Diagnostics Testing and Oil Processing

PO: S/4526238

Content
❖ Introduction

❖ Scope of work

❖ Safety

❖ Activity Description( summary)

❖ Site Mobilization

❖ Scaffolding Preparation & Inspection

❖ Oil draining.

❖ Oil circulation in storage Tank

❖ Hv chamber link disconnection .

❖ Testing of Bushings

❖ Link fixing and Chambers final Inspection .

❖ Vacuum & Oil filling

❖ Site clearance

❖ Demobilization

❖ Annexure

• Reference photos

• Bushings Test Reports.


Diagnostics Testing and Oil Processing

PO: S/4526238

Introduction

The main objective of this project describes Diagnostics Testing and Oil Processing
Service at Alba Line 5 Transformer units (6 nos). PGP contracting carried out the
services on following Transformer units under the supervision of ALBA.

Scope of work:

For the Transformer Id 71BAT10, 73BAT10 & 81BAT10 (487.1 MVA)


• Drain the oil from conservator and Hv cable chambers to storage tank .
• Disconnect the links from Hv side.
• Testing of Transformer Bushings - Tan delta ,capacitance & IR.
• Inspection of Bushings and chambers.
• Oil filtration.
• Link Connection.
• Vacuuming the Hv cable box.
• Refill the filtered oil from the storage tank to transformer .

For the Transformer Id 72BAT10, 74BAT10 & 82BAT10 (196 MVA)


• Drain the oil from conservator and Hv cable chambers to storage tank .
• Disconnect the links from Hv side.
• Testing of Transformer Bushings - Tan delta , capacitance & IR
• Inspection of Bushings and chambers.
• Oil filtration in the tank.
• Links Connection.
• Vacuuming the Hv cable box.
• Refill the filtered oil from the storage tank to transformer.
Diagnostics Testing and Oil Processing

PO: S/4526238

Note:
The Activities described in this report are same and common for all 6 Transformer
units .

Transformer specifications

71BAT10 , 73BAT10 & 81BAT10 ( 487.1 MVA)

• Transformer Type 1:

specifications:
• Gas turbine Generator Step-up
Transformer
• Rated Power (MVA):487.1
• Block # 1#2#3- HV/LV
• Voltage (kV): 230/20
• Make GE
• HV/LV Current (Amp)
979.0/11258.3
• Vector Group Ynd11

72BAT10, 74BAT10 & 82BAT10(196 MVA)

• Transformer Type 2:

Specifications:
• Steam turbine Generator Step-up
Transformer
• Rated Power (MVA):196
• Block # 1#2#3- HV/LV
• Voltage (kV): 230/219
• Make GE
• HV/LV Current (Amp)
624.8/5955.8
• Vector Group Ynd11
Diagnostics Testing and Oil Processing

PO: S/4526238

Safety
In Alba Line 5 Transformer services, all necessary safety PPEs and procedures are
followed by PGP employees as per the Alba safety Policies .

Safety sign boards Permit display

Safety Meeting and daily Tool Box Talk Fire Extinguisher Usage

Proper Barrications Proper PPE usage


Diagnostics Testing and Oil Processing

PO: S/4526238

Proper House Keeping Routine scaffolding Inspection

Safe Lifting Operation COVID-19 – Daily Health screening

Working in height with Harness Tools Inspection


Diagnostics Testing and Oil Processing

PO: S/4526238

MANPOWER USED :

SNO NAME DEPT GRADE

Site Manager
1 Ramakrishnan Project

Electrical Electrical Technician


2 Aurangzeb

Electrical Electrical Technician


3 Haseen Ullah

Electrical Technician
4 Gunaseelan Electrical

Electrical Technician
5 Pravin Nagarajan Electrical

Electrical Electrical Technician


6 Sijo Mohanan

Electrical Electrical Technician


7 Chandra Roa

Electrical Electrical Technician


8 Mohd Wahid

Safety
9 Cyril Atemkeng Safety Officer
Mechanical
10 Ansar Ali Crane Operator
Mechanical
11 Moeen Rashid Rigger
Diagnostics Testing and Oil Processing

PO: S/4526238

Activity Description : Block 1 : 71BAT 10 & 72 BAT10

sno Date Activity Resources


• Safety talk and Tool box talk
• Lifting and shifting of storage Tanks and Manpower -6
1 1.2.2021 machines to Block1 area .
• House keeping

• Safety & tool box talk. Manpower -10


• scaffold erection & modification for HV & LV sites
for transformer (ST-72 & GT-71)GSUT.
• Oil drained from the HV chamber of (ST-72 &
GT-71)GSUT.
2 4.2.2021
• Chamber box opening & cleaning for both HV
sites of (ST-72 & GT-71)GSUT.
• oil tank circulation on going for both sites.
• Housekeeping

• Safety & Tool Box talk


• chamber cleaning for ST-72 & GT-71. Manpower -7
• link disconnection for GT-71).
• electrical test conducted for both transformers.
link fixing for GT-71 & ST-82
3 5.2.2021 • GT- Lv site open, inspected & closed.
• Preparation for vacuuming for both
transformers.
• continuation of oil tank circulation for GT-71
• House keeping

• Safety & tool box talk


• vacuuming & oil filling for GT-71 completed.
• oil tank circulation for ST-72 on going ).
4 06.2.2021 • ST-72, Lv site open, inspected & closed.
Manpower -9
• Shifting of oil filtration & vacuuming machine to
ST-72.
• House keeping
• Safety & tool box talk
5 7.2.2021
Diagnostics Testing and Oil Processing

PO: S/4526238

• vacuuming & oil filling for ST-72 Completed.


• Air bag filling for both GT-71 & ST-72. Manpower –8
• Housekeeping maintained at site.
• Both GT-71 & ST-72 transformers Handover to
Alba
• House Keeping

Block 2 : 73BAT 10 & 74 BAT10

sno Date Activity Resources


• Safety talk and Tool box talk
• lifting & shifting of oil storage tanks & Machines Manpower -10
1 9.2.2021
to Block 2
• House Keeping
• Safety & tool box talk. Manpower -10
• scaffold erection & modification completed for
both transformers.
2 11.2.2021 • Oil drainage completed from both transformers.
• Start oil tank circulation for GT-73.
• House keeping

• Safety & Tool Box talk


• chamber opening, inspected & closed for ST-74 Manpower -10
& GT-73.
• link disconnection for GT-73 & ST-74).
• Electrical test conducted for both transformers.
3 13.2.2021
• link fixing for GT-73 & ST-74
• vacuum preparation done for GT-73
• continuation of oil tank circulation for GT-73
• House Keeping

• Safety & tool box talk


• Oil tank circulation for GT-73 completed.
• shifting of filtration machine to ST-74.
4 14.2.2021
• start oil tank circulation for ST-74.
Manpower -9
• Awaiting Hv chamber approval for both
transformers.
Diagnostics Testing and Oil Processing

PO: S/4526238

• House keeping
• Safety & tool box talk
• Continuation of Oil circulation for ST 74
5 15.2.2021 • Housekeeping maintained at site.
Manpower –9

• Safety & tool box talk


• Fixed measuring tap cap for both transformers.
• vacuuming completed for ST-74
6 16.2.2021
• oil tank circulation for ST-74 completed.
• Hv oil chamber filling completed for ST-74
Both GT 73 & ST 74 Handover to Alba.

