Professional Documents
Culture Documents
homepage.
Alt+Left Ar Back a page.
Alt+Right AForward a page.
Display the current website in full-
F11 screen mode. Pressing F11 again will
exit this mode.
Stop loading the page or
Esc
a download from loading.
Zoom in or out of a page, "-" will zoom
Ctrl+(- or +
out and "+" will zoom in on the page.
Pressing Ctrl and any number 1
Ctrl+1-8 through 8 moves to the corresponding
tab in your tab bar.
Ctrl+9 Switch to last tab.
Ctrl+0 Reset browser zoom to default.
Ctrl+Enter
Open the Clear browsing data window
Ctrl+Shift+
to quickly clear private data.
Toggle the bookmarks bar between
Ctrl+Shift+
hidden and shown.
Ctrl+A Select everything on a page.
Add a bookmark for the page currently
Ctrl+D
opened.
Open the "find" bar to search text on
Ctrl+F
the current page.
Ctrl+O Open a file in the browser.
Ctrl+Shift+Open the Bookmark manager.
Ctrl+H Open browser history in a new tab.
Ctrl+J Display the downloads window.
Moves your text cursor to
the omnibox so that you can begin
Ctrl+K or Ctrl+E
typing your search query and perform
a Google search.
Move the cursor to the
Ctrl+L, Alt+D
browser address bar and highlight
everything in it.
Ctrl+N Open New browser window.
Open a new window in incognito
Ctrl+Shift+
(private) mode.
Ctrl+P Print current page or frame.
Ctrl+R or F5Refresh the current page or frame.
Opens the Save As window to save the
Ctrl+S
current page.
Ctrl+T Opens a new tab.
Ctrl+U View a web page's source code.
Ctrl+W Closes the current tab.
Ctrl+Shift Closes the currently selected window.
This combination reopens the last tab
you've closed. If you've closed multiple
Ctrl+Shift+tabs, you can press this shortcut key
multiple times to restore each of the
closed tabs.
Moves through each of the open tabs
Ctrl+Tab
going to the right.
Moves through each of the open tabs
Ctrl+Shift+
going to the left.
Open a link in a new tab in the
Ctrl+Left-cl
background.
Open a link in a new tab and switch to
Ctrl+Shift L
the new tab.
Ctrl+Page Open the browser tab to the right.
Ctrl+Page UOpen the browser tab to the left.
Spacebar Moves down a page at a time.
Shift+SpaceMoves up a page at a time.
Home Go to top of page.
End Go to bottom of page.
Display all previous text entered in a
Alt+Down Atext box and available options on
a drop-down menu.
CLIENT
STAR GROUP
MATERIALS APPROVAL
PANEL GA DRAWING APPROVAL
RACEWAYS, S & I
SITE DEPENDENCY Floor Marking
Floor Chipping
Supply of Raceways Floor
Floor Race way Installation.
Floor Plastering
Ceiling Raceway Marking
Supply of Raceways Ceiling
Ceiling Raceway Installation & Dropping.
DISTRIBUTION BOARDS
Supply of DB's
Marking of db location with sizes
Fixing of DBS with Frames
Dressing of DBS
Supply of MCB's
Fixing of MCB on DB
EARTHING CONDUCTORS
Supply and Fixing
LIGHT FIXTURES
Supply of Fixtures
Installation of Fixtures
HANDOVERING
Testing, Commisioning and Handovering
NOTE : THIS DATES ARE TENTATIVE AND DEPENDS UPON THE SITE CLEARANCE, DRAWINGS APPROVAL AND ANY UNEXPECT
ARCHITECTS CONSULTANTS
RALYS
CONSULTANT
E ELECTRIFICATION WORK FOR PROJECT M/S STAR GROUP 7th FLOOR at HYDERABAD
- MATERIAL TRACKER & SCHEDULE - WORK BREAK DOWN STRUCTURE
SEVENTH FLOOR
TIME - LINE / EACH FLOOR
START
COMPLETED
COMPLETED
DAYS
5 28-Sep-20
4 3-Oct-20
COMPLETED
COMPLETED
12 Days 04th AUG -20
COMPLETED
12 Days 04th AUG -20
12 Days 04th AUG -20
COMPLETED
COMPLETED
COMPLETED
6 Days 15th AUG -20
COMPLETED
6 Days 15th AUG -20
COMPLETED
7 Days 15th AUG -20
SYMMETRICS SCOPE
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
2 Days Leftover with UPS Wiring (After UPS Installation Only)
COMPLETED
SYMMETRICS SCOPE
12 Days SITE DEPENDENCY
ANCE, DRAWINGS APPROVAL AND ANY UNEXPECTED INCIDENTS/ISSUES AND DEPENDENCY - ELSE WHICH MAY VARY.
CONTRACTOR
th FLOOR at HYDERABAD
OWN STRUCTURE
SEVENTH FLOOR
END
COMPLETED
COMPLETED
2-Oct-20
6-Oct-20
COMPLETED
COMPLETED
15th AUG -20
COMPLETED
15th AUG -20
15th AUG -20
COMPLETED
COMPLETED
COMPLETED
20th AUG -20
COMPLETED
20th AUG -20
COMPLETED
21th AUG -20
SYMMETRICS SCOPE
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
th UPS Wiring (After UPS Installation Only)
COMPLETED
SYMMETRICS SCOPE
SITE DEPENDENCY
31th AUG - 20
29-Sep
30-Sep
11-Oct
10-Oct
1-Oct
3-Oct
4-Oct
5-Oct
6-Oct
7-Oct
8-Oct
9-Oct
2-Oct
END DATE Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
30-Sep-20
4-Oct-20
9-Oct-20
15-Oct-20
22-Oct-20
26-Oct-20
31-Oct-20
3-Nov-20
OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
7-Nov-20
12-Nov-20
18-Nov-20
25-Nov-20
28-Nov-20
2-Dec-20
OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
6-Dec-20
11-Dec-20
15-Dec-20
20-Dec-20
24-Dec-20
29-Dec-20
2-Jan-21
6-Jan-21
9-Jan-21
12-Jan-21
15-Jan-21
18-Jan-21
21-Jan-21
24-Jan-21
27-Jan-21
30-Jan-21
2-Feb-21
5-Feb-21
8-Feb-21
3-Mar-21
6-Mar-21
9-Mar-21
12-Mar-21
4-Apr-21
7-Apr-21
8-Apr-21
9-Apr-21
10-Apr-21
11-Apr-21
12-Apr-21
13-Apr-21
14-Apr-21
11-Oct
OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
OK OK OK OK OK OK OK OK OK OK OK OK OK OK
OK OK OK OK OK OK OK OK OK OK OK OK OK OK
PROJECT TIMELINE SCHEDULE:
PROJ. DURATION 60
START DATE: 28-Sep-20
END DATE: 27-Nov-20
DURATION
TE
TE
DA
ACTIVITY
DA
PLANNED Vs
D
AR
ACTUAL
EN
ST
Timeline
RACEWAYS, S & I
Floor Marking PLANNED 3 28-Sep-20
ACTUAL R1 4 1-Oct-20
TE
Sep Oct
DA
DA
T
28 29 30 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18
D
AR
EN
ST
M T W T F S S M T W T F S S M T
30-Sep-20 P P P
4-Oct-20 A A A A
30-Sep-20 P P P
4-Oct-20 A A A A
30-Sep-20 P P P
4-Oct-20 A A A A
9-Oct-20 P P P P P
13-Oct-20 A A A A
14-Oct-20 P P P P P
17-Oct-20 A A A
17-Oct-20
19-Oct-20 P
Oct Oct
19 20 21 22 23 24 25 26 27