Professional Documents
Culture Documents
PO: S/4526238
Content
❖ Introduction
❖ Scope of work
❖ Safety
❖ Site Mobilization
❖ Oil draining.
❖ Testing of Bushings
❖ Site clearance
❖ Demobilization
❖ Annexure
• Reference photos
PO: S/4526238
Introduction
The main objective of this project describes Diagnostics Testing and Oil Processing
Service at Alba Line 5 Transformer units (6 nos). PGP contracting carried out the
services on following Transformer units under the supervision of ALBA.
Scope of work:
PO: S/4526238
Note:
The Activities described in this report are same and common for all 6 Transformer
units .
Transformer specifications
• Transformer Type 1:
specifications:
• Gas turbine Generator Step-up
Transformer
• Rated Power (MVA):487.1
• Block # 1#2#3- HV/LV
• Voltage (kV): 230/20
• Make GE
• HV/LV Current (Amp)
979.0/11258.3
• Vector Group Ynd11
• Transformer Type 2:
Specifications:
• Steam turbine Generator Step-up
Transformer
• Rated Power (MVA):196
• Block # 1#2#3- HV/LV
• Voltage (kV): 230/219
• Make GE
• HV/LV Current (Amp)
624.8/5955.8
• Vector Group Ynd11
Diagnostics Testing and Oil Processing
PO: S/4526238
Safety
In Alba Line 5 Transformer services, all necessary safety PPEs and procedures are
followed by PGP employees as per the Alba safety Policies .
Safety Meeting and daily Tool Box Talk Fire Extinguisher Usage
PO: S/4526238
PO: S/4526238
MANPOWER USED :
Site Manager
1 Ramakrishnan Project
Electrical Technician
4 Gunaseelan Electrical
Electrical Technician
5 Pravin Nagarajan Electrical
Safety
9 Cyril Atemkeng Safety Officer
Mechanical
10 Ansar Ali Crane Operator
Mechanical
11 Moeen Rashid Rigger
Diagnostics Testing and Oil Processing
PO: S/4526238
PO: S/4526238
PO: S/4526238
• House keeping
• Safety & tool box talk
• Continuation of Oil circulation for ST 74
5 15.2.2021 • Housekeeping maintained at site.
Manpower –9
PO: S/4526238
PO: S/4526238
Additional work :
Bushing Inspection On Block 1 :
In Both GT 71BAT10 & ST 72BAT transformer units , B phase bushing test tap cover found
carbonized with smoke.
In ST 82BAT transformer unit , B phase bushing test tap cover found carbonized .
Due to the abnormalities noticed while inspecting the bushings Test lead cap , the followings
additional work has been performed as instructed by Alba .
Diagnostics Testing and Oil Processing
PO: S/4526238
PO: S/4526238
Site preparation
All necessary tools and equipment were mobilized to site and stored in allocated area and
barricaded.
PO: S/4526238
Scaffolding :
In this project, scaffolding erected in both hv and Lv side to drain oil from the
chambers and to open chambers inspection windows. Scaffolding were inspected at
regular intervals before Initiating the job.
Oil Draining:
The HV chamber oil drained to oil storage tanks . ensured that oil from each
chambers and conservator completely drained and stored in storage Tanks.
Diagnostics Testing and Oil Processing
PO: S/4526238
Oil sampling:
Before Processing the oil , oil sample was taken. Oil Parameters were tested by Alba
Lab.
PO: S/4526238
Inspection of LV side :
Lv side chambers and Bushings are inspected internally for any abnormalities .
Oil circulation :
Oil in the storage tanks circulated on required cycles and ensured the BDV and PPM
values are at correct parameters .
Diagnostics Testing and Oil Processing
PO: S/4526238
Testing of Bushings
Bushings test were conducted on each bushings in HV side and tested values are
recorded and witnessed by Alba supervisor.