Block 3 : 81BAT 10 & 82 BAT10

sno Date Activity Resources


• Safety talk
1 17.1.2021 Manpower -7
• Site mobilization and equipment shifting slot 1
• Safety talk Manpower -7
2 22.1.2021
• Site Mobilization and Material shifting slot 2
• Safety & Tool Box talk
• shifting of oil storage tank, filtration & Manpower -8
vacuuming machine to PS5 Block#3.
3 23.1.2021
• Proper barrications of machines and storage
tanks.
Pre-inspection of working equipment and tools.
• Safety & tool box talk
• Oil flushing completed for both oil storage tank
at their respective locations.
• Scaffold erection & modification for both HV &LV
4 24.1.2021 Manpower -9
sites completed.
• Oil drained from both transformer cable box
with conservator.
• House keeping
• Safety & tool box talk
5 25.1.2021 • oil circulation for both tanks conducted.
• Scaffold erection & modification for ST-82 GSUT
Diagnostics Testing and Oil Processing

PO: S/4526238

• Chamber box opening and disconnection of links


for transformer GT-81 GSUT Manpower –9
• Chamber box opening & cleaning for
transformer ST-82 & GT-81(GSUT).
• Oil quality test conducted.
• Testing preparation completed for transformer
GT-81
• House Keeping
• Safety & tool box talk
• oil circulation for both tanks in progress.
• Electrical testing completed for GT-81 & ST-
82(GSUT).
• Chamber cleaning & link fixing for both units Manpower –9
6 26.1.2021 completed(GT-81 & ST-82)(GSUT).
• Sensor from HV chambers replaced with dummy
cap.
• Oil samples obtained for quality test.
• Both transformers ready for vacuuming.
• House Keeping
• Safety & tool box talk
• vacuuming for transformer ST-82 (GSUT)
completed.
• Start Oil filling for ST-82 GSUT.
7 27.1.2021 Manpower 10
• Oil Tank circulation ongoing for GT-81 GSUT.
• ST-82 Lv side open, inspected and closed.
• Lv side rubber bello for GT-81 fixed & final.
• House Keeping
• Safety & tool box talk
• Oil Tank circulation for GT-81 GSUT completed.
• Vacuuming & Oil filling for unit GT-81 GSUT
completed. .
Manpower 7
• Air cell for GT-81 & ST-82 dry air filled.
8 28.1.2021
• All dummy covers to drainage valve Fixed.
• Proper Housekeeping maintained at site.
• Both GT-81 & ST-82 transformers Handover to
Alba
Diagnostics Testing and Oil Processing

PO: S/4526238

Additional work :
Bushing Inspection On Block 1 :

In Both GT 71BAT10 & ST 72BAT transformer units , B phase bushing test tap cover found
carbonized with smoke.

Bushing Inspection On Block 3 :

In ST 82BAT transformer unit , B phase bushing test tap cover found carbonized .

Due to the abnormalities noticed while inspecting the bushings Test lead cap , the followings
additional work has been performed as instructed by Alba .
Diagnostics Testing and Oil Processing

PO: S/4526238

Additional Work 1: Block1 GT -71BAT10 & ST -72 BAT10

• Safety tool box talk


• Oil drained from GT-71 & ST-72. Manpower -9
• Chamber opening, inspection & maintenance
completed for both transformers.
1 27.2.2021
• In GT 71 Physical Inspection on Bushings
Grounding and fabrication (by Alba).
• Vacuuming & Oil filling completed for GT-71.
• Housekeeping
• Safety Tool box talk
• In GT 72 Physical Inspection on Bushings Manpower -9
2 28.2.2021 Grounding and fabrication (by Alba).
• vacuuming & oil filling completed for ST-72
• House Keeping

Additional Work 2 : Block3 GT-81BAT10 & ST -82BAT10

• Mobilization of equipment & materials to GT-81


& ST-82. Manpower -9
1 22.2.2021
• Oil drainage completed for GT-81.
Oil drainage for ST-82 in progress.
• Oil tank circulation for GT-81 completed.
• Oil drainage for ST-82 Completed.
2 23.2.2021 • In GT 81 Physical Inspection on Bushings Manpower -9
Grounding and fabrication (by Alba) .
• Oil filling to GT-81 Completed
• Filling of dry air to GT-81 & ST- 82 Conservator
• In GT 81 Physical Inspection on Bushings
Grounding and fabrication (by Alba) . Manpower -9
3 24.2.2021
• Vacuuming & Oil filling completed for ST-82.
• Filling of dry air to ST- 82 Conservator
• Proper housekeeping maintained at site
• Shifting of materials & equipment to Block #1 Manpower -9
4 25.2.2021 • Housekeeping maintained at site.
Diagnostics Testing and Oil Processing

PO: S/4526238

Site preparation

All necessary tools and equipment were mobilized to site and stored in allocated area and
barricaded.

Shifting of Oil filter machines and storage Tanks

Supply connection Oil Tank Inspection and flushing


Diagnostics Testing and Oil Processing

PO: S/4526238

Scaffolding :

In this project, scaffolding erected in both hv and Lv side to drain oil from the
chambers and to open chambers inspection windows. Scaffolding were inspected at
regular intervals before Initiating the job.

Oil Draining:

The HV chamber oil drained to oil storage tanks . ensured that oil from each
chambers and conservator completely drained and stored in storage Tanks.
Diagnostics Testing and Oil Processing

PO: S/4526238

Oil sampling:

Before Processing the oil , oil sample was taken. Oil Parameters were tested by Alba
Lab.

Disconnection of Links from HV side:


Before disconnecting the links , HV chamber is checked internally for any
abnormalities through inspection windows
Diagnostics Testing and Oil Processing

PO: S/4526238

Inspection of LV side :

Lv side chambers and Bushings are inspected internally for any abnormalities .

Oil circulation :
Oil in the storage tanks circulated on required cycles and ensured the BDV and PPM
values are at correct parameters .
Diagnostics Testing and Oil Processing

PO: S/4526238

Testing of Bushings

Bushings test were conducted on each bushings in HV side and tested values are
recorded and witnessed by Alba supervisor.

Following test were performed in HV Bushings


• Tan Delta
• Insulation Resistance

Link Fixing :

• Hv links terminals are connected back and ensured the tightness .


• Ensured hv chambers are free from any abnormalities or sludges
• Cleaned the bushings and chambers boxes .
• Ensure the LV side bellows are properly refixed .
• Ensure that cap in the tan delta measurement point in the bushing is fixed back
properly.
• After final inspection . Both HV and Lv chamber’s inspection windows are
closed.
Diagnostics Testing and Oil Processing

PO: S/4526238

Vacuuming and Oil Filling


The circulated oil from storage Tanks are filled to the transformer when the vacuum
level reached below 1 torr . ensured the oil level in the conservator with reference to
the Transformer Temperature .

Final Inspection :

Ensured No leakage of oil in any part of unit.


Ensured oil level in the conservator.
Ensure that all valves are in normal Position.
Ensure healthiness of Air Cell.
Diagnostics Testing and Oil Processing

PO: S/4526238

Demobilization:
With proper clearance and inspection , storage tanks and machines are demobilized
from site .

