Professional Documents
Culture Documents
NOTE:
KEUN YUNG KIM SOO YOUNG PARK SHARIF MADSMO H. HASIM SAMSON L. HEBRA, CESO IV MAXIMO L. CARVAJAL
PROJECT MANAGER SR BRIDGE DESIGN ENGINEER PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN UNDERSECRETARY
NAMKWANG-KUKDONG-GUMGWANG JV PROJECT MANAGEMENT CONSULTANT ROADS MANAGEMENT CLUSTER II FOR TECHNICAL SERVICES
YOOSHIN-PYUNGHWA-KYONGHO JV (MULTILATERAL) UPMO
REPORTS 6 Final Survey Report of PBBP Project Topo & Oceanographical Survey Report
Package 1-Part 3 14 Package 1-3 Design Report Abutment Piles and ILM Yard Piles Abutment Piles and ILM Yard Piles
Package 1-Part 4 15 Submission of Package 1-Part 4 Temporary Works - Embankment and Wharf Temporary Works - Embankment and Wharf
Package 2- Part 1 16 Package 2-1 Approach Bridge 1 Piles Approach Bridge 1 - Piles
Package 2- Part 2 17 Package 2-2 Main Bridge Piles Main Bridge - Piles
Package 2- Part 2 17 Package 2-2 Approach Bridge 2 Piles Approach Bridge 2 - Piles
Package 3 - Part 1 18 Approach Bridge 1 - Superstructure (General Drawings) Approach Bridge 1 & 2, Main Bridge - Superstructure (General Drawings)
Package 3 - Part 2 19 Approach Bridge 1 & 2, and Main Bridge - Superstructure (Reinforcement Drawings) Approach Bridge 1 & 2, and Main Bridge - Superstructure (Reinforcement Drawings)
Package 3 - Part 3 20 Ancillary Works Ancillary Works, Construction Sequence, Temporary Works
Package 3 - Part 4 27 Expansion Joints and Bearing Expansion Joint and Bearing
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
PACKAGE 2 - PART 1 16
Approach Bridge 1 - Piles
DRAWING INDEX
TABLE OF CONTENTS
DRAWING
ITEMS NO. TITLE REMARKS
NO.
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
Plan and Profile (1/6)
N
t
The Beginning of Project
or
ap
STA.0+000
ng
la
Si
BP 0+000
ub
ng
Ta
NOTE:
THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
PLAN
THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
SCALE 1:1,000
CONFIRMATION BY THE PROCURING ENTITY. 80
THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR 70 Bridge Begin
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE STA.0+360 1,020,000(Approach Bridge 1)
WITHOUT THE CONFORMITY OF THE CONTRACTOR.
60
17@60,000=1,020,000
50
KEUN YUNG KIM LEGEND :
PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV
40 The Beginning of Project Fault Zone
STA.0+000 Decomposed Zone
7.000
Casing)
7.700
8.100
8.200
4.700
Casing)
Casing)
Casing)
Casing)
(Steel
Residual Soil
(Steel
2.0
(Steel
(RCD EXCAVATION) (Steel
(Steel
2.3 1.5
3.2
4.0 1.0
Weathered Soil 2.4 1.2
2.0 2.2
2.7 2.3
3.0
-10 13.0 Unit-Ⅱ
(RCD EXCAVATION)
14.2
(RCD EXCAVATION)
(RCD EXCAVATION)
(RCD EXCAVATION)
16.7 12.7
-20 15.2
36.300
15.1
18.0
42.000
18.6
40.900
19.0
41.800
24.6
22.0
47.300
22.7
-30 30.0
32.0 Unit-Ⅲ 28.3
30.4 29.8
27.5 27.1
30.5
35.5 31.3
-40 35.1
37.0
34.9
38.2
35.8
42.0 40.7
42.0
-50 45.5
47.8
49.1 49.1
51.9 52.0
-60 54.7
52.9 53.3 Unit-Ⅳ
59.3
-70 65.0
68.3
65.5 65.0 65.0
-80
PVI STA.0+028,EL=2.62 PVI STA.0+290,EL=7.64
-90 CL=56 M (K=19.2 M/%) CL=100 M (K=145.77 M/%)
2.90 0+000
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500
520
540
560
580
600
20
40
60
80
S T A
-1.92 10.22
-2.02 10.47
-2.04 10.71
-2.12 10.96
-2.20 11.21
-2.19 11.45
2.80
2.92
3.23
3.62
4.00
4.38
4.77
5.15
5.53
5.92
6.30
6.68
7.05
7.39
7.71
8.00
8.25
8.50
8.75
8.99
9.24
9.48
9.73
9.98
Design Level
2.90
2.22
2.26
2.04
1.82
1.72
1.40
1.53
1.18
0.80
0.90
1.55
1.11
0.69
-0.41
-0.91
-0.88
-1.19
-1.37
-1.60
-1.86
-1.87
-1.97
-2.00
-2.01
Ground Level
L=2574.126
HOR. CURVATRE
L=56.00 L=184.00 L=100.00 L=1,040.00
VER. CURVATRE K=19.20 g=+1.916% K=145.77 g=+1.230%
SUPERELEVATION
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
NOTE:
THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE
CONFIRMATION BY THE PROCURING ENTITY.
