- General Progress UTM Steam Line Area 11

( Up Date 22 Februari 2021 )

No. Uraian Diameter Jenis Material Jumlah


Elbow 113
1 Line no. 1 20" dan 24" Tee 9
Reducer 11
Elbow 84
2 Line no. 2 20", 24" dan 30" Tee 7
Reducer 11
Elbow 119
3 Line no. 3 20", 24" dan 30" Tee 31
Reducer 36
Elbow 24" 25
4 WLS Station 24"
Ecc. Red. 24" x 20" 19
Total 465
5 WLS Station 48" Pipa 48" 126 spot
am Line Area 11 dan Area 12 -
Februari 2021 )

Sudah UTM Sisa Keterangan


38 175
4 5
10 1
36 48
6 1
9 2
24 95
5 26
10 26
13 12
19 0
174 391
24 spot 102 spot