Link Fixing :
PO: S/4526238
Final Inspection :
PO: S/4526238
Demobilization:
With proper clearance and inspection , storage tanks and machines are demobilized
from site .
Handover :
After completion of final inspection , Ensured all the tools and materials are cleared
from the site with proper housekeeping and handover to Alba .
Diagnostics Testing and Oil Processing
PO: S/4526238
PO: S/4526238
PO: S/4526238
TRANSFORMER DETAILS
Customer : ALBA
Make :GE
Rated Frequency : 50 Hz
Serial No 5337PA169-01
Tested By Witnessed/Approved 8
Company PGP Contracting
Signature
Page NO. 01
`JstsJ ___
E -- a \ i
L_-.(jA
/,a Lz`e l""nel"a
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS
Po/s:45236238
nag.dr-..-
Transformer Test Report Date: 05/02/2021
Location: Block-01 Transformer - GT-71BAT1 Serial No. 5337PA169-01
Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name f ln\,Itv,f7 ts§£t=LAr`O S OS`S
Signature
&`fuftfan,
u page No. 02
PROJECT-ALBA LINE-05 DIAGNOSTIC
i.
TESTING AND OIL PROCESS
Po/s:45236238
HV Y Phase Rushing:
TanDelta-PF 2:
Card Type: TanDelta
Date/TiliFie: 02/05,r202113:25:43
Overload : n c}
Assessment: n/a
CPTD= 81217F
Calib.No.i 37.0
By= 0mii=ron electronics: Factorly. Calibration
Calibrat.ion Date: 01.J.17../201714:10:24
Mode= UST-A
Bandwidth; 5Hz
Averaging: 5
Temperature Compensation: k: 1.00
T oil: 20-00 0C
T ambient: 21.00 oc
rel. Hum.: 31.o c:ro
Results=
Vtest I vnieas. i Imeas. Frequency ( Cp I DF t
10.Q0000 k`.' 1000o `..J 0.95887 rnA ±50.00 Hz 305.21 pF 0.3006?..a
Tested By Witnessed/A|)proved By
Company PGP Contracting
Signature
Page No. 03
PROJECT-ALBA LINE-05 DIAGNOSTIC
6-gz=i5=-'-.-----.- TESTING ANI) OIL PROCESS
Po/s:45236238
HV 8 Pliase Bushing:
TanDelta-PF 1:
Card Type: TanDelta
Date/Time: 02/05/202113:22:15
Ch/euload : no
Assessment: n./'a
CPTD= 81217F
Ca'ib.No.= 37.0
By= C)micron electrcinics; Factory Calibration
Calibration Date: 01./17/201714:10:24
hlode= UST-A
Bandwidth: 5Hz
Averaging: 5
Temperature CotTipensation= k: 1.00
T oil: 20.00 ac
T ambient: 21.oo oc
rel. Hum.: 31.0 a/a
Resu]ts=
Vtest I v meas. I meas, Frequeney| Cp DF
10.00000 k`..` 10001\J 0.95774mA *50.00 Hz 304.84pF 0.3001 Pp:
Tested By Witnessed/Approved By
Company PGP Contracting
Signature
Page NO. 04
I:---ed€,` _ PROJECT-ALBA LINE-05 DIAGNOSTIC
«.-. rs , ..1. r
TESTING AND OIL PROCESS ch€¥Bdi-,A . --
_
Po/s:45236238
Measured Pointrv-Tank
No Time Oun)
1 01 87.2 GQ
2 05 132 GQ
3 10 147 GQ
4 PI Value 1.685
Measured Point(01Min)
No R Value
® Criteria: R Value Required Minimum loo M£2 for Core hsu lation and 800 M£2 for Winding @ 01 Min
• Criteria: PI Value Must be Higher than 1.5@ ( 10Mirv01Min
• Remarks: Test results are found Satisfactory
Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name (s``jp~ a c`S:x=s= LArfo ,BEX`9.
