18Z00026

Design - Build for the Construction of Panguil Bay Bridge Project


REVISED Mobilization Plan of Equipment

2020 2021 2022 2023

Location Equipment Capacity Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec TOTAL

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

Concrete Batch Plant (Land) 90 m3/hr 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16

Concrete Batch Plant (Sea) 150 m3/hr 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15

Excavator 0.6 m3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 30

Dump Truck 15 m3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 30

Concrete Pump Truck 135 m3/hr 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 30

Bored Pile Drilling Machine D3,000 mm 1 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 29

Crawler Crane 180 ton 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 30

Crawler Crane 120 ton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16

Vibro Pile Hammer AFC400 1 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 29

Vibro Pile Hammer 150KW 1 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 29

Hammer Grab D3,000 mm 1 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 29

Oscillator(Rotator) D3,000 mm 1 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 29

Chisel D2,500 mm 1 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 29

Cargo Crane 25Ton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16

Generator 500 kw 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16
Bored Pile
Generator 300 kw 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16

Air compressor 900 cfm 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 30

Con'c Tremie Pipe Unit D 300 mm 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 30

Con'c Mixer Truck 6 m3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 64

Cargo Crane 25 ton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16

Steel Cutting Machine 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16

Skipen 30m3 6 6 6 6 6 6 6 6 6 6 6 6 6 6 3 3 90

Welding Machine 600A 12 12 12 12 12 12 12 12 12 12 12 12 12 12 6 6 180

Water Pump 30HP 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 2 60

Tug Boat 1600HP 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16

Tug Boat (Anchor) 1000HP 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16

Passenger Boat 200HP 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16

Crane Barge 160ton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16

Barge 1500HP 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17

Barge 2000P~3000P 1 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 46

Crawler Crane 50 ton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 22

Substructure Barge 2000P 2 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 86

Tug Boat 1000HP 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 22

Concrete Mixer 5 m3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 46

Concrete Pump Truck 135 m3/hr 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 46

Cable Tensioning System, Hydraulic 750 tons 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 28

Crawler Mounted Crane 100 ton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 23

Crawler Mounted Crane 50 ton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 23

Tower Crane 12 ton 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 92

Prestressing Jack 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 28

Form Traveler 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 56

FCM Con'c Vibrator 32mm 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 138

Movable Crane 130 ton 1 1 1 1 1 1 6

Cargo Crane 25 ton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 23

Bar Cutting Machine 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 46

Bar Bending Machine 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 46

Flat Top Barge (4-Anchor) 2,500 ton 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 46

Flat Top Barge (4-Anchor) 2,000 ton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 23

Tug Boat 1080 hp 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 23

Boat 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 23

Concrete Mixer 5 m3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 2 2 2 2 2 2 2 2 1 1 1 1 1 76

Concrete Pump Truck 135 m3/hr 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 48

Crawler Mounted Crane 150 ton 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 39

Prestressing Jack 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 2 2 2 2 2 2 2 2 1 1 1 1 1 76

Con'c Vibrator 32mm 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 3 3 3 3 3 144

Con'c Mixer Truck 6 m3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 2 2 2 2 2 2 2 2 1 1 1 1 1 76

Movable Crane 50 ton 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 39

Cargo Crane 25 ton 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 39


ILM
Bar Cutting Machine 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 2 2 2 2 2 2 2 2 1 1 1 1 1 76

Bar Bending Machine 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 2 2 2 2 2 2 2 2 1 1 1 1 1 76

Forklift 5 ton 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 39

Lifting Jack 300 ton 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 2 2 2 2 2 2 2 2 1 1 1 1 1 76

Pushing Jack 250 ton 8 8 8 8 8 8 8 8 8 8 8 8 8 8 4 4 4 4 4 4 4 4 4 2 2 2 2 2 152

Launching Unit 75 hp 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 39

Boiler system 1~2 ton 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 39

Boat 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 25

Excavator 2 4 4 2 2 2 2 2 2 3 3 3 3 2 4 2 3 3 3 3 3 3 3 3 66

Bulldozer, crawler with ripper 1 3 3 2 2 2 2 2 2 19

Dump Truck 5 11 11 6 6 6 6 6 6 8 8 8 8 5 15 10 10 10 10 10 10 10 10 10 205

Vibratory Roller 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 36

Motor Grader 2 2 2 2 2 2 2 2 2 2 20

Water Truck 1 2 2 2 2 2 2 2 2 1 1 1 1 1 1 23

Asphalt Distributor 1 1 1 1 1 1 1 1 1 1 10
Others
Tired (Pneumatic) Roller 1 1 1 1 1 1 1 1 1 1 10

Macadam Roller 1 1 1 1 1 1 1 1 1 1 10

Asphalt Finisher 1 1 1 1 1 1 1 1 1 1 10

Cargo Truck 1 1 2 2 2 2 2 2 2 2 18

Concrete Batch Plant (Land) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 24

Concrete Batch Plant (Sea) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 24

Concrete Pump Truck 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 27

Prepared By : Checked By : Reviewed By : Recommending Approval : Approved By : Project Location Sheet No.

Republic of the Philippines


KYONG‐HO  DEPARTMENT OF PUBLIC WORKS
AND HIGHWAYS Tangub City, Misamis Occidental
Roads Management Cluster II (Multilateral) and Tubod, Lanao del Norte,
Unified Project Management Office TERESITA V. BAUZON SHARIF MADSMO H. HASIM EMIL K. SADAIN, CESO I
KEUN YUNG KIM Northern Mindanao, Region Ⅹ
JIN SANG JU Project Manager III Project Director Undersecretary for UPMO Operation
Project Manager Project Manager Roads Management Cluster II Roads Management Cluster II and Technical Services
Multilateral, UPMO Multilateral, UPMO