CONTENTS
• Configuration Diagram and Layout
• Cabinet Installation
• Cabinet Cabling
• Battery Installation
• TTA Installation
• RTA Installation
• Antenna Installation
• TTA/RTA Cable Installation
• MW Installation
• Labeling
• Site Environment
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel Confidential to ZTE and Belltel 5
Version No: V1.5
BellTel Project 2G/4G Nationwide
Schematic Diagram
DC Power/OF/IF
Fiber
DC Power
Configuration of Cabinet
For the ODF, have 2 types:
(*)References Page 4 of RD 1
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 8
Version No: V1.5
BellTel Project 2G/4G Nationwide
Extension Cabinet
(if available)
(*)References Page 6 of RD 1
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 9
Version No: V1.5
BellTel Project 2G/4G Nationwide
Cabinet Installation
Cabinet located in position as Site
Detail Design Drawing (DDD)
Cabinet Installation
Install C- Channel Adapter
Cabinet Installation
Install C- Channel Adapter
Cabinet Cabling
Cable gland
assignment for
scenario 1
(First Batch Sites)
References Page 19 of RD 1
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 13
Version No: V1.5
BellTel Project 2G/4G Nationwide
Cabinet Cabling
Cable bushing assignment for scenario 1 (First Batch Sites)
For the Sites that cable can not go through from the bottom of the cabinet can use cable bushing of Cabinet
MW Fiber Battery
Trunk Fiber Cable
Sector A&B&C Genset
Trunk Power Modbus/SNMP
MW IF Cable Cable Sector B For temp probe to Slave
MW DC Grounding Cable of
Trunk Power Cable
FOC Fiber Cabinet plinth GPS Feeder Cable
Cable Sector C Trunk Power
Cable Sector A
AC Power Cable
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 14
Version No: V1.5
BellTel Project 2G/4G Nationwide
Cabinet Cabling
Cable gland
assignment for
scenario 2
References Page 2 of RD 7
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 15
Version No: V1.5
BellTel Project 2G/4G Nationwide
Cabinet Cabling
Cable bushing assignment for scenario 2
For the Sites that cable can not go through from the bottom of the cabinet can use cable bushing of Cabinet
Cabinet Cabling
References Page 21 of RD 1
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 18
Version No: V1.5
BellTel Project 2G/4G Nationwide
Cabinet Cabling
Signal cables and power cable routing
shall be separately at least 2cm.
DC Power Cable
Power cable To
Battery Cabinet
AC Power Cable
Cabinet Cabling---Conduit
Below cables need to put protective conduit between cabinet and cable tray
Cabinet Cabling
Routing of cable should through from the bottom of the cabinet, if can not, then go through the cable bushing of
cabinet.
Conduit
Need to
install C- For AC Power cable from site
Channel ACDB to cabinet ACPDU use
Adapter protective conduit that with
IP cable gland
OR
16mm2 16mm2
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 23
Version No: V1.5
BellTel Project 2G/4G Nationwide
L1 L
OR
L2 N
BKR LVBD
1 2 1 2 3 4 5 6 7 8 9 10
125A 125A 10A 16A 25A 25A 16A 16A 16A 16A 16A 16A
IPRAN Redundancy
Extension Cabinet
BBU02 or AOU03
MW AOU01
MW AOU02
DC Fan
BBU01
BAT02
BAT01
IPRAN
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 25
Version No: V1.5
BellTel Project 2G/4G Nationwide
References Page 38 of RD 1
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 26
Version No: V1.5
BellTel Project 2G/4G Nationwide
Cabinet Cabling
Cable Connection Schematic Diagram between Master Cabinet and Extension Cabinet
Battery Extension
breakers power breaker
SSM1 Positive
Negative module Bus bar
Bus bar (+0V)
(-48V) FAN breaker
Positive Bus
bar (+0V) 2AWG x 2
RFID
Signal
Cable
Ethernet
cable x 1
16AWG x1
/1
16AWG x1
/1
/1
/1
/1 2AWG x 4
References Page 39 of RD 1 /2 2AWG x 4
Doc No: BTL P15-PM-QM-STD-SIG-003 /2
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 28
Version No: V1.5
BellTel Project 2G/4G Nationwide
Cabinet Cabling
Battery Power Cable 0V for Batt 4
Connection From 0V for Batt 3 Positive Bus bar (+0V) of PDU
Master Cabinet to
Extension Cabinet 0V for Batt 2
PDU 0V for Batt 1
-48V
Insulation panel
Cabinet Cabling
Extension Cabinet Fan Power Cable Connection From Master Cabinet to Extension Cabinet PDU
Power system in
Master Cabinet -48V
Cabinet Cabling
Ethernet Cable Connection From Master Cabinet to Extension Cabinet
Master Cabinet
Extension Cabinet
Cabinet Cabling
RFID Signal RS485 Cable Connection From Master Cabinet to Extension Cabinet
Master Cabinet
Extension Cabinet
TE1
(Temp. Equipment)
There is 2 strings
battery in Extension
Cabinet only
TE2
(For fan control)
String 03
String 01
TB1
TB2
String 02 String 04
TA
References Page 44 of RD 1
(Temp. Ambient)
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 35
Version No: V1.5
BellTel Project 2G/4G Nationwide
All modules must grounding properly connect to the grounding bar of the cabinet ,
connector should be lugged, with heat shrink tube or boots.
