You are on page 1of 68

www.im-mining.

com JULY 2012

Informed and in-depth editorial on the world mining industry

OPERATION FOCUS: SX-EW


Pampalo and Geomin TECHNOLOGY

MINING
CHEMICALS

MINE DESIGN
SOFTWARE

POTASH
EXTRACTION
Booth 2839

Solid filtration
Metso ensures maximum volume reduction

Metso filtration systems are specially designed and built for maximum volume reduction in tough minerals dewatering
applications. Our VPA filters provide exceptional air flow rates that result in higher capacities, lower cake moisture and
an extended application range. Their simple design, high capacity and fully automatic control system ensure easier
maintenance and parts replacement, while lowering dewatering costs.
With the added options of tube presses and vacuum filters, Metso can meet all of your filtration needs efficiently,
economically and responsibly. You can rely on Metso’s equipment and reputation. They’re both rock solid.

metso.com – email: minerals.info@metso.com


CONTENTS
8 J U L Y 2 0 1 2
8 GREAT MINES –
KIMBERLEY AND KOFFIEFONTEIN
John Chadwick examines Petra Diamonds’ other
South African operations of Kimberley
Underground, Koffiefontein and the Fissure
mines.

13 OPERATION FOCUS – Pampalo


John Chadwick reports from Endomines’
Pampalo, one of the cleanest gold mines in the
world in the farthest east boundary of the EU,
with expanding production likely.

20 OPERATION FOCUS – Geomin


Paul Moore visited the specialist underground
13 white marble mining operations of Geomin at
20 Hermsdorf in eastern Germany near the Czech
border, to see the company’s mechanised mining
fleet in action.

26 SX-EW TECHNOLOGY
New ideas, chemicals and technologies in the
heap leaching world, John Chadwick takes a
look.

34 MINING SOFTWARE
Reviewing mining software developments in
26 mine design, scheduling and management, Paul
Moore highlights the importance of functionality
across the board, and some exciting
34 developments in the area of 3D visualisation.

48 MINING CHEMICALS
John Chadwick looks at new products and trends
in a sector of growing importance, the global
market for which is projected to surpass $25.7
billion by 2017

56 HIGH PROFILE – AGGREKO


Paul Moore spoke with Andy Walker, Head of
Business Development for Mining and Cement
48 56 at global temporary power specialist Aggreko,
about mining as an industry focus for the
company.

58 POTASH EXTRACTION
Paul Moore looks at the ongoing hive of activity
in the potash market, from both majors and
juniors, that is proving highly prospective for the
key shaft sinking groups, EPCMs and continuous
58 mining machine manufacturers.

www.im
-minin
g.com

COVER: Aggreko JULY 201


2

Informe
d and
in-dept

Banro Corporation’s Twangiza gold mine is located 45 km south-southwest of Bukavu in OPERAT


h editor
ial on
the wo
rld min
ing ind
ustry
Pampalo ION FOCUS:
and Geomin
the South Kivu Province of DRC, close to the Rwandan border. The mine began operating SX
TECHNO -EW
LOGY
in October 2011 and is expected to produce 120,000 oz of gold annually with an MIN
CHEMIC ING
ALS
MINE DE
expected mine life of seven to eight years from currently-defined reserves. The entire SI
SOFTW GN
ARE
PO
EXTRAC TASH
Twangiza operation is powered via an 8 MW Aggreko power plant. Being located in an TION

area with no power infrastructure, the Aggreko solution was an excellent match for
Banro’s power requirements at Twangiza
www.aggreko-always-on.com

AROUND THE WORLD 3 The Leader 4 World Prospects 64 Forthcoming events IBC Classifieds

JULY 2012 | International Mining 1


Weir Minerals. Working hard to keep you in the black.

There are all kinds of economic indicators you can talk about. In this business, the
only one that matters is a steady flow of coal coming out of the ground. That’s what
it’s all about. That’s what we’re all about. The idea is to build products better.
And back them better. That means genuine Weir® Minerals replacement parts. And Excellent
real, live Weir® Minerals engineering support, when and where you need it, anywhere Mining
there’s coal in the ground. What goes down when a pump or valve goes down? Pro- Solutions
ductivity. Which is why we put everything we’ve got into keeping you working. And
in the black.