OF THE APPROVAL OR
N
KEUN YUNG KIM
PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV
BH-5 BH-6 BH-7 BH-8 BH-9 BH-10 BH-11 BH-12 BH-13 BH-14
Tubod
PLAN
SCALE 1:1,000
80
70
1,020,000(Approach Bridge 1)
60
17@60,000=1,020,000
50
LEGEND :
40 Fault Zone
Decomposed Zone
MATCH LINE STA. 0+600
BH-11
(Steel Casing)
9.800
12.000
(Steel Casing)
Casing)
(Steel Casing)
BH-12
13.600
Casing)
Casing)
(Steel
BH-13
15.300
15.300
16.200
16.300
(Steel
(Steel
Casing)
18.000
Casing)
Casing)
18.500
Casing)
(Steel
(Steel
(Steel
(Steel
-10
2.8
4.0 3.7
5.6 6.2
Sedimentary Clayey Soil Sedimentary Clayey Soil 2.3
6.5 6.8 4.7 1.9
7.5 6.5 6.5
7.9
8.7
10.0 8.5
9.5
10.1
Residual Soil 7.3 6.8
12.0 11.5 9.7
10.3
-20 Weathered Soil 9.3
(RCD EXCAVATION)
9.9
(RCD EXCAVATION)
15.1 10.1
(RCD EXCAVATION)
16.7
(RCD EXCAVATION)
(RCD EXCAVATION)
(RCD EXCAVATION)
18.2 14.2
(RCD EXCAVATION)
18.0
(RCD EXCAVATION)
19.2 17.3
(RCD EXCAVATION)
15.5
40.200
(RCD EXCAVATION)
39.200
17.4
38.000
21.4
36.400
21.0 20.6 18.7 18.5
-30 23.5
35.800
36.700
35.500
27.1 26.2
27.2 22.5
40.000
28.7 27.7 26.6 24.7
47.700
49.700
30.5
31.3 29.9 29.6
32.5 31.4
-40 35.8
36.9
33.0
34.4
Unit-Ⅲ
30.9
38.7
41.0 40.4 36.7
41.2 40.3
-50 43.7
47.0
42.7 41.5
49.1 45.7
52.0 49.1
-60 53.6
57.0
54.7 53.3
54.1 53.2
50.4
-80
-90
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
100
120
140
160
180
200
20
40
60
80
S T A
-2.19 11.45
-2.30 11.70
-2.23 11.95
-2.31 12.19
-2.37 12.44
-2.30 12.68
-2.33 12.93
-2.34 13.18
-2.39 13.42
-2.47 13.67
-2.66 13.91
-2.56 14.16
-2.95 14.40
-3.21 14.65
-3.23 14.90
-3.37 15.14
-3.50 15.39
-3.73 15.63
-3.92 15.88
-4.12 16.13
-4.54 16.62
-5.01 16.86
-5.40 17.11
-5.84 17.36
-6.10 17.60
-6.33 17.85
-6.58 18.09
-6.92 18.34
-7.25 18.59
-7.59 18.83
Design Level
Ground Level
L=2574.126
HOR. CURVATRE
L=1,040.00
VER. CURVATRE g=+1.230%
SUPERELEVATION
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
NOTE:
THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE
CONFIRMATION BY THE PROCURING ENTITY.
OF THE APPROVAL OR
N
KEUN YUNG KIM
PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV
PLAN
SCALE 1:1,000
80
70
1,020,000(Approach Bridge 1) 320,000(Main Bridge) 900,000(Approach Bridge 2)
60
17@60,000=1,020,000 85,000 150,000 85,000 15@60,000=900,000
50 EL. 41.748 EL. 41.646
40
MATCH LINE STA. 1+200
2.25m
10
2.31m
EL. -0.560 EL. -1.060 PY1 BXH= PY2 EL. -1.060 EL. -0.560
90mX15m
0 H.W.L =0.94
(Steel Casing)
BH-14 BH-15
(Steel Casing)
(Steel Casing)
21.100
BH-16
23.200
24.700
BH-17
-10 0.3
EL. -20.860
BP-1
BP-2 BP-3
BH-18 EL. -20.960
BH-19
4.7 Sedimentary Sandy Soil Sedimentary Clayey Soil BP-4 EL. -23.760
6.5 2.7
3.5 EL. -24.240
-20 8.5
8.5 Residual Soil
10.4 9.3
2.5
4.0 1.1
1.0
3.7
Residual Soil 3.5
6.3
Weathered Soil 6.0 1.2 2.2 4.4
14.5
56.000 8.4 8.4 4.4 9.0
(RCD EXCAVATION)
5.0
60.000
-30 16.0 11.0 10.8
(RCD EXCAVATION)
19.5 7.7
65.000
19.5 16.5
Unit-Ⅲ
(RCD EXCAVATION)
14.0 14.5
69.000
10.8 13.4
BORED PILE BORED PILE
34.900
16.0
26.0 13.2 16.9
35.800
19.0
23.9 16.0
-40 Φ3,000 Φ3,000
37.300
16.8
31.5 23.0 22.5 21.7
27.7
30.7
BORED PILE 19.2
BORED PILE
35.0
37.1
EL. -56.560 Φ3,000 Φ3,000
LEGEND : -50 Unit-Ⅳ
31.0
43.5 42.6 42.5
EL. -61.060 35.5 34.6 31.2 30.9 36.9
38.8
Fault Zone 47.4
44.5 37.4
EL. -65 .560
Decomposed Zone
-60 49.3
51.5
46.2
48.9
43.4 43.5
36.2
39.7 EL. -70.060
46.4
Sheared/Fractured Zone 45.3 48.0
-70 52.7 51.1 46.5
55.8 55.4
65.6 65.0 63.5 56.9
-80 66.5
Unit-Ⅴ 61.3
-90 75.5
73.5 71.9 CL=320 M (K=123.21 M/%) 68.1
71.5 75.5
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
76.6
80.0
S T A
85.5
86.8
86.0 85.5
-7.59 18.83
-8.17 19.08
-8.21 19.32
-8.55 19.57
-8.91 19.82
-9.45 20.06
-9.63 20.31
-9.98 20.55
-10.96 20.80
-11.66 21.05
-12.71 21.28
-13.76 21.47
-14.75 21.64
-15.63 21.77
-16.96 21.87
-18.19 21.94
-19.26 21.97
-19.98 21.98
-20.06 21.95
-20.06 21.88
-19.36 21.79
-18.70 21.66
-18.36 21.50
-16.90 21.31
-16.62 21.08
-16.34 20.83
-15.82 20.55
-15.85 20.28
-15.65 20.01
-15.83 19.73
-14.67 19.46
Design Level
Ground Level
L=2574.126
HOR. CURVATRE
SUPERELEVATION
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
NOTE:
THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE
CONFIRMATION BY THE PROCURING ENTITY.
