SIEMENS STAMP: ENGINEER'S STAMP:

C 28.08.2017 DTS-00539; steel supports Fz Langh. Langh.

REVISIONS
B 28.02.2017 DTS-00015 Fz Langh. Langh.

A 12.01.2017 as marked; phase sequence; title block; DTS-00010 Fz Langh. Langh.

0 29.09.2016 FIRST ISSUE Fz Langh. Langh.

REV DATE DESCRIPTION PREP. CHECK. APPR.


CONFIDENTIAL ©2016 ALUMINIUM BAHRAIN B.S.C (ALBA)
THIS DOCUMENT CONTAINS INFORMATION CONFIDENTIAL AND/OR PROPRIETARY TO ALBA THAT IS NOT TO BE USED, DISCLOSED OR REPRODUCED IN ANY FORM BY ANY THIRD PARTY WITHOUT THE
PRIOR WRITTEN PERMISSION OF ALBA. THE DOCUMENT SHOULD ONLY BE USED FOR THE AUTHORIZED PURPOSE AND MUST BE RETURNED TO ALBA UPON REQUEST. ALL RIGHTS ARE RESERVED.

CLIENT:
ALUMINIUM BAHRAIN B.S.C.
PO Box 570, Kingdom Of Bahrain
Tel : + 973 17 830000
Fax : + 973 17 830083

CONSULTANT:
ESB International,
Stephen Court, 18-21,
St. Stephen's Green, Dublin 2, Ireland.
Tel : +353 (0)1 703 8000
Fax: +353 (0)1 703 8088

CONTRACTOR:
SIEMENS LLC - Bahrain Branch
PO Box 5903, Seef District,
Manama - Kingdom of Bahrain
Tel : +973 1710 3777
Fax : +973 1722 4065

PROJECT TITLE:

ALBA LINE 6 EXPANSION


POWER DISTRIBUTION SYSTEM (PDS)
CONTRACT NO.: FUNCTIONAL LOCATION NO.: SUPPLIER CODE:
L6 - 82713 01-01-023 7720
NAME DATE SIGN. DOC. TITLE:

PREPARED Franz 29.09.2016 Franz 220 kV GIS (SH9) - Layout and Sections
CHECKED Langh. 29.09.2016 Langh. A-A, B-B, C-C, D-D
Location diagram
APPROVED Langh. 29.09.2016 Langh.

STANDARD: A0 SCALE: 1:50 ALBA PDS : SH9 & SH7


SIEMENS DRWG No: DRWG No: REV. SHEETS
(0) E50115 - B0797 - V023 - C L6-PDS-01-H-4102-V-31013 C 1 OF 3