Handover :

After completion of final inspection , Ensured all the tools and materials are cleared
from the site with proper housekeeping and handover to Alba .
Diagnostics Testing and Oil Processing

PO: S/4526238

Reference pictures: Block 1 : 71BAT 10 & 72 BAT10


Diagnostics Testing and Oil Processing

PO: S/4526238

Reference pictures: Block 2 : 73BAT 10 & 74 BAT10


Diagnostics Testing and Oil Processing

PO: S/4526238

Reference pictures: Block 3: 81BAT 10 & 82 BAT10


PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS
Po/s:45236238

Transformer Test Report Date: 05/02/2021


Location: Block-01 Transformer - GT-71BAT10 Serial No. 5337PA169-01

TRANSFORMER DETAILS

Customer : ALBA

Make :GE

Type Of Cooling : ONAN/ONAF/ODAF

Rated Power : ONAN - 293000 kvA


: ONAF - 390000 kvA
: ODAF -487100 kvA

Rated Voltage : HV - 230000V


:LV - 20000V

Rated Frequency : 50 Hz

Number of Phase : 3 Phase

Vector Group : YNdll

Standard : IHC 60076

Serial No 5337PA169-01

Year of Manufacturi : 2017

Tested By Witnessed/Approved 8
Company PGP Contracting

Signature

Page NO. 01
`JstsJ ___
E -- a \ i
L_-.(jA
/,a Lz`e l""nel"a
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS
Po/s:45236238
nag.dr-..-
Transformer Test Report Date: 05/02/2021
Location: Block-01 Transformer - GT-71BAT1 Serial No. 5337PA169-01

Measurement of Bushing Insulation Power Factor and CaDacitance:AInbientTemp:21°COilTemp:20ac

Power Factor Capacitance ®F)


No Phase / Serial No Mode kv rnA Site Factory Site Factory
Measured Measured Measured Measured

1 R Ph / H03073337 0.960 0.297 0.300 305.60 308.5

2 Y Ph / IH03073338 UST 10kv 0.958 0.300 0.300 305.21 308.5

3 a ph / Im03073336 0.957 0.300 0.290 304.84 307.7

• Criteria: PF must be less than o.5°/o


• Tandelta Kit Results are Attached with this Report
• Remarks: Test Results are found SatisfactoryTesthitDetails:

No Name Make Serial Number Cal. Date Cal.Due Date


2 Omicron CPC 100 Omicron FC576G 05.01.2021 04.01.2022
3 Omicron CP TD1 Omicron 81217F 05.01.2021 04.01.2022

Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name f ln\,Itv,f7 ts§£t=LAr`O S OS`S
Signature
&`fuftfan,
u page No. 02
PROJECT-ALBA LINE-05 DIAGNOSTIC
i.
TESTING AND OIL PROCESS
Po/s:45236238

Transformer Test Report Date: 05/02/2021


Location: Block-01 Transformer - GT-71BAT1 Serial No. 5337PA169-01

Measurement of Bushing Insulation Power Factor and CaDacitance:


HV R Phase Pushing:
TanDelta-PF 3:
Card Type: TanDelta
Date/Time: 02/05/20211=:27:56
th/erload: nQ
Assessment: n/a
CPTD= 81217F
Calib.no-= 37.0
By= 0mjcron electronics; Factory Calibration
Calibration Date: 01/17/`201714:10:24
Mode= UST-A
Bandwidth: 5Hz
Averaging: 5
Temperattlire Compensation: k: 1.00
T oil: 20.00 0C
T ambient: 21.oo oC
rel. Hum.: 31.0 a/a
Results=
V test V meas. I meas- Frequeney| Cp DF
10.00000 kv 10001 `../ 0.96020 rnA *50.00 Hz 305.60 pF 0.2975 Pfo

HV Y Phase Rushing:
TanDelta-PF 2:
Card Type: TanDelta
Date/TiliFie: 02/05,r202113:25:43
Overload : n c}
Assessment: n/a
CPTD= 81217F
Calib.No.i 37.0
By= 0mii=ron electronics: Factorly. Calibration
Calibrat.ion Date: 01.J.17../201714:10:24
Mode= UST-A
Bandwidth; 5Hz
Averaging: 5
Temperature Compensation: k: 1.00
T oil: 20-00 0C
T ambient: 21.00 oc
rel. Hum.: 31.o c:ro
Results=
Vtest I vnieas. i Imeas. Frequency ( Cp I DF t
10.Q0000 k`.' 1000o `..J 0.95887 rnA ±50.00 Hz 305.21 pF 0.3006?..a

Tested By Witnessed/A|)proved By
Company PGP Contracting

Signature

Page No. 03
PROJECT-ALBA LINE-05 DIAGNOSTIC
6-gz=i5=-'-.-----.- TESTING ANI) OIL PROCESS
Po/s:45236238

Transformer Test Report Date: 05/02/2021


Location: Block-01 Transformer - GT-71BAT1 Serial No. 5337PA169-01

Measurement of Bushing Insulation Power Factor and CaDacitance:

HV 8 Pliase Bushing:
TanDelta-PF 1:
Card Type: TanDelta
Date/Time: 02/05/202113:22:15
Ch/euload : no
Assessment: n./'a
CPTD= 81217F
Ca'ib.No.= 37.0
By= C)micron electrcinics; Factory Calibration
Calibration Date: 01./17/201714:10:24
hlode= UST-A
Bandwidth: 5Hz
Averaging: 5
Temperature CotTipensation= k: 1.00
T oil: 20.00 ac
T ambient: 21.oo oc
rel. Hum.: 31.0 a/a
Resu]ts=
Vtest I v meas. I meas, Frequeney| Cp DF
10.00000 k`..` 10001\J 0.95774mA *50.00 Hz 304.84pF 0.3001 Pp:

• Criteria: PF must be less than 0.50/o


• Tandelta Kit Results are Attached with this Report
• Remarks: Test Results are found Satisfactory

Test Kit Details:


Serial Number Cal. Date Cal.Due Date
Omicron CPC 100 Omicron FC576G 05 . 01.2021 04.01.2022
Omicron CP TD1 81217F 05.01.2021 04.01.2022

Tested By Witnessed/Approved By
Company PGP Contracting

Signature

Page NO. 04
I:---ed€,` _ PROJECT-ALBA LINE-05 DIAGNOSTIC
«.-. rs , ..1. r
TESTING AND OIL PROCESS ch€¥Bdi-,A . --
_
Po/s:45236238

Transformer Test Report Date: 05/02/2021


Location: Block-01 |Transformer -GT-71BAT1 Serial No. 5337PA169-01

Measurement of HV-Tank Insulation Resistance :

Ambient Temp: 21 °C Oil Temp; 20 °C

Measured Pointrv-Tank
No Time Oun)

1 01 87.2 GQ

2 05 132 GQ

3 10 147 GQ

4 PI Value 1.685

Measure ment of Bushing Insulation Resistance :

Measured Point(01Min)
No R Value

1 R Phase - Earth 120 GQ

2 Y Phase - Earth 131 GQ

3 8 Phase - Earth 129 GQ

® Criteria: R Value Required Minimum loo M£2 for Core hsu lation and 800 M£2 for Winding @ 01 Min
• Criteria: PI Value Must be Higher than 1.5@ ( 10Mirv01Min
• Remarks: Test results are found Satisfactory

Test Kit Details:


No Name Make I Seria]Number Cal. Date Cal.DueDate I
I hsulation Tester Megger | NA 22 . 10.2020 21.10.2021 I

Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name (s``jp~ a c`S:x=s= LArfo ,BEX`9.
Signature
S" v PageNo. 05
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING ANI) OIL PROCESS
Po/s:45236238

Transformer Test Report Date: 05/02/2021


Location: Block-01 Transformer - ST-72BAT10 Serial No. 5337PA169-04

TRANSFORMER DETAILS

Customel. : ALBA

Make :GE

Type of cooling : ONAN/ONAF/ODAF

Rated power : ONAN -118000 kvA


: ONAF - 157000 kvA
: ODAF - 196000 kvA

Rated Voltage : HV - 230000V


:LV - 19000V

RatedFrequency : 50Hz

Number of phase : 3 Phase

Vector Group : YNdll

Standard : IFC 60076

Serial No 5337PA169-04

Year of Manufactun : 2017

Tested By Witnessed/Approved By
Company PGP Contracting

sigratHre

Page NO. 01
r` ----3f i st`- __- PROJECT-ALBA LINE-05 DIAGNOSTIC
I-`, " , .J`-. '
TESTING AND OIL PROCESS diaflnI--- --
Po/s:45236238

Transformer Test Report Date: 05/02/2021


Location: Block-01 Transformer - ST-72BAT10 Serial No. 5337PA169-04

Measurement of Bushing Insulation Power Factor and CaDacitance:

Ambient Temp: 21 °C Oil Temp: 20 °C

Power Factor Capacitance ®F)


No Phase / Serial No Mode kv rnA SiteFactory Site Factory
Measured Measured Measul.ed Measul.ed

1 R Ph / RE03073171 0.964 0.299 0.359 307.11 313.9

2 Y Ph / IH03073176 UST 10kv 0.954 0.315 0.376 303.66 310.1

3 8 Ph / IH03073181 0.950 0.327 0.385 302.37 309.0

• Criteria: PF must be less than 0.5%


• Tandelta Kit Results are Attached with this Report
• Remarks: Test Results are found SatisfactoryTestKitDetails:

No Name Make Serial Number Cal. Date Cal.Due Date


2 Omicron CPC 100 Omicron FC576G 05.01.2021 04.01.2022
3 Oncron CP TD1 Omicron 81217F 05.01.2021 04.01.2022

Tested By Witnessed/Approved By
Company PGP Contrasting Alba
Name £`givflfl=E- I uaro 8 C¥` 9
Signature
ofAVf2fro.
Page NO. 02
r__`• rfe iin`` _---
PROJECT-ALBA LINH-05 DIAGNOSTIC
TESTING AND OIL PROCESS nQTID-® .--
=r=_=LjinrLT,un Po/s:45236238

Transformer Test Repoll Date: 05/02/2021


Location: Block-01 I Transformer -ST-72BAT10 Serial No. 5337PA169-04

Measurement of Bushing Insulation Power Factor and CaDacitance:HVRPhaseBushing:

TanDelta-PF 1:
Card Type: TanDelta
Date/Time: 02./05/202110:47:31
Chrerload: ri a
Assessrrtent: n/a
CPTD: 81217F
Calib.No.: 37.0
By: Omicron electronics; Factory Calibration
Calibration Date: 01/17;'201714: 10:24
Mode: UST-A
Banduridth: 5 Hz
Avel-ag i ng: 5
Temperature CofTtpensation: k: 1.00
T c)il: 20-00 0C
T ambient: 21.00 oC
rel. Hum.: 31.0 P.'a
Results:
Vtest !Vmeas.i Imeas. iFrequency| Cp I DF i
10.00000 kv 10000V Cl.964S4 rnA *5Cl.00 Hz 307.12 pF 0.2994 C!.';

HV Y Phase Bushing:
TanDelta-PF 2:
Card Type: TanDelta
Date/Time: 02`/05/202110:53:07
o`/erload: no
Assessment: n/a
CPTD: 81217F
Calib.Mo.: 37.0
By: Ornicron electrc)nics; Factory Calibratlc]n
Calibration Date: 01./.17./201714: 10:24
Mode: lJST-.a`
Banduridth; 5 Hz
Aver'aging: S
Temperature CofT.pensation: k: 1.00
T oil: 20.00 ®C
T ambient: 21.00 oC
ref. Hum.: 31.0 e.r®
Flesutts=
Vtest |Vmeas.I Irneas. !F=f-equenc`r! Cp i DF (
10.00000 kv 10001'ur 0.95407mA #50.00 HZ 303.67PF 0.3105%

Tested By Witnessed/Approved By
Company P_GP contracting Alba
Name £tl\}r`F)c`#`=ELfi+i®S9C9S.S±
Signature
cg!
Page No. 03
(---e#' ,`` __

f%¥\RA#TING
PROJFCT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS dQ(|B _
Po/s:45236238

Transformer Test Report Date: OS/02/2021


Location: Block-01 I Transformer -ST-72BAT10 Serial No. 5337PA169-04

Measurement of Bushing Insulation Power Factor and CaDacitance:HV8PhaseBushing:

TanDelta-PF 3=
Card Type: TanDelta
Date/Time: 02`/r05./202110:56:27
Overload: no
Assessment: n..'a
CPTD: 81217F
Ca]ib.No.: 37.0
By: Omicron electrQni€s: Factory calibration
Calibration Oat.e: 01/17/201714:10:24
Mode: UST-A
Bandwidth: 5 Hz
Averagir)g: 5
Temperattire Cofnpensation: k: 1-00
T oil: 20.00 ac
T ambient: 21.00 oc
rel. Hum.: 31.0 C!/a
Results=
Vtest |Vmeas.I Ifneas. |Frequencv| Cp I DF I
10.00000 kv 10001V 0.9S004mA R50.00Hz 3C}2.38 pF 0.3278 P.`o

• Criteria: PF must be less than 0.5%


• Tandelta Kit Results are Attached with this Report
• Remarks: Test Results are found SatisfactoryTestKitDetails:

No Name Make Serial Number Cal. Date Cal.Due Date


2 0micron cpc 100 0micron FC576G 05.01.2021 04.01.2022
3 0micron cp TDI Omicron 81217F 05.01.2021 04.01.2022

Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name £,,Irtyf9^q±Eha.o ,9c7Lq±_Q .
Signature
a.fu L,

Page NO. 04
-.--3#,--I -_-_
PROJECT-ALBA LINE-05 DIAGNOSTIC
f=irg=T=#cT.NG TESTING AND OIL PROCESS a(I.di"-'--
Po/s:45236238

Transformer Test Report Date: 05/02/2021


Location: Block-01 I Transformer -ST-72BAT10 Serial No. 5337PA169-04

Measurement of HV-Tank Insulation Resistance :

AInbient Temp: 21 °C Oil Temp: 20 °C

Measured PointHV-Tank
No Time qun)

1 01 77.7 GQ

2 05 120 GQ

3 10 126 GQ

4 PI Value 1.621

Measure ment of Bushing Insulation Resistance :

Measured Point(01Min)
No IR Value

1 R Phase - Earth 102 GQ

2 Y Phase - Earth 115 GQ

3 8 Phase - Earth 104 GQ

® Criteria: IR Value Required Minimum 100 M£2 for Core hsu lation and 800 M£2 for Winding @ 01 Min
• Criteria: PI Value Must be Higher than I.5@ (10Min/OIMin
• Remarks: Test results are found Satisfactory