Signature
S" v PageNo. 05
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING ANI) OIL PROCESS
Po/s:45236238
TRANSFORMER DETAILS
Customel. : ALBA
Make :GE
RatedFrequency : 50Hz
Serial No 5337PA169-04
Tested By Witnessed/Approved By
Company PGP Contracting
sigratHre
Page NO. 01
r` ----3f i st`- __- PROJECT-ALBA LINE-05 DIAGNOSTIC
I-`, " , .J`-. '
TESTING AND OIL PROCESS diaflnI--- --
Po/s:45236238
Tested By Witnessed/Approved By
Company PGP Contrasting Alba
Name £`givflfl=E- I uaro 8 C¥` 9
Signature
ofAVf2fro.
Page NO. 02
r__`• rfe iin`` _---
PROJECT-ALBA LINH-05 DIAGNOSTIC
TESTING AND OIL PROCESS nQTID-® .--
=r=_=LjinrLT,un Po/s:45236238
TanDelta-PF 1:
Card Type: TanDelta
Date/Time: 02./05/202110:47:31
Chrerload: ri a
Assessrrtent: n/a
CPTD: 81217F
Calib.No.: 37.0
By: Omicron electronics; Factory Calibration
Calibration Date: 01/17;'201714: 10:24
Mode: UST-A
Banduridth: 5 Hz
Avel-ag i ng: 5
Temperature CofTtpensation: k: 1.00
T c)il: 20-00 0C
T ambient: 21.00 oC
rel. Hum.: 31.0 P.'a
Results:
Vtest !Vmeas.i Imeas. iFrequency| Cp I DF i
10.00000 kv 10000V Cl.964S4 rnA *5Cl.00 Hz 307.12 pF 0.2994 C!.';
HV Y Phase Bushing:
TanDelta-PF 2:
Card Type: TanDelta
Date/Time: 02`/05/202110:53:07
o`/erload: no
Assessment: n/a
CPTD: 81217F
Calib.Mo.: 37.0
By: Ornicron electrc)nics; Factory Calibratlc]n
Calibration Date: 01./.17./201714: 10:24
Mode: lJST-.a`
Banduridth; 5 Hz
Aver'aging: S
Temperature CofT.pensation: k: 1.00
T oil: 20.00 ®C
T ambient: 21.00 oC
ref. Hum.: 31.0 e.r®
Flesutts=
Vtest |Vmeas.I Irneas. !F=f-equenc`r! Cp i DF (
10.00000 kv 10001'ur 0.95407mA #50.00 HZ 303.67PF 0.3105%
Tested By Witnessed/Approved By
Company P_GP contracting Alba
Name £tl\}r`F)c`#`=ELfi+i®S9C9S.S±
Signature
cg!
Page No. 03
(---e#' ,`` __
f%¥\RA#TING
PROJFCT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS dQ(|B _
Po/s:45236238
TanDelta-PF 3=
Card Type: TanDelta
Date/Time: 02`/r05./202110:56:27
Overload: no
Assessment: n..'a
CPTD: 81217F
Ca]ib.No.: 37.0
By: Omicron electrQni€s: Factory calibration
Calibration Oat.e: 01/17/201714:10:24
Mode: UST-A
Bandwidth: 5 Hz
Averagir)g: 5
Temperattire Cofnpensation: k: 1-00
T oil: 20.00 ac
T ambient: 21.00 oc
rel. Hum.: 31.0 C!/a
Results=
Vtest |Vmeas.I Ifneas. |Frequencv| Cp I DF I
10.00000 kv 10001V 0.9S004mA R50.00Hz 3C}2.38 pF 0.3278 P.`o
Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name £,,Irtyf9^q±Eha.o ,9c7Lq±_Q .