OF THE APPROVAL OR
N
KEUN YUNG KIM
PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV
BH-20 BH-21 BH-22 BH-23 BH-24 BH-25 BH-26 BH-27 BH-28 BH-29
Tubod
PLAN
SCALE 1:1,000
80
70
900,000(Approach Bridge 2)
60
15@60,000=900,000
50
LEGEND :
40 Fault Zone
Decomposed Zone
MATCH LINE STA. 1+800
(Steel Casing)
BH-23 Sedimentary Sandy Soil
(Steel Casing)
20.400
(Steel Casing)
BH-22
(Steel Casing)
(Steel Casing)
BH-24 4.0
(Steel Casing)
25.000
25.100
BH-25
(Steel Casing)
(Steel Casing)
BH-26
-10
27.000
BH-21
27.800
28.700
(Steel Casing)
30.700
31.000
32.800
(Steel Casing)
7.0 7.0 15.5
5.5
50.600
4.0 11.5 15.5
(RCD EXCAVATION)
-30 13.7
(RCD EXCAVATION)
12.5 17.1 16.5
(RCD EXCAVATION)
(RCD EXCAVATION)
20.0 18.3 16.8
17.0
(RCD EXCAVATION)
17.8
Weathered Soil
(RCD EXCAVATION)
(RCD EXCAVATION)
22.5
(RCD EXCAVATION)
(RCD EXCAVATION)
19.0 21.0
32.900
23.0
32.000
26.4
-40 24.4 29.0
33.200
36.5
41.000
26.200
32.000
53.600
37.300
31.9 31.7
38.300
28.1 33.7
35.2 37.3
Unit-Ⅰ
(RCD EXCAVATION)
-50 32.5
39.1
35.3
36.1 47.1 48.0
37.5 41.4 Unit-Ⅲ
17.400
40.5 40.3
53.0
-90
-9.30 16.73 2+000
800
820
840
860
880
900
920
940
960
980
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
20
40
60
80
S T A
-14.67 19.46
-13.70 19.19
-12.92 18.91
-12.22 18.64
-11.78 18.37
-10.88 18.09
-10.23 17.82
-9.13 17.55
-8.28 17.27
-8.98 17.00
-9.75 16.45
-9.96 16.18
-10.52 15.91
-11.30 15.63
-11.53 15.36
-11.62 15.08
-12.04 14.81
-12.17 14.54
-11.80 14.26
-10.60 13.99
-9.05 13.72
-7.51 13.44
-5.48 13.17
-3.66 12.90
-2.26 12.62
-0.96 12.35
-0.81 12.08
-0.61 11.80
-0.68 11.53
-0.55 11.26
Design Level
Ground Level
L=2574.126
HOR. CURVATRE
L=1,170.00
VER. CURVATRE g=-1.367%
SUPERELEVATION
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
BC 2+650.4101
NOTE:
THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
4
THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
05.298
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.
7
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
EC 2+
WITHOUT THE CONFORMITY OF THE CONTRACTOR.
IP
R
A1
EB-3
A2
Tangub
N
KEUN YUNG KIM
PROJECT MANAGER
2+600
NAMKWANG-KUKDONG-GUMGWANG JV
2+400 2+500
AH-2 0+100 2+700
0+
BH-30 BH-31 BH-32 EB-7 EB-6 0+300
20
0
0
0+00 2+80
0
00 0
Tubo
TP-4 d
ETC 2+650.4101
BTC 2+600.0001
A. 3+
BTC 2
2+90
ETC
0
+705.2
EB-4
E ST
2+75
TP-5
984
5.70
3+00
H LIN
0
84
C
MAT
PLAN
SCALE 1:1,000
80
70 Bridge End
900,000(Approach Bridge 2) STA.2+600
60
15@60,000=900,000
50
LEGEND :
40 Fault Zone
Decomposed Zone
MATCH LINE STA. 2+400
4.2 4.2
4.0 5.7 5.0 Residual Soil
24.500
5.5 5.5
6.5 8.5 8.5 8.0 10.2
9.5 8.5
14.0
Residual Soil
-20 15.0
(Steel Casing)
(Steel Casing)
51.500
49.800
19.5 21.3 23.4
22.1 22.2 23.0
23.0
24.0
25.5
23.3 Weathered Soil
(RCD EXCAVATION)
24.6
-30 25.2
Weathered Soil 28.5
(RCD EXCAVATION)
27.0
30.0
31.0 30.3
Weathered Soil Unit-Ⅰ
28.500
44.8 44.5
-50 47.3
5.200
49.0
Unit-Ⅰ
11.500
50.0 49.5
Unit-Ⅱ
-60 56.0
59.9 60.1
57.3
58.5
57.0
Unit-Ⅱ
62.0
64.7
63.3
63.9 Unit-Ⅰ
65.0
-70 65.7
68.2 70.3
72.0
-80 76.2
79.0
PVI STA.2+960,EL=3.6
-90 CL=180 M (K=131.65 M/%)
3.69 3+000
400
420
440
460
480
500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
S T A
-0.55 11.26
-0.44 10.98
-0.49 10.71
-0.36 10.44
-0.41 10.16
9.89
9.62
9.34
9.07
8.80
8.52
8.25
7.98
7.70
7.43
7.15
6.88
6.61
6.33
6.06
5.79
5.51
5.24
4.97
4.70
4.45
4.24
4.06
3.91
3.79
Design Level
0.00
0.51
1.02
1.39
1.04
0.40
0.20
0.42
0.29
0.09
0.07
0.14
0.17
0.37
0.58
-0.33
-0.30
-0.25
-0.20
-1.12
-1.08
-0.06
-0.36
-0.73
-0.74
-1.80
Ground Level
R=400.000
2+600.000 2+650.410 LC=54.888 2+705.298 LS=50.4101 2+755.708 L=566.889
HOR. CURVATRE LS=50.410
L=1,170.00 L=180.00
VER. CURVATRE g=-1.367% K=102
2+650.410 2+705.298
2+600.000 +4.0 % 2+755.708
SUPERELEVATION -4.0 %
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
NOTE:
THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE
CONFIRMATION BY THE PROCURING ENTITY.
