The document provides an update on general progress of the UTM Steam Line in Area 11 as of February 22, 2021. It includes details such as the pipe diameters, material types, and number of elbows, tees, reducers, and pipes across five line items and two WLS station items. As of the date, 174 components had been installed out of 565 total, with 391 remaining.
The document provides an update on general progress of the UTM Steam Line in Area 11 as of February 22, 2021. It includes details such as the pipe diameters, material types, and number of elbows, tees, reducers, and pipes across five line items and two WLS station items. As of the date, 174 components had been installed out of 565 total, with 391 remaining.
The document provides an update on general progress of the UTM Steam Line in Area 11 as of February 22, 2021. It includes details such as the pipe diameters, material types, and number of elbows, tees, reducers, and pipes across five line items and two WLS station items. As of the date, 174 components had been installed out of 565 total, with 391 remaining.
Elbow 113 1 Line no. 1 20" dan 24" Tee 9 Reducer 11 Elbow 84 2 Line no. 2 20", 24" dan 30" Tee 7 Reducer 11 Elbow 119 3 Line no. 3 20", 24" dan 30" Tee 31 Reducer 36 Elbow 24" 25 4 WLS Station 24" Ecc. Red. 24" x 20" 19 Total 465 5 WLS Station 48" Pipa 48" 126 spot am Line Area 11 dan Area 12 - Februari 2021 )
Ersatzteilliste Typ 41-23 Spare Parts List Type 41-23 Pièces de Rechange Type 41-23 Lista Dei Pezzi Di Ricambio Tipo 41-23 Lista de Repuestos Tipo 41-23