Weir Minerals. Expertise where it counts.


www.weirminerals.com/coal
Copyright ©2012, Weir Slurry Group, Inc. All rights reserved.
THE LEADER VO LU M E 8 • N U M B E R 7

Much more mechanisation potential


Publisher ollowing the publication of detailed articles equipment as a whole,
John Chadwick
Email: john@im-mining.com
Editor
Paul Moore
Email: paul@im-mining.com
F on advances in underground drilling, loading,
hauling and utility equipment in the June
issue of IM a report has just been released that
Atlas Copco and Sandvik
are the clear market
leaders, each with more
summarises the results of research conducted by than a third of the total
Associate Editor
Chris Cann The Parker Bay Co and Raw Materials Group market. Caterpillar's
Email: chris@im-mining.com
(RMG). Market Analysis: Underground Mining significant shares of the
Editorial Board
Professor Malcolm Scoble
Equipment examines the market for underground LHD and truck markets,
Robert E. Hallbauer mobile mining equipment operating in hard rock make it the most viable third competitor with the
Chair in Mining
Engineering., mines around the world. It covers the market for others being mostly regional and niche players.”
University of BC, wheel loaders/LHD's, mining trucks, drills Wheel loaders comprise the largest single
Vancouver
Jeff Roschyk (development and production) and bolters. product group with nearly 11,000 units in operation
Vice President of Equipment population data is derived from an followed by trucks and development drills both at
Product Management
& Marketing, P&H Mining, USA Underground Mining Equipment Database (UGDb) around 7-8,000. Production drills and bolters have
Peter Knights currently under development by Parker Bay and far smaller installed bases, in the vicinity of 2,000
BMA Chair & Prof. of Mining
Engineering University RMG. Underground mineral production data is each. Sandvik is the leader in underground loading
of Queensland
taken from RMG databases covering metal and iron and haulage equipment while trailing Atlas Copco
Stephen Stone
West One Management ore production at mines worldwide. Initially this in drilling and bolting. Competition in these latter
Perth, Western Australia database covers all countries except China. categories is particularly scarce with the big two
Dr. Andrew M. Robertson
President, Robertson Data from the UGDb is combined with estimates approaching a 90% combined share compared to
GeoConsultants for the global installed base for each product line. about 2/3rds of LHDs. They account for about half
Vancouver, Canada.
Ed McCord
These estimates were derived from figures the world’s underground trucks between them.
Project Consultant obtained from the primary manufacturers of the Other loader and truck manufacturers covered
Caterpillar Global Mining, USA
underground mobile mining equipment covered by include GHH Fahrzeuge, Volvo, Zanam Legmet,
Jason Nitz
Mining Systems Strategist this report and industry contacts, such as MTI, AARD, Fadroma, Dux, Bell, Getman, Maclean
Newcrest Mining Ltd, Australia
International Mining, with knowledge of such data. and Russia’s MoAZ. Development drills included
Dr Terry Mudder
Managing Director The numbers were further refined examining MTI and Oldenburg. Production drill analysis also
TIMES Ltd, USA
RMG’s underground mineral production figures. took in Cubex and Boart Longyear. Maclean and
Simon Tarbutt
Consultant, Santiago, Chile The authors warn that “the UGDb is judged to Mine Master. Each category included many others,
Dr. Mike Daniel identify approximately one third of the total of smaller fleet numbers.
Comminution Process Consultant
Ausenco Minerals & Metals, Australia population of nearly 30,000 underground trucks, There is still vast untapped potential for
LHDs, drills and bolters with a variation by product mechanisation, as the report notes. “Despite being
Editorial Enquiries:
Tel: +44 (0)1442 870 829 line ranging from 17% to 37%. While the 9,000+ the clear leader in underground mineral
Fax +44 (0)1442 870 617
identified machines is a notable subset of data production, Asia has the smallest equipment
Advertising Sales:
Phil Playle from which to draw conclusions about the population owing to both a large number of non-
Email: phil@im-mining.com population as a whole, it may not be statistically mechanised mines as well the absence of an
+44 1442 87 77 77
representative due to greater availability of accounting for indigenous suppliers (especially
Advertising Production
Emma Smith sources of data for certain manufacturers, regions, China) among the known population. The most
Email: emma@im-mining.com
models, etc.” The data comes from some 400 notable inverse to this ratio being North America
Publishing Consultant mines out of an estimated total of 1,000 and Oceania where mines account for far greater
Robin Peach
underground mines in the world. They “make no shares of the worldwide equipment population
Design & Production
Trevor Sheldon guarantees of the accuracy of the information, but than global mineral production.”
Email: sheldonmann@gmail.com
have endeavored to provide a thorough, logical Africa is a region where mechanisation has far to
Website:
analysis of available data.” come yet. “South Africa and Zambia account for
www.im-mining.com
Some 1,100 to 1,200 Mt of ore is extracted almost 90% of the underground market in Africa
Annual Subscription Enquiries:
Emma Smith annually from underground hard rock mines with some underground mines in Zimbabwe,
Email: emma@im-mining.com
around the world; 500 Mt is covered by mines with Ghana and Mali providing much of the rest.
Annual Subscription
UK and Europe £160, €230
machine data. While conventional, non- “Many mines in Africa, particularly gold mines,
Rest of the world US$270 mechanised methods are still widely employed in still use conventional mining methods with hand-
International Mining is published certain parts of the world, underground mobile held drills and track-bound equipment. In contrast
monthly by Team Publishing Ltd,
2 Claridge Court, Lower Kings Road mining equipment is the mainstay throughout to gold, PGM mines are mechanised to a higher
Berkhamsted, Herts. HP4 2AF, UK many regions and for the majority of the largest degree.”
Printed by The Manson Group, St Albans operations, though its use varies depending on the
© Team Publishing Ltd 2012 type of mine. John Chadwick
ISSN 1747 -146X
The report concludes, as was expected, that in Publisher
hard rock “taking underground mobile mining john@im-mining.com