For the cable inside the cabinet use white cable tie (except fiber),
black cable tie be used outdoor.
Cabinet Cabling---Fiber
For Verification only, no connection required on site
Blue is
connect to Sector B Sector C
the ports 1 Sector A Connect Sector A/B/C in one MPO Cassette
to 12 in MPO
Spool the excess length of the fibre Terminate the fiber according to the design and use specified BELCRO ties.
cables inside the fibre cable tray.
BBU
MPO
FS5
BPN2
Quantity of MPO
Scene Quantity of RRU Fiber No. Board Port MPO Cassette Port
Cassette
FS5 TX0 MPO_1 LC-LC
Fiber 1
FS5 RX0 MPO_2 LC-LC
FS5 TX1 MPO_5 LC-LC
Fiber 2
FS5 RX1 MPO_6 LC-LC
4*R8863
FS5 TX3 MPO_9 LC-LC
Fiber 3
FS5 RX3 MPO_10 LC-LC
Scene Quantity of RRU Quantity of MPO Cassette Fiber No. Board Port MPO Cassette Port
GPS Port Grounding Kit for GPS Feed Cable Cable will be
inside Cabinet installed 1m before entry the power Cabinet.(depend
on the position of the grounding bar)
Battery Installation
Do not drag a battery along the floor, if the battery has been dropped or has any damage
or electrolyte leakage, do not install this battery, need to change a new one!
Battery Installation
References Page 35 of RD 1
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 53
Version No: V1.5
BellTel Project 2G/4G Nationwide
Battery Power
Cable(-)
References Page 36 of RD 1
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 54
Version No: V1.5
BellTel Project 2G/4G Nationwide
TTA Installation
Bracket
TTA Installation
Bracket
TTA Installation
Hoisting
TTA Installation
Tower Top Assembly
References Page 35 of RD 6
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 59
Version No: V1.5
BellTel Project 2G/4G Nationwide
TTA Installation
Stiff Arms need to be installed for all tower or pole installation
RTA Installation
RTA Overall view
Connect the grounding cable from TTA/RTA to the Tower/Rooftop Grounding Bar
Azimuth of antenna
reference to Site DDD
Antenna Installation
45 Degree
TTA/RTA Cable Installation --- DC and Fiber Trunk cable Hoisting for Tower sites
Key Points:
References Page 48 of RD 6
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 67
Version No: V1.5
BellTel Project 2G/4G Nationwide
Grip must be
used for cable
hoisting
References Page 5 of RD 2
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 69
Version No: V1.5
BellTel Project 2G/4G Nationwide
Mark cutback length Notch Armor using flush cutter Place Rip Cord in Notches Pull Rip Cord Parallel to Cable
in-line with Kevlar strings
Stop at Length Marker
(while supporting breakout)
6 7 8 9 10
Connect the DC
Power Cable as