Test Kit Details:


No Name Make I SerialNumber Cal. Date Cal.DueDate I
I hsulatjon Tester Megger I NA 22 .10.2020 21.10.2021 I

Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name ls,.I."flts1€FLflr..a3cyL`-S±
SignatureI
Sgiv A
Pa8eNO. 05
•--= sd:-_ _` PROJECT-ALBA LINE-05 DIAGNOSTIC
-- - ira
ZZ`fl,/CONTRACTING
TESTING AND OIL PROCESS dcTldi -,, . --
Po/s:45236238

Transformer Test Report Date: 13/02/2021


Location: Block-02 |Transformer -GT-73BAT1 Serial No. 5337PA169-02

TRANSFORMER DETAILS

Customer : ALBA

Make : GE

Type of cooling : ONAN/ONAF/ODAF

Rated power : ONAN -293000 kvA


: ONAF - 390000 kvA
: ODAF -487100 kvA

Ratedvoltage : HV -230000V
:LV - 20000V

RatedFrequency : 50Hz

Number of pliase : 3 Phase

Vector Group : YNdll

Standard : IEC 60076

Serial No 5337PA169-02

Year of Manufacturi : 2017

Tested By W itnessed/Approved By
Company PGP contracting Alba
Nape /trL.oAvfl€EETLaLr\T)ASO_SLJ±
Sfgnature
fr. .fl
Page NO. 01
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS
Po/s:45236238

Transformer Test Report Date: 13/02/2021


Location: Block-02 Transformer - GT-73BAT1 Serial No. 5337PA169-02

Measurement of Bushin2 Insulation Power Factor and Cat}acitance:


HV R Phase Bushing:
TanDelta-PF 1:
Card Type: TanDelta
Date/Time: 02/13/202110:24:31
0`rerload : na
Assessmeftt: n/a
CPTD: 81217F
Calib.No.: 37.0
By= 0rnicron electronics; Factory Calibration
Calibration Date: 01/17/201714:10:24
Mode: UST-A
Bandwidth: SHz
Avef.aging: 5
Temperature Compensation: k: 1.00
T oil: 20.00 0C
T ambient: 22.Oo oc
rel. Hum.: 31.0 a,Jo
Results:
V test V meas. I meas. ; Frequency i Cp DF
10.00000 kv iooo1`/ 0.99247 rnA *50.00 Hz 315.8S pF 0.3004a,i'o

HV Y Phase Bushing:
TanDelta-PF 2:
Card Type: TanDelta
Date/Time: 02/13/202110:27:43
Ch/erload: na
Assessment: n./a
CPTD: 81217F
Calib.No.: 37.0
By: C)micron electrc)nics; Factory Calibration
Calibration Date: 01./17/201714:10:24
tu,ode= UST-A
Bandwidth: 5Hz
Averaging: 5
Temperatuf-e Compensation: k: 1.00
T oil: 2o.0o oc
T ambient: 22.oo oC
rel. Hum.: 31.0 ?v.6
Results:
Vtest |Vttteas.i Imeas. !Frequenc`/ Cp , DF i
10.00000 k\..10001 V 0.95725 rnA *50.00 liz 304.67 pF CI.3056 a,'o

Tested By Witnessed/Approved By
Company PGP Contracting
c2S.Si
Signature

Page NO. 03
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS
Po/s:45236238

Transformer Test Report Date: 13/02/2021


Location: Block-02 Transformer - GT-73BAT1 Serial No. 5337PA169-02

Measurement of Bushing Insulation Power Factor and CaDacitance:

HV 8 Phase Bushing:
TanDelta-PF 3:
Card Tvpe! TanDelta
Date/Time: 02/13/202110:29:58
Overload: no
Assessment: n/a
CPTD: 81217F
Ca'ib-No.: 37.C'
By: Cmicron electrcmics; Factory Calibration
Calibration Date: 01/17/`201714:10:24
Dlode: UST-A
Bandwidth: 5Hz
Averaging: 5
TeiTtperatLEf-e Cornp€nsation: k: 1.00
T oil: 20.00 OC
T ambient: 22.Clo oc
rel. Hum.: 31.0 I?;a
Results:
Vtest :Vmeas.i Imeas. Frequentry CpDF
10.00000kv 10000V 0.99850mA *50.00Hz 317.82pF 0.3879°i'a

• Criteria: PF must be less than 0.5%


• Tandelta Kit Results are Attached with this Report
• Remarks: Test Results are found Satisfactory

Test hit Details:


Serial Number Cal. Date Cal.Due Date
Omicron CPC 100 omicron FC576G 05 .01.2021 04.01.2022
Omicron CP TD1 81217F 05.01.2021 04.01.2022

Tested By Witnessed/Approved By
Company PGP Contracting

Signature

Page NO. 04
•-. zg
,, -,IE=-,
'J, -Idfl i/'C O NTRACT|NG
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS n(fld ,-
Po/s:45236238

Transformer Test Report Date: 13/02/2021


Location: Block-02 |Transformer -GT-73BAT1 Serial No. 5337PA169-02

Measurement of HV-Tank Insulation Resistance :

Ambient Temp: 22°C Oil Temp: 2o°C

Measured PointIV-Tank
No Time (Min)

1 01 107 GQ

2 05 157 GQ

3 10 185 GQ

4 PI Value I.728

Measure ment of Bushing Insulation Resistance :

Measured Point(01Min)
No IR Value

1 R Phase - Earth 167 GQ

2 Y Phase - Earth 151 GQ

3 8 Phase - Earth 155 GQ

Criteria: in Value Required Minimum 100 M£2 for Core Insu1ation and 800 M£2 for Winding @ 01 Min
• Criteria: PI Value Must be Higher than 1. 5@ ( 10Min/01Min
• Remarks: Test results are found Satisfactory

Test Kit Details:


No Name Make I SerialNumber Cal. Date Cal.DueDate I
I insulation Tester Megger I NA 22 . I 0. 2020 21.10.2021 I

Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name f&`.IN f+hiti=`E LArc f== |``.e`S` .
Signatul.eI
fr fro
Pa8eNO. 05
`-. PROJECT-ALBA LINE-05 DIAGNOSTIC
t,«)o
•\ ,`,-, :,.
TESTING AND OIL PROCESS •--. -_
Po/s:45236238

Transformer Test Report Date: 13/02/2021


Location: Block-02 I Transformer -ST-74BAT10 Serial No. 5337PA169-05

TRANSFORMER DETAILS

Customer : ALBA

Make : GE

Type of cooling : ONAN/ONAF/ODAF

Rated power : ONAN -118000 kvA


: ONAF - 137000 kvA
: ODAF - 196000 kvA

Ratedvoltage : HV -230000V
:LV - 19000V

RatedFrequency :50IIz

Number of phase : 3 Phase

Vector Group : YNdll

Standard : IEC 60076

Serial No : 5337PA169-05

Year of Manufacturi : 2017

Tested By Witnessed/Approved By
Company PGP contracting Alba
Name I-J=`, I , =*,*

SEgnzrfure
6'+_
-I
Page No. 01
r=i--3#,S± __
\Lri6=i,¥EfacTiNG
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS ('Q(.t' -,+ . --
Po/s:45236238

Transformer Test Report Date: 13/02/2021


Location: BIock-02 I Transformer -ST-74BAT10 Serial No. 5337PA169-05

TRANSFORMER DETAILS

Customer : ALBA

Make : GE

Type of cooling : ONAN/ONAF/ODAF

Rated power : ONAN -118000 kvA


: ONAF - 137000 kvA
: ODAF - 196000 kvA

Ratedvoltage : HV -230000V
:LV - 19000V

RatedFrequency : 50Hz

Number of phase : 3 Phase

Vector Group : YNdll

Standard : IEC 60076

Serial No : 5337PA169-05

Year of ManufacturI : 2017

Tested By Witnessed/Approved By
Company PGP contracting Alba
Name R-.I A i.. , .- __j I \ a=.