OF THE APPROVAL OR
N
KEUN YUNG KIM
PROJECT MANAGER STA.3+169
NAMKWANG-KUKDONG-GUMGWANG JV
d
bo
Tu
Tangub
P-5
T3+000 3+100
3+200 3+300
EB-5
EP 3+300
PLAN
SCALE 1:1,000
80
70
60
50
The End of Project LEGEND :
40 Fault Zone
STA.3+169
Decomposed Zone
MATCH LINE STA. 3+000
30
Sheared/Fractured Zone
20
10
EB-5
S=+0%
0 1.7
Residual Soil
-10 10.2
-30 28.5
35.6
-40
-50
-60
-70
-80
-90
3.69 3+000
3.60 3+300
100
120
140
160
180
200
220
240
260
280
20
40
60
80
S T A
3.63
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
Design Level
0.58
0.38
1.43
2.14
3.60
3.60
3.60
3.60
3.60
3.60
3.60
-0.21
-0.42
-0.28
-0.20
-0.19
Ground Level
L=566.889
HOR. CURVATRE
L=188.151
VER. CURVATRE g=0.000%
SUPERELEVATION
SAND CLAY GRAVEL SHALE
Decomposed/ SANDSTONE MUDSTONE CONGLOMERATE
Shared Zone
LONGITUDINAL ELEVATION
SCALE 1:1,000
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
BORED PILE DETAIL (1/14)
SCALE 1:50
[Type-1 : P1~P5]
H4
2,500 CA PA PB PC
(Column Section A) (Pile Section A) (Pile Section B) (Pile Section C)
INNER HOOP 250 R2 R1 150
(SPACER)
SEA Bed
(EL. D)
H.W.L 0.94 m
EXTERNAL
DETAIL "A"
A B P1 S36 P2 S36 R1 H20 R2 H20 REINFORCEMENT C D E
44 EA 44 EA @3000 @3000 BAND
270
6,000
1,500
CL OF PILE
1,330
3,200
3,000
1,330
1,500
270
1,000 S1 H16
A B C D E
HOOP BAR 250 S4 S3 S2 S1 300
H4
FRONT VIEW
SCALE 1:50
P1 S36
MAIN BAR
(WELDING)
DIMENSIONAL TABLE
150 500
T2 H25
DIVISION H4 CA PA PB PC R1 R2 S1 S2 S3 S4 15EA
P1 52.149 0.649 3.940 9.060 36.000 34@1.500=51.000 0.749 218@150=32.700 169@100=16.900 15@100=1.500 0.499
P2 58.887 1.387 3.940 9.760 41.300 38@1.500=57.000 1.487 254@150=38.100 183@100=18.300 15@100=1.500 0.437
P1 S36
P3 53.625 2.125 4.040 10.060 34.900 35@1.500=52.500 0.725 211@150=31.650 195@100=19.500 15@100=1.500 0.425 MAIN BAR
P4 55.363 2.863 4.140 10.060 35.800 36@1.500=54.000 0.963 217@150=32.550 203@100=20.300 15@100=1.500 0.463
500
500
P5 56.101 3.601 4.140 11.660 34.200 36@1.500=54.000 1.701 206@150=30.900 227@100=22.700 15@100=1.500 0.451
WELDING
(4MM)
T1 H25
DETAIL "A"
S=NONE
750
STEEL CASING COUPLER FOR REBARS LONGITUDINAL BARS
50
(T=23MM)
MAIN REINFORCEMENT
S
416
SPACER THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
C.T.C 3,000 * THE SPACERS CAN BE CHANGED DEPENDING * THE SPACE(S) AND SPACER BAR(R) CAN BE CHANGED THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
4 PCS. EACH LEVEL ON THE THICKNESS OF THE CASING AND MAIN BAR. ACCORDING TO SIZE OF COUPLER. BY CONDITION OF CONSTRUCTION SITE, SO EARTH CONFIRMATION BY THE PROCURING ENTITY.
WORK AND ROCK ANALYSIS SHOULD BE ADJUSTED. THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
2. CURRNTLY THE LENGTH OF PILE IS REFLECTED WITHOUT THE CONFORMITY OF THE CONTRACTOR.
SPACER DETAIL DETAIL OF CONNECTING BAR BY WORKING DESIGN SO PILE LENGTH CAN BE
S=NONE S=NONE CHANGED WHEN THE PILE LOADING TEST CONDUCTED.
KEUN YUNG KIM
PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
BORED PILE DETAIL (2/14)
SCALE 1:50
[Type-1 : P1~P5]
SPACER SPACER
@3000 @3000
170
170
56
56
S1 H16 S1 H16
R1 H20 @100 R1 H20 @100
1,274
1,274
@3000 @3000
3,000
1,274
1,274
DIVISION 44 (OUT SIDE)
P2 S36 P2 S36
44 EA 44 EA
P1 S36 P1 S36
SPACER
56
56
44 EA 44 EA
170
170
@3000
23 135 3636 20
170
1620
56
S1 H16
R1 H20 @150
1,274
@3000
SECTION A-A SECTION B-B
SCALE 1:25 SCALE 1:25
R2 H20
@3000
3,000
T1 H25
DIVISION 44 (OUT SIDE) DIVISION 44 (OUT SIDE)
DETAIL "A"
1,274
S=NONE
170
P1 S36
56
56
56
44 EA
170
S1 H16 S1 H16
R1 H20 @100 R1 H20 @150
T1 H25
1,274
@3000 @3000
1,110
R2 H20 R2 H20
@3000 @3000 SECTION E-E
3,000
3,000
SCALE 1:25
1,274
1,274
P2 S36 P2 S36
44 EA 44 EA
P1 S36 P1 S36
56
56
44 EA 44 EA
170
170
NOTE:
THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.
