Professional Documents
Culture Documents
On May 6, 2019 Kelowna City Council passed a motion stating in part “THAT Council endorse the
compliance of all new Part 9 residential buildings to the BC Energy Step Code to satisfy the energy
efficiency requirements of the British Columbia Building Code as follows;
The motion also directs staff to consult with key stakeholders on the Energy Step Code implementation
for Part 3 buildings as outlined on the May 6, 2019 report of the Sustainability Coordinator.
The institutions have formally signed a Collaboration Agreement but have already been collaborating in
the technology/engineering area related to Advanced Construction Materials and construction
processes. Both have programs related to energy efficient materials and structures
Industry;
Some developers have moved to consider more efficient residential structures and install sensors to
monitor comparable performance.
Niche designers and constructors are providing high end energy efficient buildings for individuals.
The Need
It’s critical to bring all parties in the region involved with the built environment together to;
In 2016, the City of Vancouver released its Zero Emissions Building Plan, which requires most
new buildings to be near zero emissions by 2025 and all new buildings to be zero emissions by
2030. To achieve this ZEBx was formed , a dedicated to supporting the industry through this
transition, acting as a catalyst that transforms the entire design and construction value chain
towards cost-effective, attractive, zero emission buildings.
Page 1|3
Potential Workshop re Collaboration
Opportunities as Step Code is
Implemented for the Region
The Workshop
A one day workshop is proposed in Kelowna (possibly AO )
Moderator TBD
Invitees to include;
Industry;
o Contractors, Designers, Developers
Post-Secondary Institutions;
o UBCO, OC- technology and engineering
Local Government;
o Development and Building Approving Departments
Utilities;
o Fortis, BC Hydro, Telus, Shaw
Other Agencies/Associations;
o AO, COEDC, UDI, CHBA
Workshop Committee;
Kim Larson-All Elements
Page 2|3
Potential Workshop re Collaboration
Opportunities as Step Code is
Implemented for the Region
Trevor Butler-Archineers
Andrew Hay- OC
Fortis Gas??
Page 3|3