20.Z.6-5 Roller Bearings 1

14 ZQ-141 GB1096-79 straight key 6×6×40 1

36
XQ140/20Y Hydraulic Power Tong Manual

Fig 27 Back clamp clamp head

37
XQ140/20Y Hydraulic Power Tong Manual

Back clamp clamp head components schedule


NO. Procurement code Code Name and specifications Amount
2.60 within the cylinder head Luo
1 ZQB-91 GB70-85 16
nail M10×20
2 ZQB-19 ZQ.B-34 After handlebar 2
3 ZQB-1 XQ20.B-01 Back clamp shelters 1
4 ZQB-3 XQ20.B-02 Back clamp reset knob axis 1
5 ZQB-72 XQ20.B-35 Roller 1
6 ZQB-4 XQ20.B-03 Block sale 1
7 ZQB-24 XQ20.B-10 Luo nail positioning 2
8 ZQB-5 XQ20.B-04 Back-plate clamp jaw 1
9 ZQB-21 XQ20.B-08.1 Clamp the main dorsal 1
10 ZQB-17 XQ20.B-07 Before bearing 2
2.60 within the cylinder head Luo
11 ZQB-18 GB70-85 6
nail M12×30
12 ZQB-27 GB93-87 Spring washers12 4
13 ZQB-12 XQ20.B-2 Back clamp reset knob 1
14 ZQB-58 GB119-86 Cylindrical pin 5 × 20 1
15 ZQB-11 XQ20.B-20 Spring 2
16 ZQB-69 GB308-89 Ball S5 2
17 ZQB-71 XQ20.B-34 Axis 1
2.60 within the cylinder head Luo
18 ZQB-20 GB70-85 17
nail M10×30
2.60 within the cylinder head Luo
19 ZQB-90 GB70-85 2
nail M10×25
20 ZQB-110.3 XQ20.Z-01.12 Dental block(3)R65 4
21 ZQB-29 XQ20.B-12 Dental Block(156-151) 2
22 ZQB-31 XQ20.Z-01.11 Luo nail block sale 8
23 ZQB-27 XQ20.Z-01.08 Wheel-axis 2
Slotted cone-bear set Luo nail M8
24 ZQB-113 GB71-85 4
× 12
25 ZQB-25 XQ20.Z-01.06 Wheel 2

26 ZQB-28.1 XQ20.B-11 gnathostegite(1) 2


ZQB-28.2 gnathostegite(2) 2
27 ZQB-108 GB119-86 Cylindrical pin 6 × 18 4
28 ZQB-23 XQ20.B-09A Ramp 4

38
XQ140/20Y Hydraulic Power Tong Manual

Fig 28 Back clamp Tailstock

Back clamp Tailstock components schedule

NO. Procurement code Code Name and specifications Amount


1 ZQB-35 XQ20.B-08.3 straight key 2
2 ZQB-19 XQ20.B-13 Cylinder 1
3 ZQB-1 JB/ZQ4264-86 Hole Yx-ring D45 2
4 ZQB-3 XQ20.B-15 Flat 2
2.60 within the cylinder head Luo
5 ZQB-72 GB70-85 3
nail M6×15
6 ZQB-4 GB1235-76 o-seal ring O 56×3.5 2
7 ZQB-24 XQ20.B-14 Cylinder 2
2.60 within the cylinder head Luo
8 ZQB-5 GB70-85 8
nail M12×30
9 ZQB-21 XQ20.B-9 Yau Tong Luo Shuan 2
10 ZQB-17 GB1235-76 o-seal ring O 22×2.4 4
11 ZQB-18 XQ20.B-17 Joints 1 each
12 ZQB-27 JB/ZQ4427-86 Hose connector 10 Ⅱ -900/1000 1 each
13 ZQB-12 XQ20.B-12 Lengthened joints 1
39
XQ140/20Y Hydraulic Power Tong Manual

NO. Procurement code Code Name and specifications Amount


14 ZQB-58 XQ20.B-16 Rack plunger 1
15 ZQB-11 XQ20.B-08.2 Clamp the main rear dorsal 1
16 ZQB-69 GB93-87 Spring washers12 1
17 ZQB-71 XQ20.B-05 Luo positioning nail M12 × 20 1
2.60 within the cylinder head Luo
18 ZQB-20 GB70-85 4
nail M16×40
19 ZQB-90 GB93-87 Spring washers16 4
20 ZQB-110.3 XQ20.B-8 Double-gear 1
21 ZQB-29 XQ20.B-7 Shaft 1
22 ZQB-31 XQ20.Z-20 locator card 1

Fig 29 Assembly leader

Assembly leader components schedule

Procurement
NO. Code Name and specifications Amount
code
1 ZQQ-01 XQ20.QD-01 Block leader 1

2 ZQQ-02 XQ20.QD-02 Leader of tube 1

3 ZQQ-03 XQ20.QD-03 Leader 1

4 ZQQ-04 XQ20.QD-04 Spring-leader 1

5 ZQQ-05 XQ20.QD-05 Pin 1

6 ZQQ-06 GB91 Open sell 2.5 × 20 1

40
XQ140/20Y Hydraulic Power Tong Manual

Fig 30 After the guided-assembly

After the guided-assembly components schedule

Procurement
NO. Code Name and specifications Amount
code
1 ZQH-01 XQ20.QD-01 After the guided-Block 1

2 ZQH-02 XQ20.QD-02 After the guided-cylinder 1

3 ZQH-03 XQ20.QD-03 After the guided 1

4 ZQH-04 XQ20.QD-04 Before and after the lead-spring 1

5 ZQH-05 XQ20.QD-05 Pin 1

6 ZQH-06 GB91 Open sell 2.5×20 1

41
XQ140/20Y Hydraulic Power Tong Manual

Fig 31 Spring hanging tube assembly

Spring hanging tube assemblycomponents schedule

Procurement
NO. Code Name and specifications Amount
code
1 ZQT-01 XQ20.QT-01 Luo mother M20 2

2 ZQT-02 XQ20.QT-02 Joints 1

3 ZQT-03 XQ20.QT-03 Suspension 1

4 ZQT-04 XQ20.QT-04 Spring 1

5 ZQT-05 XQ20.QT-05 Cover 1

6 ZQT-06 XQ20.QT-06 Open sell4×40 1

7 ZQT-07 XQ20.QT-07 Working tube 1

8 ZQT-08 XQ20.QT-08 The first suspension 1

9 ZQT-09 XQ20.QT-09 2.60 bolt head Luo M20 × 70 2


42

You might also like