SECTION C-C SECTION D-D INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
BORED PILE DETAIL (3/14)
SCALE 1:50
[Type-2 : P6~P11, P15~P16]
H4
2,500 CA PA PB PC
(Column Section A) (Pile Section A) (Pile Section B) (Pile Section C)
INNER HOOP 250 R2 R1 150
(SPACER) EXTERNAL
SEA Bed
(EL. D)
H.W.L 0.94 m
REINFORCEMENT DETAIL "A"
S2 H16 A P21 S25 B P1 S50 C P2 S50 P2-1 S50 R1 H25 R2 H25 D BAND E F G
22 EA 44 EA 22 EA 22 EA @3000 @3000
280
290
6,000
1,500
CL OF PILE
1,030
S3 30@100=3,000 1,050
3,200
3,000
1,030
1,500
290
280
1,000 S1 H16
A B C D E F G
HOOP BAR 250 S4 S3 S2 S1 300
H4
FRONT VIEW
DIMENSIONAL TABLE SCALE 1:50
DIVISION 44 (OUT SIDE)
P6 56.839 4.339 4.240 12.560 33.200 37@1.500=55.500 0.939 200@150=30.000 228@100=22.800 19@150=2.850 0.639
P9 74.053 6.553 5.240 16.060 43.700 48@1.500=72.000 1.653 270@150=40.500 273@100=27.300 34@150=5.100 0.603
900
P10 72.791 7.291 5.740 15.560 41.700 47@1.500=70.500 1.891 256@150=38.400 273@100=27.300 39@150=5.850 0.691
S2 H16
3,000
P11 62.529 8.029 6.440 15.760 29.800 41@1.500=61.500 0.629 177@150=26.550 282@100=28.200 44@150=6.600 0.629
@150
P15 69.481 10.981 10.540 16.560 28.900 45@1.500=67.500 1.581 171@150=25.650 331@100=33.100 64@150=9.600 0.581
P21 S25
900
P16 73.219 11.719 11.640 17.560 29.800 48@1.500=72.000 0.819 177@150=26.550 352@100=35.200 69@150=10.350 0.569 22 EA
P1 S50
MAIN BAR
155
(WELDING)
150 500
T2 H25
MAIN REINFORCEMENT
S
P1 S50
416
MAIN BAR
SPACER THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
500
500
C.T.C 3,000 * THE SPACERS CAN BE CHANGED DEPENDING * THE SPACE(S) AND SPACER BAR(R) CAN BE CHANGED THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
4 PCS. EACH LEVEL ON THE THICKNESS OF THE CASING AND MAIN BAR. ACCORDING TO SIZE OF COUPLER. BY CONDITION OF CONSTRUCTION SITE, SO EARTH CONFIRMATION BY THE PROCURING ENTITY.
WORK AND ROCK ANALYSIS SHOULD BE ADJUSTED. THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
WELDING DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
(4MM) 2. CURRNTLY THE LENGTH OF PILE IS REFLECTED
T1 H25 WITHOUT THE CONFORMITY OF THE CONTRACTOR.
SPACER DETAIL DETAIL OF CONNECTING BAR * TOTAL WELDING LENGTH : L=29.0M PER PILE
BY WORKING DESIGN SO PILE LENGTH CAN BE
S=NONE S=NONE CHANGED WHEN THE PILE LOADING TEST CONDUCTED.
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
BORED PILE DETAIL (4/14) DIVISION 44 (OUT SIDE)
SCALE 1:50 DIVISION 22 (IN SIDE)
170 180
75
DIVISION 44 (OUT SIDE) DIVISION 44 (OUT SIDE) S1 H16
@100
DIVISION 22 (IN SIDE)
R1 H25
1,075
@3000
SPACER
@1500
R2 H25
130 290 180
180
@3000
75
3,000
S1 H16 S1 H16
@100 @100
R1 H25
1,075
1,245
@3000
P2-1 S50 P2 S50
900
22 EA 22 EA
DETAIL "A" R2 H25
3,000
180 170
@100 44 EA
75
P21 S25
900
1,245
22 EA
P2 S50
180 290 130
22 EA
S3 H16 P1 S50 P1 S50
@100 44 EA 44 EA SECTION D-D
75
180
SCALE 1:25
23 139 50 5025
16 25
180
DIVISION 44 (OUT SIDE) DIVISION 44 (OUT SIDE) S1 H16
DETAIL "A" R1 H25
@150
DIVISION 22 (IN SIDE)
1,320
S=NONE
@3000
SPACER SPACER
@1500 @1500
R2 H25
170 180
180 @3000
75
R1 H25
@3000
1,075
1,320
@3000
R2 H25
@3000 P1 S50
3,000
3,000
3,000
44 EA
180
1,075
T1 H25
1,320
P1 S50 P1 S50
180 170
44 EA 44 EA SECTION G-G
75
180
SCALE 1:25
NOTE:
THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.
SECTION E-E SECTION F-F INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
BORED PILE DETAIL (5/14)
SCALE 1:50
[Type-3 : P12~P14]
H4
2,500 CA PA PB PC
(Column Section A) (Pile Section A) (Pile Section B) (Pile Section C)
INNER HOOP 250 R2 R1 150
(SPACER) EXTERNAL
SEA Bed
(EL. D)
H.W.L 0.94 m
REINFORCEMENT DETAIL "A"
S2 H16 A P21 S25 B P1 S50 C P2 S50 P3 S50 R1 H25 R2 H25 D BAND E P4 S36 F G
22 EA 44 EA 44 EA 36 EA @3000 @3000 18 EA
280
290
6,000
1,500
CL OF PILE
1,030
S3 30@100=3,000 1,050
3,200
3,000
1,030
1,500
290
280
H4
FRONT VIEW
SCALE 1:50
DIVISION 44 (OUT SIDE)
DIMENSIONAL TABLE DIVISION 22 (IN SIDE)
DIVISION H4 CA PA PB PC R1 R2 S1 S2 S3 S4
P14 70.743 10.243 9.440 14.560 34.000 46@1.500=69.000 1.343 205@150=30.750 300@100=30.000 59@150=8.850 0.593
900
S2 H16
3,000
@150
P21 S25
900
22 EA
(WELDING)
155
150 500
T2 H25
15EA
STEEL CASING COUPLER FOR REBARS
750
LONGITUDINAL BARS
SECTION A-A
50
MAIN BAR
416
500
NOTE:
1. THE LENGTH OF THE PILE CAN BE A DIFFERENCE
50
SPACER THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
C.T.C 3,000 * THE SPACERS CAN BE CHANGED DEPENDING * THE SPACE(S) AND SPACER BAR(R) CAN BE CHANGED THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
4 PCS. EACH LEVEL ON THE THICKNESS OF THE CASING AND MAIN BAR. ACCORDING TO SIZE OF COUPLER. BY CONDITION OF CONSTRUCTION SITE, SO EARTH CONFIRMATION BY THE PROCURING ENTITY.