Signature
a.fu L,
Page NO. 04
-.--3#,--I -_-_
PROJECT-ALBA LINE-05 DIAGNOSTIC
f=irg=T=#cT.NG TESTING AND OIL PROCESS a(I.di"-'--
Po/s:45236238
Measured PointHV-Tank
No Time qun)
1 01 77.7 GQ
2 05 120 GQ
3 10 126 GQ
4 PI Value 1.621
Measured Point(01Min)
No IR Value
® Criteria: IR Value Required Minimum 100 M£2 for Core hsu lation and 800 M£2 for Winding @ 01 Min
• Criteria: PI Value Must be Higher than I.5@ (10Min/OIMin
• Remarks: Test results are found Satisfactory
Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name ls,.I."flts1€FLflr..a3cyL`-S±
SignatureI
Sgiv A
Pa8eNO. 05
•--= sd:-_ _` PROJECT-ALBA LINE-05 DIAGNOSTIC
-- - ira
ZZ`fl,/CONTRACTING
TESTING AND OIL PROCESS dcTldi -,, . --
Po/s:45236238
TRANSFORMER DETAILS
Customer : ALBA
Make : GE
Ratedvoltage : HV -230000V
:LV - 20000V
RatedFrequency : 50Hz
Serial No 5337PA169-02
Tested By W itnessed/Approved By
Company PGP contracting Alba
Nape /trL.oAvfl€EETLaLr\T)ASO_SLJ±
Sfgnature
fr. .fl
Page NO. 01
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS
Po/s:45236238
HV Y Phase Bushing:
TanDelta-PF 2:
Card Type: TanDelta
Date/Time: 02/13/202110:27:43
Ch/erload: na
Assessment: n./a
CPTD: 81217F
Calib.No.: 37.0
By: C)micron electrc)nics; Factory Calibration
Calibration Date: 01./17/201714:10:24
tu,ode= UST-A
Bandwidth: 5Hz
Averaging: 5
Temperatuf-e Compensation: k: 1.00
T oil: 2o.0o oc
T ambient: 22.oo oC
rel. Hum.: 31.0 ?v.6
Results:
Vtest |Vttteas.i Imeas. !Frequenc`/ Cp , DF i
10.00000 k\..10001 V 0.95725 rnA *50.00 liz 304.67 pF CI.3056 a,'o
Tested By Witnessed/Approved By
Company PGP Contracting
c2S.Si
Signature
Page NO. 03
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS
Po/s:45236238
HV 8 Phase Bushing:
TanDelta-PF 3:
Card Tvpe! TanDelta
Date/Time: 02/13/202110:29:58
Overload: no
Assessment: n/a
CPTD: 81217F
Ca'ib-No.: 37.C'
By: Cmicron electrcmics; Factory Calibration
Calibration Date: 01/17/`201714:10:24
Dlode: UST-A
Bandwidth: 5Hz
Averaging: 5
TeiTtperatLEf-e Cornp€nsation: k: 1.00
T oil: 20.00 OC
T ambient: 22.Clo oc
rel. Hum.: 31.0 I?;a
Results:
Vtest :Vmeas.i Imeas. Frequentry CpDF
10.00000kv 10000V 0.99850mA *50.00Hz 317.82pF 0.3879°i'a
Tested By Witnessed/Approved By
Company PGP Contracting
Signature
Page NO. 04
•-. zg
,, -,IE=-,
'J, -Idfl i/'C O NTRACT|NG
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS n(fld ,-
Po/s:45236238
Measured PointIV-Tank
No Time (Min)
1 01 107 GQ
2 05 157 GQ
3 10 185 GQ
4 PI Value I.728
Measured Point(01Min)
No IR Value
Criteria: in Value Required Minimum 100 M£2 for Core Insu1ation and 800 M£2 for Winding @ 01 Min
• Criteria: PI Value Must be Higher than 1. 5@ ( 10Min/01Min
• Remarks: Test results are found Satisfactory
Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name f&`.IN f+hiti=`E LArc f== |``.e`S` .
Signatul.eI
fr fro
Pa8eNO. 05
`-. PROJECT-ALBA LINE-05 DIAGNOSTIC
t,«)o
•\ ,`,-, :,.