Sfgnahare
f}:fyvN2
-I
Page No. 01
(-i-5#-: _
-- a = ` . . €
/a
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS @(I.d
I;zzre.urHjmeT.H® Po/s:45236238 .,.

Transformer Test Report Date: 13/02/2021


Location: Block-02 Transformer - ST-74BAT10 Serial No. 5337PA169-05

Measurement of Bushing Insulation Power Factor and CaDacitance.

Ambient Temp: 21 °C Oil Temp: 20°C

Power Factor Capacitance ®F)


No Phase / Serial No Mode kv rnA Factory
Site Site Factory
Measured Measured Measured Measured

I R Ph / EL03073173 0.99 0..328 0.306 318.1 304.7

2 Y Ph / IH03073180 UST 10kv 0.996 0.301 0.328 317.2 303.8

3 a Ph / IH03073172 0.952 0.290 0.319 303.1 302.5

• Criteria: PF must be less than 0.5%


• Tandelta Kit Results are Attached with this Report
• Remarks: Test Results are found SatisfactoryTestKitDetails:

No Name Make Serial Number Cal. Date Cal.Due Date


2 Omicron CPC 100 Omicron FC576G 05.01.2021 04.01.2022
3 Omicron CP TD1 Omicron 8 1 2 1 7F 05.01.2021 04.01.2022

Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name iin...AIR is:x=sJ.AN fr} nQ!Q
Signatul.e
9 Page NO. 02
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS
---.-,.--..-I,,i
Po/s:45236238

Transformer Test Report Date: 13/02/2021


Location: Block-02 Transformer - ST-74BAT10 Serial No. 5337PA169-05

Measurement of Bushing Insulation Power Factor and Capacitance:


HV R Phase Bushing:
TanDcha-PF 1:
Card Type: TanDelta
Date/Time: 02/13/202115:56:06
0`rerload: no
Assessment: n/a
CPTD= 81217F
Calib.No.i 37.0
Bv= 0micron electronics: Factory Calibration
Calibration Date: 01/17./`201714:10:24
Mode: LJST-A
Bandwidth: 5Hz
Averagitlg: 5
Teri'tperature Corripensation: k: 1.00
T c'il: 20.00 0C
T ambient: 21.oo oc
rel. HurTi.: 31.0 C!/a
Results=
V test V meas. I meas. FfJeqLierlcy Cp I DF
10.00000 k`r 10000 V 0.99944mA *50.00 Hz 318.13 pF 0.32S9 C!ro

HV Y Phase Bushing:
TanDelta-F]F 2:
Card Type: TanDelta
Date/Time: C)2/`13,'202115:5S:47
Ch/erload: no
Assessment: n/a
CPTD= 81217F
Calib-No.i 37.a
By= 0micron electronics; Factor/ Calibration
Calibration flate: 01/17/201714:10:24
f4ode= UST-Jh
Band`hrid&h: 5Hz
Averaging: 5
Temperature Corr-pensation: k: 1-00
T ail: 20.00 0C=
T ambient: 21.oo oc
rel. Hum.: 31.a a/a
Results=
Vtest |Vmea5. I meas, FT-equency Cp DF
lo.00C)00 k`u/ 10000 V 0.99660 rnA =50.00 Hz 317.21 pF C).Sols C:.'a

Tested By Witnessed/Approved By
Company PGP Contracting

Signature

Page No. 03
PROJECT-ALBA LINH-05 DIAGNOSTIC
TESTING AND OIL PROCESS
Po/s:45236238

Transformer Test Report Date: 13/02/2021


Location: Block-02 Transformer -ST-74BAT10 Serial No. 5337PA169-05

Measurement of Bushing Insulation Power Factor and Capacitance:

HV 8 Phase Rushing:
TanDelta-PF 3=
Card Types TanDelta
Date/Time: 02/13/202116:03:53
0`rerload = no
Assessment; n/a
CPTD= 81217F
Calib-No-= 37.0
By= 0micron electronics; Fac±ory Calibration
Calibration Date: 01/17..''201714:10:24
modes UST-A
Bandwidth: 5Hz
^veragir'g= S
Temperature Compertsation: k: 1-00
T oil: 20.00 0C
T ambient: 21.oo oc
rel. Hum.: 31.0 PJQ
Results=
Vtest !Vmeas.( Imeas. |Frequen[y Cp DF
10.00000 kv IOO01 V 0.952S6 rnA Sscl.00 Hz 303.18 pF 0.2905 a,;a

• Criteria: PF must be less than 0.5%


• Tandelta Kit Results are Attached with this Report
• Remarks: Test Results are found Satisfactory

Test Kit Details:


Serial Number Cal. Date Cal.Due Date
Omicron CPC 100 Omicron FC576G 05.01.2021 04.01.2022
Omicron CP TD1 8 1 2 1 7F 05.01.2021 04.01.2022

Tested By Witnessed/Approved By
Company PGP Contracting

Signature

Page NO. 04
•.-
`. --f3#gr-` _
ERE
` 8i7 ;'CONTiiACTING
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS dot.d
Po/s:45236238 rl.,a,i`T.Ti,I;a

Transformer Test Report Date: 13/02/2021


Location: Block-02 I Transformer -ST-74BAT10 Serial No. 5337PA169-05

Measurement of HV-Tank Insulation Resistance :

Ambient Temp: 21°C Oil Temp: 20°C

Measured PointHV-Tank
No Time Orin)

1 01 162 GQ

2 05 311 GQ

3 10 340 GQ

4 PI Value 2.098

Measure ment of Bushing Insulation Resistance :

Measured Point(01Min)
No IR Value

1 R Phase - Earth 242 GQ

2 Y Phase - Earth 269 GQ

3 8 Phase - Earth 301 GQ

® Criteria: R Value Required Minimum 100 M£2 for Core Insu lation and 800 M£2 for Winding @ 01 Min
• Criteria: PI Value Must be Higher than 1.5@ ( 10Min/01Min
• Remarks: Test results are found Satisfactory

Test RIt Details:


No Name Make I SerialNumber Cal. Date Cal.DueDate I
1 insulation Tester Megger I NA 22.10.2020 21.10.2021 I

Tested By Witnessed/Ap|}roved By
Company PGP Contracting Alba
Name 6`,hjA fl€ELAro .gBAI<±
Si8natul.e
®.fro
Pa8eNo. 05
``. -I-E=`..-¢
', -. . . .3sed'` ;
PROJECT-ALBA LINE-05 DIAGNOSTIC
chQ(.n
TESTING AND OIL PROCESS
--zifz#-®FT-ra Po/s:45236238
I--+ .-11