WELDING
(4MM) WORK AND ROCK ANALYSIS SHOULD BE ADJUSTED. THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
T1 H25 INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
2. CURRNTLY THE LENGTH OF PILE IS REFLECTED WITHOUT THE CONFORMITY OF THE CONTRACTOR.
SPACER DETAIL DETAIL OF CONNECTING BAR * TOTAL WELDING LENGTH : L=29.0M PER PILE BY WORKING DESIGN SO PILE LENGTH CAN BE
S=NONE S=NONE CHANGED WHEN THE PILE LOADING TEST CONDUCTED.
DETAIL "A" KEUN YUNG KIM
PROJECT MANAGER
S=NONE NAMKWANG-KUKDONG-GUMGWANG JV
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
BORED PILE DETAIL (6/14) DIVISION 44 (OUT SIDE)
180 180
68 75
S1 H20
DIVISION 44 (OUT SIDE) DIVISION 44 (OUT SIDE) @100
R3 H25 R1 H25
DIVISION 22 (IN SIDE) @3000 @3000
997
R4 H25
SPACER @3000
@3000 R2 H25
130 290 180
180
R5 H20 @3000
3,000
75
@3000
S1 H20 S1 H20 P4 S36
@100 @100 18 EA
997
R1 H25
P3 S50
1,245
@3000
36 EA
900
75 68
P1 S50
180 180
S2 H16 @3000
3,000
3,000
44 EA
@100
44 EA
1,245
22 EA
180 290 130
75
SCALE 1:25
180
23 135 50 5025
20 25
P2 S50
44 EA
DIVISION 44 (OUT SIDE)
180
S1 H16
DIVISION 44 (OUT SIDE) DIVISION 44 (OUT SIDE) @150
DETAIL "A" R1 H25
1,320
DIVISION 36/18 (IN SIDE) S=NONE @3000
SPACER SPACER
@3000 @3000 R2 H25
@3000
180 180
180
3,000
68 75
T1 H25
S1 H20 S11 H16
@100 @150
R3 H25 R1 H25 R1 H25
1,320
1,320
@3000 @3000 @3000
997
R4 H25
@3000 R2 H25
P1 S50
R5 H20 @3000
3,000
3,000
44 EA
@3000
180
P4 S36
18 EA T1 H25
997
1,320
P3 S50
36 EA
75 68
44 EA 44 EA SCALE 1:25
180
P2 S50 NOTE:
THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
44 EA THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.
SECTION E-E SECTION F-F INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
BORED PILE DETAIL (7/14)
SCALE 1:50
P1 REBAR DETAIL P2 REBAR DETAIL
j j
L L
b
COUPLER COUPLER
a a
P1 S36 L=51.749 N=44 S1 H16 L=9.817 N=403 P1 S36 L=58.487 N=44 S1 H16 L=9.817 N=453
COUPLER=352 a=8.577 b=300 j=640X1 COUPLER=396 a=8.577 b=300 j=640X1
j j
a a
b
b
a a
R1 H20 L=9.250 N=17 R1 H20 L=9.250 N=19
a=8.250 j=1.000X1 a=8.250 j=1.000X1
T1 H25 L=3.015 N=14 R2 H20 L=8.772 N=17 T1 H25 L=3.015 N=14 R2 H20 L=8.772 N=19
a=1.283~2.748 b=500 a=7.772 j=1.000X1 a=1.283~2.748 b=500 a=7.772 j=1.000X1
c
r r r r
b
b
a a
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
BORED PILE DETAIL (8/14)
SCALE 1:50
P3 REBAR DETAIL P4 REBAR DETAIL
j j
L L
b
COUPLER COUPLER
a a
P1 S36 L=53.225 N=44 S1 H16 L=9.817 N=422 P1 S36 L=54.963 N=44 S1 H16 L=9.817 N=436
COUPLER=352 a=8.577 b=300 j=640X1 COUPLER=396 a=8.577 b=300 j=640X1
j j
a a
b
b
a a
R1 H20 L=9.250 N=18 R1 H20 L=9.250 N=18
a=8.250 j=1.000X1 a=8.250 j=1.000X1
T1 H25 L=3.015 N=14 R2 H20 L=8.772 N=17 T1 H25 L=3.015 N=14 R2 H20 L=8.772 N=17
a=1.283~2.748 b=500 a=7.772 j=1.000X1 a=1.283~2.748 b=500 a=7.772 j=1.000X1
c
r r r r
b
b
a a
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
BORED PILE DETAIL (9/14)
SCALE 1:50
P5 REBAR DETAIL P6 REBAR DETAIL
j
a
L
j
b
L
c
COUPLER
r
d
a e
f
COUPLER
P1 S36 S1 H16 S3 H16 L=1.585 N=539
L=55.701 N=44 L=9.817 N=449
COUPLER=396 a=8.577 b=300 j=640X1 a=283 b=333 c=333 d=300 e=100 f=236 r=100
a
COUPLER=44
b
a P21 S25 R1 H25 L=9.137 N=19
R1 H20 L=9.250 N=18 L=7.639 N=22
a=8.250 j=1.000X1 COUPLER=22 a=8.137 j=1.000X1
b
a=6.384 b=300 j=640X1
c
a
r r
c
b
a
r r
b T1 H25 T2 H25
a L=3.015 N=14 L=1.494 N=15
a=1.283~2.748 b=500 a=180 b=157 c=500 r=100
TOTAL UNIT
P5 REBAR TOTAL TABLE ID BAR LENGTH(m) QUANTITY LENGTH WEIGHT
TOTAL REMARK
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
BORED PILE DETAIL (10/14)
SCALE 1:50
P7 REBAR DETAIL P8 REBAR DETAIL
j j
a a
L L
b
b
b
c
c
COUPLER COUPLER
