08.00am
Unbolt valve Introduce Introduce
Lift out old
& bellow sea Unbolt water into water into
09.00am Common Line
side (to make valve shore pipe sleeper pipe rack
underground Lift out pipe at Lift in new S
it 2 spools) side & lift from 1st from 1st Flange
spool from PDB 1st bellow & pipe into
10.00am out bellow for bellow for Torquing
Prai Fuel install blind location
Mobilize pipe fillet patch fillet patch Dewatering Dewatering
Terminal to
laydown ->
Site Walkabout with Terminal PBCT Dewatering &
11.00am Product 2nd bellow Welding Welding Fillet Flange Flange
SUSD, PD&T RA and contractor Uninstall
Draining at Fillet Patch Patch 10 Torquing Torquing
12.00pm for line checking and LOTO Spade
Product Product Product Product Terminal, Welding Fillet Welding repair 4 points Welding Fillet points
Draining Draining Draining Draining transfer into Lift in new Patch 6 points (if any) Patch 8 points
1.00pm valve &
(break (break (break (break pigging line Dye Pen to Dye Pen to
flange at 1st flange at flange at 1st flange at tighten bolt follow follow
2.00pm
bellow, 2nd bellow, bellow, 2nd bellow, Spade
ACTIVITY 3.00pm pump into pump into pump into pump into undeground
Lift in 1st
4.00pm Tanker) Tanker) Tanker) Tanker) spool at gate Lift out 1st Welding 2
new pipe
side long spool & Golden Joints Install new Uninstall
into
5.00pm install new spool spade
location &
spool
tighten bolt
6.00pm
into
position
7.00pm
8.00pm
9.00pm
10.00pm
Radiography
Radiography
Midnight Test (RT) -
Test (RT)
(if repair)