JULY 2012 | International Mining 3


WORLD PROSPECTS

years, whilst targeting unit operating costs of


Williamson growth of Tanzanian diamonds $7.6/t. This will extract 170 Mt of the remaining
986 Mt resource. Petra foresees a long life for
etra Diamonds – the last Great Mines Petra to put in place an appropriate expansion the operation, particularly since the orebody

P article on the company appears this


month - has commissioned the rebuilt
plant at Williamson. In line with previous
plan to 10 Mt/y, with a life of mine plan of 17 remains open-ended at depth.

The tailings conveyor


statements, the company is revisiting the from the two-roll
Classifier at Williamson
longer-term 10 Mt/y expansion project. This
project will be dependent upon a secure
electricity supply, appropriate for the 10 Mt/y
plant, and treatment results of main pit material
following a six to nine month period of
production using the rebuilt plant processing
facility. This expanded output would yield some
600,000 ct/y and take mining to a depth of
approximately 260 m.
The following conditions are unique to
Williamson, Petra says:
■ An immensely large resource located within
an open pit lending itself to economies of
scale
■ A low stripping ratio
■ A soft ore that lends itself to AG milling
■ The ore contains sufficient grinding material
in the form of granite.
It was the confluence of these factors that led

Twiflex disc brakes meet overland conveyor needs


hen coal processing plants are an long distance, there are many design Disc brakes meet the requirements of

W appreciable distance from the mine,


how best to transport the coal from one
to the other is a key consideration, says
considerations to take into account; all of which
will impact on long term reliability, availability
and maintenance requirements. Transporting
overland coal conveyors in several areas. As well
as being the ideal technology for normal
stopping and parking operations, they also
Jonathan Cooksley, Sales and Marketing vast tonnages of coal overland, particularly provide vital emergency stops. They are the
Director, Twiflex. It is not unusual for the where there are inclines involved, requires the ideal choice where one conveyor feeds another
processing plant to be many kilometres away, highest levels of expertise in sophisticated and there is a risk of spill – e.g. where the
which might at first glance suggest delivery by conveyor and control systems. conveyor from a crusher at the mine feeds the
truck. “But overland conveyors can often “One of the most important design overland conveyor to the processing plant.
provide a far more economical solution, considerations is the braking technology to be In normal operation, depending on the
providing cost reductions in the order of 20-40% employed,” Cooksley says. “Today Twiflex offers installation, the disc brakes may only be used
or more,” he says. the largest range of industrial disc brakes in the during the final stages of braking, when they are
Of course with a conveyor that may run for a world.” applied to lock the conveyor in its parked
position. In other applications, they may be
needed to provide general slowing and stopping
duties. Most importantly, in the event of a power
failure, the brakes will be required to stop and
hold a fully loaded belt.
Twiflex specialises in ‘Power Off’ braking
systems. Powerful springs apply force to
compress the brake pads against the disc. To
release the brakes the springs are compressed
by a retraction device, which in overland
conveyor applications will typically be
hydraulically actuated. Any failure in the supply
to the retraction device would cause the springs
to be released, so providing ‘Power Off’ braking.
Twiflex braking systems are used on overland
coal conveyors across the globe, but some of
the most demanding of these are installed in the
USA. One example is a conveyor transporting

