Professional Documents
Culture Documents
GENERAL JOURNAL
Date Code Account Name Ev
01/1/2021 1102 Account Receivable 1
01/1/2021 2105 VAT Output 1
01/1/2021 4101 Sales Revenue 1
6,562,500 posting
6,562,500 posting
17,650,000 posting
17,650,000 posting posting
927,500 posting
927,500 posting
15,600,000 posting
15,600,000 posting posting
24,500,000 posting
4,200,000 posting
20,300,000 posting
3,750,000 posting
3,750,000 posting posting
19,000,000 posting
19,000,000 posting
2,500,000 posting
2,500,000 posting
1,875,000 posting
1,875,000 posting
1,250,000 posting
1,250,000 posting
625,000 posting
625,000 posting
12,500,000 posting
400,000 posting
400,000 posting
144,375,000 posting
144,375,000 posting posting
6,250,000 posting
5,500,000 posting posting
750,000 posting posting
1,750,000 posting
1,750,000 posting
4,150,000 posting
4,150,000 posting posting
16,335,000 posting
16,335,000 posting
120,000 posting
120,000 posting
1,000,000 posting
1,000,000 posting
375,000 posting
375,000 posting posting
995,000 posting
675,000 posting posting
320,000 posting posting
6,300,000 posting
6,300,000 posting
13,850,000 posting
13,850,000 posting posting
138,600,000 posting
138,600,000 posting posting
35,000,000 posting
35,000,000 posting
5,687,500 posting
5,687,500 posting
3,500,000 posting
3,500,000 posting
1,400,000 posting
1,400,000 posting
800,000 posting
600,000 posting posting
200,000 posting posting
750,000 posting
750,000 posting
125,125,000 posting
125,125,000 posting posting
96,250,000 posting posting
8,750,000 posting
87,500,000 posting
4,375,000 posting
4,375,000 posting
15,000,000 posting
15,000,000 posting
7,350,000 posting
2,625,000 posting
6,600,000 posting posting
3,375,000 posting posting
5,450,000 posting posting
4,078,000 posting posting
6,649,000 posting posting
5,710,000 posting
2,725,000 posting
785,000 posting
1,550,000 posting
2,350,000 posting
2,805,500 posting
5,289,000 posting
4,000,000 posting
41,391,500 posting
42,000,000 posting
42,000,000 posting
1,290,000 posting
1,900,000 posting
790,000 posting
1,000,000 posting
750,000 posting
250,000 posting
5,980,000 posting
517,500 posting
862,500 posting
690,000 posting
345,000 posting
172,500 posting
172,500 posting
345,000 posting
345,000 posting
3,450,000 posting
1,100,000 posting
1,000,000 posting
2,100,000 posting
180,000 posting
180,000 posting
300,000 posting
300,000 posting
225,000 posting
375,000 posting
300,000 posting
1,500,000 posting
1,905,706,500 1,905,706,500
Deskripsi
Sales, Toko Hidayah
Pembayaran PPN
Sales, Bp Rahmanto
GENERAL LEDGER
CASH
DATE AC REMARK EV DR
01/1/2021 1101 Beginning Balance 137,485,000
01/1/2021 1101 Sales Fee, Toko Hidayah 2
01/1/2021 1101 Pelunasan Piutang, TB Madani 3 17,650,000
03/1/2021 1101 Promotion Expense, Suara Merdeka 4
03/1/2021 1101 Purchase Fuel & Lubricant, Pertamina 5
04/1/2021 1101 Pelunasan Piutang, Tn Ahmad Riyadi 7 15,600,000
05/1/2021 1101 Pembayaran Utang, Semen Gresik 8
05/1/2021 1101 Thinner Purchase, Toko Murni 9
06/1/2021 1101 Pembayaran PPh Pasal 25 10
06/1/2021 1101 Pembayaran PPN 11
06/1/2021 1101 Pelunasan Piutang, Tn Yahya Effendi 12 3,750,000
07/1/2021 1101 Pembayaran Utang, Semen Gresik 13
07/1/2021 1101 Paint Purchase, Toko Pelangi 14
08/1/2021 1101 Pembayaran Gaji Upah 1 16
09/1/2021 1101 Beban Listrik PLN 19
09/1/2021 1101 Pembelian Bahan Habis Pakai Administrasi 20
10/1/2021 1101 Pelunasan Piutang, Toko Hidayah 21 144,375,000
11/1/2021 1101 Pembayaran Utang, Semen Gresik 22
11/1/2021 1101 Beban Telepon, Telkom 24
12/1/2021 1101 Pelunasan Piutang, Tn Lukman Hidayat 25 4,150,000
12/1/2021 1101 Pembayaran Utang, CV Bumi Permai 26
15/1/2021 1101 Pembayaran Gaji Upah 2 29
15/1/2021 1101 Beban Langganan Koran, SM 30
17/1/2021 1101 Beli ATK, TB Toga Mas 31
20/1/2021 1101 Sales Fee, TB Madani 37
21/1/2021 1101 Pelunasan Piutang, CV Harapan Jaya 38 13,850,000
21/1/2021 1101 Pembayaran Utang, Semen Gresik 39
23/1/2021 1101 Pelunasan Piutang, TB Madani 42 138,600,000
23/1/2021 1101 Pembayaran Utang, CV Bumi Permai 43
24/1/2021 1101 Pembayaran Gaji Upah 3 45
24/1/2021 1101 Sales Fee, Toko Agung 47
26/1/2021 1101 Sewa Kendaraan, Wahid Transport 50
26/1/2021 1101 Bahan Habis Pakai, CV Laries 51
26/1/2021 1101 Servis Komputer, Aziz Computer 53
27/1/2021 1101 Pelunasan Piutang, Toko Agung 54 125,125,000
27/1/2021 1101 Pembayaran Utang, Semen Gresik 56
27/1/2021 1101 Pembayaran Utang, CV Bumi Permai 57
27/1/2021 1101 Sales Fee, CV Harapan Jaya 58
28/1/2021 1101 Prima's Drawing/Prive, Banu Prima 61
28/1/2021 1101 Lubricant Purchase, Pertamina 63
29/1/2021 1101 Pembayaran Gaji Upah 4 66
ACCOUNT RECEIVABLE
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 55,000,000
01/1/2021 1102 Sales, Toko Hidayah 1 144,375,000
01/1/2021 1102 Pelunasan Piutang, TB Madani 3
04/1/2021 1102 Pelunasan Piutang, Tn Ahmad Riyadi 7
06/1/2021 1102 Pelunasan Piutang, Tn Yahya Effendi 12
10/1/2021 1102 Pelunasan Piutang, Toko Hidayah 21
12/1/2021 1102 Pelunasan Piutang, Tn Lukman Hidayat 25
20/1/2021 1102 Sales, TB Madani 36 138,600,000
21/1/2021 1102 Pelunasan Piutang, CV Harapan Jaya 38
23/1/2021 1102 Sales, Bp Rahmanto 41 33,687,500
23/1/2021 1102 Pelunasan Piutang, TB Madani 42
24/1/2021 1102 Sales, Toko Agung 46 125,125,000
27/1/2021 1102 Pelunasan Piutang, Toko Agung 54