r r
d
d
a e a e
f f
P1 S50 L=57.177 N=44 S1 H16 L=9.791 N=457 S3 H16 L=1.585 N=594 P1 S50 L=57.915 N=44 S1 H16 L=9.791 N=467 S3 H16 L=1.585 N=649
COUPLER=396 a=8.551 b=300 j=640X1 a=283 b=333 c=333 d=300 e=100 f=236 r=100 COUPLER=396 a=8.551 b=300 j=640X1 a=283 b=333 c=333 d=300 e=100 f=236 r=100
b
P21 S25 L=8.377 N=22 P21 S25 L=9.115 N=22
a a
COUPLER=22 COUPLER=22
S2 H16 L=7.624 N=54 R2 H25 L=8.508 N=18 S2 H16 L=7.624 N=59 R2 H25 L=8.508 N=19
b
b
a=6.384 b=300 j=640X1 a=7.508 j=1.000X1 a=6.384 b=300 j=640X1 a=7.508 j=1.000X1
a a
c
T1 H25 L=3.015 N=14 r r T1 H25 L=3.015 N=14 r r
b
b
a=1.283~2.748 b=500 a a=1.283~2.748 b=500 a
SUB TOTAL 3,210.108 15.410 49.468 52.436 SUB TOTAL 3,304.180 15.410 50.917 53.972
P21 S25 8.377 22 184.294 ADD 6% P21 S25 9.115 22 200.530 ADD 6%
SUB TOTAL 184.294 3.860 0.711 0.754 SUB TOTAL 200.530 3.860 0.774 0.820
S1 H16 9.791 457 4,474.487 ADD 3% S1 H16 9.791 467 4,572.397 ADD 3%
SUB TOTAL 5,827.673 1.580 9.208 9.484 SUB TOTAL 6,050.878 1.580 9.560 9.847
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
BORED PILE DETAIL (11/14)
SCALE 1:50
P9 REBAR DETAIL P10 REBAR DETAIL
j j
L a L a
b
COUPLER COUPLER
b
c
c
r r
a d a
d
e e
f f
P1 S50 L=73.653 N=44 S1 H16 L=9.791 N=578 P1 S50 L=72.391 N=44 S1 H16 L=9.791 N=569 S3 H16 L=1.585 N=759
S3 H16 L=1.585 N=704
COUPLER=528 a=8.551 b=300 j=640X1 COUPLER=528 a=8.551 b=300 j=640X1 a=283 b=333 c=333 d=300 e=100 f=236 r=100
a=283 b=333 c=333 d=300 e=100 f=236 r=100
b
P21 S25 L=9.115 N=22 P21 S25 L=10.591 N=22 a
COUPLER=22 a COUPLER=22
b
a=6.384 b=300 j=640X1 L=8.508 N=24 a=6.384 b=300 j=640X1 a=7.508 j=1.000X1
a=7.508 j=1.000X1
a a
c
c
T1 H25 L=3.015 N=14 T1 H25 L=3.015 N=14 r r
r r b
a=1.283~2.748 b=500 a=1.283~2.748 b=500 a
b
a
SUB TOTAL 4,062.652 15.410 62.605 66.361 SUB TOTAL 3,996.124 15.410 61.580 65.275
P21 S25 9.115 22 200.530 ADD 6% P21 S25 10.591 22 233.002 ADD 6%
SUB TOTAL 200.530 3.860 0.774 0.820 SUB TOTAL 233.002 3.860 0.899 0.953
S1 H16 9.791 578 5,659.198 ADD 3% S1 H16 9.791 569 5,571.079 ADD 3%
SUB TOTAL 7,262.974 1.580 11.475 11.819 SUB TOTAL 7,300.150 1.580 11.534 11.880
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
BORED PILE DETAIL (12/14)
SCALE 1:50
P11 REBAR DETAIL P15 REBAR DETAIL
j j
a a
L L
b
b
b
c
c
COUPLER COUPLER
r r
d
d
a e a e
f f
P1 S50 L=62.129 N=44 S1 H16 L=9.791 N=504 S3 H16 L=1.585 N=814 P1 S50 L=69.081 N=44 S1 H16 L=9.791 N=567 S3 H16 L=1.585 N=1,034
COUPLER=440 a=8.551 b=300 j=640X1 a=283 b=333 c=333 d=300 e=100 f=236 r=100 COUPLER=484 a=8.551 b=300 j=640X1 a=283 b=333 c=333 d=300 e=100 f=236 r=100
b
P21 S25 L=11.329 N=22 P21 S25 L=14.281 N=22
a a
COUPLER=22 COUPLER=44
S2 H16 L=7.624 N=74 R2 H25 L=8.508 N=20 S2 H16 L=7.624 N=94 R2 H25 L=8.508 N=22
b
b
a=6.384 b=300 j=640X1 a=7.508 j=1.000X1 a=6.384 b=300 j=640X1 a=7.508 j=1.000X1
a a
c
T1 H25 L=3.015 N=14 r r T1 H25 L=3.015 N=14 r r
b
b
a=1.283~2.748 b=500 a a=1.283~2.748 b=500 a
SUB TOTAL 3,568.796 15.410 54.995 58.295 SUB TOTAL 4,000.084 15.410 61.641 65.339
P21 S25 11.329 22 249.238 ADD 6% P21 S25 14.281 22 314.182 ADD 6%
SUB TOTAL 249.238 3.860 0.962 1.020 SUB TOTAL 314.182 3.860 1.213 1.286
S1 H16 9.791 504 4,934.664 ADD 3% S1 H16 9.791 567 5,551.497 ADD 3%
SUB TOTAL 6,789.030 1.580 10.727 11.049 SUB TOTAL 7,907.043 1.580 12.493 12.868
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
BORED PILE DETAIL (13/14) P12 REBAR DETAIL
j
SCALE 1:50
P16 REBAR DETAIL
L
b
j
j
a COUPLER
L P1 S50 L=63.867 N=44 a a
COUPLER=440
b
S1 H20 L=9.817 N=284
c
COUPLER P2 S50 L=22.300 N=44 a=8.577 b=300 j=730X1 R1 H25 L=9.137 N=21
r COUPLER=132 a=8.137 j=1.000X1