TESTING AND OIL PROCESS •--. -_
Po/s:45236238
TRANSFORMER DETAILS
Customer : ALBA
Make : GE
Ratedvoltage : HV -230000V
:LV - 19000V
RatedFrequency :50IIz
Serial No : 5337PA169-05
Tested By Witnessed/Approved By
Company PGP contracting Alba
Name I-J=`, I , =*,*
SEgnzrfure
6'+_
-I
Page No. 01
r=i--3#,S± __
\Lri6=i,¥EfacTiNG
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS ('Q(.t' -,+ . --
Po/s:45236238
TRANSFORMER DETAILS
Customer : ALBA
Make : GE
Ratedvoltage : HV -230000V
:LV - 19000V
RatedFrequency : 50Hz
Serial No : 5337PA169-05
Tested By Witnessed/Approved By
Company PGP contracting Alba
Name R-.I A i.. , .- __j I \ a=.
Sfgnahare
f}:fyvN2
-I
Page No. 01
(-i-5#-: _
-- a = ` . . €
/a
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS @(I.d
I;zzre.urHjmeT.H® Po/s:45236238 .,.
Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name iin...AIR is:x=sJ.AN fr} nQ!Q
Signatul.e
9 Page NO. 02
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS
---.-,.--..-I,,i
Po/s:45236238
HV Y Phase Bushing:
TanDelta-F]F 2:
Card Type: TanDelta
Date/Time: C)2/`13,'202115:5S:47
Ch/erload: no
Assessment: n/a
CPTD= 81217F
Calib-No.i 37.a
By= 0micron electronics; Factor/ Calibration
Calibration flate: 01/17/201714:10:24
f4ode= UST-Jh
Band`hrid&h: 5Hz
Averaging: 5
Temperature Corr-pensation: k: 1-00
T ail: 20.00 0C=
T ambient: 21.oo oc
rel. Hum.: 31.a a/a
Results=
Vtest |Vmea5. I meas, FT-equency Cp DF
lo.00C)00 k`u/ 10000 V 0.99660 rnA =50.00 Hz 317.21 pF C).Sols C:.'a
Tested By Witnessed/Approved By
Company PGP Contracting
Signature
Page No. 03
PROJECT-ALBA LINH-05 DIAGNOSTIC
TESTING AND OIL PROCESS
Po/s:45236238
HV 8 Phase Rushing:
TanDelta-PF 3=
Card Types TanDelta
Date/Time: 02/13/202116:03:53
0`rerload = no
Assessment; n/a
CPTD= 81217F
Calib-No-= 37.0
By= 0micron electronics; Fac±ory Calibration
Calibration Date: 01/17..''201714:10:24
modes UST-A
Bandwidth: 5Hz
^veragir'g= S
Temperature Compertsation: k: 1-00
T oil: 20.00 0C
T ambient: 21.oo oc
rel. Hum.: 31.0 PJQ
Results=
Vtest !Vmeas.( Imeas. |Frequen[y Cp DF
10.00000 kv IOO01 V 0.952S6 rnA Sscl.00 Hz 303.18 pF 0.2905 a,;a
Tested By Witnessed/Approved By
Company PGP Contracting
Signature
Page NO. 04
•.-
`. --f3#gr-` _
ERE
` 8i7 ;'CONTiiACTING
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS dot.d
Po/s:45236238 rl.,a,i`T.Ti,I;a
Measured PointHV-Tank
No Time Orin)
1 01 162 GQ
2 05 311 GQ
3 10 340 GQ
4 PI Value 2.098
Measured Point(01Min)
No IR Value
® Criteria: R Value Required Minimum 100 M£2 for Core Insu lation and 800 M£2 for Winding @ 01 Min
• Criteria: PI Value Must be Higher than 1.5@ ( 10Min/01Min