27/1/2021 1102 Sales, CV Harapan Jaya 55 96,250,000
SAND INVENTORY
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 10,625,000
03/1/2021 1201 Production, Mixing Dept, Material 6
08/1/2021 1201 Sand Purchase, CV Bumi Permai 18 19,125,000
14/1/2021 1201 Production, Mixing Dept, Material 27
17/1/2021 1201 Sand Purchase, CV Bumi Permai 33 10,625,000
22/1/2021 1201 Production, Mixing Dept, Material 40
24/1/2021 1201 Sand Purchase, CV Bumi Permai 49 13,600,000
28/1/2021 1201 Sand Purchase, CV Bumi Permai 60 13,600,000
28/1/2021 1201 Production, Mixing Dept, Material 62
CEMENT INVENTORY
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 24,000,000
03/1/2021 1202 Production, Mixing Dept, Material 6
08/1/2021 1202 Cement Purchase, Semen Gresik 17 41,000,000
14/1/2021 1202 Production, Mixing Dept, Material 27
17/1/2021 1202 Cement Purchase, Semen Gresik 32 24,000,000
22/1/2021 1202 Production, Mixing Dept, Material 40
24/1/2021 1202 Cement Purchase, Semen Gresik 48 28,800,000
28/1/2021 1202 Cement Purchase, Semen Gresik 59 24,800,000
28/1/2021 1202 Production, Mixing Dept, Material 62
PAINT INVENTORY
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 2,700,000
07/1/2021 1203 Paint Purchase, Toko Pelangi 14 3,000,000
19/1/2021 1203 Pemakaian Paint & Thinner, Finishing Dept 35
26/1/2021 1203 Pemakaian Paint & Thinner, Finishing Dept 52
THINNER INVENTORY
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 800,000
05/1/2021 1204 Thinner Purchase, Toko Murni 9 1,600,000
19/1/2021 1204 Pemakaian Paint & Thinner, Finishing Dept 35
26/1/2021 1204 Pemakaian Paint & Thinner, Finishing Dept 52
FUEL INVENTORY
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 0
03/1/2021 1205 Purchase Fuel & Lubricant, Pertamina 5 12,650,000
11/1/2021 1205 Pemakaian Fuel & Lubricant, Power 23
29/1/2021 1205 Pemakaian Fuel, Power 64
LUBRICANT INVENTORY
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 0
03/1/2021 1206 Purchase Fuel & Lubricant, Pertamina 5 1,125,000
11/1/2021 1206 Pemakaian Fuel & Lubricant, Power 23
19/1/2021 1206 Pemakaian Lubricant, Power Dept 34
28/1/2021 1206 Lubricant Purchase, Pertamina 63 3,750,000
29/1/2021 1206 Lubricant, Power Maintenance 64
WIP_MIXING DEPT
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 0
03/1/2021 1211 Production, Mixing Dept, Material 6 14,625,000
07/1/2021 1211 Utang Gaji Upah 1 15 5,000,000
14/1/2021 1211 Production, Mixing Dept, Material 27 38,300,000
14/1/2021 1211 Utang Gaji Upah 2 28 3,550,000
22/1/2021 1211 Production, Mixing Dept, Material 40 36,750,000
23/1/2021 1211 Utang Gaji Upah 3 44 6,250,000
28/1/2021 1211 Production, Mixing Dept, Material 62 23,800,000
29/1/2021 1211 Utang Gaji Upah 4 65 5,450,000
WIP_PRESSING DEPT
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 0
07/1/2021 1212 Utang Gaji Upah 1 15 2,500,000
14/1/2021 1212 Utang Gaji Upah 2 28 2,100,000
23/1/2021 1212 Utang Gaji Upah 3 44 9,850,000
29/1/2021 1212 Utang Gaji Upah 4 65 4,078,000
WIP_FINISHING DEPT
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 77,440,000
07/1/2021 1213 Utang Gaji Upah 1 15 3,125,000
14/1/2021 1213 Utang Gaji Upah 2 28 2,750,000
23/1/2021 1213 Utang Gaji Upah 3 44 7,800,000
29/1/2021 1213 Utang Gaji Upah 4 65 6,649,000
PREPAID INSURANCE
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 18,000,000
29/1/2021 1301 Pembebanan Beban Asuransi 71
VAT_INPUT
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 4,200,000
05/1/2021 1302 Thinner Purchase, Toko Murni 9 160,000
06/1/2021 1302 Pembayaran PPN 11
07/1/2021 1302 Paint Purchase, Toko Pelangi 14 300,000
08/1/2021 1302 Cement Purchase, Semen Gresik 17 4,100,000
17/1/2021 1302 Cement Purchase, Semen Gresik 32 2,400,000
24/1/2021 1302 Cement Purchase, Semen Gresik 48 2,880,000
28/1/2021 1302 Cement Purchase, Semen Gresik 59 2,480,000
OFFICE EQUIPMENT
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 18,000,000
29/1/2021 1410 Office Equipment, Ending Balance
VEHICLES
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 210,000,000
29/1/2021 1420 Vehicles, Ending Balance
FACTORY MACHINERY
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 598,000,000
29/1/2021 1430 Factory Machinery, Ending Balance
BUILDING
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 345,000,000
29/1/2021 1440 Building, Ending Balance
LAND
DATE AC REMARK EV DR
01/1/2021 Beginning Balance 736,000,000
29/1/2021 1501 Land, Ending Balance
ACCOUNTS PAYABLE
DATE AC REMARK EV DR
01/1/2021 Beginning Balance
05/1/2021 2102 Pembayaran Utang, Semen Gresik 8 47,500,000
07/1/2021 2102 Pembayaran Utang, Semen Gresik 13 40,000,000
08/1/2021 2102 Cement Purchase, Semen Gresik 17
08/1/2021 2102 Sand Purchase, CV Bumi Permai 18
11/1/2021 2102 Pembayaran Utang, Semen Gresik 22 45,100,000
12/1/2021 2102 Pembayaran Utang, CV Bumi Permai 26 19,125,000
17/1/2021 2102 Cement Purchase, Semen Gresik 32
17/1/2021 2102 Sand Purchase, CV Bumi Permai 33
21/1/2021 2102 Pembayaran Utang, Semen Gresik 39 26,400,000
23/1/2021 2102 Pembayaran Utang, CV Bumi Permai 43 10,625,000
24/1/2021 2102 Cement Purchase, Semen Gresik 48
24/1/2021 2102 Sand Purchase, CV Bumi Permai 49
27/1/2021 2102 Pembayaran Utang, Semen Gresik 56 31,680,000
27/1/2021 2102 Pembayaran Utang, CV Bumi Permai 57 13,600,000
