We further highlight here that we specialize in designing and specifying state-of-theart HVAC systems like VAV (Variable Air Volume), VWV (Variable Water Volume) & associated BMS (Building Management System) based control systems. Designs including VAV terminals, variable speed drives for AHUs, DDC based control logic can be offered for control of indoor conditions and free cooling. Also, Integrated Building Management system, encompassing HVAC, Fire Alarm, Access Control & Security systems can be designed and configured to suit the needs. BMS is a Utility with which all the aforesaid services can be centrally Controlled and Monitored. The system is Microprocessor based and can be even designed to control Lighting inside the premises, in order to achieve energy conservation. Further, by introducing the Energy Management System in the BMS, effective power savings can be implemented for the controlled Utilities. All our designs for HVAC Heat loads, ducting etc. are carried using computer software and the drawings are prepared in AutoCAD. The computer software is developed by us, in-house, and is also marketed by us to professionals. General Scope of Service Broadly, the consultancy service offered by us shall cover: Designing of various Utilities and space planning for plant rooms in close coordination with the Architects, Laying out and finalizing the systems, and achieve the most economical and feasible layout for all the services, Preparing Tender Drawings and Specifications, Floating tenders and evaluating the offers received, Vendor rating Assisting the Owners / Architects during negotiations with the Vendors, Award of Contract, Periodic supervision of the works at site till successful completion of the project. Providing co-ordination and assistance to the Owners during post commissioning Warranty period and maintenance of the systems. SECTION 3 CONSTRUCTION PRACTICES 6 CONSTRUCTION CONTROL AND PRACTICES . 19 7 TEMPORARY WORKS . 21 8 STORAGE, STACKING AND HANDLING PRACTICES . 23 SECTION 4 SAFETY IN CONSTRUCTION 9 SAFETY IN CONSTRUCTION OF ELEMENTS OF A BUILDING . 34 10 SAFETY IN DEMOLITION OF BUILDINGS . 52 SECTION 5 REPAIRS, RETROFITTING AND STRENGTHENING OF BUILDINGS 11 MAINTENANCE MANAGEMENT . 57 12 PREVENTION OF CRACKS . 57 13 REPAIRS AND SEISMIC STRENGTHENING OF BUILDINGS . 58 SECTION 6 HABITAT AND WELFARE REQUIREMENTS FOR WORKERS 14 HABITAT AND OTHER WELFARE REQUIREMENTS FOR CONSTRUCTION . 59 WORKERS ANNEX A CHECK LIST FOR STACKING AND STORAGE OF MATERIALS . 63 LIST OF STANDARDS . 64 Supplied by Book Supply Bureau Under the License from BIS for LARSEN AND TOUBRO CONSTRUCTION - MANAPAKKAM, CHENNAI ON 17-03-2017 09:00:59 (123.63.24.35) valid upto31-12-2017 Book Supply Bureau Under the License from BIS for LARSEN AND TOUBRO CONSTRUCTION - MANAPAKKAM, CHENNAI ON 17-03-2017 09:00:59 (123.63.24.35) valid upto31- PART 7 CONSTURCTION MANAGEMENT, PRACTICES AND SAFETY 3 National Building Code Sectional Committee, CED 46 FOREWORD This Code (Part 7) covers construction project management; construction planning, site management and building construction practices; storage, stacking and handling of materials; and safety of personnel during construction operations for all elements of a building and demolition of buildings; and habitat and welfare requirements for workers. It also covers guidelines relating to repairs, retrofitting and strengthening of buildings. The principles enunciated in the various sections of this Part are to be ultimately utilized and implemented in the physical construction of the buildings with the required infrastructure. This would require sound construction practices and efficient management thereof in order to ensure that the implementation of the project is carried out within the estimated cost and planned period to the required quality standards and in a safe and sustainable manner. Workers in large number, both skilled and unskilled, are engaged in the innumerable construction works. Due to increased tempo of such a building activity and large scale mechanization, hazards of accidents could increase considerably. It is, therefore, imperative that adequate safety rules are laid down for every phase of construction work. It is also important to give due cognizance to habitat and welfare requirements of workers at construction site. This Part also deals with these aspects. Planning the various construction operations before hand and making adequate arrangements for procurement and storage of materials, and the machinery to get work done is as important as carrying out these construction operations in accordance with good practice. Lack of planning or defective planning may result in avoidable delay in the completion of work and consequently increased hazards from the point of view of fire, health and structural soundness. This Part covers provisions in this regard. A construction project is an endeavour undertaken by a project team on behalf of owner/client to create a built facility suited to the defined functional objectives. From inception to commissioning, the project goes through various distinct stages leading to progressive achievement of project objectives. Each stage involves specific inputs, processes (both technical and managerial) and deliverables. Typically, the life cycle of a project from commencement to completion involves the following stages: a) Project formulation and appraisal . Inception, feasibility and strategic planning; b) Project development . Project brief development, planning and design, finalization of proposals, procurement strategy, construction documentation including tender drawings, working drawings, specifications, cost estimates, bills of quantities, procurement documents; c) Planning for construction . Sequencing of project components, planning tools, resource planning and time cost trade off; d) Tender action . Open competitive bidding/pre-qualification of agencies, issue of tender documents, evaluation of bids, negotiation if required and award of work; e) Construction . Execution, monitoring, control, work acceptance; and f) Commissioning and handing over . Contractual closeout, financial closeout, defect liability commencement, facility handing over. The distinct features of a construction project include the temporary nature of the organizations involved, the evolutionary process of project deliverables during project development stages and the unique output of the built facility. As a result of these features, unless there is efficient and effective project management, a construction project is faced with challenges of uncertainties leading to time over-runs, cost over-runs, changes in project parameters, loss of quality and inability to meet the functional objectives. While technical soundness of a proposal is an important aspect of a construction project, the management aspects, which involve techno-legal, financial and other issues, have also a significant role in the success of a project. Therefore, management functions and technical processes in a construction project need to be integrated towards achieving project objectives. Top management commitment plays an important role in harmoniously achieving these project objectives. In some of the public sector projects, it may be necessary to share relevant information with public at large through appropriate