the instruction
in the inside of
the Cover
RRU DC
TERMINAL
Fiber Optic
Cable
Terminal
1 2
References Page 32 of RD 1
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 75
Version No: V1.5
BellTel Project 2G/4G Nationwide
DC Power cable
connection for RRU
SN of DC Breaker for 1 2 3 4 5 6
RTA/TTA from 12 to 23
SN of DC Breaker for TDD from 1 to 6
References Page 5 of RD 1
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 77
Version No: V1.5
BellTel Project 2G/4G Nationwide
12 BLUE 1
RED 2
13
ORANGE 3
14
YELLOW 4
15
BROWN 5
16
WHITE 6
17 BRIDGED
7
Note: In the Fiber Box, since terminal 5&6 and 6&7 were bridged; for troubleshooting and maintenance purposes - breakers 16 and 17 needs to be SWITCHED OFF
13 RED 2 A
14 ORANGE 3 A
15 Future 4
16 BLUE 1 B
17 RED 2 B
18 ORANGE 3 B
19 Future 4
20 BLUE 1 C
21 RED 2 C
22 ORANGE 3 C
23 Future 4
13 RED 2 A
14 ORANGE 3 A
15 YELLOW 4 A
16 BLUE 1 B
17 RED 2 B
18 ORANGE 3 B
19 YELLOW 4 B
20 BLUE 1 C
21 RED 2 C
22 ORANGE 3 C
23 YELLOW 4 C
BLUE 1 A
12
RED 2 A
13
ORANGE 3 A
14
YELLOW 4 A
15
BROWN 5 A
16
17
WHITE 6 BRIDGED A
23
WHITE 6 BRIDGED B
BLUE 1 C
1 (Extension Cabinet PDU)
RED 2 C
2 (Extension Cabinet PDU)
ORANGE 3 C
3 (Extension Cabinet PDU)
YELLOW 4 C References Page 21&25 of RD 2 and
4 (Extension Cabinet PDU)
BROWN 5 C
Equipment Connectivity Layer Diagram
5 (Extension Cabinet PDU) RD 5
6 (Extension Cabinet PDU)
WHITE 6 BRIDGED C
BLUE 1 A
12
RED 2 A
13
ORANGE 3 A
14
YELLOW 4 A
15
BROWN 5 A
16
WHITE 6 BRIDGED A
17
7 A
BLUE 1 B
1 (Slave Cabinet PDU)
RED 2 B
2 (Slave Cabinet PDU)
ORANGE 3 B
3 (Slave Cabinet PDU)
YELLOW 4 B
4 (Slave Cabinet PDU)
BROWN 5 B
5 (Slave Cabinet PDU)
WHITE 6 BRIDGED B
6 (Slave Cabinet PDU)
7
References Page 22&23 of RD 2 and Equipment Connectivity Layer Diagram RD 5 Note: In the Fiber Box, since terminal 5&6 and 6&7 were bridged; for troubleshooting and maintenance
Doc No: BTL P15-PM-QM-STD-SIG-003 purposes - breakers 16 and 17 , 5 and 6 (in Slave Cabinet PDU) needs to be SWITCHED OFF
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 82
Version No: V1.5
BellTel Project 2G/4G Nationwide
DC Trunk cable
References Page 11 of RD 2
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 83
Version No: V1.5
BellTel Project 2G/4G Nationwide
Tighten
to 6 - 8
N*m
References Page 53 of RD 6
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 86
Version No: V1.5
BellTel Project 2G/4G Nationwide
Cable Routing
Redundant DC and Fiber cable should spiral in the cabinet side, fix
to the cable tray, Power and Optical Cable bending radius does not
exceed minimum 6“ (152mm).