28/1/2021 2102 Cement Purchase, Semen Gresik 59
28/1/2021 2102 Sand Purchase, CV Bumi Permai 60
VAT_OUTPUT
DATE AC REMARK EV DR
01/1/2021 Beginning Balance
01/1/2021 2105 Sales, Toko Hidayah 1
06/1/2021 2005 Pembayaran PPN 11 24,500,000
20/1/2021 2105 Sales, TB Madani 36
23/1/2021 2105 Sales, Bp Rahmanto 41
24/1/2021 2105 Sales, Toko Agung 46
27/1/2021 2105 Sales, CV Harapan Jaya 55
EQUITY
DATE AC REMARK EV DR
01/1/2021 Beginning Balance
29/1/2021 3101 Prima Equity, Ending Balance
SALES REVENUE
DATE AC REMARK EV DR
01/1/2021 Beginning Balance
01/1/2021 4101 Sales, Toko Hidayah 1
20/1/2021 4101 Sales, TB Madani 36
23/1/2021 4101 Sales, Bp Rahmanto 41
24/1/2021 4101 Sales, Toko Agung 46
27/1/2021 4101 Sales, CV Harapan Jaya 55
MARKETING EXPENSE
DATE AC REMARK EV DR
01/1/2021 Beginning Balance
01/1/2021 5601 Sales Fee, Toko Hidayah 2 6,562,500
03/1/2021 5601 Promotion Expense, Suara Merdeka 4 927,500
09/1/2021 5601 Beban Listrik PLN 19 625,000
14/1/2021 5601 Utang Gaji Upah 2 28 750,000
20/1/2021 5601 Sales Fee, TB Madani 37 6,300,000
24/1/2021 5601 Sales Fee, Toko Agung 47 5,687,500
26/1/2021 5601 Sewa Kendaraan, Wahid Transport 50 3,500,000
27/1/2021 5601 Sales Fee, CV Harapan Jaya 58 4,375,000
29/1/2021 5601 Utang Gaji Upah 4 65 4,000,000
29/1/2021 5601 Pembebanan Beban Depresiasi Gedung 68 345,000
29/1/2021 5601 Pembebanan Beban Depresiasi Kendaraan 69 1,000,000
29/1/2021 5601 Pembebanan Beban Asuransi 71 300,000
SEMUA SALDO AKHIR BUKU BESAR INI POSTING KE TRIAL BALANCE PADA WORKSHEET
Untuk mengecek kebenaran jumlah posting, lihat jumlah ak
1101
CR BALANCE SALDO AWAL
137,485,000 137,485,000
6,562,500 130,922,500
148,572,500
927,500 147,645,000
13,775,000 133,870,000
149,470,000
47,500,000 101,970,000
1,760,000 100,210,000
6,000,000 94,210,000
20,300,000 73,910,000
77,660,000
40,000,000 37,660,000
3,300,000 34,360,000
19,000,000 15,360,000
12,500,000 2,860,000
400,000 2,460,000
146,835,000
45,100,000 101,735,000
1,750,000 99,985,000
104,135,000
19,125,000 85,010,000
16,335,000 68,675,000
120,000 68,555,000
1,000,000 67,555,000
6,300,000 61,255,000
75,105,000
26,400,000 48,705,000
187,305,000
10,625,000 176,680,000
35,000,000 141,680,000
5,687,500 135,992,500
3,500,000 132,492,500
1,400,000 131,092,500
750,000 130,342,500
255,467,500
31,680,000 223,787,500
13,600,000 210,187,500
4,375,000 205,812,500
15,000,000 190,812,500
3,750,000 187,062,500
42,000,000 145,062,500
1102
CR BALANCE
55,000,000 55,000,000
199,375,000
17,650,000 181,725,000
15,600,000 166,125,000
3,750,000 162,375,000
144,375,000 18,000,000
4,150,000 13,850,000
152,450,000
13,850,000 138,600,000
172,287,500
138,600,000 33,687,500
158,812,500
125,125,000 33,687,500
129,937,500
1201
CR BALANCE
10,625,000 10,625,000
10,625,000 0
19,125,000
15,300,000 3,825,000
14,450,000
12,750,000 1,700,000
15,300,000
28,900,000
20,400,000 8,500,000
1202
CR BALANCE
24,000,000 24,000,000
4,000,000 20,000,000
61,000,000
23,000,000 38,000,000
62,000,000
24,000,000 38,000,000
66,800,000
91,600,000
3,400,000 88,200,000
1203
CR BALANCE
2,700,000 2,700,000
5,700,000
675,000 5,025,000
600,000 4,425,000
1204
CR BALANCE
800,000 800,000
2,400,000
320,000 2,080,000
200,000 1,880,000
1205
CR BALANCE
0 0
12,650,000
5,500,000 7,150,000
6,600,000 550,000
1206
CR BALANCE
0 0
1,125,000
750,000 375,000
375,000 0
3,750,000
3,375,000 375,000
1211
CR BALANCE
0 0
14,625,000
19,625,000
57,925,000
61,475,000
98,225,000
104,475,000
128,275,000
133,725,000
1212
CR BALANCE
0 0
2,500,000
4,600,000
14,450,000
18,528,000
1213
CR BALANCE
77,440,000 77,440,000
80,565,000
83,315,000
91,115,000
97,764,000
1220
CR BALANCE
90,400,000 90,400,000
90,400,000
1301
CR BALANCE
18,000,000 18,000,000
1,500,000 16,500,000
1302
CR BALANCE
4,200,000 4,200,000
4,360,000
4,200,000 160,000
460,000
4,560,000
6,960,000
9,840,000
12,320,000
1303
CR BALANCE
0 0
6,000,000
1410
CR BALANCE
18,000,000 18,000,000
18,000,000
1411
CR BALANCE
9,000,000 9,000,000 9,000,000
180,000 9,180,000
1420
CR BALANCE
210,000,000 210,000,000
210,000,000
1421
CR BALANCE
105,000,000 105,000,000 105,000,000
2,100,000 107,100,000
1430
CR BALANCE
598,000,000 598,000,000
598,000,000
1431
CR BALANCE
212,500,000 212,500,000 212,500,000
5,980,000 218,480,000
1440
CR BALANCE
345,000,000 345,000,000
345,000,000
1441
CR BALANCE
172,000,000 172,000,000 172,000,000
3,450,000 175,450,000
1501
CR BALANCE
736,000,000 736,000,000
736,000,000
2101
CR BALANCE
0 0 0
19,775,000 19,775,000
775,000
15,600,000 16,375,000
40,000
35,590,000 35,630,000
630,000
41,391,500 42,021,500
21,500
2102
CR BALANCE
87,500,000 87,500,000 87,500,000
40,000,000
0
45,100,000 45,100,000
19,125,000 64,225,000
19,125,000
0
26,400,000 26,400,000
10,625,000 37,025,000
10,625,000
0
31,680,000 31,680,000
13,600,000 45,280,000
13,600,000
0
27,280,000 27,280,000
13,600,000 40,880,000
2105
CR BALANCE
24,500,000 24,500,000 24,500,000
13,125,000 37,625,000
13,125,000
12,600,000 25,725,000
3,062,500 28,787,500
11,375,000 40,162,500
8,750,000 48,912,500
3000
CR BALANCE
590,000,000 590,000,000 590,000,000
590,000,000
0 0
15,000,000
562,150,000 562,150,000
562,150,000 562,150,000
4101
CR BALANCE
0 0
131,250,000 131,250,000
126,000,000 257,250,000
30,625,000 287,875,000
113,750,000 401,625,000
87,500,000 489,125,000
5211
CR BALANCE