• Remarks: Test results are found Satisfactory
Tested By Witnessed/Ap|}roved By
Company PGP Contracting Alba
Name 6`,hjA fl€ELAro .gBAI<±
Si8natul.e
®.fro
Pa8eNo. 05
``. -I-E=`..-¢
', -. . . .3sed'` ;
PROJECT-ALBA LINE-05 DIAGNOSTIC
chQ(.n
TESTING AND OIL PROCESS
--zifz#-®FT-ra Po/s:45236238
I--+ .-11
TRANSFORMER DETAILS
Customer : ALBA
Make : GE
Ratedvoltage : HV -230000V
:LV - 20000V
RatedFrequency :50Hz
Serial No 5337PA169-03
Tested By Witnessed/Approved By
Company PGP contracting Alba
Name /mj~f\ rfet-i jf]rD jBQss`
Signature
ci5.fro
v Page No. 01
r`.`---3#9` __. PROJECT-ALBA LINE-05 DIAGNOSTIC
".--in , .,:-,- I-
TESTING AND OIL PROCESS n«)t.1. .--
Po/s:45236238
Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name l€n\..Nflc£E>EIA r® A±OSS± S±
Sig-ture
p`ftyde- Page No. 02
PROJECT-ALBA LINE-05 DIAGNOSTIC
`,,,.
HV Y Phase Rushing:
TanDelta-PF 1:
Card Type: TanDelt3
Date/Time: 01,'26,`202109: 14:43
Ch/erload: nQ
ilssessfTTent: n./a
CPTD= 81217F
Calib.No.I 37.a
By= Omicron electronics; Factory Calibratic}n
Caliht.ation Date: 01,'17./201714:10:24
mode= UST-A
Bandwid±l-: 5Hz
JA`,era9irlg= 5
Temperature Colrtpensation: k: 1.00
T oil: 1S.00 0C
T ambient: 17.00 oC
rel, Hum.: 31.0 q7'a
Results=
V test `/rheas. i I meas. I Frequet.c`/ i Cp DF
10.00000 kv 10001`./ 0.97065 rnA $50.00 liz 308.94pF 0.3271 C!.`a
Tested By Witnessed/Approved By
Company PGP Contracting
Signature
Page NO. 03
PROJECT-ALBA LINE-05 DIAGNOSTIC
'`,,
rv 8 Phase Bushing:
TanDelta-flF 1:
Card Type: TanDelta
Date/Time: 01/26/202109:23:19
Ch/erload: no
Assessment: n/a
CPTD= 81217F
Ca!ib.No.; 37.0
By: 0micron electronics; Factory Calibration
Calibration Date: 01/17.I'201714:10:24
Modes UST-A
Bandwidth: 5Hz
Averaging: 5
Temperature Conipensation: k: 1.00
T oil: 18.00 oc
T ambient: 17.C}o oC
rel. Hum.: 31.a a/a
Results=
V test V me@s, I meas, Frequeney| Cp DF
10.00000 ku 10Clo1 '`.' 0.96569 rnA $50.00 HZ 307.35 PF 0.3219?.'a
Tested By Witnessed/Approved 8
Coml}any PGP Contracting
Signature
Page No. 04
r`- --r` _. PROJECT-ALBA LINE-05 DIAGNOSTIC
`j¥ri-ioi=-ACT]us TESTING AND OIL PROCESS diQ(|di
Po/s:45236238
Measured PointHV-Tank
No Time own)
I 01 98.5 GQ
2 05 131 GQ
3 10 155 GQ
4 PI Value 1.573
Measured Point(01Min)
No IR Value
® Criteria: R Value Required Minimuni 100 M£2 for Core Insu 1ation and 800 NI2 for Winding @ 01 Min
• Criteria: PI Value Must be Higher than 1.5@ (10Min/01Min
• Remarks. Test results are found Satisfactor)/
Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name G"alf)^Fis£J|9ir`-g5Jtiss±
Signature
f>`fatryJ-`
PageNO. 05
;v--S¥- -_ PROJECT-ALBA LINE-05 DIAGNOSTIC
dqflo-,-+--
#... .. ,=J , .``,-. .