Transformer Test Report Date: 26/01/2021


Location: Block-03 |Transformer -GT-81BAT1 Serial No. 5337PA169-03

TRANSFORMER DETAILS

Customer : ALBA

Make : GE

Type of cooling : ONAN/ONAF/ODAF

Rated power : ONAN -293000 kvA


: ONAF - 390000 kvA
: ODAF -487100 kvA

Ratedvoltage : HV -230000V
:LV - 20000V

RatedFrequency :50Hz

Number of pliase : 3 Phase

Vector Group : YNdll

Standard : IEC 60076

Serial No 5337PA169-03

Year of Manufacturl : 2017

Tested By Witnessed/Approved By
Company PGP contracting Alba
Name /mj~f\ rfet-i jf]rD jBQss`
Signature
ci5.fro
v Page No. 01
r`.`---3#9` __. PROJECT-ALBA LINE-05 DIAGNOSTIC
".--in , .,:-,- I-
TESTING AND OIL PROCESS n«)t.1. .--
Po/s:45236238

Transformer Test Report Date: 26/01/2021


Location: Block-03 Transformer - GT-81BAT1 Serial No. 5337PA169-03

Measurement of Bushing Insulation Power Factor and CaDacitance:AmbientTemp:17°COilTemp.18°C

Power Factor Capacitance ®F)


No Phase / Serial No Mode kv rnA Factory
Site Site Factory
Measured Measured Measured Measured

1 R Ph / IH03073646 0-964 0.317 0.303 307.09 307.7

2 Y Ph / IH03073184 UST 10kv 0.970 0.327 0.301 308.93 309.7

3 a Ph / IH03073647 0.965 0.321 0.292 307.35 308.2

• Criteria: PF must be less than 0.5%


• Tandelta Kit Results are Attached with this Report
• Remarks: Test Results are found SatisfactoryTesthitDetails:

No Name Make Serial Number Cal. Date Cal.Due Date


2 Omicron CPC 100 Omicron FC576G 05.01.2021 04.01.2022
3 Omicron CP TD1 Omjcron 8 I 2 1 7F 05.0]-202] 04.01.2022

Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name l€n\..Nflc£E>EIA r® A±OSS± S±
Sig-ture
p`ftyde- Page No. 02
PROJECT-ALBA LINE-05 DIAGNOSTIC
`,,,.

TESTING AND OIL PROCESS


Po/s:45236238

Transformer Test Report Date: 26/01/2021


Location: Block-03 Transformer - GT-81BAT1 Serial No. 5337PA169-03

Measurement of Bushing Insulation Power Factor and CaDacitance:


HV R Phase Bushing:
TanDelta-PF 1:
Card Types TanDelta
Date/Time: 01/26/202108:56:05
Ch/erload: no
Assessment: n/a
CPTD= 81217F
Calib.No.= 37.0
BYE 0micron electronics.: Factori/ Calibration
Calibration Date: 01./17/201714:10:24
Mode: UST-A
Bandwidth: 5Hz
Averagifig: 5
Temperatut-e Compertsation: k: 1.00
T Oil: 18.00 °C
T arTibient: 17.00 ac=
rel. Hum.: 31.0 P..`o
Results=
V test I v meas. I rrieas. i FreqLienc\/ i Cp DF=
10-00000 t<V 10000V 0.96481 in.i *50.00 H2 307.09 pF 0.3176 a,`a

HV Y Phase Rushing:
TanDelta-PF 1:
Card Type: TanDelt3
Date/Time: 01,'26,`202109: 14:43
Ch/erload: nQ
ilssessfTTent: n./a
CPTD= 81217F
Calib.No.I 37.a
By= Omicron electronics; Factory Calibratic}n
Caliht.ation Date: 01,'17./201714:10:24
mode= UST-A
Bandwid±l-: 5Hz
JA`,era9irlg= 5
Temperature Colrtpensation: k: 1.00
T oil: 1S.00 0C
T ambient: 17.00 oC
rel, Hum.: 31.0 q7'a
Results=
V test `/rheas. i I meas. I Frequet.c`/ i Cp DF
10.00000 kv 10001`./ 0.97065 rnA $50.00 liz 308.94pF 0.3271 C!.`a

Tested By Witnessed/Approved By
Company PGP Contracting

Signature

Page NO. 03
PROJECT-ALBA LINE-05 DIAGNOSTIC
'`,,

TESTING AND OIL PROCESS


Po/s:45236238

Transformer Test Report Date: 26/01/2021


Location: Block-03 Transformer - GT-81BAT1 Serial No. 5337PA169-03

Measurement of Bushing Insulation Power Factor and CaDacitance:

rv 8 Phase Bushing:
TanDelta-flF 1:
Card Type: TanDelta
Date/Time: 01/26/202109:23:19
Ch/erload: no
Assessment: n/a
CPTD= 81217F
Ca!ib.No.; 37.0
By: 0micron electronics; Factory Calibration
Calibration Date: 01/17.I'201714:10:24
Modes UST-A
Bandwidth: 5Hz
Averaging: 5
Temperature Conipensation: k: 1.00
T oil: 18.00 oc
T ambient: 17.C}o oC
rel. Hum.: 31.a a/a
Results=
V test V me@s, I meas, Frequeney| Cp DF
10.00000 ku 10Clo1 '`.' 0.96569 rnA $50.00 HZ 307.35 PF 0.3219?.'a

• Criteria: PF must be less than 0.5°/o


• Tandelta Kit Results are Attached with this Report
• Remarks: Test Results are found Satisfactory

Test Kit Details:


Serial Number Cal. Date Cal.Due Date
Omicron CPC 100 Omicron FC576G 05.01.2021 04.01.2022
Omicron CP TD1 81217F 05.01.2021 04.01.2022

Tested By Witnessed/Approved 8
Coml}any PGP Contracting

Signature

Page No. 04
r`- --r` _. PROJECT-ALBA LINE-05 DIAGNOSTIC
`j¥ri-ioi=-ACT]us TESTING AND OIL PROCESS diQ(|di
Po/s:45236238

Transformer Test Report Date: 26/01/2021


Location: Block-03 |Transformer -GT-81BAT1 Serial No. 5337PA169-03

Measurement of HV-Tank Insulation Resistance .

Ambient Temp: 17 °C Oil Temp: 18 °C

Measured PointHV-Tank
No Time own)

I 01 98.5 GQ

2 05 131 GQ

3 10 155 GQ

4 PI Value 1.573

Measure ment of Bushing Insulation Resistance :

Measured Point(01Min)
No IR Value

1 R Phase - Earth 127 GQ

2 Y Phase - Earth 119 GQ

3 a Phase - Earth 118 GQ

® Criteria: R Value Required Minimuni 100 M£2 for Core Insu 1ation and 800 NI2 for Winding @ 01 Min
• Criteria: PI Value Must be Higher than 1.5@ (10Min/01Min
• Remarks. Test results are found Satisfactor)/

Test Kit Details:


No Name Make I SerialNumber Cal. Date Cal.DueDate I
I insulation Tester Megger I NA 22.10.2020 2].10.202] I

Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name G"alf)^Fis£J|9ir`-g5Jtiss±
Signature
f>`fatryJ-`
PageNO. 05
;v--S¥- -_ PROJECT-ALBA LINE-05 DIAGNOSTIC
dqflo-,-+--
#... .. ,=J , .``,-. .
TESTING AND OIL PROCESS
Po/s:45236238
-..--
Transformer Test Report Date: 26/01/2021
Location: Block-03 I Transformer -ST-81BAT10 Serial No. 5337PA169-06

TRANSFORMER DETAILS

Customer : ALBA

Make : GE

Type of cooling : ONAN/ONAF/ODAF

Rated power : ONAN -108000 kvA


: ONAF - 137000 kvA
: ODAF - 196000 kvA

Ratedvoltage : HV -230000V
:LV - 19000V

RatedFrequency : 50Hz

Number of phase : 3 Phase

Vector Group : YNdll

Standard : IEC 60076

Serial No : 5337PA169-06

Year of Manufacturi : 2017

Tested By Witnessed/Approved By
Company PGP contracting Alba
Name fiAalfis!€f=~^,ifecyf±si
I s i gn attE re g±,twin
Page No. 01
l-i --ssedsJ _ __ --_
PROJECT-ALBA LINE-05 DIAGNOSTIC
•--..,, w, I RE :-
TESTING AND OIL PROCESS dr,tltB- .-. --
Po/s:45236238 -''1''''''''''1_
Transformer Test Report Date: 26/01/2021
Location: Block-03 Transformer - ST-81BAT10 Serial No. 5337PA169-06

Measurement of Bushing Insulation Power Factor and CaDacitance:AmbientTemp:19°COilTemp:20°C

Power Factor Capacitance ®F)


No Phase / Serial No Mode kv rnA Factory
Site Site Factory
Measured Measured Measured Measured

1 R Ph / IH03073174 0.964 0.310 0.309 307.04 312.6

2 Y Ph / IH03073179 UST 10kv 0.982 0.296 0.318 312.56 303.4

3 a Ph / IH03073175 0.954 0.308 0.314 303.72 306.8

• Criteria: PF must be less than 0.5%


• Tandelta Kit Results are Attached with this Report
• Remarks: Test Results are found SatisfactoryTesthitDetails:

No Name Make Serial Number Cal. Date Cal.Due Date


2 Omicron CPC loo olricron FC576G 05.01.2021 04.01.2022
3 Omicron CP TD1 Omicron 8 1 2 1 7F 05.01.2021 04.01.2022

Tested By Witnessed/Approved By
Company PGP Contracting Alba
Name .Itm ± EI..es -.
Signature
-
I page No. o2
PROJECT-ALBA LINE-05 DIAGNOSTIC
=FiE=EEi= TESTING AND OIL PROCESS
Po/s:45236238

Transformer Test Report Date: 26/01/2021


Location: BIock-03 Transformer - ST-81BAT10 Serial No. 5337PA169-06

Measurelnent of Bushing Insulation Power Factor and Canacitance:


HV R Phase Bushing:
TanDeita-PF 1:
Card Type: TanDelta
Date/Time: 01/26.f202113:26:18
0`/erload: no
IALsse5srnent: n/a
CPTD= Br2i7F
Calib.No.: 37.0
By: 0micrc)n electronics; Factory C=alibration
Calibration Date: 01/17/201714:10:24
Mode: UST-A
Bandwidtli: SHz
Averaging= 5
TemperatLii-e Compensatioft: k: 1.00
T oil: 20.00 OC
T ambient: 19.oo oc
rel. Hum.: 31.0 C!.Ja
Results=
V test Vmeas.I Imeas. i Frequency Cp I DF
10.00000kv 10001V 0.96466mA *50.00Hz 307.04pF 0.3102Q/a

HV Y Phase Rushing:
TanDelta-PF 2=
Gal.d Type: TanDelta
Date/Time: 01./26/202113:30: 32
Overload : na
Assessment: n/a
CPTD= 81217F
Calib.No.= 37.0
By: 0mlcron electrcmics; Factory Calibraticm
Calibration Date: 01,'17/201714:10:24
M®de= UST-A
Bandwidth: 5Hz
Avel-aging= 5
Temperature Compensation: k: 1.00
T oil: 20.00 0C
T ambient: 19.00 ac
rel. Hum.: 31.a a,'a
Results=
Vtest !VmeasJ Imeas. jFrequenc`/I Cp I DF t
io.00000 kv 10001V 0.9S202 rnA aL-50.00 HZ 312.57 pF 0.296St!/a

Tested By Witnessed/Approved By
Company PGP Contracting

Signature

Page NO. 03
PROJECT-ALBA LINE-05 DIAGNOSTIC
r.,.,
TESTING AND OIL PROCESS
Po/s:45236238

Transformer Test Report Date: 26/01/2021


Location: Block-03 Transformer - ST-81BAT10 Serial No. 5337PA169-06

Measurement of Bushing Insulation Power Factor and CaDacitance:

HV 8 Phase Bushing:
TanDelta-PF 3:
Card Type= TanDelta
Date/Time: 01/26/202113:34:27
0`/erload : no
Asse55ment: n/a
CPTD: 81217F
Calib.No.= 37.a
By= 0micron electronics; Factory Calibration
Calibration Date: 01/17/201714:10:24
Hode= UST-A
Baridwidth: SHE
Averaging: 5
Temperature Comperisation: k: 1.00
T oil: 20.00 OC
T ambient: 19.00 C!C
rel. Hum.: 31.0 a/a
Results:
Vtest |Vmeas.( Imeas. !F=requenc`/ CpDF
10.00000k\/ 10001\/ 0.95424mA *50.00Hz 303.73pF 0.30S2C:/a

• Criteria: PF must be less than 0.5%


• Tandelta Kit Results are Attached with this Report
• Remarks: Test Results are found Satisfactory

Test Ffit Details:


Serial Number Cal. Date Cal.Due Date
Omicron CPC 100 Omicron FC576G 05.01.2021 04.01.2022
Omicron CP TD1 8 1 2 1 7F 05.01.2021 04.01.2022

Tested By Witnessed/Approved By
Company PGP Contracting

Signature

Page No- 04
PROJECT-ALBA LINE-05 DIAGNOSTIC
TESTING AND OIL PROCESS
'CONTRACTING
Po/s:45236238

Transformer Test Report Date: 26/01/2021


Location: Block-03 Transformer - ST-81BAT10 Serial No. 5337PA169-06

Measurement of HV-Tank Insulation Resistance :

Ambient Temp: 19°C Oil Temp: 20°C

Measured Point
No Time (Min)
rv-Tank

1 01 219 GQ

2 05 354 GQ

3 10 411 GQ

4 PI Value 1.876

Measurement of Bushing Insulation Resistance :

Measured Point
No IR Value
(01Min)

I R Phase - Earth 306 GQ

2 Y Phase - Earth 308 GQ

3 8 Phase - Earth 285 GQ

• Criteria: R Value Required Minimum 100 M£2 for Core insulation and 800 Mf2 for Winding @ 01 Min
• Criteria: PI Value Must be Higher than 1.5@ (10Min/01Min)
• Remarks: Test results are found Satisfactory

Test Kit Details:


Serial Number Cal. Date Cal.Due Date
insulation Tester Me88er 22.10.2020 21.10.2021

Tested By Witnessed/Approved 8
Company PGP Contracting
j5 Qsis± 1
Sig-ture
PageNO. 05