0 0
1,500,000
4,000,000
4,450,000
4,900,000
10,610,000
11,900,000
12,417,500
12,642,500
5212
CR BALANCE
0 0
450,000
2,950,000
3,550,000
6,050,000
8,775,000
10,675,000
11,537,500
11,912,500
5213
CR BALANCE
0 0
500,000
2,375,000
2,875,000
3,870,000
4,470,000
5,270,000
6,055,000
6,845,000
7,535,000
7,835,000
5221
CR BALANCE
0 0
1,550,000
3,425,000
9,675,000
10,425,000
10,800,000
12,350,000
19,700,000
21,250,000
22,250,000
22,595,000
5222
CR BALANCE
0 0
2,350,000
3,600,000
5,300,000
8,820,000
10,220,000
12,845,000
15,195,000
15,945,000
16,117,500
5223
CR BALANCE
0 0
2,800,000
4,050,000
5,850,000
8,920,000
11,725,500
11,975,500
12,148,000
5501
CR BALANCE
0 0
625,000
1,025,000
2,775,000
3,425,000
3,545,000
4,545,000
5,295,000
10,584,000
10,929,000
12,029,000
12,209,000
12,509,000
5601
CR BALANCE
0 0
6,562,500
7,490,000
8,115,000
8,865,000
15,165,000
20,852,500
24,352,500
28,727,500
32,727,500
33,072,500
34,072,500
34,372,500
129,937,500
8,500,000
88,200,000
4,425,000
1,880,000
550,000
375,000
133,725,000
18,528,000
97,764,000
90,400,000
16,500,000
12,320,000
6,000,000
18,000,000
9,180,000
210,000,000
107,100,000
598,000,000
218,480,000
345,000,000
175,450,000
736,000,000
21,500
40,880,000
48,912,500
590,000,000
15,000,000
565,000,000
562,150,000
489,125,000
12,642,500
11,912,500
7,835,000
22,595,000
16,117,500
12,148,000
12,509,000
34,372,500
2,806,299,000 2,806,299,000
Saldo Awal+Transaksi 1-71
Harus sama
CV Primajaya Abadi
Jl. Pembangunan Utara No. 12 Semarang
Rp 90,000,000
Rp 18,750,000
Rp 20,000,000
20% 160% 95%
CATION TABLE 2
ULATIONS
PRODUCTION DEPATEMENTS
MIXING PRESSING FINISHING
Rp 12,642,500 Rp 11,912,500 Rp 7,835,000
29/1/2021 Profit/Loss 88
29/1/2021 Cost Of Goods Sold 88
29/1/2021 General Administrative Expense 88
29/1/2021 Marketing Expense 88
T JOURNAL
Dr Cr BB BP
2,259,500.00 posting
2,259,500.00 posting
4,519,000.00 posting
6,778,500.00 posting
6,778,500.00 posting
22,595,000.00 posting
4,594,250.00 posting
5,513,100.00 posting
4,594,250.00 posting
3,675,400.00 posting
18,377,000.00 posting
4,750,437.50 posting
9,500,875.00 posting
4,750,437.50 posting
19,001,750.00 posting
22,695,000.00 posting
29,644,800.00 posting
19,307,800.00 posting
22,695,000.00 posting
29,644,800.00 posting
19,307,800.00 posting
4,730,037.50 posting
4,730,037.50 posting
3,141,325.00 posting
3,141,325.00 posting
3,731,537.50 posting
3,731,537.50 posting
11,602,900.00 posting
11,602,900.00 posting
154,402,855.05 posting
154,402,855.05 posting posting
218,747,180.00 posting
218,747,180.00 posting
489,125,000.00 posting
489,125,000.00 posting
277,231,580.00 posting
230,350,080.00 posting
12,509,000.00 posting
34,372,500.00 posting
1,658,156,615.05 1,658,156,615.05
Deskripsi
COGS Entry
ACCOUNT RECEIVABLE
DATE AC REMARK EV
01/1/2021 1102 Beginning Balance
01/1/2021 1102 Sales, Toko Hidayah 1
01/1/2021 1102 Pelunasan Piutang, TB Madani 3
04/1/2021 1102 Pelunasan Piutang, Tn Ahmad Riyadi 7
06/1/2021 1102 Pelunasan Piutang, Tn Yahya Effendi 12
10/1/2021 1102 Pelunasan Piutang, Toko Hidayah 21
12/1/2021 1102 Pelunasan Piutang, Tn Lukman Hidayat 25
20/1/2021 1102 Sales, TB Madani 36
21/1/2021 1102 Pelunasan Piutang, CV Harapan Jaya 38
23/1/2021 1102 Sales, Bp Rahmanto 41
23/1/2021 1102 Pelunasan Piutang, TB Madani 42
24/1/2021 1102 Sales, Toko Agung 46
27/1/2021 1102 Pelunasan Piutang, Toko Agung 54
27/1/2021 1102 Sales, CV Harapan Jaya 55
SAND INVENTORY
DATE AC REMARK EV
01/1/2021 Beginning Balance
03/1/2021 1201 Production, Mixing Dept, Material 6
08/1/2021 1201 Sand Purchase, CV Bumi Permai 18
14/1/2021 1201 Production, Mixing Dept, Material 27
17/1/2021 1201 Sand Purchase, CV Bumi Permai 33
22/1/2021 1201 Production, Mixing Dept, Material 40
24/1/2021 1201 Sand Purchase, CV Bumi Permai 49
28/1/2021 1201 Sand Purchase, CV Bumi Permai 60
28/1/2021 1201 Production, Mixing Dept, Material 62
CEMENT INVENTORY
DATE AC REMARK EV
01/1/2021 Beginning Balance
03/1/2021 1202 Production, Mixing Dept, Material 6
08/1/2021 1202 Cement Purchase, Semen Gresik 17
14/1/2021 1202 Production, Mixing Dept, Material 27
17/1/2021 1202 Cement Purchase, Semen Gresik 32
22/1/2021 1202 Production, Mixing Dept, Material 40
24/1/2021 1202 Cement Purchase, Semen Gresik 48
28/1/2021 1202 Cement Purchase, Semen Gresik 59
28/1/2021 1202 Production, Mixing Dept, Material 62
PAINT INVENTORY
DATE AC REMARK EV
01/1/2021 Beginning Balance
07/1/2021 1203 Paint Purchase, Toko Pelangi 14
19/1/2021 1203 Pemakaian Paint & Thinner, Finishing Dept 35
26/1/2021 1203 Pemakaian Paint & Thinner, Finishing Dept 52
THINNER INVENTORY
DATE AC REMARK EV
01/1/2021 Beginning Balance
05/1/2021 1204 Thinner Purchase, Toko Murni 9
19/1/2021 1204 Pemakaian Paint & Thinner, Finishing Dept 35
26/1/2021 1204 Pemakaian Paint & Thinner, Finishing Dept 52
FUEL INVENTORY
DATE AC REMARK EV
01/1/2021 Beginning Balance
03/1/2021 1205 Purchase Fuel & Lubricant, Pertamina 5
11/1/2021 1205 Pemakaian Fuel & Lubricant, Power 23
29/1/2021 1205 Pemakaian Fuel, Power 64
LUBRICANT INVENTORY
DATE AC REMARK EV
01/1/2021 Beginning Balance
03/1/2021 1206 Purchase Fuel & Lubricant, Pertamina 5
11/1/2021 1206 Pemakaian Fuel & Lubricant, Power 23
19/1/2021 1206 Pemakaian Lubricant, Power Dept 34
28/1/2021 1206 Lubricant Purchase, Pertamina 63
29/1/2021 1206 Lubricant, Power Maintenance 64
WIP_MIXING DEPT
DATE AC REMARK EV
01/1/2021 Beginning Balance
03/1/2021 1211 Production, Mixing Dept, Material 6
07/1/2021 1211 Utang Gaji Upah 1 15
14/1/2021 1211 Production, Mixing Dept, Material 27
14/1/2021 1211 Utang Gaji Upah 2 28
22/1/2021 1211 Production, Mixing Dept, Material 40
23/1/2021 1211 Utang Gaji Upah 3 44
28/1/2021 1211 Production, Mixing Dept, Material 62
29/1/2021 1211 Utang Gaji Upah 4 65
29/1/2021 1211 FOH Applied Mixing (Adjusment) 72
29/1/2021 1211 Transfer WIP Mixing to Pressing 83
WIP_PRESSING DEPT
DATE AC REMARK EV
01/1/2021 Beginning Balance
07/1/2021 1212 Utang Gaji Upah 1 15
14/1/2021 1212 Utang Gaji Upah 2 28
23/1/2021 1212 Utang Gaji Upah 3 44
29/1/2021 1212 Utang Gaji Upah 4 65
29/1/2021 1212 FOH Applied Pressing (Adjusment) 73
29/1/2021 1212 Transfer WIP Mixing to Pressing 83
29/1/2021 1212 Transfer WIP Pressing to Finishing 84
WIP_FINISHING DEPT
DATE AC REMARK EV
01/1/2021 Beginning Balance
07/1/2021 1213 Utang Gaji Upah 1 15
14/1/2021 1213 Utang Gaji Upah 2 28
23/1/2021 1213 Utang Gaji Upah 3 44
29/1/2021 1213 Utang Gaji Upah 4 65
29/1/2021 1213 FOH Applied Finishing (Adjusment) 74
29/1/2021 1213 Transfer WIP Pressing to Finishing 84
29/1/2021 1213 Transfer WIP Finishing to Finished Goods 85
PREPAID INSURANCE
DATE AC REMARK EV
01/1/2021 Beginning Balance
29/1/2021 1301 Pembebanan Beban Asuransi 71
VAT_INPUT
DATE AC REMARK EV
01/1/2021 Beginning Balance
05/1/2021 1302 Thinner Purchase, Toko Murni 9
06/1/2021 1302 Pembayaran PPN 11
07/1/2021 1302 Paint Purchase, Toko Pelangi 14
08/1/2021 1302 Cement Purchase, Semen Gresik 17
17/1/2021 1302 Cement Purchase, Semen Gresik 32
24/1/2021 1302 Cement Purchase, Semen Gresik 48
28/1/2021 1302 Cement Purchase, Semen Gresik 59
OFFICE EQUIPMENT
DATE AC REMARK EV
01/1/2021 Beginning Balance
29/1/2021 1410 Office Equipment, Ending Balance
VEHICLES
DATE AC REMARK EV
01/1/2021 Beginning Balance
29/1/2021 1420 Vehicles, Ending Balance
FACTORY MACHINERY
DATE AC REMARK EV
01/1/2021 Beginning Balance
29/1/2021 1430 Factory Machinery, Ending Balance
BUILDING
DATE AC REMARK EV
01/1/2021 Beginning Balance
29/1/2021 1440 Building, Ending Balance
LAND
DATE AC REMARK EV
01/1/2021 Beginning Balance
29/1/2021 1501 Land, Ending Balance
ACCOUNTS PAYABLE
DATE AC REMARK EV
01/1/2021 Beginning Balance
05/1/2021 2102 Pembayaran Utang, Semen Gresik 8
07/1/2021 2102 Pembayaran Utang, Semen Gresik 13
08/1/2021 2102 Cement Purchase, Semen Gresik 17
08/1/2021 2102 Sand Purchase, CV Bumi Permai 18
11/1/2021 2102 Pembayaran Utang, Semen Gresik 22
12/1/2021 2102 Pembayaran Utang, CV Bumi Permai 26
17/1/2021 2102 Cement Purchase, Semen Gresik 32
17/1/2021 2102 Sand Purchase, CV Bumi Permai 33
21/1/2021 2102 Pembayaran Utang, Semen Gresik 39
23/1/2021 2102 Pembayaran Utang, CV Bumi Permai 43
24/1/2021 2102 Cement Purchase, Semen Gresik 48
24/1/2021 2102 Sand Purchase, CV Bumi Permai 49
27/1/2021 2102 Pembayaran Utang, Semen Gresik 56
27/1/2021 2102 Pembayaran Utang, CV Bumi Permai 57
28/1/2021 2102 Cement Purchase, Semen Gresik 59
28/1/2021 2102 Sand Purchase, CV Bumi Permai 60
VAT_OUTPUT
DATE AC REMARK EV
01/1/2021 Beginning Balance
01/1/2021 2105 Sales, Toko Hidayah 1
06/1/2021 1302 Pembayaran PPN 11
20/1/2021 2105 Sales, TB Madani 36
23/1/2021 2105 Sales, Bp Rahmanto 41
24/1/2021 2105 Sales, Toko Agung 46
27/1/2021 2105 Sales, CV Harapan Jaya 55
EQUITY
DATE AC REMARK EV
01/1/2021 Beginning Balance
29/1/2021 3101 Prima Equity, Ending Balance
MARKETING EXPENSE
DATE AC REMARK EV
01/1/2021 Beginning Balance
01/1/2021 5601 Sales Fee, Toko Hidayah 2
03/1/2021 5601 Promotion Expense, Suara Merdeka 4
09/1/2021 5601 Beban Listrik PLN 19
14/1/2021 5601 Utang Gaji Upah 2 28
20/1/2021 5601 Sales Fee, TB Madani 37
24/1/2021 5601 Sales Fee, Toko Agung 47
26/1/2021 5601 Sewa Kendaraan, Wahid Transport 50
27/1/2021 5601 Sales Fee, CV Harapan Jaya 58
29/1/2021 5601 Utang Gaji Upah 4 65
29/1/2021 5601 Pembebanan Beban Depresiasi Gedung 68
29/1/2021 5601 Pembebanan Beban Depresiasi Kendaraan 69
29/1/2021 5601 Pembebanan Beban Asuransi 71
29/1/2021 5601 Closing COGS & Expenses Accounts 88
PROFIT/LOSS
DATE AC REMARK EV
01/1/2021 Beginning Balance
29/1/2021 7011 Closing Revenue Accounts 87
29/1/2021 7011 Closing COGS & Expenses Accounts 88
ADJUSMENT LEDGER
1101
DR CR BALANCE
137,485,000.00
6,562,500.00 130,922,500.00
17,650,000.00 148,572,500.00
927,500.00 147,645,000.00
13,775,000.00 133,870,000.00
15,600,000.00 149,470,000.00
47,500,000.00 101,970,000.00
1,760,000.00 100,210,000.00
6,000,000.00 94,210,000.00
20,300,000.00 73,910,000.00
3,750,000.00 77,660,000.00
40,000,000.00 37,660,000.00
3,300,000.00 34,360,000.00
19,000,000.00 15,360,000.00
12,500,000.00 2,860,000.00
400,000.00 2,460,000.00
144,375,000.00 146,835,000.00
45,100,000.00 101,735,000.00
1,750,000.00 99,985,000.00
4,150,000.00 104,135,000.00
19,125,000.00 85,010,000.00
16,335,000.00 68,675,000.00
120,000.00 68,555,000.00
1,000,000.00 67,555,000.00
6,300,000.00 61,255,000.00
13,850,000.00 75,105,000.00
26,400,000.00 48,705,000.00
138,600,000.00 187,305,000.00
10,625,000.00 176,680,000.00
35,000,000.00 141,680,000.00
5,687,500.00 135,992,500.00
3,500,000.00 132,492,500.00
1,400,000.00 131,092,500.00
750,000.00 130,342,500.00
125,125,000.00 255,467,500.00
31,680,000.00 223,787,500.00
13,600,000.00 210,187,500.00
4,375,000.00 205,812,500.00
15,000,000.00 190,812,500.00
3,750,000.00 187,062,500.00
42,000,000.00 145,062,500.00 145,062,500
1102
DR CR BALANCE
55,000,000.00
144,375,000.00 199,375,000.00
17,650,000.00 181,725,000.00
15,600,000.00 166,125,000.00
3,750,000.00 162,375,000.00
144,375,000.00 18,000,000.00
4,150,000.00 13,850,000.00
138,600,000.00 152,450,000.00
13,850,000.00 138,600,000.00
33,687,500.00 172,287,500.00
138,600,000.00 33,687,500.00
125,125,000.00 158,812,500.00
125,125,000.00 33,687,500.00
96,250,000.00 129,937,500.00 129,937,500
1201
DR CR BALANCE
10,625,000.00
10,625,000.00 0.00
19,125,000.00 19,125,000.00
15,300,000.00 3,825,000.00
10,625,000.00 14,450,000.00
12,750,000.00 1,700,000.00
13,600,000.00 15,300,000.00
13,600,000.00 28,900,000.00
20,400,000.00 8,500,000.00 8,500,000
1202
DR CR BALANCE
24,000,000.00
4,000,000.00 20,000,000.00
41,000,000.00 61,000,000.00
23,000,000.00 38,000,000.00
24,000,000.00 62,000,000.00
24,000,000.00 38,000,000.00
28,800,000.00 66,800,000.00
24,800,000.00 91,600,000.00
3,400,000.00 88,200,000.00 88,200,000
1203
DR CR BALANCE
2,700,000.00
3,000,000.00 5,700,000.00
675,000.00 5,025,000.00
600,000.00 4,425,000.00 4,425,000
1204
DR CR BALANCE
800,000.00
1,600,000.00 2,400,000.00
320,000.00 2,080,000.00
200,000.00 1,880,000.00 1,880,000
1205
DR CR BALANCE
0.00
12,650,000.00 12,650,000.00
5,500,000.00 7,150,000.00
6,600,000.00 550,000.00 550,000
1206
DR CR BALANCE
0.00
1,125,000.00 1,125,000.00
750,000.00 375,000.00
375,000.00 0.00
3,750,000.00 3,750,000.00
3,375,000.00 375,000.00 375,000
1211
DR CR BALANCE
0.00
14,625,000.00 14,625,000.00
5,000,000.00 19,625,000.00
38,300,000.00 57,925,000.00
3,550,000.00 61,475,000.00
36,750,000.00 98,225,000.00
6,250,000.00 104,475,000.00
23,800,000.00 128,275,000.00
5,450,000.00 133,725,000.00 133,725,000
22,695,000.00 156,420,000.00
128,953,333.33 27,466,666.67
22,695,000.00 128,953,333.33
1212
DR CR BALANCE
0.00
2,500,000.00 2,500,000.00
2,100,000.00 4,600,000.00
9,850,000.00 14,450,000.00
4,078,000.00 18,528,000.00 18,528,000
29,644,800.00 48,172,800.00
128,953,333.33 177,126,133.33
163,221,916.67 13,904,216.67
158,598,133.33 163,221,916.67
1213
DR CR BALANCE
77,440,000.00
3,125,000.00 80,565,000.00
2,750,000.00 83,315,000.00
7,800,000.00 91,115,000.00
6,649,000.00 97,764,000.00 97,764,000
19,307,800.00 117,071,800.00
163,221,916.67 280,293,716.67
154,402,855.05 125,890,861.62
182,529,716.67 154,402,855.05
1220
DR CR BALANCE
90,400,000.00
90,400,000.00 90,400,000
154,402,855.05 244,802,855.05
218,747,180.00 26,055,675.05
154,402,855.05 218,747,180.00
1301
DR CR BALANCE
18,000,000.00
1,500,000.00 16,500,000.00 16,500,000
1302
DR CR BALANCE
4,200,000.00
160,000.00 4,360,000.00
4,200,000.00 160,000.00
300,000.00 460,000.00
4,100,000.00 4,560,000.00
2,400,000.00 6,960,000.00
2,880,000.00 9,840,000.00
2,480,000.00 12,320,000.00 12,320,000
1303
DR CR BALANCE
0.00
6,000,000.00 6,000,000.00 6,000,000
1410
DR CR BALANCE
18,000,000.00
18,000,000.00 18,000,000
1411
DR CR BALANCE
9,000,000.00
180,000.00 9,180,000.00
1420
DR CR BALANCE
210,000,000.00
210,000,000.00 210,000,000
1421
DR CR BALANCE
105,000,000.00
2,100,000.00 107,100,000.00
1430
DR CR BALANCE
598,000,000.00
598,000,000.00 598,000,000
1431
DR CR BALANCE
212,500,000.00
5,980,000.00 218,480,000.00
1440
DR CR BALANCE
345,000,000.00
345,000,000.00 345,000,000
1441
DR CR BALANCE
172,000,000.00
3,450,000.00 175,450,000.00
1501
DR CR BALANCE
736,000,000.00
736,000,000.00 736,000,000
2101
DR CR BALANCE
0.00
19,775,000.00 19,775,000.00
19,000,000.00 775,000.00
15,600,000.00 16,375,000.00
16,335,000.00 40,000.00
35,590,000.00 35,630,000.00
35,000,000.00 630,000.00
41,391,500.00 42,021,500.00
42,000,000.00 21,500.00
2102
DR CR BALANCE
87,500,000.00
47,500,000.00 40,000,000.00
40,000,000.00 0.00
45,100,000.00 45,100,000.00
19,125,000.00 64,225,000.00
45,100,000.00 19,125,000.00
19,125,000.00 0.00
26,400,000.00 26,400,000.00
10,625,000.00 37,025,000.00
26,400,000.00 10,625,000.00
10,625,000.00 0.00
31,680,000.00 31,680,000.00
13,600,000.00 45,280,000.00
31,680,000.00 13,600,000.00
13,600,000.00 0.00
27,280,000.00 27,280,000.00
13,600,000.00 40,880,000.00
2105
DR CR BALANCE
24,500,000.00
13,125,000.00 37,625,000.00
4,200,000.00 160,000.00
12,600,000.00 25,725,000.00
3,062,500.00 28,787,500.00
11,375,000.00 40,162,500.00
8,750,000.00 48,912,500.00
3000
DR CR BALANCE
590,000,000.00
590,000,000.00
0.00
15,000,000.00 15,000,000.00 15,000,000
565,000,000.00
565,000,000.00
562,150,000.00
562,150,000.00
4101
DR CR BALANCE
0.00
131,250,000.00 131,250,000.00
126,000,000.00 257,250,000.00
30,625,000.00 287,875,000.00
113,750,000.00 401,625,000.00
87,500,000.00 489,125,000.00
489,125,000.00 0.00
5101
DR CR BALANCE
0.00
11,602,900.00 11,602,900.00
218,747,180.00 230,350,080.00
230,350,080.00 0.00
230,350,080.00 0.00
5211
DR CR BALANCE
0.00
1,500,000.00 1,500,000.00
2,500,000.00 4,000,000.00
450,000.00 4,450,000.00
450,000.00 4,900,000.00
5,710,000.00 10,610,000.00
1,290,000.00 11,900,000.00
517,500.00 12,417,500.00
225,000.00 12,642,500.00 12,642,500
4,519,000.00 17,161,500.00
5,513,100.00 22,674,600.00
4,750,437.50 27,425,037.50
22,695,000.00 4,730,037.50
4,730,037.50 0.00
14,782,537.50 27,425,037.50
5212
DR CR BALANCE
0.00
450,000.00 450,000.00
2,500,000.00 2,950,000.00
600,000.00 3,550,000.00
2,500,000.00 6,050,000.00
2,725,000.00 8,775,000.00
1,900,000.00 10,675,000.00
862,500.00 11,537,500.00
375,000.00 11,912,500.00 11,912,500
6,778,500.00 18,691,000.00
4,594,250.00 23,285,250.00
9,500,875.00 32,786,125.00
29,644,800.00 3,141,325.00
3,141,325.00 0.00
20,873,625.00 32,786,125.00
5213
DR CR BALANCE
0.00
500,000.00 500,000.00
1,875,000.00 2,375,000.00
500,000.00 2,875,000.00
995,000.00 3,870,000.00
600,000.00 4,470,000.00
800,000.00 5,270,000.00
785,000.00 6,055,000.00
790,000.00 6,845,000.00
690,000.00 7,535,000.00
300,000.00 7,835,000.00 7,835,000
6,778,500.00 14,613,500.00
3,675,400.00 18,288,900.00
4,750,437.50 23,039,337.50
19,307,800.00 3,731,537.50
3,731,537.50 0.00
15,204,337.50 23,039,337.50
5221
DR CR BALANCE
0.00
1,550,000.00 1,550,000.00
1,875,000.00 3,425,000.00
6,250,000.00 9,675,000.00
750,000.00 10,425,000.00
375,000.00 10,800,000.00
1,550,000.00 12,350,000.00
7,350,000.00 19,700,000.00
1,550,000.00 21,250,000.00
1,000,000.00 22,250,000.00
345,000.00 22,595,000.00 22,595,000
22,595,000.00 0.00
0.00 22,595,000.00
5222
DR CR BALANCE
0.00
2,350,000.00 2,350,000.00
1,250,000.00 3,600,000.00
1,700,000.00 5,300,000.00
3,520,000.00 8,820,000.00
1,400,000.00 10,220,000.00
2,625,000.00 12,845,000.00
2,350,000.00 15,195,000.00
750,000.00 15,945,000.00
172,500.00 16,117,500.00 16,117,500
2,259,500.00 18,377,000.00
18,377,000.00 0.00
2,259,500.00 18,377,000.00
5223
DR CR BALANCE
0.00
2,800,000.00 2,800,000.00
1,250,000.00 4,050,000.00
1,800,000.00 5,850,000.00
3,070,000.00 8,920,000.00
2,805,500.00 11,725,500.00
250,000.00 11,975,500.00
172,500.00 12,148,000.00 12,148,000
2,259,500.00 14,407,500.00
4,594,250.00 19,001,750.00
19,001,750.00 0.00
6,853,750.00 19,001,750.00
5311
DR CR BALANCE
0.00
22,695,000.00 22,695,000.00
22,695,000.00 0.00
22,695,000.00 22,695,000.00
5312
DR CR BALANCE
0.00
29,644,800.00 29,644,800.00
29,644,800.00 0.00
29,644,800.00 29,644,800.00
5313
DR CR BALANCE
0.00
19,307,800.00 19,307,800.00
19,307,800.00 0.00
19,307,800.00 19,307,800.00
5401
DR CR BALANCE
0.00
4,730,037.50 4,730,037.50
3,141,325.00 7,871,362.50
3,731,537.50 11,602,900.00
11,602,900.00 0.00
11,602,900.00 11,602,900.00
5501
DR CR BALANCE
0.00
625,000.00 625,000.00
400,000.00 1,025,000.00
1,750,000.00 2,775,000.00
650,000.00 3,425,000.00
120,000.00 3,545,000.00
1,000,000.00 4,545,000.00
750,000.00 5,295,000.00
5,289,000.00 10,584,000.00
345,000.00 10,929,000.00
1,100,000.00 12,029,000.00
180,000.00 12,209,000.00
300,000.00 12,509,000.00 12,509,000
12,509,000.00 0.00
5601
DR CR BALANCE
0.00
6,562,500.00 6,562,500.00
927,500.00 7,490,000.00
625,000.00 8,115,000.00
750,000.00 8,865,000.00
6,300,000.00 15,165,000.00
5,687,500.00 20,852,500.00
3,500,000.00 24,352,500.00
4,375,000.00 28,727,500.00
4,000,000.00 32,727,500.00
345,000.00 33,072,500.00
1,000,000.00 34,072,500.00
300,000.00 34,372,500.00 34,372,500
34,372,500.00 0.00
7011
DR CR BALANCE
0.00
489,125,000.00 489,125,000.00
277,231,580.00 211,893,420.00
2,806,299,000
TRIAL BALANCE
22,695,000 128,953,333
158,598,133 163,221,917
182,529,717 154,402,855
154,402,855 218,747,180
9,180,000
107,100,000
218,480,000
175,450,000
21,500
40,880,000
48,912,500
590,000,000
565,000,000
562,150,000
489,125,000
230,350,080 0
14,782,538 27,425,038
20,873,625.00 32,786,125.00
15,204,337.50 23,039,337.50
0 22,595,000
2,259,500 18,377,000
6,853,750 19,001,750
22,695,000 22,695,000
29,644,800 29,644,800
19,307,800 19,307,800
11,602,900 11,602,900
2,806,299,000 891,800,035 891,800,035
TRIAL BALANCE ADJUSMENT
CV Primajaya Abadi
Jl. Pembangunan Utara No. 12 Semarang
WORKSHEET
No Trial Ballances Adjustment
Accounts
Code D K Debet
1101 Cash 145,062,500.00
1102 Account Receivable 129,937,500.00
1201 Sand Inventory 8,500,000.00
1202 Cement Inventory 88,200,000.00
1203 Paint Inventory 4,425,000.00
1204 Thinner Inventory 1,880,000.00
1205 Fuel Inventory 550,000.00
1206 Lubricant Inventory 375,000.00
1211 WIP_Mixing Dept 133,725,000.00 22,695,000.00
1212 WIP_Pressing Dept 18,528,000.00 158,598,133.33
1213 WIP_Finishing Dept 97,764,000.00 182,529,716.67
1220 Roof tile Inventory 90,400,000.00 154,402,855.05
1301 Prepaid Insurance 16,500,000.00
1302 VAT_Input 12,320,000.00
1303 Prepaid Income Tax (Persekot PPh) 6,000,000.00
1410 Office Equipment 18,000,000.00
1411 Acc. Depr_Office Equipment 9,180,000.00
1420 Vehicles 210,000,000.00
1421 Acc. Depr_Vehicles 107,100,000.00
1430 Factory Machinery 598,000,000.00
1431 Acc. Depr_Factory Machinery 218,480,000.00
1440 Building 345,000,000.00
1441 Acc. Depr_Building 175,450,000.00
1501 Land 736,000,000.00
2101 Salaries & Wages Payable 21,500.00
2102 Accounts Payable 40,880,000.00
2105 VAT_Output 48,912,500.00
2106 Income Tax Payable
3101 Prima's Equity 590,000,000.00
3102 Prima's Drawing 15,000,000.00
3103 Jaya's Equity 565,000,000.00
3104 Jaya's Drawing
3105 Abadi's Equity 562,150,000.00
3106 Abadi's Drawing
4101 Sales Revenue 489,125,000.00
5101 Cost of Goods Sold 230,350,080.00
5211 FOH act_Mixing Dept 12,642,500.00 14,782,537.50
5212 FOH act_Pressing Dept 11,912,500.00 20,873,625.00
5213 FOH act_Finishing Dept 7,835,000.00 15,204,337.50
5221 FOH act_Power Dept 22,595,000.00 -
5222 FOH act_Maintenance Dept 16,117,500.00 2,259,500.00
5223 FOH act_Service Dept 12,148,000.00 6,853,750.00
5311 FOH applied_Mixing Dept 22,695,000.00
5312 FOH applied_Pressing Dept 29,644,800.00
5313 FOH applied_Finishing Dept 19,307,800.00
5401 FOH Variance 11,602,900.00
5501 General Administrative Expense 12,509,000.00
5601 Marketing Expense 34,372,500.00
7001 Profit/Loss
2,806,299,000.00 2,806,299,000.00 891,800,035.05
590,000,000.00
15,000,000.00 15,000,000.00
565,000,000.00
562,150,000.00
489,125,000.00 489,125,000.00
- 230,350,080.00 230,350,080.00
27,425,037.50 -
32,786,125.00 -
23,039,337.50 -
22,595,000.00 -
18,377,000.00 -
19,001,750.00 -
22,695,000.00 -
29,644,800.00 -
19,307,800.00 -
11,602,900.00 -
12,509,000.00 12,509,000.00
34,372,500.00 34,372,500.00
- 211,893,420.00
891,800,035.05 2,806,299,000.00 2,806,299,000.00 489,125,000.00 489,125,000.00 2,529,067,420.00
Neraca
Kredit
9,180,000.00
107,100,000.00
218,480,000.00
175,450,000.00
21,500.00
40,880,000.00
48,912,500.00
590,000,000.00
565,000,000.00
562,150,000.00
211,893,420.00
2,529,067,420.00
PRODUCTION COST REPORT
CV Primajaya Abadi
PRODUCTION COSTS REPORT
MIXING DEPARTMENT
31 JANUARY 2021
COST APPLIED
WIP Beginning Curent Period
Direct Material 0 113,475,000
Direct Labor 0 20,250,000
Factory Overhead 0 22,695,000
Total 156,420,000
COST RESPONSIBILITY
Transfered out: 400.000 unit
Direct Material 400.000 units x Rp 227 = 90,780,000
Direct Labor 400.000 units x Rp 45 = 18,000,000
Factory Overhead 400.000 units x Rp 50 = 20,173,333.33
Ending WIP
Direct Material 100.000 units x 100% x Rp 227 = 22,695,000
Direct Labor 100.000 units x 50% x Rp 45 = 2,250,000
Factory Overhead 100.000 units x 50% x Rp 50 = 2,521,666.67
CV Primajaya Abadi
PRODUCTION COSTS REPORT
PRESSING DEPARTMENT
31 JANUARY 2021
COST APPLIED
WIP Beginning Curent Period
Costs from Mixing 0 128,953,333
Direct Labor 0 18,528,000
Factory Overhead 0 29,644,800
Total 177,126,133.33
COST RESPONSIBILITY
Transfered out: 365.000 unit
Costs from Mixing 365.000 units x Rp 322 = 117,669,916.67
Direct Labor 365.000 units x Rp 48, = 17,520,000
Factory Overhead 365.000 units x Rp 76,8 = 28,032,000
Ending WIP
Costs from Mixing 35.000 units x 100% x Rp 322 = 11,283,416.7
Direct Labor 35.000 units x 60% x Rp 48, = 1,008,000.0
Factory Overhead 35.000 units x 60% x Rp 76,8 = 1,612,800.0
CV Primajaya Abadi
PRODUCTION COSTS REPORT
FINISHING DEPARTMENT
31 JANUARY 2021
PHYSICAL UNITS
Begining WIP (1 January) 0% 80,000
Transfered in 365,000 +
445,000
Transfered out 240,000
Ending WIP (31 January) 80% 205,000 +
445,000
EQUIVALENT UNITS
Costs from Pressing CC
Transfer out, Finished Goods 240,000 240,000
Ending WIP 205,000 164,000
Total 445,000 404,000
COST APPLIED
WIP Beginning Curent Period
Costs from Pressing Rp 58,000,000 163,221,917
Direct Labor Rp 13,440,000 20,324,000
Factory Overhead Rp 6,000,000 19,307,800
Total 77,440,000 202,853,717
COST RESPONSIBILITY
Transfered out: 240.000 unit
Costs from Pressing : 240.000 units x Rp 497 = 119,310,696.63
Direct Labor : 240.000 units x Rp 83,57 = 20,057,821.78
Factory Overhead : 240.000 units x Rp 62,64 = 15,034,336.63
Ending WIP
Costs from Pressing 205.000 units x 100% x Rp 497 = 101,911,220.04
Direct Labor 205.000 units x 80% x Rp 83,57 = 13,706,178.22
Factory Overhead 205.000 units x 80% x Rp 62,64 = 10,273,463.37
Sel Kuning Diisi
MIXING
unit WIP Begin 0
In 500,000 500,000 400,000
WIP Ending 100,000
unit
128,953,333.33
27,466,666.67
156,420,000.00
unit
unit
18,528,000
163,221,916.67
13,904,216.67
177,126,133.33
unit
unit
32,488,934.08
154,402,855.05
125,890,861.62
280,293,716.67
Mixing Pressing Finishing
0 0 80,000 Units
500,000 400,000 365,000
400,000 365,000 240,000 NIM AKHIR
0-4 250,000
5-9 240,000
PRESSING FINISHING
0 80,000
400,000 365,000 365,000 240,000 Out
35,000 205,000
CV Primajaya Abadi
Jl. Pembangunan Utara No. 12 Semarang
CV Primajaya Abadi
Jl. Pembangunan Utara No 12 Semarang
COGS REPORT
Period 31-12-2020 -sd- 31-1-2021
CV Primajaya Abadi
Jl. Pembangunan Utara No 12 Semarang
INCOME STATEMENT
Period 31-12-2020 -sd- 31-1-2021
Revenues
4101 Sales Revenue
Other Expenses:
6201 Interest Expense Rp -
6202 Bank Expense Rp -
6203 Miscellaneous Expense Rp -
PROFIT/LOSS
489,125,000.00
230,350,080.00
258,774,920.00
46,881,500.00
211,893,420.00
0.00
211,893,420.00
0.00
211,893,420.00
CV PRIMAJAYA ABADI
STATEMENT OF FINANCIAL POSITION
January 31, 2021
ASSET LIABILITIES
Cash 145,062,500.00 Salaries & Wages Payable
Account Receivables
Bp Rahmanto 33,687,500.00 Accounts Payable
Tn Yahya Effendi 0.00
Tn Lukman Hidayat 0.00
TB Madani 0.00
CV Harapan Jaya 96,250,000.00
129,937,500.00 VAT_Output
Inventory
Sand 8,500,000.00 TOTAL LIABILITIES
Cement 88,200,000.00
Paint 4,425,000.00 EQUITY
Thinner 1,880,000.00
Fuel 550,000.00 Primas Equity
Lubricant 375,000.00 Primas Drawing
WIP Mixing 27,466,666.67
WIP Pressing 13,904,216.67
WIP Finishing 125,890,861.62 Jayas Equity
Roof Tile 26,055,675.05 Jayas Drawing
297,247,420.00
Prepaid Insurance 16,500,000.00 Abadis Equity
VAT_Input 12,320,000.00 Abadis Drawing
Prepaid Income Tax 6,000,000.00
Land 736,000,000.00
Accounts Payable
Semen Gresik 27,280,000.00
CV Bumi Permai 13,600,000.00
40,880,000.00
VAT_Output 48,912,500.00
EQUITY