Professional Documents
Culture Documents
MINING
CHEMICALS
MINE DESIGN
SOFTWARE
POTASH
EXTRACTION
Booth 2839
Solid filtration
Metso ensures maximum volume reduction
Metso filtration systems are specially designed and built for maximum volume reduction in tough minerals dewatering
applications. Our VPA filters provide exceptional air flow rates that result in higher capacities, lower cake moisture and
an extended application range. Their simple design, high capacity and fully automatic control system ensure easier
maintenance and parts replacement, while lowering dewatering costs.
With the added options of tube presses and vacuum filters, Metso can meet all of your filtration needs efficiently,
economically and responsibly. You can rely on Metso’s equipment and reputation. They’re both rock solid.
26 SX-EW TECHNOLOGY
New ideas, chemicals and technologies in the
heap leaching world, John Chadwick takes a
look.
34 MINING SOFTWARE
Reviewing mining software developments in
26 mine design, scheduling and management, Paul
Moore highlights the importance of functionality
across the board, and some exciting
34 developments in the area of 3D visualisation.
48 MINING CHEMICALS
John Chadwick looks at new products and trends
in a sector of growing importance, the global
market for which is projected to surpass $25.7
billion by 2017
58 POTASH EXTRACTION
Paul Moore looks at the ongoing hive of activity
in the potash market, from both majors and
juniors, that is proving highly prospective for the
key shaft sinking groups, EPCMs and continuous
58 mining machine manufacturers.
www.im
-minin
g.com
Informe
d and
in-dept
area with no power infrastructure, the Aggreko solution was an excellent match for
Banro’s power requirements at Twangiza
www.aggreko-always-on.com
AROUND THE WORLD 3 The Leader 4 World Prospects 64 Forthcoming events IBC Classifieds
There are all kinds of economic indicators you can talk about. In this business, the
only one that matters is a steady flow of coal coming out of the ground. That’s what
it’s all about. That’s what we’re all about. The idea is to build products better.
And back them better. That means genuine Weir® Minerals replacement parts. And Excellent
real, live Weir® Minerals engineering support, when and where you need it, anywhere Mining
there’s coal in the ground. What goes down when a pump or valve goes down? Pro- Solutions
ductivity. Which is why we put everything we’ve got into keeping you working. And
in the black.
STRONGER
THIS WAY! booth C-7309 Central Hall
applied, hydraulically released VKSD type disc In a more demanding installation in the US, deceleration control. LC power packs provide a
brakes are used, acting on 25.4 mm thick discs, VKSD disc brakes are used to provide 295,000 range of standalone units with options for soft
1,067 mm in diameter, to provide 104,000 Nm of Nm of braking torque on an overland coal braking, a range of operating and motor
braking torque. The VKSD is part of Twiflex’s conveyor for Bowie Resources, Colorado. The voltages, and various add-on accessories
modular series and is a standard two-module conveyor carries a 1,500 t/h along an 840-m including a terminal box.
design, with the brake provided as standard conveyor with a 13.25° decline. The two VKSD On an installation for Cripple Creek and Victor
with two pre-fitted brake pads. The brakes were brakes act on 38 mm thick discs of 1,422 mm Gold, Colorado, requiring 47,450 Nm of braking
supplied complete with an electro-hydraulic diameter. torque, Twiflex recommended a GMRSH type
power pack with provision for variable At an installation for Mulzer Crushed Stone, disc brake acting on a 25.4 mm thick 72 mm
deceleration control. Indiana, an overland conveyor carries 1,100 t/h diameter disc. These brakes were supplied with
Bucim mine, Macedonia has an example of a over 87 m at a 5° incline. Here Twiflex a Twiflex MP electro-hydraulic power pack with
longer conveyor that runs to 2,696 m long, recommended the MXSH series disc brakes, provision for fast approach and deceleration
carrying some 5,180 t/h. Here two VKSD disc which feature a patented, compliant link control. MP series power packs have been
brakes act on 38 mm thick discs of 1,220 mm mechanism to ensure uniform pad wear. The two designed to provide an advanced and flexible
diameter, providing 60,300 Nm of braking brakes act on 38 mm thick discs of 610 mm means of brake control and to operate under the
torque. The brakes were supplied complete with diameter, providing 5,965 Nm of braking torque. most arduous conditions where the environment
an electro-hydraulic power pack with the The supplied LC electro-hydraulic power pack is extreme but reliable operation all year round
provision for soft braking. offered provision for fast approach and variable is paramount. www.twiflex.com
B i n a t i o n a l Pa s c u a L a m a t a k i n g s h a p e
arrick Gold’s Pascua-Lama will be one of the highest altitude mines in temperature through the year is 0°C. Operating in these conditions is not
B the world, at between 3,800 and 5,200 m above sea level. The average new to Barrick. Its Veladero mine, located 10 km away in Argentina, opened
in 2005.
Each year it is expected to produce 800,000 - 850,000 oz
of gold, and about 35 Moz of silver, in its first full five years
of operation at negative cash costs of $225-275/oz. For
every $1/oz increase in the silver price, total cash costs are
expected to decrease by about $35/oz over this period.
It has proven and probable reserves of 17.9 Moz of gold
and 676 Moz of silver contained within reported gold
resources, as of December 31, 2011.
The Chilean side of the mine (lower half of the overview
image), will use conventional surface mining methods,
including drilling, blasting and hauling by truck to an
adjacent crushing facility. Ore will be transported
underground by conveyor through a 4 km tunnel to the
process plant facility, on the Argentine side of the mine.
Looking down on the project site, the platform for the
primary crusher is seen on the right. The portal of the tunnel
that will take ore for processing on the Argentine side can
be seen on the left.
The other picture shows a Komatsu haul truck draped in
the flags of Argentina and Chile rolling out of the open pit
staging area as employees look on. Pascua-Lama will be an
open pit operation producing both refractory and
non-refractory ore. The mining fleet will include 30 large
haul trucks like this, five shovels and three loaders.
We’re not known for dabbling in make-believe. In fact, few things are more real than the benefits that
come with our new T-thread. Especially when you consider that large rods require a robust thread system.
The new T-WiZ drill string looks a lot like its predecessor, but that’s where the similarities end. We’re not
about to reveal all our tricks, but you’ll be amazed to know that T-WiZ offers up to 30% longer service life.
Which means fewer rod changes and more productivity per shift.
So test the combination of T-WiZ Speedrods with T-WiZ shank adapters – the benefits are spectacular.
he company’s two large underground mines employ a slusher drift block caving Kimberley underground mines
ENERGY
E N E R G Y DISTRIBUTION
DISTRIBUTION
AUTOMATION
A U T O M AT I O N
COMMUNICATION
C O M M U N I C AT I O N
TTRANSPORTATION
R A N S P O R TAT I O N
becker.
b e c k e r. keeping
k e e p i n g your
y o u r lifeline
l i f e l i n e flowing.
flowing.
TThe
he n
new
ew B
Becker
ecker M
Mining
ining S
Systems
ystems B
Belt
elt R
Rip
ip D
Detection
etection S
System
ystem B
BRS
RS 2 h
has
as b
been
een d
developed
eveloped tto
o h
help
elp iincrease
ncrease tthe
he
productivity off cconveyor
productivity o belts
onveyor b byy d
elts b detecting belt
etecting b elt rrips ass ssoon
ips a and
oon a ass rreliable
nd a eliable aass p
possible.
ossible. TTo
ommonitor
onitor ssteel
teel ccable
able aand
nd
fibre belts,
fibre b elts, iinductive
nductive lloops need
oops n eed tto
obbe
eeembedded
mbedded iin
n tthe belt.
he b Once
elt. O nce iinstalled,
nstalled, tthe
he B
BRS
RS 2 w
will
ill ddetect
etect tthe
he lloops
oops oon
n
the
the cconveyor, define
onveyor, d and
efine a number
nd n umber tthe
he lloops and
oops a nd ccreate
reate iits own
ts o wn iimage off tthe
mage o belt
he b elt aand
nd iits
ts lloops
oops iin
n rreal
eal ttime.
ime. TThe BRS
he B RS 2
using
using iits
ts rreal
eal ttime
ime lloop diagnostics,
oop d iagnostics, ccontinuously monitors
ontinuously m onitors tthe belt’s
he b health
elt’s h ealth aand
nd iin
n tthe
he eevent
vent ooff a rrip,
ip, sstops
tops tthe
he bbelt
elt
and
a nd rreduces any
educes a ny ffurther damage
urther d and
amage a downtime.
nd d Access
owntime. A and
ccess a nd tthe monitoring
he m off tthe
onitoring o he ssystem
ystem iiss ssimple,
imple, eeither
ither llocally
ocally
with
with iits 12”TFT
ts 1 2”TF T sscreen,
creen, 5 sshortcut buttons,
hortcut b mouse
uttons, m pad
ouse p and
ad a nd vvirtual
irtual kkeypad orr rremotely
eypad o emotely vvia
ia TTCP/IP
CP/IP oorr M
Modbus. An
odbus. A n IIS
S
version off tthe
version o BRS
he B RS iiss a
also
lso a
available.
vailable.
Fo r m
For ore iinformation
more nformation p lease ccontact
please ontact BRS2@de.becker-mining.com
BRS2@de.becker-mining.com o
orr ggo
o tto
o www.becker-mining.com
www.becker-mining.com
GREAT MINES
REDEFININGECCENTRIC
The Niagara is the definitive scalping screen; it’s classic, but far from
ordinary. The single eccentric shaft guarantees constant circular motion
and consistent G-force, even under extreme conditions.
DSI has
the most
extensive
product range
available on
the market.
Innovative Solutions
DYWI® Polymer Rock Dust System
Easy to batch and spray
Quick troubleshooting
One stop shop service
Operating at low pressures
No production interruption
Cost effective and easy operation
Quick - Safe - Reliable www.dsiunderground.com
North America, USA South America, Chile EMEA, Austria APAC (ASEAN), Australia
www.dsiunderground.com www.dsi-chile.com www.alwag.com www.dsiminingproducts.com/au
Karelian
gold
ndomines’ Pampalo gold mine is currently Like so many of the mines coming on stream Mucking by remote control.
EVG1127e
P
ohjois-Karjalan aikuisopisto (www.pkky.fi North Karelia Municipal Education and Training
Consortium) is the organisation whose main function is to provide qualified vocational education
in the county of North Karelia. Each year some 1,600 students, both young people and adults,
obtain a vocational qualification at its institutes. It is owned by all 14 of the county's municipalities.
One of its strengths lies in effective cooperation; intercommunication between the College, the
Adult Education Centre and the Upper Secondary Schools in the region as well as the North Karelia
Polytechnic and, in the case of mining at Outokumpu, close ties with the industry itself. National
indicators show that it is among the elite of Finnish education providers.
There are 20 educators specialising in training mining technologies attached to the Outokumpu
college. The primary mining courses cover explosives and blasting, mining technology, mine
development and mineral processing. The college also co-operates with GTK, the Geological Survey
of Finland, for rock sampling education and training.
The standard courses in after-training, retraining adults to work in mining, cover underground or
surface mining and mineral processing and most of the work is tailored to specific client mining
company needs. Maintaining and improving adult learning skills, it takes one year to qualify – half
the time being spent on theory and half practical.
In addition to the three machines at Pampalo, the college has two other Sandvik drill rigs – a DX 780 and
a CHA 560 – and two small Commando rigs. There is also a surface drill
Line of gold on one of the Deister shaking
simulator – a Sandvik DP1500i. tables
The institute intends also to buy an LHD, an emulsion charger,
Endomines is the leading partner in the
haul trucks and an underground drill simulator. The aim is always to
TEKES Green Mining Project, “Responsible
have new equipment on which operators can train, so each unit in
Gold” together with JOSEK, Outotec and GAIA-
the fleet will be replaced within five years.
consulting. Stage 1 is evaluating possibilities to
The most important types of education are vocational education
produce “traceable, responsible gold” using
and training (upper secondary level), adult education, vocational
Endomines gold as a raw material and was to be
further and supplementary education and training, labour policy
completed by August 2012. Stage 2 will develop
education, apprenticeship training, common non-vocational
a prefeasibility study and investor plan, with the
education, and summer university teaching.
final investment plan established in Stage 3.
Adding to FLSmidth’s
FLSmidth’s services
es and offerings,
service offerings, Ludowici technologies allow
ow FLSmidth to provide
allo provide
complete minerals processing
processin ng and preparation
preparation plants from
from start to finish;
finish; including engineering,
process
testing, process equipment, material handling solutions, and more.
more. With
With the combined strength
strength of
Ludowici, FLSmidth now trutruly
uly becomes your One Source
Source for minerals processing
p ocessing and material handling
pr
equipment and services.
For mor
more
e information, ca
call
ll 1800 800 827 (Australia only) or visitt us at www
www.flsmidth.com
.flsmidth.com
Along the Gold Line main target in 2012, along with Rämepuro
Ekberg points to the similarities and the drilling, where pilot plant process testing is
analogous Archaen geology in Ilomantsi (no underway. The total 2012 drilling target is 8,000
gold mines in production in 2009) and the to 10,000 m.
Southern Cross greenstone belt in Australia. The A combination of Endomines clean credentials
latter had four mines in production in 2009, and and the otherwise generally poor employment
more than 40 had been closed over the time the opportunities in North Karelia mean the
belt has been producing: company is welcomed wherever it goes.
40 km of gold mineralisation with excellent Rämepuro 134 000 3,9 16 802 523 Probable MAPTEK
potential in Archean rocks. Endomines holds Muurinsuo 67 000 3,0 6 462 201 Probable MAPTEK
Grand total 1 628 000 3,5 183 616 5 711
400 km2 in claims and reservations, including
23 known gold showings. It has been granted
two mining concessions to date and five more Mineral Resources – Karelian Gold Line 31st Dec 2011
Grade
are under application. An EIA (Environmental Deposit Tonnes Oz kg Classification Consultant
Au g/t
Impact Assessment) for the entire area is Pampalo 130 000 3,5 14 629 455 Inferred Outotec Oyj
ongoing. A total of 65 new claim applications Pampalo East 21 000 1,5 1 013 32 Inferred Runge Limited
Hosko 547 000 1,8 31 656 985 Inferred Runge Limited
have been lodged and exploration is ongoing at Rämepuro 61 000 4,1 8 041 250 Inferred Runge Limited
a good pace. Muurinsuo 786 000 1,5 37 906 1 179 Inferred Runge Limited
Kuivisto East 37 000 3,2 3 807 118 Indicated
Pampalo underground diamond drilling Kuivisto East 145 000 1,0 4 662 145 Inferred
commenced early this year and surface diamond Kuittila 275 000 2,6 22 988 715 Inferred GSF, historical
Grand total 2 002 000 1,9 124 700 3 879
drilling there began in May. Korvilansuo is the
he Hermsdorf mine is one of two mines Proterzoic metagranitoids as well as Cambrian features. In the former about 30-40 m thick reef
Older drill rig used passing the material back into the ore car
at Geomin until the behind it. Czech-made and Flotman drills were
1980s
used. At that time a shaft was used to take
material out; and the five production levels were
connected by shafts as well as steep ramps
equipped with winches.
Following the modernisation programme
beginning in the early 1990s, the mining method
was changed to LHD with underground truck;
initially with two loaders (GHH LF6 and LF7) and
Paus/GHH (MK15) trucks. Whereas formerly, the
battery locos could only handle 4% grades;
underground trucks and LHDs can cope with
grades of up to 22% making it much easier to
access the best material. The increased mine
efficiency is reflected in the workforce figures
and production rates – formerly 130 employees
and production of 120 t/d; to the current rate of
320-330 t/d with only 31 employees. This huge
striking E-W. Large SW-NE trending fault zones, adjusted to the complicated geological productivity increase is largely the result of the
which are thought to be related with Upper conditions with respect to the performance switch to LHD/truck mining techniques.
Carboniferous post-kinematic volcanic activity, characteristics of the mining equipment. Heidkamp then sold the mine in 2008 to
divide the phyllites of Hermsdorf into several Due to a lack in stability, drives in the wall Schön+Hippelein Group, a large natural stone
blocks with displacements of up to 40 m. The rocks are protected by reinforced shotcrete. The quarrying group based in Satteldorf.
central part of these blocks has been underground production is based on drilling by The current fleet has five loaders and four
downthrown as a graben and covered with electro-hydraulic drilling jumbos and by trucks. Drill rigs include older Tamrock and
rhyolites, which preserved the upper Herold conventional blasting. Diesel-powered vehicles Secoma models, with the third machine a new
Formation (including the marble deposit) from transport the blasted raw material from diesel-electric Atlas Copco Boomer 281, which is
erosion. underground to the processing plant. A more the most productive in terms of advance rates. It
The white marble from Hermsdorf dominantly than 1 km long decline serves as main mine also has an enclosed air cab, which is much
consists of calcite with variable but low contents entrance and transportation route. more comfortable for the operator. It is
of quartz and phyllosilicates. The metamorphic designed with service access in mind with easy
foliation is traced by oriented crystals of quartz, Background to modern mining access points, allowing for a short turnaround.
chlorite and white mica as well as by grain size The modern era for the mine began in 1989 after The diesel-electric system also allows for fast
variations of the calcites resulting in a banded the fall of Communism in the former East relocation from face to face, which can be as
marble structure. The marble is free of bacterial Germany (GDR), when Heitkamp, a large Ruhr much as 1 km. The 281 can drill 3 m holes in
and organic components and does not contain based industrial and construction group, bought only 50 seconds, with a 43 mm diameter. Each
any graphitic inclusions. the operation. Heidkamp set about modernising face has up to 50 holes; with the hole pattern
the operation, which had used small battery determining the blast result, with the most
Mining method summary locos and ore cars. The drills and loaders were central hole containing the most charge. The
The mining activities comprise mining of also rail-mounted machines, with the loader detonator is connected to the other hole
residual marble occurrences in older parts of the
The two ball mills used
mine and the contemporaneous exploitation of to grind the marble into
unexplored parts of the deposit. The current fillers for the paint and
underground workings are developed between plastics industries
the existing mine area and the Fiscal Quarry as
well as in the north and east of the older
workings. Marble is presently mined up to 190 m
deep.
Room widths are at a maximum of 8 m and
room heights at a maximum of 9 m, with the
pillar planes a minimum of 8 m x 8 m. The
thickness of the rock between two levels is 5 to
6 m, depending on rock characteristics, and the
thickness of the hanging wall rock some 2 to 4
m. At Hermsdorf, the mine uses a modified open
stoping technology with square pillars. The
technology is independent from conventional
mine levels and fits best with the tectonically
disrupted blocks of marble. Underground
preparation, development and mining are
technology products.
The filters use two separate layers of media
for coalescing and for filtration. The upper
media layer provides for organic removal while
the second layer filters particulates in the
electrolyte.
Low electrical energy consumption is a cost-
saving benefit, as the adsorption filtration
technique uses low pumping pressures
compared to alternate solutions utilizing
flotation.
Automatic (PLC) control of the electrolyte
New ideas, chemicals and filtration and media cleaning steps at the end of
technologies in the heap leaching each filtration cycle ensures maximum filtration
time in subsequent cycles. Outotec says “DM
world, John Chadwick takes a look electrolyte filters are delivered as an automated
operational filtration system which can be fully
integrated to any SX-EW solution package.
n their paper at this year’s SME Annual recently acquired by Outotec, is well known for “Using lean electrolyte for backwashing and
SX reagents
Knight Piésold works with the world’s look to source from the larger manufactures Cytec notes that “largely unchanged over the
prominent gold producers providing design and such as Kemira who can guarantee the last 30 years, the SX process employs a very
operational assistance for tailings
consistency and compatibility of their products. small number of highly specific oxime molecules
management, water management, and heap
leach facilities. Recently, the company’s work What may be acceptable as a flocculant for a which are ideally tailored for this application. As
involved designing a combined heap leach and tailings thickening application could easily a result of this extraordinary class of
tailings facility in which the heap leach ore upset the SX circuit. extractants, copper SX is the least complex
stack provides containment for all the tailings.
“Managing the interaction between process of its kind and also the most versatile.
It has been in operation for over four years and
has met or exceeded the design criteria and flocculation and SX is the key to running a Despite this there are always many ways in
provided its owner with a unique, cost and successful operation. Having both a qualitative which to optimise an SX process, particularly
space effective solution and well as a quantitative aspect to consider using the experience and toolkit of the reagent
makes the process a lot more complex than supplier. Much value can be generated by
typical tails thickening. Initially we would look optimising parameters such as i) the reagent
The company also claims to be “to date the to control the solids in the overflow with a target formulation, ii) reagent concentration iii) the
only supplier of SX plants to use vacuum somewhere between 20 and 50 mg/l but we extract O to A ratio, iv) the stage efficiency, v)
infused, fully composite mixer settler tanks also need to minimise the residual flocculant selectivity of copper over iron, vi) entrainment of
which optimise a huge number of benefits.” It effects. This means simply adding a higher dose organic in the raffinate and rich electrolyte vii)
also says its Jet Scrubber “is a paradigm shift in as you may do with other thickeners is not an entrainment of aqueous in the loaded and
attritioning technology.” The principal of the option. Minimising the residual floc in the stripped organic as well as many other aspects.
Burgen Turbine attrition scrubber is “that we overflow is influenced heavily by having a good Many of these aspects can be optimised using
need to create more attritioning zones within addition scheme such as properly designed the reagent supplier’s modelling tools that allow
the machine, akin to a jet engine or turbine, feedwell lances and effective dilution streams. one to simulate alternative operating conditions
where multiple compression vanes in a single Design and the maintenance of the make-down and select the best operating parameters for the
vessel.” and dosing equipment used with the flocs are given PLS and circuit design.
very important as poorly dissolved material will “Over the last 15 years the market has made a
Flocculation in SX/EW track through to the overflow and eventually steady shift from aldoxime-ketoxime extractants
Mick Bower of Kemira Oil & Mining commented into the SX circuit. One common problem has to modified-aldoxime and modified-aldoxime-
that “the solids/liquids separation processes in been that a lot of operators have expanded ketoxime extractants. In 2012 modified
leach/SX/EW plants are very different from most plants, increasing the flocculant dosage but extractants will make up more than 70% of the
of mining’s typical settling applications. In the have not added sufficient extra capacity to the copper extractant market. The primary benefit of
case of leach plants the value is actually make-down system thereby shortening the the presence of a modifier is the ability to tailor
contained in the liquid rather than the solid effective residence time. extractant formulations to precise strengths to
such as a concentrate. This means that although “As the technology becomes more advanced maximise copper transfer for specific feed
the equipment used is essentially similar to that it will also become less forgiving and the level of conditions whilst improving selectivity over iron
seen elsewhere on a plant operators’ understanding of the interactions is and hydrolytic stability.
(settlers/clarifiers/filters) their operation is key. The processes are becoming more like the “Finally SX refineries are being increasingly
different. The settling of solids in low pH chemical industry than a mine and a high level built that recover more than one metal by SX
solutions is actually straightforward when using of training is required. Typical reactions such as and need to capture these multiple revenue
the correct types of flocculant, such as Kemira’s increasing reagent dosages in the event of a streams to be economical. Extraction circuits for
Superfloc N100. The most important aspect for plant upset may not have the desired effect. metals other than copper are more complicated
reagent selection in these plants is the “The trend since the early plants has been to and these operations need to be optimised for
downstream compatibility with the SX process. move away from filters over to lower cost CCD more than one metal and thus are finding even
The SX stage is very sensitive to contaminants, trains and plants are now starting to be built greater need to have expert services delivered
poor selection and application of reagents can with high compression thickeners. Clarifiers are with their multiple reagents purchased.”
lead to significant problems with crud formation becoming more common and Kemira is looking Over the last few years as copper oxide ores
and excessive phase disengagement times. at chemistries for improving this further. The have become depleted, there is increased
Control over the provenance of the reagents is difficulty being that a lot of the conventionally interest in processing sulphidic ores using
often overlooked and plant operators should used reagents are incompatible with the SX. hydrometallurgical routes. This allows mine
operation experiences and innovative solutions importantly demonstrated that the iron can be operating variables have been established.
unique to their plants. The attendees will separated from the vanadium by using SX, Work at Process Research Ortech (PRO)
present technical papers covering a variety of producing high grade Iron. commenced in the first quarter of 2012, and
topics including developments in plant design, This new processing route has now been significant progress has been achieved.
plant expansions, equipment, new leaching and proven to allow more than a single product to be Flowsheets to achieve the separation of
anode technology, organic recovery systems and generated and may therefore have a positive zirconium, niobium, uranium & thorium, and
new reagent technology. As usual a tour of a impact on the overall project economics. REE concentrate have been developed. Quest
commercial mining property will be included as However the anticipated lower capital and reports that bench scale work has confirmed
part of the conference. The extensive technical operating costs and the higher recovery of the these flowsheets to the extent that a zirconium
program provides each participant with the valuable products still need to be demonstrated hydroxide product and a REE+Y oxalate product
opportunity to learn something new that they in further test work. have been produced. Uranium and thorium have
can apply at their hydrometallurgical operation The process developed by TNG and METS also been extracted successfully from the circuit
to improve product quality, metal recovery utilises the combined process of acid leaching, with the intention of producing an
and/or lower costs and improve sustainability. SX and stripping to selectively recover the environmentally stable discharge product.
metals. METS Director and Principal Consulting Significant work has been carried out on
More SX ideas Engineer, Damian Connelly, said the niobium and titanium separation. It was
In March, TNG Ltd advised that the pilot plant development of the new process had the expected that this separation will be resolved in
test work program for its flagship Mount Peake potential to deliver a significant breakthrough in June, 2012.
iron-vanadium-titanium project in Australia’s the processing of vanadium ores globally, Extensive bench scale testing of a thermal
Northern Territory had commenced. The work subject to further test work. sulphation process has been completed at
program, which follows detailed and exhaustive In mid-May, TNG advised of an important step Hazen. In the process that has been developed,
bench scale and optimisation test work, focuses towards confirming the commercial potential of ROM material is crushed and ground, then
on the final stage of the process, which involves the TIVAN process after receiving outstanding mixed with sulphuric acid. The material is then
the production of the final marketable products analytical results from a recently completed heated and undergoes a thermal sulphation
from the Mount Peake deposit – iron, vanadium continuous-run pilot plant test work program. process where the sulphuric acid attacks the ore
and titanium. Importantly, recoveries of 80-90%, which are and forms the sulphates of the contained value
This phase of the proprietary TIVAN™ SX higher than previous results, were achieved for metals. The dry calcine proceeds to a water
process test work is a chemical phase which will vanadium pentoxide (V2O5), which was extracted leach where the values are dissolved into
run continuously during this test work at the to a purity of 99%. solution. The slurry is filtered and washed to
ALS-AMMTEC laboratory in Perth using modified The grade and purity of V205 have been produce a pregnant leach solution (PLS).
SX equipment. It will aim at achieving a determined by Inductively Coupled Plasma (ICP) Extensive testing of the thermal process has
definitive test of the commercial potential of the analysis. This is now being independently determined conditions at which the refractory
TIVAN process to produce a high-purity aqueous verified at the CSIRO in Sydney. Final grades of rare earth containing minerals can be attacked
vanadium solution leading to production of the Ti02 and Fe203 are currently being assessed without the use of caustic (sodium hydroxide) or
vanadium pentoxide of commercial grade. via additional analytical test work. extreme temperatures. Rare earth, zirconium,
The new hydrometallurgical process has been The final PFS is on track to be delivered by and niobium recoveries to solution of up to
jointly developed with TNG‟s representative the end of June 2012. If proven, TIVAN offers 96%, 93%, and 96%, respectively, have been
metallurgical consultants, Mineral Engineering competitive advantages over standard demonstrated.
Technical Services (METS). This new processing processing including lower capital and operating Bench scale SX test work to develop the
route has been successful in recovering the costs, higher recoveries and purity, and the separation processes is underway at PRO. The
three principal commodities – vanadium, ability to produce three product streams – PLS containing the zirconium, niobium, and rare
titanium and iron – from bulk samples of Mount vanadium pentoxide, titanium oxide, and ferric earth values is the starting point for SX testing.
Peake ore. TNG and METS have submitted a oxide. The bench scale testing involves selecting
joint Patent Application to protect the invention TNG believes it has the potential to be appropriate organic reagents and analysing
and allow commercialisation at a later date. approximately 40% cheaper than standard their ability to separate the value metals from
The Mount Peake deposit – which currently pyrometallurgical process costs. The contaminants and each other. All SX separations
contains a JORC Inferred Resource of 139 Mt commercialisation of the process underpins are achieved using commercially available
grading 0.29% (V2O5), titanium (TiO2), 23.7% TNG’s development proposition at Mount Peake. extractants.
iron (Fe), is amenable to processing using The technology also has the potential to be In the flowsheet that has been developed,
conventional pyrometallurgy and produces rolled out and applied to other vanadium zirconium and niobium are removed and
smelter acceptable concentrate grades. deposits globally. uranium and thorium recovered for final
However, TNG and METS believe that the Quest Rare Minerals is working on its Strange disposal. Following these initial separations,
hydrometallurgical route may provide an Lake B-Zone deposit, where significant oxalic acid is added to the main process stream
alternative route for improving project improvements in metal extraction have been to precipitate rare earths and yttrium. Over 97%
economics, being cheaper and less achieved at Hazen Research. Acid consumptions of the REE+Y values in solution are recovered to
environmentally challenging. of approximately 200 kg/t are being achieved the oxalate precipitate. This oxalate precipitate
Test work carried out by TNG/METS has now with REE (rare earth element) dissolutions in the will then be re-dissolved to produce a
shown the magnetic concentrate is amenable to 90-96% range, niobium dissolutions in the 93- concentrated solution of rare earths and yttrium,
hydrometallurgical processing, resulting in very 96% range, and zirconium dissolutions in the which will undergo further refining using SX to
high recoveries of vanadium (98%) and iron (83- 85-93% range. Considerable bench scale work achieve the individual separations.
99%) in the acid leaching. These results have has shown excellent reproducibility, and most Mini-pilot plant testing to confirm individual
product flowsheets established from bench technically ineffective options based on an SX-EW safety
scale testing is scheduled to begin in understanding of the material and its EW produces carcinogenic sulphuric acid mist
September, 2012. The results of these pilot behaviour. which raises health, safety, environmental,
programs will be used to finalise the flowsheet The material is low-grade and complex, with efficiency and operating cost issues. Oxygen
for the full scale pilot plant, which is expected to conventional leaching options not proving to be bubbles are released at the anode as metal is
be operational in Q1 2013. economic. Through thorough evaluation of the simultaneously deposited on the cathode. The
Will Goodall and J.C. Perkins of Aura Energy mineralogy and using that knowledge to direct bubbles rise from the anode through an acidic
note that “the development of complex low- and explain test work results, a previously un- electrolyte solution then burst at the surface,
grade mineral deposits is becoming an tested leaching option was examined and ejecting fine droplets of toxic mist.
increasingly important target. These deposits shown to transform the project both technically CSIRO says “a fundamental understanding
often present marginal economic opportunities, and economically. This step forward has opened of how bubble characteristics influence the
which are highly dependent on the development up a major uranium resource that had previously size and quantity of acid mist droplets is the
of low-cost and efficient processing strategies been considered uneconomic, potentially first step in reducing, and ultimately
and the utilisation of byproducts to become a transforming the approach to recovery of metals eliminating, the mist.” To facilitate this study,
viable development target. For exploration- from similar deposits. it has “built the largest transparent EW rig in
focused companies this presents a critical Examination of operations that treated the world, which is important because the
investment decision stage early in project similar material to the Black Shale at Häggån depth of the solution affects the size of the
development on whether to pursue potentially identified Talvivaara’s polymetallic operation in bubbles that form.
expensive resource definition or look for other Finland (IM, November 2008, pp8-16). This “Data gathered from the study can be further
targets. project effectively utilises a bacterial heap used to develop a computational fluid dynamic
“The Häggån project, Sweden has presented leaching process to recover Ni, Cu and Zn from model to simulate mist generation and
a target requiring careful technical evaluation material similar to the Häggån material but dispersion in operations.” IM
through the early development stages. The with pyrrhotite as the dominant sulphide
project represents a low-grade complex uranium mineral, rather than pyrite. Successful
resource, with significant vanadium, implementation at Talvivaara, demonstrated
molybdenum, nickel and zinc credits.” A process that bacterial leaching could be a technically
of mineralogical characterisation and multi- and commercially viable option. All the References
directional scoping metallurgical test work has preliminary indicators examined to date have 1. Dhawan N. et al, Insights into heap leach technology.
been undertaken. “Implementation of this shown that the material is ideally suited to SME Annual Meeting, February 2012, Seattle.
process has allowed the development of bacterial heap leaching, with good 2. Goodall, W.R. and Perkins J.C., Early stage
conceptual flowsheets targeted at efficient permeability and an accessible source of metallurgical evaluation of a complex low-grade
recovery of value metals and the rejection of pyrite for bacterial growth. uranium project, ALTA 2012, Perth, Australia.
L
insight into the mine plan
acquisition activity in the past few years, Gemcom Software International recently
functionality is the name of the game in released GEMS 6.4, the latest version of its viewers, we can be sure that everyone can be
mining software, whether that be in orebody collaborative geology and mine planning accessing the most current data and models,”
modelling, mine design, mine planning, mine software. With a focus on data management, said Paul Jensen, Senior Geologist at the
operations scheduling or mine asset GEMS is used to quantify, model, plan, and company. “For over seven years I have enjoyed
management. Key areas in mine software schedule the extraction of mineral deposits. It the ability to customise and access GEMS data
delivery and market success today include also highlights the importance of interfacing from the Access or SQL back-ends; this
advanced 3D visualisation, large dataset between different software systems. framework makes the data much more usable
handling, real-time updating of models, the The most significant feature of GEMS 6.4 is than other formats.”
ability to interface with other datasets and its powerful new patent-pending block model In addition to the block model conversion
systems, and the global/corporate level conversion engine, which according to Gemcom engine, GEMS 6.4 provides enhancements to
managing of models and data, including across is a “world first” and the only one of its kind in existing features requested by its users. To
multiple operations. The market is moving away existence. The engine brings a new level of data further increase productivity, GEMS includes
from single mines having a myriad of different sharing flexibility to the industry by providing enhanced block modelling capabilities;
mining software packages to a more streamlined direct conversion between different block model increased line, surface, and solid import and
approach across entire organisations. formats, delivering better collaboration and export options; and two point transformation
Better visualisation helps geologists, mining improved data integrity as well as time savings. profiles to transform solids and surfaces.
engineers and surveyors to better understand Justin Meade, technical product manager for In more detail, highlights include an
their data for analysis and interpretation. This GEMS comments: “With many mining “interpolate and report” feature, which allows
flows through to the planning and design organisations facing staff shortages, it is users to work with larger datasets and use more
stages. Putting data in the context of becoming increasingly common for collaboration than 100 interpolation profiles. Geospatial
surrounding structures also opens up the design to occur between site users and outside parties filtering is also now possible through the use of
process to a wider audience and allows rapid who may be using different software products. clipping boundaries when importing points and
communication of mine plans to all Thanks to the new block model conversion lines. The packages includes enhanced
stakeholders. engine, it is possible for a user to work in one importing support for Optech 3D rings (.xyz
Mining operations support many complex software package on a task such as resource files), and Leapfrog mesh files; while ESRI
processes and often software solutions from estimation and deliver the block model in the shapefiles can now be imported as points,
one supplier do not occupy all the applications format of another software package, while also polylines, or polygons. A new two point
or processes in the mining value chain. Legacy ensuring data integrity between the two. With transformation profile can also be used to
systems regularly mean that some processes the engine, users will also benefit by being able transform the coordinates of solids and surfaces
cannot talk to each other at a site. As an to efficiently operate between multiple block from one system to another. Finally, improved
example of countering this issue, a key part of model types for evaluation and processing sorting capabilities in GEMS’ production
the mining software market is offering specialist within GEMS.” scheduler allows for more efficient scheduling.
services to integrate existing applications and “At Midas Gold we have developed a In response to the increasing remoteness of
build applications to foster streamlined continuous stream for our data – from the mine locations, Gemcom has developed
workflows, including built in import/export versatile GEMS Logger digital logging software Gemcom Hub, a secure remote collaboration
protocols built in for transferring data to other to Gemcom GEMS geological modelling, and solution which enables mining professionals to
systems. then to Whittle. With several GEMS licenses and work with and more easily share data regardless
of where they are located. It does this by kind in existence. The block model conversion Gemcom Surpac 6.3. A key feature of this
overcoming the challenges posed by poor engine brings a new level of data sharing version is its innovative new solids repair
quality, intermittent network connections with flexibility to the industry by providing direct functionality, which reduces manual solids
patent-pending technology that detects and conversion between different block model validation time. New auto correction repairs
transmits only the particular elements of the file formats, delivering better collaboration and invalid solids, while manual repair allows for a
that changed. Whereas traditional transfer improved data integrity while saving users a detailed examination of each problem area
methods require an entire file to be transferred, great deal of time.” within spatial context.
perhaps a block model that is gigabytes in size, What makes the block model converter A major focus for CAE Mining over the past
Hub does not, sending the data which has unique, says Gemcom, is its ability to open and year has been the development of CAE Studio
changed, which can be only kilobytes instead. work with one type of block model and then 5D Planner. Based on the premise of Mine2-4D
This means that the frustrations and often save it out to a model type from an unrelated version 12 coupled with the mining production
impossibilities of sending data from remote product. The block model converter understands focus of EPS, Studio 5D planner is a tightly
sites to head offices are overcome. all types of block models at once; including sub- integrated solution. Whilst maintaining the
Different software systems supporting blocked, superblocked and free block models, popular design and functionality, the company
geology and mine planning processes are often and converts them internally into a regular says it has made vast enhancements in the
used in conjunction with one another. This may model before bringing them into GEMS. areas of usability, interface and data
occur due to user training on specific software, The block model converter application can management with the release of CAE Studio 5D
history of individual departments using a also convert a block model to any supported Planner. The new package has been available
particular software application, or because the format; for example, a sub-blocked model can since January 2012.
site works with external consultants who may be converted into a regular model of any Some of the most significant enhancements
employ a variety of different packages. For dimension using the optional reblocking are the result of upgrading the platform from
example, it is not uncommon to find some capability before it is brought into GEMS. Studio 2 to Studio 3. In the geological modelling
systems used in planning and different ones in Reblocking is a process that allows the user to world, the transition from Studio 2 to Studio 3
geology. Jose Santos, Product Line Manager for redefine the structure of an existing block represents a major step forward in the
Gemcom GEMS and Gemcom Surpac comments: model, typically by changing the size of the progression of Datamine Studio. The company
“To address this, Gemcom has developed a blocks in the model. Reblocking is often states that the jump to CAE Studio 5D Planner
patent-pending block model conversion engine, performed to reduce the amount of data in an will be the equivalent of that for the
now available with the latest version of its existing block model by increasing the size of underground mine planning and scheduling
collaborative geology and mine planning the blocks, or to change the structure of the world. CAE Studio 5D Planner makes use of
solution, the recently released Gemcom GEMS block model for operational purposes. several Studio 3 enhancements, including the
6.4. This is a world first and the only one of its Another recent Gemcom software release is advanced 3D visualisation provided by the VR
Vulcan 64-bit from Maptek combines the Short Term Planner tool has been improved to
advantages of a superior 3D modelling allow mine engineers to analyse more options.
environment with the power of modern
Mill constraints can be incorporated into the
64-bit technology
automated scheduling plan, with improved
stockpiling usage. Vulcan’s Short Term Planner
works directly from the block model allowing for
better utilisation of the resource model.
Vulcan users already have the innovative
HARP methodology which produces more
accurate stratigraphic models. A Run of Mine
(ROM) version introduced in the latest version,
Vulcan 8.1.4, allows users to incorporate
operational parameters in the geological block
model. This way the mine model can take full
advantage of the stratigraphic block models.
window, an enhanced user interface and a A standalone version running on CAE Mining’s Solid modelling from polygons is now faster
completely revamped, object-oriented data InTouch visualiser will also be available and will using a new combination of Vulcan’s powerful
management system. Users will no longer be provide sequence animation viewer capabilities block models and improved surface extraction
required to use filters to separate different through the free InTouchGo viewer. tools. Models with geology attributes are built
design type strings since they will be loaded as Another notable change is that the Design in a fraction of the time compared with
separate objects. Manager is being replaced by the Project traditional solid building and the results are
Studio 5D Planner includes a new Control Manager, which uses CAE Mining’s MineTrust already stored in the block model.
Panel with smart workflow, where the vertical functionality. This provides a CAE Studio 5D Vulcan 64-bit also makes it possible to work
control panel has been completely redesigned Planner specific view of Projects, delivering all with large datasets, such as larger dynamic
with a clearer, cleaner interface. The new panel of the file management functions of Design block models or triangulations. The 64-bit
facilitates a ‘smart workflow’ concept that shows Manager as well as a number of others, program is the first step toward providing
users what functions are expected at which including a “3D thumbnail” view of files within customers with large data set support, with
point in the process, removing any reliance on the current project. It also allows for enhanced plans to provide enhancements to
warning messages to inform users that they’ve data security and integrity “far beyond what was triangulations, grids and design data which will
forgotten to do something. Commands are also provided by the Mine2-4D version 12 Userlist”, allow customers to support even larger data
now organised into more intuitive groupings. If including making use of Windows account sets for those types. Future priorities include
there is any uncertainty, an in-panel context credentials to control access permissions. estimation, block manipulation, block model
help displays a message for any item selected in Project Manager is also designed to be scalable: display and simulation. Leveraging multiple
the Control Panel system. although users can easily use the features of the cores on hardware and graphics processing
The Project Setup panel has been greatly Project Manager on their own computer units on modern graphics cards are other Vulcan
simplified and reorganised. For example, EPS immediately, the full MineTrust client developments that are underway.
project configuration options, which are now application is available for those who wish to Resource models must be constantly updated
handled by a new, enhanced, EPS Template make use of the additional database as new information becomes available during
process, are no longer duplicated. As a result management facilities, such as to create mining. These models can be very complex and
the Project Setup panel is now laid out in a multiple, local databases or to perform a quite time consuming to develop. Vulcan
clean and intuitive manner, which CAE argues is database-wide spatial search; or multi-user automatically updates just that portion of the
less imposing to new users. sites can make use of the enterprise user and model that has new data, and carries the
Automatic and manual dependency generation data management features of MineTrust Server. changes through all related levels with a
and editing is now housed within a single Maptek released Vulcan 64-bit to global repeatable, auditable process was first released
Dependency Editor dialog. New features include mining customers in April 2012. Vulcan 64-bit in 2001. Now that Maptek also manufactures
enhanced virtual reality (VR) sequence animation combines the advantages of a superior 3D scanning hardware, the company has added
playback and improved dependency layer control. modelling environment with the power of more power and useful tools to the software as
In addition, the sequence export process in modern 64-bit technology to make it possible to part of the integration development. The
CAE Studio 5D Planner has been modified and work with larger datasets, such as larger company told IM; “In the ten years since its
now accepts EPS Template (.ewst) files and dynamic block models or triangulations. The 64- release, I-Site Studio has evolved from a
preserves all template settings, including bit support covers the entire software offering, powerful cruncher of massive point cloud
number formats and global constants. allowing all Vulcan users access to the platform. datasets to a feature-laden product containing
Three-dimensional visualisation of the EPS The company told IM: “Benchmarking open pit model update, contour and label
schedule has now been integrated into CAE conducted in-house shows massive step-wise elevations, automatic toe and crest detection,
Studio 5D Planner itself, making use of the improvements in loading large data sets and measuring volume displacement tools that
powerful VR window. Creating a synchronised, compared to 32-bit. Vulcan 64-bit will use all surveyors use every day.”
real-time link between the EPS Gantt chart and available RAM on a system when needed. The latest release of I-Site Studio 3.5 in
the 3D mine model, users are able to produce Customers on current maintenance receive this August 2011 included the launch of a dedicated
schedule-driven animations, create new Vulcan 64-bit as part of the standard Maptek geotechnical module, with extensive tools for
dependencies and use the EPS task filtering upgrade and enhancement program.” easily monitoring changes in surfaces such as
functions to instantly visualise a subset of data. In the open pit mine planning area, the Vulcan walls, batters and faces. Stereonet plots allow
users to plot slope and slope limited by the computing power you
direction onto a two-dimensional give it. Our largest clients are
graph, helping to identify handling models that exceeded 60
discontinuity sets and analyse the million sub-blocks. XPAC can
stability of rock slopes. Contours complete detailed scheduling
can be added for pinpointing data scenarios on typical models with
of interest. Rose diagrams reveal datasets of 100,000 individual
the frequency of data versus the records, not aggregated benches,
direction of the data for identifying within minutes. XPAC can also
directional trends. Colouring automate dump scheduling as well.
surfaces by the dip or strike values Including an extra 50,000 dump
of the individual facets helps to records to take the total to 150,000
highlight discontinuities and planar areas, Runge’s Haulnet product adds to the picture records in a typical dataset makes little
making it easy to see fractures. when used with XPAC, one operation is difference to the processing time.”
successfully scheduling up to 1,400 km of
Overlapping surfaces that have been scanned underground roadways using Haulnet XPAC integration allows for the update of
at different times can be compared to reveal scheduling models as new geological data
extent and rate of movement, for example to The powerful 3D visualisation capability of becomes available. XPAC propagates updates
identify a slow moving failure in an open pit Maptek’s alpha-stage Eureka exploration across all scheduling horizons, given users
mine. Surfaces can be coloured based on software “provides the essential link for greater control of the future scheduling
changes from a previous surface and data can geologists to apply their specialist knowledge to scenarios, based on current knowledge. Runge
be exported to measure distances from previous come to better understand a deposit” according scheduling software also integrates with most
and base surface measurements. to the group. It brings together large geospatial modern mining systems and is being used with
I-Site Studio 3.5 includes general datasets for viewing, as well as modelling and just about every geological modelling and mine
enhancements in performance and usability. analysis. Viewing the data in the same context design tool available, says the group. XPAC and
Filtering can now be done based on point as the seismic and drilling data provides XACT allow for data compatibility with modern
selection, rather than the entire scan dataset. additional information to correlate the models financial modelling systems and automated
When used in conjunction with the new for the resource. It allows visualisation of integration with corporate enterprise solutions
freehand or polygonal lasso selection tools, it seismic sections alongside drillholes, and uses such as SAP and SharePoint. XACT also
reduces the time required to remove stray points the drillhole information to convert the seismic integrates with most fleet management
caused by dust or other transient objects. Many time data into depth. This can then be systems.
of I-Site Studio’s existing tools have been incorporated into horizon models. Mintec continues to improve its flagship
tweaked with more options for quickly Mining engineers have been using Runge’s product, MineSight 3D (MS3D). Version 7
comparing as-builts against design models to XPAC since 1980 to model reserves, generate released late last year removes the limits on
highlight variations or non-conformance. production schedules and evaluate alternative block model sizes. “Geologists and engineers
The ability to quickly create a 3D PDF, also scenarios. All Runge scheduling products use using block models to make mine plans and
delivered with the latest Vulcan release, means advanced 3D graphics rendering, combined with production schedules can now create models
that rotatable models can be shared with people detailed spatial data, to accurately represent the without constraint. They can produce a more
who don’t have specialised viewing software. I- complex shapes of the mine. Large dataset detailed block model, while maintaining the
Site Studio 3.5 users can also export to a handling is another key attribute. Alun Phillips, original block model extents. All related
Universal 3D file, meaning that the valuable Product Manager, Scheduling at Runge told IM: MineSight programs and procedures have been
information can be shared with decision makers “Where other packages place limits on your modified to work with no model limits”, says the
at all levels immediately. ability to model large projects, XPAC is only company.
GeoModeler provides true 3D volumetric speeds of loading or processing data. Micromine to specifying a radius to restrict the positioning
modelling, geostatistical analysis and 2011 has also introduced a number of CAD of pivot points in the drives, it is now possible to
interactive visualisation to help geologists design tools to further help engineering clients. specify a user-defined rig shape. This is
integrate and transform multiple data sources Tasks in a Micromine 2011 mine schedule may achieved by using the string editing tools in the
into the best ore reserve estimates. be filtered on-the-fly to exclude unnecessary application to draw the shape, saving it as a
GeoModeler’s modern and componentised detail. Real-time Reporting window allows the String file and then using it as the rig outline.
design also encourages gradual adaptation on a user to generate a report based upon the date If necessary, multiple (rather than one) user-
module-by-module basis.” GeoModeler provides range and the selected attributes. defined shape can be used to define a custom
true visual WYSIWYG 3D block modeling, Significant enhancements to the Pit rig shape; one shape for the carousel (rotatable)
geostatistical analysis and interactive Optimisation module include 64-bit support, and one or more shapes for the rig itself
visualisation to help geologists integrate and allowing it to process very large block models, (stable). This is achieved by reading the rig
transform multiple data sources into the best and reporting with ease. In particular, a new shape for all polygons in the String file. While
ore reserve estimates. Creating a block model of Input Parameters Report gathers all Pit they all become part of the rig shape, only the
grades simply involves specifying a block Optimiser settings into one place. first polygon encountered in the file can be
dimension and selecting an arbitrary mesh. Finally, an enhancement has been made for rotated - the others are static. This allows for
GeoModeler will voxelise the mesh and the setup of a user-defined drill rig restriction in the design of a more complicated rig shape,
interpolate the grades of the blocks falling into the Ring Design options form. As an alternative with as many static parts as required.
the mesh with the resulting block model will be
auto-clipped to topography.
MICROMINE’s namesake flagship software
solution Micromine, has powerful 3D design
($)$)".*!/2- .*'0/$*).
tools to create and visualise the optimum Planning, Engineering, or Automating
resource and pit design. In August 2011, the
company released the latest major update of
Micromine with Micromine 2011. The 3D
-'.*)($)$)"
Powerful Features & Ease of Use
geological modelling and mine design product
benefits from number of new features focussing With Carlson Software, you’ll have turned to Carlson
reduce idle time and increase Software Mining Modules:
on intuitive usability, enhanced and shortened I
production rates. This equals Geology
workflows and more logical processes. lowered costs & increased I Surface Mining
Combined with faster processing speeds, efficiency. Join the more than I Underground Mining
flexible import and export functions and 90% of U.S. coal mines that I Basic Mining
compatibility with third-party applications, gains
in productivity remain at the core of the offering Carlson Mining 2013 is HERE!
development, according to the company.
Significant updates include a new user
interface from Micromine 2010 incorporating Get the Tools
fresh visual themes and a simplified Contact You Need
Support function for faster access to software I Data Collection
support. Micromine 2011 is compatible with I Geological Modeling
I Production Monitoring
many new CAD/GIS vector (line work) and raster
I Fleet Management
(grid or image) file formats. This compatibility
I Drilling
makes Micromine more flexible in its ability to
I Civil Engineering
handle external data. As stated, very few I Machine Control
people work with one software application so I Underground/Surface
this is a benefit for improving workflows across Planning/Scheduling
multiple applications. Enhancing file format I Reclamation
compatibility simplifies the exchange of data
between these tools and saves time and resources.
Micromine 2011 is also now compatible with
Google KML files, allowing an interface with
Google Earth. The ever increasing quality and For more information or for
accuracy of Google Earth’s imagery makes it an a Carlson Mining expert, call or visit:
excellent data source for traditional air-photo
606-564-5028 • 800-989-5028
interpretation and Micromine can now exploit mining@carlsonsw.com
that feature. New Export formats include ESRI www.carlsonsw.com/mining Free Technical Support
By Phone, Email, and Web
Shapefile, Mapinfo Table/Interchange, AutoCAD
DXF, Microstation DGN, Google Earth (KML) and Authorized ®
®
1 2
Fig. 1 View inside a POLYCOM® high-pressure grinding roll for copper ore grinding.
Fig. 2 Copper ore grinding plant with ball mills.
The present contract is the second of ThyssenKrupp For the erection of such large ball mills we have
Polysius for this copper mine.This follow up order developed POLWELD®, an intelligent welding method
that allows welding of mill bodies directly on site.
tk Polysius AG
Graf-Galen-Str. 17 · 59269 Beckum · Germany
Tel.: +49-2525-99-0 · Fax: +49-2525-99-2100 tk Polysius
polysius@thyssenkrupp.com · www.polysius.com
MINING SOFTWARE
Visit MINExpo.com
for the latest information.
Sponsored by
National Mining Association
MINING SOFTWARE
changes, and real-world safety challenges. data streams.” Intuition Executive is part of a mine planning retain their critical place in
“Data integration and visualisation is a must growing family of Intuition solutions that solve successful execution of a mining operation, but
have for our customers today,” said Ian Brown, key industry needs such as operations to deliver the increased coordination and
Vice President & General Manager, Advanced monitoring, alarm management, asset automation the industry is demanding these
Solutions, Honeywell Process Solutions. “The management, remote operation centres, and processes must be much better integrated into
ability to see, understand and act on the business process optimisation. Powered by the operation as a whole.” MineScape, ABB
relationships within critical data is key to Matrikon, Intuition Executive is vendor neutral Ventyx’s flagship mine planning platform, has
creating competitive advantage, and this can and will connect to any control system or been progressively achieving road map
only be achieved when all applications and underlying data source. milestones for Version 5 providing
underlying data are amalgamated. Once you do ABB has advanced its position as a world- comprehensive mine planning capability on an
this, you can identify and take advantage of leading supplier of enterprise asset open architecture platform and promoting
opportunities earlier, mitigate potentially management (EAM) software, according to integration with third party solutions as well as
damaging plant events and make confident newly released findings from ARC Advisory other Ventyx solutions. Releases later this year
business decisions.” Group, a leading research and advisory firm. The will provide integration with best-of-breed 3D
Intuition Executive is developed on and results are part of ARC’s annual market and geostatistics and pit optimisation, as well as
extends the functionality of Microsoft technology analysis, titled “Enterprise Asset provide a new Software Developer’s Kit (SDK) to
technologies such as Microsoft SharePoint 2010, Management and Field Service Management further open up the platform, enabling
SQL Server and StreamInsight to meet the Worldwide Outlook.” customers, value added resellers as well as
requirements of industrial operations. According to the report, ABB is now the Ventyx, to provide deeply integrated and
“Monitoring and analysing data in motion leads second-largest supplier of EAM software streamlined solutions.
to earlier event detection and faster decision worldwide. Regionally, ABB remains the leading Ensuring sales commitments are met relies on
making. Combining business intelligence and EAM supplier in Asia and Latin America, and was good mine planning but also requires high
analytics tools with existing workflows ranked second in North America. The company quality inventory management, logistics
empowers organisations with the ability to take was also ranked the leading global EAM planning and contract management. Ventyx
immediate action and stay ahead in today’s supplier to the mining and minerals, electric MineMarket has also seen some major
highly competitive industrial marketplace,” said power generation, and electric transmission and improvements over the last 6 months, including
Caglayan Arkan, general manager, Worldwide distribution sectors. an overhaul to the 3D stockpile modelling
Manufacturing and Resources Sector, Microsoft. ABB believes that the industry is moving engine and major improvements to supply chain
“Combined with Microsoft technologies, towards dramatically increased automation and planning. Supplementing the existing general
Intuition Executive is positioned to take better coordination from the mine planning right commodity sales and marketing capability, there
advantage of computing power and complex through to delivery to the customer. The is new support for specialist metals contracts
event processing technology to analyse large company states: “Geological modelling and such as toll-treatment. Upcoming releases will
KEYNOTE SESSION:
Jeffrey Mulyono, President Director of PKN Coal Mangantar Sabungan Marpaung, Mining Strategist
and former Chairman, Indonesian Coal Mining and former Director, Indonesia Energy and
Association (ICMA) Mining Ministry
Bob McCarthy, General Manager, Snowden: Rico Neumann, Senior Mining Engineer, Takraf:
Developing a coding system to better classify fully Reviewing 20 years of IPCC system development,
mobile IPCC layouts and systems practice and study work
Christian Dirscherl, Drive Technologies Division, Ruediger Durchholz, Managing Director
Siemens and Peter Sehl, General Manager, Engineering, RWE Power International:
ThyssenKrupp Robins: Latest Developments in Determination of performance and utilisation of
Gearless Conveyor Drives IPCC systems – the key role of the conveyor
Doug Turnbull, Principal Mining Engineer, Sandvik Ian Gibbs, General Manager, RCR Mining: Mobile
Mining & Construction Materials Handling: Real mining units – innovative solutions
mine case study of a new IPCC concept
Stephen Kou, IPCC Business Development Director,
Marcilio Cenisio, Project Coordinator - Planning and FLSmidth: Innovative New Technologies for IPCC
Development Department, Vale: An application
study of IPCC technology on a developing project –
Registering
Moatize case study The rate for full attendance at the event is $1,600, which
will include the evening Welcome Reception on 24th
Lynn Peterson, Product Sales Manager, FLSmidth:
Economic evaluation of next generation IPCC October, two full days attendance at the event, as well as
systems two lunches. The easiest way to register is online at
http://corporate.im-mining.com/imevents.asp though we can
Mario Dilefeld, Chief Engineer Conveyor Systems, also accept bank transfers and other forms of payment;
Takraf: Gearless drive solutions for IPCC systems
please contact Paul Moore for more details.
I N D U S T R Y S P O N S O R S M E D I A P A R T N E R S
ADVERTISEMENT FEATURE
for its cutting-edge technology industry to take the company’s operations to the
next level.
Metal Innovations was named by a business
Metal Innovations is a highly innovative engineering and mining magazine as ‘one of Wales’ most forward-
company which designs and manufactures the unique Celtic Miner® thinking companies’. The company has a
machines which can transform the efficiency of mining and tunnelling sophisticated in-house design studio and
operations, particularly in restricted working conditions. highly-skilled workshop team which, in close
liaison with clients, turns out imaginative,
eltic Miners® combine compact size, specifically modified to suit the customer’s precision-made products to precise
Mining
chemicals
ccording to new report by Global Industry value chain is likely to grow in coming years as “Frameworks exist to increase social
Cytec Industries has also been active in Neptune Chemical Pump designed its 500-D phosphoric acid. These reagents are added to
Series (Duplex) diaphragm metering pumps for
developing technologies beyond the collector frother applications in coal mine prep plants. the process streams to minimise or even
business, addressing needs in electrostatic The EZE-CLEAN™ valve cartridges can be eliminate scale in inter-stage piping and
separation, magnetic separation and scale removed from the pump heads without having evaporators. Benefits of using these products
to disturb the pump’s piping. Neptune’s
control in phosphoric acid production. These Variable Oil By-pass™ stroke adjustment include increased production, increased energy
bolt-on technologies are aimed at providing a provides better valve performance than efficiency, and process stability.
means to improve overall unit operations variable-linkage designs, the company says. Steve Paulson, Lead Marketing Manager – N.
Other standard features of Neptune pumps
without the need for large amounts of capital include double ball-check valves, internal relief & S. America with Nalco’s Global Mining &
investment. valve, and a hydraulically balanced Teflon Mineral Processing Group explains that “for
Several issues in electrostatic separation, diaphragm for extended life. Optional features many applications, the site-specific ore
available are automatic flow rate adjustment
such as finer particles and contaminant surface using an electronic stroke controller and composition and the chemistry of the process
coating can cause issues with separation variable frequency drives solution will have a very strong influence on the
efficiency resulting in lower production rates type of product used. Subtle differences in
and product purity issues. Cytec has process. mineralogy or water chemistry can have a very
developed AERO™ EZ 1000 and EZ The AERO® NSK significant impact on product selection and
2000 for electrostatic separation of product line was performance. For example, a flotation collector
differing minerals that have increased developed to that works very well at Plant A may not work at
separation efficacy by 8-11% improve magnetic all at Plant B – even though both plants are
compared to a control, especially at separation, and floating copper sulphide minerals. For this
first pass. In addition, there are application of reason, product selection frequently involves
substantial energy savings as the these products ore-specific and/or site-specific testing of
separation process can now be conducted at has numerous products and perhaps customisation
ambient temperature. An added benefit is the demonstrated the of products in order to implement the most
reduced capital expenditure due to the bolt-on capability to obtain effective program for that specific operation.
nature of the electrostatic process. Application higher purity finished While some products do have applications over
of these products can lead to the ability to products, process mineral slurries of a wider a wide range of conditions (such as some
produce comparable product in quality with cost particle size range, and even separate two non flocculants and handling aids), it is usually not a
effectiveness compared to incumbent magnetic materials. case that ‘one size fits all.’
technologies, separation of minerals over wide The Phosflow® series of anti scalants is novel “There are some classes of chemicals that
size range, reducing the recirculation load and scale inhibition technology developed to have been used for many years in mineral
providing an overall more efficient and robust address scaling issues in the production of processing applications. These include
flocculants, coagulants, sulfhydryl collectors, in a process application. With specialty am very glad to move forward in this direction;”
surfactants, and chelants. However our, R&D chemicals, the customer is paying for an end said Steffen Kudis, Head of the Global Oilfield
efforts have resulted in numerous modifications result, and it is our job to ensure that we have and Mining Solutions business.
and improvements to these existing materials the best total program (chemical + feed system The Regional Mining Solutions organisations
over the past several years. Innovation is a key + monitoring program + on-site service) to will be strengthened by shifting business
part of our customers’ success and our growth, deliver that result.” responsibilities into the strongest regional and
so we are continuously searching for: Axis House has successfully developed local markets. Regional Business Management
■ New chemistries which will deliver improved copper oxide flotation chemistries that use Asia Pacific will move from Hong Kong, China to
performance and value for our customers combinations of patented hydroxamates and Melbourne, Australia, while those Santiago,
■ Modifications to existing products to enhance modified fatty acid amines in conjunction with Chile; Houston, Texas and Ludwigshafen,
performance in the customer’s process traditional sulphidisation chemicals. The Germany will remain located where they are
■ Completely new applications for existing reagent suites are now successfully being used today.
products across the globe – and can be found on plants in BASF Mining Solutions offers an extensive
■ New chemistries that reduce or eliminate the DRC, Namibia, Botswana, Morocco, Russia range of mineral processing reagents. It is a
environmental impacts. and Canada. The roll-out of this technology has global business and currently the strengths are
“Among the main areas of progress and been sped up by the availability of the Axis in solid/liquid separation and solvent
innovation that Nalco has focused on in mineral House Flotation Laboratory, where specially extraction; however it also offers reagents for
processing are: trained chemists and metallurgists work with flotation, dispersing, agglomerating and others.
■ Coal flotation collectors – At the end of last year, BASF signed a
alternatives to diesel fuel that long-term agreement with the
reduce environmental impacts; Commonwealth Scientific and Industrial
NALFLOTE® collectors increase fine Research Organisation (CSIRO) to lease
coal recovery laboratory and office space at the
■ Scale inhibitors – improved Australian Minerals Research Centre in
performance on sulphate scale Perth. There BASF is establishing a
control global R&D and technology centre,
■ Automation systems – monitoring employing six researchers and
system performance and chemical developers by the end of 2012.
program control In first projects, scientists will be
■ Sulphide flotation collectors – improved client ore and are able to formulate optimal studying mineral processing specific innovation
selectivity against Fe minerals and increased solutions very quickly (concentrate sample needs such as advanced rheology modifiers for
molybdenum recovery; Pinnacle® sulphide analysis is in-house). the improvement of the thickening process for
flotation collectors – improved Cu and Mo After the successful industrial implementation valuables and tailings or modification of the
recoveries and better selectivity of the Axis House hydroxamates and fatty acids crystallisation process in alumina production.
■ Flocculant technology – products that in copper flotation plants around the globe, the The company also agreed to sponsor research
enhance the settling of red mud and products company has expanded the application base of undertaken by the Parker Centre starting from
that invert more rapidly; POL-E-Z® liquid these reagents to include rare earth oxides July 2012. For five years, BASF will make a
flocculants–quick inverting flocculant (REOs) and industrial minerals flotation substantial financial contribution to participate
technology, and RRA® (Rigid Rod (fluorspar and phosphate). in collaborative research in the areas of
Architecture) flocculants – increased red mud REOs have successfully been floated at lab breakthrough technologies and process
underflow densities, improved overflow liquor scale and (project dependent) possible plant fundamentals primarily focused on alumina,
filterability and reduced scaling.” trials can be expected. Reagents targeting base metals (particularly cobalt, copper, nickel
Paulson also points out that a key industrial mineral flotation and specific gangue and zinc), gold and uranium.
consideration for specialty chemical programs depression (talc/carbonates) have recently been The Parker Centre is a collaborative research
“is what will deliver the lowest total cost of trialled, which resulted in the first industrial organization focused on hydrometallurgy R&D,
operation (TCO). This involves the cost scale orders being placed. involving three research institutions (CSIRO,
performance for the entire program, and not just Curtin University and Murdoch University) and
the chemical cost. This includes the consultative Global shifts strongly supported by 20 mineral processing
evaluation by the service engineer to A recent trend in this sector has seen more companies.
understand the process and objectives of the companies reorganising their global “Our vision is to become the leading chemical
customer, and then to select the right product, organisations for mining chemicals. BASF, for solutions provider to the mining industry by
apply it at the best location(s) at the right instance, will, it says, “align its Mining Solutions investing in existing and innovative technologies
dosage, and then monitor the program on a business even more strongly with customer for mineral processing and metal production of
regular basis to ensure that it is operating at needs. There are two industry platforms for ores. To be successful, we are increasing our
optimum performance and that customers ‘hold mining and oilfield “whose strategies are based R&D spending and strengthening our market
the gains’. on strong growth and adding value through focused organisation. The agreement with
“As ore characteristics or process conditions innovation and customised solutions.” CSIRO is an important step towards building
change, it may be necessary to modify the “A more focused and industry-specific set-up technology and innovation leadership and
dosage or even change to a different product. is required to successfully implement our demonstrates our global commitment to the
It’s a common mistake to assume that all strategies. I see this as investment and strong mining industry,” said Kudis.
products are equivalent and function the same commitment to our customer industries and I With the participation at the Parker Centre in
Perth and the agreement with CSIRO, standards, including the installation of
BASF intends to strengthen its R&D a fume hood and dust control to foster
capabilities in proximity to industrial a safe work environment for
research centres and key customers. employees. The lab contains all
This creates the opportunity to equipment necessary to perform
connect BASF technologies and flotation trials, and will be further
research and development platforms equipped with mineral analytical
with opinion leaders in academia and capability through planned new
industry and thereby jointly address equipment installation later in 2012.
new developments for mineral The lab will also process mineral ores
processing. “Our research will greatly and coal samples to optimise
benefit from the intellectual property recoveries and grade for Clariant
generated from the Parker Centre and Mining customers.
from our interactions with the Also in April, AkzoNobel Surface
participant research groups,” explained Gregor In this way we want to continue to provide major Chemistry, a leading supplier of collectors and
Brodt, Global Development, Oilfield and Mining operational, environmental and economic mineral coating agents for the industry,
Chemicals. benefits for the mining industry.” announced plans to invest in the growth and
“Mining has become a central focus for BASF In April Clariant Mining Solutions celebrated continued operational excellence of its fatty
globally, and particularly in Australia and New the opening of a new, state-of-the-art mineral amines manufacturing plant in Saskatoon,
Zealand,” said Neil Fitzmaurice, Head of the processing lab at its location in Guangzhou, Saskatchewan, Canada. This investment is being
recently established Asia Pacific Industry Target China. "The new Guangzhou mineral processing made to support the substantial growth by its
Group Mining. “We have built relationships with lab is further tangible evidence of Clariant's potash-producing customers. AkzoNobel’s fatty
leading mining houses and industry-recognised commitment to mining business development in amines and derivatives are used for the flotation
academia, a sound market understanding, an north Asia," said Jason Wang, head of BL of potash ores and anticaking of potash
attractive portfolio and the capability to Mining, region North Asia Pacific. "The lab's minerals during manufacturing.
translate market needs into chemical solutions. location will allow Clariant to share its global “Our Saskatoon plant is ideally suited to
Our Asia Pacific Industry Target Group Mining expertise with regional customers in China and service the potash industry, particularly in the
looks to develop an even more comprehensive will enhance our ability to provide excellent, Saskatchewan basin, one of the largest permit
offering with the overall portfolio of BASF, also customisable solutions to meet our customers' areas for potash exploration in the world,” says
for market segments beyond mineral needs." Gerry Labelle, Business Director for Performance
processing, metal production and construction. The lab meets Clariant's rigorous safety Applications at AkzoNobel Surface Chemistry.
S AT
VISIT U
-27
Sep 24 E 2012
50, IM P
2 0
Stand e Ind
lh i ia
New D
-26 2012
Sep 24 RNATIONAL
IN T E
INExpo A
1066, M as Vegas US
Stand L
Kemira, “Water scarcity increases accident risk and may increase the
and mining in arid areas detrimental effects present in the work
will continue to be environment. Quaker Chemical notes that local
challenges for the communities along with regulatory agencies
industry and the have put increased pressure on companies to
regulatory environment improve methods of dust suppression. In the
will keep the industry US, “the Mine Safety and Health Administration
under increased pressure (MSHA) has required mine operators to increase
to reuse, conserve and the total incombustible content of the combined
treat water.” coal dust, rock dust and other dust; and has
Kemira is developing reduced the concentration limits for coal mine
new products and dust. Whereas, the Environmental Protection
solutions to meet new Agency (EPA) has mandated that facilities that
challenges that the generate dust minimise or mitigate the
industry is facing. The production of dust in their operation.
A couple of months ago BioteQ Environmental mining industry faces the dual challenge of To alleviate industry-related issues and
Technologies commenced the 2012 operating declining ore quality and the need to save and address MSHA and EPA concerns, Quaker
season at the Minto mine in the Yukon, Canada,
providing water treatment services. BioteQ’s recycle more water. This is changing the nature Chemical has developed Dustgrip™, a dust
operations staff commissioned the water of many process circuits and is creating scaling suppression product line for various
treatment system on site. This is a fee-based conditions in mineral operations that had not applications, including crushers and conveyor
contract where BioteQ earns revenue for labour
provided and water treatment fees for volume previously experienced this kind of problem. systems, rail cars, stockpiles, unpaved haul
of water treated. The company expects to treat Mineral scaling is prevalent in water systems roads, pits and quarries, mine tailings and
some 500,000 m3 of water in the 2012 season, that are saturated with ionic constituents. screening operations.
though that can vary with precipitation and
snow melt at the site. BioteQ is an innovative Calcium carbonate or calcium sulphate fouling is It says Dustgrip “not only suppresses dust
clean technology leader in global industrial often associated with leaching processes. but offers solutions for managing company
water treatment. The company’s proven Kemira's comprehensive line of KemGuard resources and addressing environmental
technologies have been applied at sites around
the world to recover dissolved metals and scale control products can help. These allow concerns such as:
remove sulphate, producing clean water and selection from a wide range of options to ■ Improving work environment and safety by
eliminating residual waste address specific and the most difficult mineral increasing visibility and improving air quality
deposition problems. In recommending a ■ Creating a cumulative effect thereby, reducing
Canada is the top potash-producing country in product, Kemira looks at the system as a whole water consumption
the world, followed by Russia, Belarus, Germany and understands that chemical addition ■ Reducing labour and equipment costs
and the United States. “The new investment in upstream can have major effects on downstream ■ Ability to use with existing spray equipment,
our plant is part of our long-term commitment to operations. Scale control is an essential tool in and does not require post application rinsing
support our customers’ growing development managing water quality. Kemira has an active of equipment
needs with the capabilities they have long relied R&D program to develop the KemGuard product ■ Non-corrosive
upon: our consistent quality, responsiveness line to solve scaling problems where solutions ■ Ongoing field support from experienced and
and on-time deliveries,” says Bob Margevich, may not have yet been identified. respected Quaker associates.
Managing Director for AkzoNobel Surface Mines’ ability to effectively deal with It is a liquid that absorbs moisture from the
Chemistry business unit. “We will maintain our contaminants such as arsenic and selenium in air and allows small dust particles to combine
leadership as a supplier to the potash industry waste waters will be key to ensure optimal and and increase in size, making them less prone to
by continuing to fulfil and exceed our customers’ uninterrupted production. become airborne. Dustgrip Turbo, Quaker says,
expectations.” AkzoNobel’s fatty amines product Narciso adds, “We understand the important “changes the wetting characteristics of water
lines include: Armeen®, Armoflote®, Atrac®, role technology and water treatment play in making it excellent at penetrating and knocking
Berol®, Ethomeen® and Lilaflot®. production efficiency and environmental down dust particles. It can be used on
compliance. stockpiles to seal surfaces, prevent the erosion
Cleaning up “Kemira's unique position in offering both of valuable minerals, and stop air penetration.
Kemira says water is the connection in organic and inorganic coagulants means that “Dustgrip 007 dries to form a thin, flexible,
everything it does. “We use our chemistry and the optimum program for wastewater treatment continuous seal that that effectively suppresses
applications expertise to provide both in- can be developed. Proven treatment regimens dust for an extended period. It is effective on
process and effluent solutions for a wide range are used for arsenic, selenium and heavy metals stockpiles, soil stabilisation, erosion control and
of water treatment issues found in mineral ore removal.” suppression of dust caused by wind, vehicle and
processing. Mine water treatment products from Nalco heavy equipment traffic.”
“Superfloc polymers are a cornerstone of our aim at more efficient and selective removal of Nalco’s recent developments include
mining business. This brand has been trusted by heavy metals. There is also OreBind® Tailings DustFoam Plus and DustBind Plus
the mining industry for over 50 years to meet Management Technology – increased water technologies for in-plant and in-transit
tight performance requirements for multiple recovery. fugitive dust control. IM
end-use applications from water clarification As noted in the emissions management
and filtration to thickening and tails article in the February issue, dust suppression is References
management.” a continuous and costly activity because it Mining Chemicals: A Global Strategic Business Report,
Joseph Narciso, VP of Minerals & Metals at impacts operational efficiency, impairs visibility, Global Industry Analysts.
SOUTH AFRICAN
OFFERINGS
The mining industries 1st choice read – International Mining (IM) is the magazine of choice for the
mining companies and contractors of the world – many have sponsored the front cover – including
Thiess, Redpath, Newmont, Gold Fields, Dundee Precious Metals and Lundin Mining Informed and in-depth editorial on the world mining industry
Dundee Precious Metals finds International Mining to be the best technical journal available for
our industry. It is extremely well written, is very informative, and covers ALL aspects of our
business with something for each discipline to read and learn from EVERY month. The electronic
version is widely distributed across our organisation before the hard copy catches up with each of
our operating sites. Simon Meik Vice President Processing, DPM – Chelopech Mining, Bulgaria
EXPLORATION
EXCELLENCE
WORLDWIDE
AUTOMATED MINERALOGY
Paul thank you a lot for you Focus on OKD. We read it very thoroughly and think that it is really – growing apace
professional work from your side. Our CEO [Dr.Ing. Klaus-Dieter Beck] told me that “it is written www.im-mining.com MARCH 2011
Have downloaded the article with the MTT included and it looks ANATOMY OF
A GREAT MINING
INDUSTRY - INDIA
great. Thank you for allowing us the opportunity to be featured and
the article has helped pave the way for the product to be designed
into a project here in Western Australia and also in Chile.
Adam Blakiston, Project Manager, Australian Turntable Co
John: your article is one of the best blasting updates www.im-mining.com APRIL 2011
I’ve been a reader of IM for many years and enjoy receiving each Informed and in-depth editorial on the world mining industry
PASTE SUPPLEMENT
Your work is very meaningful in the mining world. Your articles and all
your magazine reflect the interest that the team that do IM. I consider
that the reading of IM is mandatory because the information about new
technologies and the knowing of the knowhow of the great mining OYU TOLGOI: Copper giant
SOUTH AMERICA’S
companies and suppliers are appearing in the diverse places of the world. BIGGEST GOLD MINE: Yanacocha
SLURRY PIPELINES:
green transport system
Although the circulation has increased, our advertising rates have not.
Please contact us for a quote to advertise in the September Minexpo issue.
HIGH PROFILE
Mining empowerment
A: As indicated, our involvement in the different
stages of a mine depends very much on the
particular need, but our delivery of optimal
service is never compromised. When the Bisha
Paul Moore spoke with Andy Walker, Head of Business Mining Share Company (BMSC) was looking to
Development for Mining and Cement at global temporary start drilling on an isolated site in Eritrea,
located 300 km from the sea, a fast and reliable
power specialist Aggreko; about mining as an industry focus power solution was urgently needed. The only
for the company barrier blocking the work on a site that had
been analysed and tested for over 10 years was
Q: Of the work Aggreko conducts with mines customers in British Columbia, Alberta, proving to investors that the miners had a stable
and mining related operations, can you give Saskatchewan, the Northwest Territories, Yukon, power supply. Through its reputation of world
some idea of the proportion of work that goes to Manitoba, Ontario and Quebec. As an example, class delivery of solutions regardless of the
providing temporary power for advanced we were contacted in June 2011 by Grand Cache issues, Aggreko was called upon to design and
exploration or early in-development projects, Coal in western Alberta with a temporary power implement a power package solution for 20 MW.
and what proportion goes to existing mine need. The mine was undergoing an expansion The power package became the mine’s only
applications, such as refrigeration/ventilation which included a new underground coal mine, source of operational power, with Aggreko
power; back up/emergency power; machine the No. 12 South B2 operation. The customer technicians manning the site 24 hours a day.
moves etc? faced a couple of significant challenges that The project was extended and is still running.
were prohibiting their production timeline:
A: Aggreko’s solutions support a number of limited availability to power from the grid and Q: Back-up power for Escondida was one of your
applications. The amount of work that goes to the newly built transmission lines had not yet largest projects to-date. Can you provide any
providing power during the different stages of a been energised. In order to meet set quotas the other examples of similar projects where you
mine, from pre-feasibility to full operation and mine elected to utilise temporary power to limit have been brought in as a strategic secondary
beyond, very much depends on the particular downtime and drive forward operations. power source?
needs of the client. These needs will be shaped Aggreko mobilised 5 MW of generator power to
by a set of variables which may be related to A: Mines that use grid support are often at the
environment, location, political movements and mercy of the reliability of the third party source.
regulation. Weather, political movements, natural disasters
What is unique about Aggreko is that we and other factors can and do often affect the
specialise in what we do – power rental and flow of energy. In more recent times, the
temperature control – and have gained a wealth significant boom in certain economies has
of experience from having partnered with the meant that grid systems are often over
sectors we have supported over the past 50 capacitated and prone to load-shedding. Mines
years, including of course, mining. Aside from running expensive projects cannot afford not to
the legacy of experience, we work all over the have a back-up solution. Even those with their
world, including expansion throughout Canada. own principal power supply need to put in place
Our people are exposed to the many different a contingency emergency plan. Aggreko is often
scenarios and challenges miners face, and are called in to provide a back-up power package, as
on hand to offer quick and flexible solutions. was the case with the Siguiri gold mine in
One challenge miners often face is sourcing Guinea. Operated by AngloGold Ashanti, the
power for remote sites where grid support is mine’s onsite generators broke down. Aggreko
unavailable. With smaller mines looking to was quick to respond and sent the needed 2.5
maximise profits and minimise costs, the option MW power package by air, just three days from
of installing their own power line is more often run the customer’s electric mining equipment, receiving the customer’s initial distress call.
than not too expensive. Power was required for drills, conveyor, offices and shops. The
one such mine in Ghana, the Damang gold mine, temporary power enabled the mine to quickly go Q: With ever more uncertainty with grid power
owned by Abosso Goldfields. Aggreko’s into production allowing the company to meet due to many countries being pushed to the limit
capability to deliver power solutions in remote previously-made customer commitments. in terms of capacity and frequent rolling
areas was well known to the customer. Within Further, any interruptions in power meant large blackouts etc, does this represent a boost to
three weeks of signing the contract, the necessary production revenue losses for the customer so potential mining applications for Aggreko?
equipment was mobilised, transported, installed Aggreko technicians were deployed 12 hours per
and commissioned on site. day for six months to monitor and maintain a A: In fact we are finding that more and more,
reliable power source. Once the transmission miners are having to explore in remote locations
Q: You mentioned expansion in Canada’s mining lines were energised, the mine transitioned to where there is little if any infrastructure in place.
market, can you provide some detail on your utility grid power for remaining production This trend is driving more exploration mining
presence in Canada plus any recent mining efforts. companies to consider rental power as an initial
specific activity there? energy solution, at least until they are up and
Q: For the principal mining power solution running and can look into the option of setting
A: Aggreko has delivered temporary power applications mentioned above, can you provide up their own power stations. There is certainly
generation services and solutions to mining examples from the past year to 18 months? truth in the observation that many markets are
Q: To what extent do you work closely with the A: Aggreko continually evaluates the viability
companies that provide the mine-wide power of potential power generation solutions, and
transmission network/infrastructure , such as introduces the latest technological
Siemens, ABB and others? innovations where appropriate – to meet
environmental considerations and where
A: While we do not work directly with Siemens, there is a sound business case for our
ABB and others, we do regularly connect to customers, such as in our natural gas
their systems on mine sites so that they can run generators. Where other new technologies
their equipment effectively. Our experts are meet our clients' needs, we will be in a
well versed with the technologies of other position to support them, too. We have an
providers. exceptional record meeting and often
exceeding environmental regulations around
Q: Are areas such as solar power, gas powered the world, and in developing existing
engines, fuel cells etc a potential threat to technology to operate in the most
Aggreko? As a company are you involved in environmentally friendly ways possible. IM
research towards future power solutions?
IInfoMine
nfoMine
f
Aggreko Canada has been seeing increased
demand for temporary power solutions, such as
this 5 MW solution for Grand Cache Coal
Mining Intelligence
I & Technology
Te
echnology
experiencing a misbalance of energy demand
versus supply, due to growth in economies. In www.InfoMine.com
ww
ww
w..InfoMine.com
these situations, Aggreko is often called in by
local utility suppliers to support in
supplementary power, while the infrastructure is
put into place to address any shortages.
he potash market continues to boom, capacity, will increase Uralkali’s potash Sandvik MF320 borer miner operating at
Manufacturer of
the leading Ural
10R and 20R
range of potash
mining machines,
Russia’s Kopeysk
celebrated its
70th anniversary
in 2011
concentration. However, dust tends to be more A new product from Famur is its mining geometry to prevent material accumulation and
of an issue and is one of the main challenges system for thin coal seams, known as FL 13/19. to ease transition to and from steep grades; a
that the equipment manufacturers have to face It includes the longwall shearer FS200, powered modular design to comply with mine-site
in the potash industry. Traditional water cooling roof supports, armoured face conveyor and restrictions for hoist capacity and shaft
systems cannot be used in potash mines beam stage loader with a lump crusher. With dimensions; non-XP electrics and enclosures;
therefore cooling systems tend to have to work adjustments, the company believes the system and a 4,160 v input voltage to replace the
in closed circuit. Because of the faster advance is also very applicable to potash mining. standard 995 v supply.
of the longwall, the canopies and other Caterpillar, through its purchase of Bucyrus is There are also other equipment suppliers for
elements of roof supports undergo significant now a major supplier of equipment for potash which potash is an important market. Salzgitter
attrition, therefore the materials used must be mining, including continuous miners and Maschinenbau AG (SMAG) manufactures and
very robust. Perhaps unexpectedly, there is no longwall systems. The successful operation of a sells automated specialist drilling vehicles
problem of corrosion with potash – as the salt first 30M4-NP continuous miner (Caterpillar specifically made for potash and salt mining, but
coats and therefore to some extent protects the CM345 N) delivered in 2004 to Agrium’s Vanscoy increasingly used in oil shale extraction. Its
equipment. potash operation, led to an order for a further products include the GB 280 S large-bore
Companies in Poland’s Famur Group three units, which were delivered by August drilling vehicle. The GB 280 has three
specialise in manufacturing equipment for hard 2010. Extensive modifications were incorporated independent drilling drives, which in each case
coal longwall mining but in their long history the by a team of engineers working closely with the propel a drill rod with a diameter of 280 mm.
companies have been also producing and customer for over two years. The maximum drilling depth is 7,500 mm. Even
delivering machines for potash mines. Since One of the major challenges was to convert on rough surfaces a movable rod guidance
1992, Famur shearer loaders and Fazos roof the cooling system from a glycol to oil system to system in the front area of the machine provides
supports have formed a major part of the allow operation of the miners in very hot optimal rod guidance. Extendable crossbeams
equipment fleet at Belaruskali’s mines in conditions. The cooling system also had to be make it possible to drill 6 horizontal holes in
Belarus. Fazos alone delivered over 2,300 roof redesigned to fit within the same footprint, parallel positions. With the optional vertical
supports. Belaruskali also uses longwall while at the same time easing the transition level control system installed it is possible to
equipment from Caterpillar and Eickhoff. from flat ground to a grade during uphill mining drill 12 holes in one drill set up. A central chain
The machines produced for Belaruskali were to avoid ground contact, as all three continuous drive is used to feed the drilling drives and an
customised for those operations. The hardness miners will be cutting extensively on grades of electronic feed
of the ore required greater installed power in up to 20°. Other changes include voltage- control system prevents the drill drives from
the cutting arms of the shearers, while the segregated electrical enclosures, a new control overloading and/or deadlocking the drill rods.
cutter motors’ planetary gearboxes were system, modifications to the frame, new cover Rock pressure can reduce the lifetime of
equipped with additional cooling systems. The layouts, and a new layout of the operator’s cab. tunnelled sections particularly in potash and
cutting drums also had a special arrangement of The customer requested an electrical control salt mines. Paus has recently designed the Slot
the pick system. The shearers were also system that operators were familiar with and Cutter PLS 10, a rubber-tyred and all-wheel-
equipped with dust reduction systems, that would facilitate operator access to driven loader designed to minimise floor
consisting of fans and dust sucking units, and individual components. With a modular design, convergence and track construction
the sensitive elements of the shearer were the control system also allows growth to underground. With its cutter, users have the
additionally covered for enhanced protection. accommodate future functionality. A completely option of cutting tension relief slots into the roof
In total, Famur delivered eight longwall new cover package was implemented for the with a continuous nominal depth of 1.8 m and a
shearer loaders (types: KGS-570/2B/Sol, KGS- continuous miners to accommodate the new thickness of 0.15 m. This process is a major
570/KGS-800S/2BP, KGU-310/Sol) to the potash electrical and cooling systems. contributor to improving roof and impact safety.
mines in Soligorsk. Fazos delivered 2,387 roof The custom machines weigh in at 74.84 t and The machine can be used in tunnels up to 2.8 m
supports (types: FAZOS-09/15,5-Oz , FAZOS- can mine seams of 1.8 to 4.63 m. Caterpillar wide with a maximum height of between 2.4 and
15/31-Oz-SOL, FAZOS- 16/24-Oz, FAZOS- 08/13- states that other features that contribute to the 3.2 m. The vehicle is also fitted with a shield to
POz, FAZOS-09/15- POz, FAZOS-16/24-POz, success of the machine include ncreased brake push fallen rock to the side in the same process.
FAZOS-13/20-POz, FAZOS-23/36-Pp, FAZOS- capacity with faster set and release times to The cutter is equipped with a 69 kW Deutz
35/43-Pp, FAZOS-22/34-Pop). facilitate operation on steep grades; improved diesel engine. Power is transmitted from the
further boosting performance capacities by away from the face and additional track powerful machines for mining trona, potash, and
automatically maintaining alignment of the AFC installed. Successful use of these machines in salt. In 1959, the first non-coal Marietta Miner
with the coal seam, a production advantage that coal led to their ultimate application into trona was delivered to a trona mine in Green River,
minimizes downtime by eliminating the need to and potash in the 1960s. The interest in this Wyoming. In 1965, machine specifications were
manually straighten the face. This alignment is type of machine among the US coal miners introduced for Canadian potash mines. Since
achieved through the use of an inertial became ever greater. The Clarkson Division of then, many miners have been delivered ranging
navigation system (INS), which is located in the National Mine Service purchased the rights to in profile dimensions of 2.1 m high by 3.6 to 4 m
shearer controller, and is used to track the manufacture the Marietta Borer and improved wide; to 3.3 m high by 5.5 m and 6 m wide. The
position of the shearer as it traverses the face, the design by increasing the installed power. In largest machine was the Marietta Borer type
measuring the face straightness. This 1969, legislation in the US stopped the Marietta 780AW-4, a four-rotor machine that cut a profile
information is transmitted to a server where the Miner from being used in underground coal 2.5 m high by 7.8 m wide. These miners range in
data is compared to a predetermined model of mines, due to the fact that many of the new roof weight from 68 t to 225 t and have a total
the seam. The server then issues recommended control and ventilation requirements could not installed power of 560 to 1,400 kW.
corrections to the powered roof supports, be met with Marietta machines. National Mine Sandvik bought the rights to the Marietta
instructing the system how far to advance on Service started with designing and Borer and set about updating the design for
subsequent cycles, which allows proper manufacturing larger, heavier, and more production at its Zeltweg, Austria location. This
alignment with the coal seam. Joy shearers
equipped with the Landmark Face Alignment
System are currently available in the US and International Mining Editor Paul Moore and Publisher
Australia.
Caterpillar has also announced its next
John Chadwick go the extra mile to report on real mines
generation EL3000 longwall shearer, which and mining projects globally, in addition to the major
features a state-of-the-art communication
system for advanced automation and
tradeshows and exhibitions. So far from 2011 to early
monitoring. The Caterpillar longwall system May 2012 alone, visits have included the following:
includes personnel proximity detection and
underground cameras that can be linked to a
surface monitoring centre. In underground Country Operations reported on
rubber tyred equipment, new additions include
the new AD60 underground truck, with 60 t BRAZIL Samarco (iron ore)
capacity, and the new R3000H underground
Anglo American Barro Alto (nickel)
loader, with a 20 t capacity.
BULGARIA Chelopech (gold)
Mining technology updates the vehicle makes for a much lighter machine as well
as an increased pay load capacity- the machine is
Every month IM posts around crawler drive, capable of carrying loads of up to 5 t. The highly
discharge manoeuvrable and agile crawler carrier is controlled by
100 news items to its website, conveyor, transfer remote control (manual and umbilical back up) and is
mainly technology related. conveyor and self loading/ unloading with a demountable load bed
feeder drive which comes in either a standard length of 3 m or
Here are some recent highlights destined for an open cast mine in China. A total of five extended at 3.6 m. The compact design of the machine
assorted Siemens Mechanical Drives gear units will be allows it to fit into a standard shipping container The
CommodasUltrasort, the mining brand of TOMRA travelling to Shouzhou City, in China’s Shanxi Province, Mule also comes with various track options including
Sorting Solutions, has after manufacture in the UK. These include two 400 kW steel and rubber tracks. Dando have already supplied
been made a member of Planurex bevel helical planetary units supplying the one of the carriers to a drilling contractor for use in
the international crawler drive (size P2KB30, weighing 11.4 t each), one Africa and have an order lined up for a further two to be
AngloGold Ashanti 350kW P2KA22 Planurex driving the apron feeder, and sent to East Asia.
Technology Innovation two Flender FZG B3SH size 14 (350 kW) and size 12
Consortium. The (275 kW) bevel helical units with integral backstops for Natural gas powered
consortium, based in the discharge conveyor and transfer conveyor. The unit high horsepower
South Africa, was established in 2011 by AngloGold for the apron feeder features an external cooling and engine specialist GFS
Ashanti and, including CommodasUltrasort, comprises lubrication system, plus an integral motor mounting Corp has brought its
46 industrial companies, eight universities and platform. first major commerical
research institutions all of which regarded as offering to the open-pit mining sector. The company’s
innovators in their field. ContiTech has EVO-MT 7930 System is specifically designed for the
The aim of the consortium is to create new ways of strengthened its Caterpillar 793 series of mine haul trucks. The company
thinking and new opportunities for deep level mining. industrial business in states that the EVO-MT system allows mining
Mike MacFarlane, Senior Vice President Technical specialised conveyor companies to substantially reduce operating costs
Development at AngloGold Ashanti says: “The belts by purchasing without major modification of either the chassis or
consortium facilitates solutions by bringing the world´s Specialised Belting drive engine of the Caterpillar 793 haul truck. The EVO-
leading innovators to solve mining´s toughest Supplies. This British MT 7930 system has been designed to maintain the
problems. Next generation mining requires company has been in the proven reliability and performance of the Caterpillar
collaborative breakthroughs.” CommodasUltrasort, has market since 1984 and, 793. In the event of a fault condition or low LNG fuel
provided state-of-the-art sensor-based sorting with 50 employees, produces primarily steep-angle level, the system seamlessly switches the truck to
technology for dry material separation in various conveyor belts for the transport of bulk materials 100% diesel operation regardless of operating mode.
minerals and ore applications since 1988. It was including ore, coal or gravel. “The purchase of this Truck haul capacity is maintained after the EVO-MT
chosen as an expert partner for sensor-based solutions profitable and established company is strategically system is installed and engine power and torque
for gold ore sorting. important and opens additional opportunities for us in output is maintained to OEM specifications.
the growing worldwide market of steep inclined and
Xstrata Technology has recently signed an Albion vertical conveying,” said Hans-Jürgen Duensing, ABB’s Minerals/Underground Mining
Process technology Business Unit Manager of the ContiTech Conveyor Belt business unit and Atlas Copco
licence agreement Group. “We are not just taking over the business Underground Rock Excavation
with GeoProMining operations, but the production as well and want to have developed an
Gold, a 100% owned further expand it. We also have for the future the new innovative mobile
subsidiary of production technology to produce particularly integration system
GeoProMining Ltd. temperature resistant corrugated sidewall belts.” between ABB’s process
The agreement allows GeoProMining Gold to use control System 800xA and Atlas Copco mining
Xstrata’s proprietary fine grind and oxidative leach Dando Drilling International, the supplier of drilling rigs machines. The solution is currently installed at the
technology for the recovery of gold and silver from and equipment for the mineral exploration, Atlas Copco test mine in Kvarntorp, Sweden. ABB says
sulphide concentrates at their GPM Gold Project in geotechnical, water well and geothermal sectors has “it will offer future mine operators unrivalled process
Armenia The agreement was signed after the recently launched a brand new type of machine- the control opportunity and information.” It will provide
successful completion of a BFS in 2011 that included Dando Mule ATV5-RC. The Dando Mule, a tracked load machine tracking for greater mining efficiency. Today,
batch and continuous pilot plant testwork on samples carrying vehicle, was designed by Dando for solving the sensors and automated data processing systems
from the GPM Gold mine in Armenia. The feasibility provide mine operators with essential information on-
study demonstrated that the Albion Process can line for each product and process control. Future
achieve high gold and silver recoveries from the GPM mining will require a high degree of integration in
sulphide concentrates on a cost competitive basis. product and process optimization, maintenance
GeoProMining Gold LLC has engaged Xstrata planning, environmental control from one single control
Technology to provide the Albion Process plant as a centre in order to get the best overall performance from
lump sum design and supply package, and to complete problem of transporting to and on-site heavy drilling mining machines underground, as well as increase
detailed design of the existing flotation plant upgrade. equipment and tooling across very rough terrain. The productivity and lower energy consumption.
design of the machine allows the Mule to be operated
International supplier of mineral sizing systems, MMD, from a distance by remote control thus keeping the To keep up with this news in detail,
has specified Siemens gear units and couplings for a operator safe. The removal of the operator from within go to www.im-mining.com
INTERNATIONAL MINING
Directional Core Drilling
& Borehole Surveying Instruments
Follow
s
s
our daily news postssrk
SURVEYING INSTRUMENTS
BOREHOLE DESIGN
consulting
s www.im-mining.com
BOREHOLE SOFTWARE
s DIRECTIONAL CORE DRILLING
info@philippinemingclub.com
www.philippinemingclub.com
A Solid Past,
INVEST IN
An Exciting Future! PROJECT NEWS
INTERVIEW OPPORTUNITIES–
COME SEE US AT BOOTH 4245!
1
Published
SALES every two weeks, IM Project Beyond that, we look at projects in So, to keep up with projects getting News
from tho
se pro
Contact
Pro
emma@
PROJEC im-mining.com
T NEW
1
News is incrammed withandvaluable development, publishing regular updates close to completion and learn about
ion
project of recent gress tow e 10, 200
information incorporating the latest news as they get closer to production. key project personnel, subscribe now
-
SLOVAKStrikeA Resource - Harmony pro
-tho
sePER/GO .............. Pro .......
ject
.......JEC
.............. tes on
T .......
N projects s.
jectLD.. .............. .......New
s ma .............. EW
collect s (21 ..............
S arou
ZAMBIA IA - Tourniga s - IRO Gold
ion ofN ORE - COPPER kin g....... ....... .......
) Jun.............. ..............nd the globe
COLUM - Africanpro n Gold rec .............. /GOLDpro
- GOL ent sta
gre .......
..............ss .......
e 10, ....... .......
ject
Eagle s aro D........... rts .............. tow.......ard....... 200 7......... ..............1
.......
USA - BIA A - Grey
collection Resourceund
the ....... and....... pro .......
.............. s pro.......duc
.............. ....... .......
..............
....2
globe .............. gre.......
PROCESS ENGINEERS
Galw star Reso of urce s - COPPER ss....... tion
.............. .......
CANADA aylikel to be in rece
y urce likely....... rep....... – mo ..............
GOL and .....................
nt- start
Reso
AUSTRA - Geo PRE FEA s - MO theLYB s
market sD/SI to.......
be....... orts ..............
.............. from .......
.............. re eve2 ry
to IM Project News.
dex SIBI DEN LVE
progress
R............ ....... .......in the aro ....... ....... ..3 two wee
ARGENT LIA - Hero MEX
Mine ralsLITY .......
TUNGST
for
UM equi
/TU
reports
.......from ..............ma.......rke....... und .......
the.............. ks
ICO -- Tyle for.......
existing mines.
Resource
ADA - GeoLVE ..............
AUSTRA- Golden Chin s - MO s.......
R..... ..............
..............
Mine s - MO .......D/SI ..............
.............. ..............
.............. ..............
DESIGN ENGINEERS
- Great HeadOwate s ....... D/SI.............. ..............
…… - Goldbelt .............. LVER....... ....... .....................
....... ....... .............. ..8 .............. .5
USA - - Freeport-McM AUSTRA ………… Basin rs
Gold Energy Resource
..............
..............
.............. .............. ..............
.............. ..................... ..........8 .............. ..............6
Futu
CANADA reGen Allia oRan LIA
CHINA Cop
……
- Moly …… - GOL Serv s - GOL .......
/ Grea D .....................
............................ .............. .............. ....... .......
....... .............. ...................6
D/SILVE ............................
ices
nce - - Goldper & Gold Mines ………… t R iver ....... ....... ..............
.............. .....9
MEXICO - AtlanticAUSTRA COAL..... / CodMO
- …… R..... .............. .......
.............. .............. ....... .............. ..............
.............. .......
Ener
en Chin
.......a....... elcoLYBDEN …… …… ....... gy/ The ..................9..................... .....6
GREENL - Baja Mini Resource - COP .......
Gold - LIA
GOLD- Gold UM.
CAN s - GOLPER .............. ……....... ............9
.............. Nort
……....... ....... ....... .......
- COP- Wes..............
ng ADA h Amer
CANADAAND - True
star Reso
D ....... ..............
.............. …… .............. ....... .............. ....................... ..6
studies or those further advanced to definition studies, 800 feasibility studies Annual subscription is only
E able .............. ..............
.............. .............. ......11
equipment
ls are .
- Etru onurce s -TheGOL .....................
BRAZILARABIA - ADVfrom
avail subscriptio
scan to other
s, eitheD/COPP n to IM .............. .............. ..............
..............
emm Resource
r as forw ER.. Project .............. ....... .............. 15 .............. .......12
PERU - Mirabela Nick Group/ Bari -min ..............
a@im s
GOL arde .............. .............. ..............
.16 .............. ..........12
-ing.c
omD ....... d em ails,
News
- ....... is perso
as phot....... nal and ..............
AUSTRAMonterrico Meta el - NICKEL Mining - GOL .....................
q
ocop....... .............. .............. ...........12
LIA ....... D/C ....... ies, or the
CANADA - COP
PER/MO..................... OPPER......... ..............copie s in..................... ...............13
- Gind ls
- Cana albie Metals/ LYBDEN .............. .............. ..............any .......
ALL dolla dian Roya Ansh UM ....... .............. .............. ..................... .........13
NICKEL & Steel Grou .............. ..................... ..................... ...........13
content rs are US an Iron
emma@im-mining.com
HOW CAN YOU
INCREASE BOTH
SAFETY AND YOUR
PRODUCTION RATE?
THIS WAY!
If you are in the mining business, you know that an improved safety
record means a lot to your employees and your entire company.
This safety mind-set is part of everything we do – from research
and product development to on-site service.