A) Current situation

 Step 1 was build up in Beginning of 2007

 Today, Step 1 in Bernes treated approx 2.9 Million Fridges

 In defiance of continnously maintenance, the Step 1 has


been worn over 12 years, that a re-installation is strongly
necessary to secure all standards and requirements of the
ECO-ORGANISMES and safety and health regulations in
front of the Authorities and the Employee for the next 12
years

 For quality reasons, some small adaption of the Step 2 is


necessary
22.04.2020 2
B) Drawing

4/22/2020 3
C) 3 - Dimensional Plan (1)

22.04.2020 4
C) 3 - Dimensional Plan (2)

22.04.2020 5
D) Advantages of the new Step 1 (1)

1.) Floor of Step 1

Today‘s Problem Solution with new Step 1 Advantage with the new Step 1

Today no oil resistant floor Oil Resistant floor - easy to keep it clean
- Safety as not slippery
- Less time for cleaning up
- Looks clean for marketing

22.04.2020 6
D) Advantages of the new Step 1 (2)

2.) Rollconveyor too low

Today‘s Problem Solution with new Step 1 Advantage with the new Step 1

- Back pain of employees Bringing up the roll conveyors in an - Better working conditions
- A lot of sick leaves optimal position - Reduction of sick leaves and cost therefore
- Low working motivation - better Motivation
- Less productivity - Optimal health conditions
- Better productivity

22.04.2020 7
D) Advantages of the new Step 1 (3)

3.) Induction heating by robotic system (225 degrees Celsius)

Today‘s Problem Solution with new Step 1 Advantage with the new Step 1

- High resistant of Oil after Induction heating by robotic system - Optimal draining without resisting oil
treatment (225 degrees Celsius) - Optimal and safe heating by robotic system
- No pollution of oil around step 1
- Not optimal Quality results
- Good quality results in front of the
- Long de-gassing time by “Ecoorganismes”
temperature less then 20 C - higher selling prices possible
- Oil pollution around the step 1 - Optimal Marketing tool to show industrial
area scale Fridge DE-Manufacturing by FRICOM
- not optimal selling price of and Derichebourg Group
compressors

22.04.2020 8
D) Advantages of the new Step 1 (4)

4.) Step -Line production

Today‘s Problem Solution with new Step 1 Advantage with the new Step 1
- 2 lines are difficult to handle Only 1 production line - No overstressing of the employees and a
by the worker and to realize better motivation
and optimal Material stream

22.04.2020 9
D) Advantages of the new Step 1 (5)

5.) Production panel

Today‘s Problem Solution with new Step 1 Advantage with the new Step 1
- Workers have no feeling for Production panel shows every hour - better feeling for productivity
productivity and throughput and shift throughput - motivation for the employees to be proud of
the good results
- Optimal marketing tool for the
Ecoorganismes to show high quality

22.04.2020 10
D) Advantages of the new Step 1 (6)

6.) Material flow balances

Today‘s Problem Solution with new Step 1 Advantage with the new Step 1
- No control of weight during the Scale on Step 1 entry, step 2 entry - Optimal Material flow controlling
process and beside the step 1 with - Continuously Monitoring
- Difficult measurement of recycelt automatic takeover in the IT - Necessary for WEEELABEX certification
material flow System

22.04.2020 11
D) Advantages of the new Step 1 (7)

7.) Marketing Panels with description of the machine

Today‘s Problem Solution with new Step 1 Advantage with the new Step 1
- No optimal marketing New Marketing panel with - Good looking panels with descriptions
presentation is available description in several languages - Easy to understand for visitors.
- Clear concept and demonstration of high
quality Fridge De-Manufacturing

12
22.04.2020
D) Advantages of the new Step 1 (8-9)

8.) Increasing of productivity


Before the new Phase 1 With new Step 1 Advantage
with the new Step 1
- Throughput by unit/h - 37 units/h - 45 units/h - approx 20 % increasing
of capacity

- Annual Capacity - approx 296.000 units - 360.000 units


(approx 20 % Typ 1
approx 80% Typ 2,3,4)
8,000 h/year

9.) WEEELABEX

Today‘s Problem Solution with new Step 1 Advantage with the new Step 1
- Test only possible by - -Every day WEEELABEX - Working according industrial scale quality
attending of Executive compliance and productivity
workers of FRICOM to secure - Easy handling and work for
good results the employees of all levels

22.04.2020 13
E) Optimisation of Step 2

1.) Exhaust values

Today‘s Problem Solution with new Step 2 Advantage with the new Step 2
- only 4 active carbon filters 2 more active carbon filters - No exceeding of exhaust values also by
- sometimes Exhaust values high production
- Higher throughput possible
exceeded (5 mg/cm VFC and
20 mg/cm VHC)

2.) VIP Filter

Today‘s Problem Solution with new Step 2 Advantage with the new Step 2
- Machines today are not SEG VIP Filter Typ 1 and 2 - All VIP dust will be covered and safety
prepared for VIP Fridges handled for destruction or recycling
- Exhaust filter are blocked
- Dangerous dust exposure of
workers
- Dangerous to health
- Stop of the production and
reduction of the productivity

22.04.2020 14