d S11 H16
a L=9.791 N=232
e
f P3 S50 L=14.560 N=36 a=8.551 b=300 j=640X1 R2 H25 L=8.665 N=21
S1 H16 S3 H16 COUPLER=72 j a=7.665 j=1.000X1
P1 S50 L=72.819 N=44 L=9.791 N=599 L=1.585 N=1,009
COUPLER=528 a=8.551 b=300 j=640X1 a=283 b=333 c=333 d=300 e=100 f=236 r=100
P4 S36 L=14.560 N=18 R3 H25 L=8.005 N=21
COUPLER=36 a=7.005 j=1.000X1
b
P2 S50 L=29.200 N=22
COUPLER=88
j P21 S25 R4 H25 L=7.535 N=21
L=12.067 N=22
P2-1 S50 COUPLER=44 a=6.535 j=1.000X1
L=17.560 N=22 j
COUPLER=66
R5 H20 L=7.151 N=21
b
a
P21 S25 a=6.151 j=1.000X1
L=15.019 N=22 a
COUPLER=44 S2 H16 L=7.624 N=79
a=6.384 b=300 j=640X1
b
R1 H25
c
L=9.137 N=24 a
a=8.137 j=1.000X1
a a
r r
b
S2 H16 L=7.624 N=99 R2 H25 L=8.508 N=24 a
b
c
a=6.384 b=300 j=640X1 a=7.508 j=1.000X1
T1 H25 r T2 H25
L=3.015 N=14 L=1.494 N=15
a a=1.283~2.748 b=500 a=180 b=157 c=500 r=100
d
e
f
c
S3 H16 L=1.585 N=869
T1 H25 r r a=283 b=333 c=333 d=300 e=100 f=236 r=100
L=3.015 N=14
b
a=1.283~2.748 b=500 a
(GRADE 75)
P12 REBAR TOTAL TABLE (PER PILE)
T2 H25 L=1.494 N=15 TOTAL UNIT
ID BAR LENGTH(m) QUANTITY LENGTH TOTAL REMARK
a=180 b=157 c=500 r=100 WEIGHT
P16 REBAR TOTAL TABLE
(GRADE 75) (PER PILE) P1 S50 63.867 44 2,810.148 ADD 6%
P1 S50 72.819 44 3,204.036 ADD 6% SUB TOTAL 4,315.508 15.410 66.502 70.492
P2-1 " 17.560 22 386.320 SUB TOTAL 262.080 8.000 2.097 2.223
SUB TOTAL 4,232.756 15.410 65.227 69.141 P21 S25 12.067 22 265.474 ADD 6%
P21 S25 15.019 22 330.418 ADD 6% SUB TOTAL 265.474 3.860 1.025 1.087
(GRADE 60)
P12 REBAR TOTAL TABLE (PER PILE)
P16 REBAR TOTAL TABLE ID BAR LENGTH(m) QUANTITY
TOTAL UNIT
TOTAL REMARK
(GRADE 60) (PER PILE) LENGTH WEIGHT
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
P13 REBAR DETAIL
j
BORED PILE DETAIL (14/14) P14 REBAR DETAIL
j
SCALE 1:50
L L
b
j j
COUPLER COUPLER
P1 S50 L=65.605 N=44 P1 S50 L=70.343 N=44
a a a a
COUPLER=440 COUPLER=484
S1 H20 L=9.817 N=306 S20 H20 L=9.817 N=301
P2 S50 L=24.500 N=44 a=8.577 b=300 j=730X1 R1 H25 L=9.137 N=22 P2 S50 L=24.000 N=44 a=8.577 b=300 j=730X1 R1 H25 L=9.137 N=23
COUPLER=176 a=8.137 j=1.000X1 COUPLER=176 a=8.137 j=1.000X1
S11 H16 L=9.791 N=229 S11 H16 L=9.791 N=264
P3 S50 L=15.960 N=36 a=8.551 b=300 j=640X1 R2 H25 L=8.665 N=21 P3 S50 L=14.560 N=36 a=8.551 b=300 j=640X1 R2 H25 L=8.665 N=23
COUPLER=72 j a=7.665 j=1.000X1 COUPLER=72 j a=7.665 j=1.000X1
P4 S36 L=15.960 N=18 R3 H25 L=8.005 N=22 P4 S36 L=14.560 N=18 R3 H25 L=8.005 N=23
COUPLER=36 a=7.005 j=1.000X1 COUPLER=36 a=7.005 j=1.000X1
b
P21 S25 L=12.805 N=22 R4 H25 L=7.535 N=21 P21 S25 L=13.543 N=22 R4 H25 L=7.535 N=23
COUPLER=44 a=6.535 j=1.000X1 COUPLER=44 a=6.535 j=1.000X1
b
c
c
a a
a a
r r r r
b
b
a a
b
b
c
c
T1 H25 r T2 H25 T1 H25 r T2 H25
L=3.015 N=14 L=1.494 N=15 L=3.015 N=14 L=1.494 N=15
a=1.283~2.748 b=500 a=180 b=157 c=500 r=100 a=1.283~2.748 b=500 a=180 b=157 c=500 r=100
d
d
e e
f f
S3 H16 L=1.585 N=924 S3 H16 L=1.585 N=979
a=283 b=333 c=333 d=300 e=100 f=236 r=100 a=283 b=333 c=333 d=300 e=100 f=236 r=100
SUB TOTAL 4,539.180 15.410 69.949 74.146 SUB TOTAL 4,675.252 15.410 72.046 76.369
SUB TOTAL 287.280 8.000 2.298 2.436 SUB TOTAL 262.080 8.000 2.097 2.223
P21 S25 12.805 22 281.710 ADD 6% P21 S25 13.543 22 297.946 ADD 6%
SUB TOTAL 281.710 3.860 1.087 1.152 SUB TOTAL 297.946 3.860 1.150 1.219
(GRADE 60)
P13 REBAR TOTAL TABLE (PER PILE) (GRADE 60)
P14 REBAR TOTAL TABLE (PER PILE)
SUB TOTAL 5,409.417 2.470 13.361 13.762 SUB TOTAL 5,711.078 2.470 14.106 14.529
S11 " 9.791 230 2,251.930 S11 " 9.791 265 2,594.615
SUB TOTAL 4,356.886 1.580 6.884 7.091 SUB TOTAL 4,824.866 1.580 7.623 7.852
PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA