Design calculation sheet

Project no: Date: 30/09/2007 Sheet No. 1 of 1 Computed by:


Subject: Checked by:
Approved by:

See Uniform Plumbing Code -2006

No. of seats = 50 Seats (As per plan)


Waste Flow rate = 1.5 gal/meal (Seating dining)
Retention Time = 2.5 hours (Commerical Kitchen waste)
Interceptor Size = 187.5 gal
200 gal
757.08 L

Drainage Period = 2 minutes (See NSPC -2003)

Interceptor Flow-rate = 100 gpm


6.31 l/s

6000
144000
545.45454545

1 M3 = 264 GALLONS 22.72727273


Design calculation sheet
Project no: Date: 30/09/2007 Sheet No. 1 of 1 Computed by:
Subject: Checked by:
Approved by:

See Uniform Plumbing Code -2006

No. of seats = 100 Seats (As per plan)


Waste Flow rate = 1.5 gal/meal (Seating dining)
Retention Time = 2.5 hours (Commerical Kitchen waste)
Interceptor Size = 375 gal
400 gal
1514.16 L

Drainage Period = 2 minutes (See NSPC -2003)

Interceptor Flow-rate = 200 gpm


12.62 l/s