TESTING AND OIL PROCESS
Po/s:45236238
-..--
Transformer Test Report Date: 26/01/2021
Location: Block-03 I Transformer -ST-81BAT10 Serial No. 5337PA169-06
TRANSFORMER DETAILS
Customer : ALBA
Make : GE
Ratedvoltage : HV -230000V
:LV - 19000V
RatedFrequency : 50Hz
Serial No : 5337PA169-06
Tested By Witnessed/Approved By
Company PGP contracting Alba
Name fiAalfis!€f=~^,ifecyf±si
I s i gn attE re g±,twin
Page No. 01
l-i --ssedsJ _ __ --_
PROJECT-ALBA LINE-05 DIAGNOSTIC
•--..,, w, I RE :-
TESTING AND OIL PROCESS dr,tltB- .-. --
Po/s:45236238 -''1''''''''''1_
Transformer Test Report Date: 26/01/2021
Location: Block-03 Transformer - ST-81BAT10 Serial No. 5337PA169-06
Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name .Itm ± EI..es -.
Signature
-
I page No. o2
PROJECT-ALBA LINE-05 DIAGNOSTIC
=FiE=EEi= TESTING AND OIL PROCESS
Po/s:45236238
HV Y Phase Rushing:
TanDelta-PF 2=
Gal.d Type: TanDelta
Date/Time: 01./26/202113:30: 32
Overload : na
Assessment: n/a
CPTD= 81217F
Calib.No.= 37.0
By: 0mlcron electrcmics; Factory Calibraticm
Calibration Date: 01,'17/201714:10:24
M®de= UST-A
Bandwidth: 5Hz
Avel-aging= 5
Temperature Compensation: k: 1.00
T oil: 20.00 0C
T ambient: 19.00 ac
rel. Hum.: 31.a a,'a
Results=
Vtest !VmeasJ Imeas. jFrequenc`/I Cp I DF t
io.00000 kv 10001V 0.9S202 rnA aL-50.00 HZ 312.57 pF 0.296St!/a
Tested By Witnessed/Approved By
Company PGP Contracting
Signature
Page NO. 03
PROJECT-ALBA LINE-05 DIAGNOSTIC
r.,.,
TESTING AND OIL PROCESS
Po/s:45236238
HV 8 Phase Bushing:
TanDelta-PF 3:
Card Type= TanDelta
Date/Time: 01/26/202113:34:27
0`/erload : no
Asse55ment: n/a
CPTD: 81217F
Calib.No.= 37.a
By= 0micron electronics; Factory Calibration
Calibration Date: 01/17/201714:10:24
Hode= UST-A
Baridwidth: SHE
Averaging: 5
Temperature Comperisation: k: 1.00
T oil: 20.00 OC
T ambient: 19.00 C!C
rel. Hum.: 31.0 a/a
Results:
Vtest |Vmeas.( Imeas. !F=requenc`/ CpDF
10.00000k\/ 10001\/ 0.95424mA *50.00Hz 303.73pF 0.30S2C:/a
Tested By Witnessed/Approved By
Company PGP Contracting
Signature
Page No- 04
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS
'CONTRACTING
Po/s:45236238
Measured Point
No Time (Min)
rv-Tank
1 01 219 GQ
2 05 354 GQ
3 10 411 GQ
4 PI Value 1.876
Measured Point
No IR Value
(01Min)
• Criteria: R Value Required Minimum 100 M£2 for Core insulation and 800 Mf2 for Winding @ 01 Min
• Criteria: PI Value Must be Higher than 1.5@ (10Min/01Min)
• Remarks: Test results are found Satisfactory
Tested By Witnessed/Approved 8
Company PGP Contracting
j5 Qsis± 1
Sig-ture
PageNO. 05