Cable Routing
The DC and Fiber cable of RRU is on the ground Need to use hoisting rod to hold the DC and Fiber cable off the ground
Grounding Bar
Cabinet
Grounding Kit
References Page 1 to 4 of RD 10
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 91
Version No: V1.5
BellTel Project 2G/4G Nationwide
References Page 1 to 2 of RD 11
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 93
Version No: V1.5
BellTel Project 2G/4G Nationwide
RPX310B-B1
Low Band Antenna
AISG Port
IN
OUT
IN
From Low Band antenna AISG “OUT” Port connect to For each sector, from 700MHz RRU connect to Low Band antenna AISG
the ”IN” Port of the other antenna in the same sector “IN” Port. (connect on site, see next page for connection guideline)
(Connected in the Factory )
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 94
Version No: V1.5
BellTel Project 2G/4G Nationwide
B 7R01 A01
Split
C 7R01 A01
7R01 A01
7R02 A03
Metro
7R03 A05
R8863
R8863
1800
Bipod frame
1800
2X Comb
2X Filter
Sector A
R8862A
R8862A
700
700
2X Comb
2X Filter
Sector B
R8862A
R8863
900
700
Sector C
2X Comb
2X Filter
R8863
Fibre
900
References of RD 12 RTA Sector Assembly RTA Sector Assembly
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 97
Version No: V1.5
BellTel Project 2G/4G Nationwide
Coupler 3
Coupler 1
Coupler 4
Coupler 2
References of RD 12
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 98
Version No: V1.5
BellTel Project 2G/4G Nationwide
Coupler 7
Coupler 5
Coupler 8
Coupler 6
References of RD 12
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 99
Version No: V1.5
BellTel Project 2G/4G Nationwide
Coupler 11
Coupler 9
Coupler 12
Coupler 10
References of RD 12
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 100
Version No: V1.5
BellTel Project 2G/4G Nationwide
Blue 4 Blue 1
Blue 3 Blue 2
To Sector B P6 To Sector B P3
To Sector B P5 To Sector B P4
To Sector C P6 To Sector C P3
To Sector C P5 To Sector C P4
References of RD 12
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 101
Version No: V1.5
BellTel Project 2G/4G Nationwide
2 X Combiner/Filter
1800 RRU
900 RRU
Coupler 3
Coupler 1
Coupler 4
Coupler 2
References of RD 15
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 103
Version No: V1.5
BellTel Project 2G/4G Nationwide
Coupler 7
Coupler 5
Coupler 8
Coupler 6
References of RD 15
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 104
Version No: V1.5
BellTel Project 2G/4G Nationwide
Coupler 11
Coupler 9
Coupler 12
Coupler 10
References of RD 15
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 105
Version No: V1.5
BellTel Project 2G/4G Nationwide
RVVPX310B-B1
1800MHz 1800MHz RRU
P6 P5 P4 P3
Sector A
Blue 1
References of RD 15
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 106
Version No: V1.5
BellTel Project 2G/4G Nationwide
1800 RRU
900 RRU
Coupler 3
Coupler 1
Coupler 4
Coupler 2
References of RD 19
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 108
Version No: V1.5
BellTel Project 2G/4G Nationwide
Coupler 7
Coupler 5
Coupler 8
Coupler 6
References of RD 19
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 109
Version No: V1.5
BellTel Project 2G/4G Nationwide
Coupler 11
Coupler 9
Coupler 12
Coupler 10
References of RD 19
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 110
Version No: V1.5
BellTel Project 2G/4G Nationwide
RVVPX310B-B1
1800MHz 1800MHz RRU
P6 P5 P4 P3
Sector A
Blue 1
References of RD 19
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 111
Version No: V1.5
BellTel Project 2G/4G Nationwide
R8863
R8863
1800
1800
R8862A
R8862A
700
700
• Sector A is primary and has all
2X Comb RRU’s
•
R8862A
Sectors B & C include filters and
R8863
900
700 combiner
• 7m RF jumpers to sectors B & C
will be coiled and stored with
2X Filter
R8863
Fibre
900
sector A
Sector A
Sectors B and C
References of RD 13
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 112
Version No: V1.5
BellTel Project 2G/4G Nationwide
700MHz RRU 02
Orange 1
Orange 2
Orange 4
Orange 3
References of RD 13
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 113
Version No: V1.5
BellTel Project 2G/4G Nationwide
700MHz RRU 03
Orange 1
Orange 2
Orange 4
Orange 3
References of RD 13
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 114
Version No: V1.5
BellTel Project 2G/4G Nationwide
P1 P2
Sector B
Filter 3 900MHz Filter 4
P2 P1
900MHz RRU 01 900MHz RRU 02
To Sector A Filter 1 P1 To Sector A Filter 2 P1
References of RD 13
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 115
Version No: V1.5
BellTel Project 2G/4G Nationwide
Blue 4 Blue 1
Blue 3 Blue 2
To Sector B P6 To Sector B P3
To Sector B P5 To Sector B P4
To Sector C P6 To Sector C P3
To Sector C P5 To Sector C P4
References of RD 13
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 116
Version No: V1.5
BellTel Project 2G/4G Nationwide
2 X Combine/Filter
1800 RRU
900 RRU
2300 RRU
Front Rear Split Metro design has 3
700 2-Port RRU Structural Steel Frame identical sectors like the
Fiber Box
one shown here
References of RD 17
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 117
Version No: V1.5
BellTel Project 2G/4G Nationwide
Coupler 1 Coupler 3
Coupler 2 Coupler 4
References of RD 17
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 118
Version No: V1.5
BellTel Project 2G/4G Nationwide
Coupler 5 Coupler 7
Coupler 6 Coupler 8
References of RD 17
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 119
Version No: V1.5
BellTel Project 2G/4G Nationwide
Coupler 9 Coupler 11
Coupler 10 Coupler 12
References of RD 17
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 120
Version No: V1.5
BellTel Project 2G/4G Nationwide
RVVPX310B-B1
Sector A
P6 P5 P4 P3
1800MHz
1800MHz RRU
RV4PX310B1
P6 P5 P4 P3
Sector A
2300MHz
2300MHz RRU
Sector A P10 P9 P8 P7
2600MHz
2600MHz RRU
Yellow 4
References of RD 17
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 123
Version No: V1.5
BellTel Project 2G/4G Nationwide
2600 RRU
2300 RRU ZTE R8964
ZTE R8964
Fiber Boxes
Sector Frame A Sector Frame B (new TDD module)
(existing RTA 3.0)
References of RD 18
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 124
Version No: V1.5
BellTel Project 2G/4G Nationwide
Coupler 1 Coupler 3
Coupler 2 Coupler 4
References of RD 18
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 125
Version No: V1.5
BellTel Project 2G/4G Nationwide
Coupler 5 Coupler 7
Coupler 6 Coupler 8
References of RD 18
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 126
Version No: V1.5
BellTel Project 2G/4G Nationwide
Coupler 9 Coupler 11
Coupler 10 Coupler 12
References of RD 18
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 127
Version No: V1.5
BellTel Project 2G/4G Nationwide
Blue 4 Blue 1
Blue 3 Blue 2
To Sector B P6 To Sector B P3
To Sector B P5 To Sector B P4
To Sector C P6 To Sector C P3
To Sector C P5 To Sector C P4
References of RD 18
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 128
Version No: V1.5
BellTel Project 2G/4G Nationwide
RV4PX310B1
Sector A P6 P5 P4 P3
2300MHz RRU
Brown 2
Brown 3
Brown 4
References of RD 18
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 129
Version No: V1.5
BellTel Project 2G/4G Nationwide
Sector A
P10 P9 P8 P7
2600MHz RRU
For Sector B and Sector C
the connection is the same Yellow 1
Yellow 2
Yellow 3
Yellow 4
References of RD 18
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 130
Version No: V1.5
BellTel Project 2G/4G Nationwide
Grounding
Cabinet
Grounding Bar
NR8250 ODU
NR8250 IDU
NR8950
Stainless steel
cable tie
MW antenna
45 Degree
Lightning Rod
NR8950
NR8950
Connect to IPRAN
All cables in cabinet are clearly labeled within 2-5 cm from end.
References of RD 4
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 142
Version No: V1.5
BellTel Project 2G/4G Nationwide
References of RD 4
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 143
Version No: V1.5
BellTel Project 2G/4G Nationwide
DC breaker labeling
Labeling --- MW
MW Antenna Labeling
3cm 3cm
Waterproof
NR8250 ODU IF
NR8950 DC Cable Labeling Cable Labeling
3cm
NR8950 Fiber Labeling
References of RD 4
Doc No: BTL P15-PM-QM-STD-SIG-003
Distribution – ZTE, Belltel © ZTE All rights reserved Confidential to ZTE and Belltel 145
Version No: V1.5