165 t/h of coal on a 5° incline. Here, two spring-

Twiflex GMR-SH spring applied, hydraulic


released brake units fitted to a power station
conveyor in Victoria, Australia

4 International Mining | JULY 2012


FASTER
HIGHER Come and see us at

STRONGER
THIS WAY! booth C-7309 Central Hall

The legends of hauling will be born soon. Stay tuned.


Join the movement towards The Future of Mining.
It’s This Way: sandvik.com/thisway
WORLD PROSPECTS

applied, hydraulically released VKSD type disc In a more demanding installation in the US, deceleration control. LC power packs provide a
brakes are used, acting on 25.4 mm thick discs, VKSD disc brakes are used to provide 295,000 range of standalone units with options for soft
1,067 mm in diameter, to provide 104,000 Nm of Nm of braking torque on an overland coal braking, a range of operating and motor
braking torque. The VKSD is part of Twiflex’s conveyor for Bowie Resources, Colorado. The voltages, and various add-on accessories
modular series and is a standard two-module conveyor carries a 1,500 t/h along an 840-m including a terminal box.
design, with the brake provided as standard conveyor with a 13.25° decline. The two VKSD On an installation for Cripple Creek and Victor
with two pre-fitted brake pads. The brakes were brakes act on 38 mm thick discs of 1,422 mm Gold, Colorado, requiring 47,450 Nm of braking
supplied complete with an electro-hydraulic diameter. torque, Twiflex recommended a GMRSH type
power pack with provision for variable At an installation for Mulzer Crushed Stone, disc brake acting on a 25.4 mm thick 72 mm
deceleration control. Indiana, an overland conveyor carries 1,100 t/h diameter disc. These brakes were supplied with
Bucim mine, Macedonia has an example of a over 87 m at a 5° incline. Here Twiflex a Twiflex MP electro-hydraulic power pack with
longer conveyor that runs to 2,696 m long, recommended the MXSH series disc brakes, provision for fast approach and deceleration
carrying some 5,180 t/h. Here two VKSD disc which feature a patented, compliant link control. MP series power packs have been
brakes act on 38 mm thick discs of 1,220 mm mechanism to ensure uniform pad wear. The two designed to provide an advanced and flexible
diameter, providing 60,300 Nm of braking brakes act on 38 mm thick discs of 610 mm means of brake control and to operate under the
torque. The brakes were supplied complete with diameter, providing 5,965 Nm of braking torque. most arduous conditions where the environment
an electro-hydraulic power pack with the The supplied LC electro-hydraulic power pack is extreme but reliable operation all year round
provision for soft braking. offered provision for fast approach and variable is paramount. www.twiflex.com

B i n a t i o n a l Pa s c u a L a m a t a k i n g s h a p e
arrick Gold’s Pascua-Lama will be one of the highest altitude mines in temperature through the year is 0°C. Operating in these conditions is not
B the world, at between 3,800 and 5,200 m above sea level. The average new to Barrick. Its Veladero mine, located 10 km away in Argentina, opened
in 2005.
Each year it is expected to produce 800,000 - 850,000 oz
of gold, and about 35 Moz of silver, in its first full five years
of operation at negative cash costs of $225-275/oz. For
every $1/oz increase in the silver price, total cash costs are
expected to decrease by about $35/oz over this period.
It has proven and probable reserves of 17.9 Moz of gold
and 676 Moz of silver contained within reported gold
resources, as of December 31, 2011.
The Chilean side of the mine (lower half of the overview
image), will use conventional surface mining methods,
including drilling, blasting and hauling by truck to an
adjacent crushing facility. Ore will be transported
underground by conveyor through a 4 km tunnel to the
process plant facility, on the Argentine side of the mine.
Looking down on the project site, the platform for the
primary crusher is seen on the right. The portal of the tunnel
that will take ore for processing on the Argentine side can
be seen on the left.
The other picture shows a Komatsu haul truck draped in
the flags of Argentina and Chile rolling out of the open pit
staging area as employees look on. Pascua-Lama will be an
open pit operation producing both refractory and
non-refractory ore. The mining fleet will include 30 large
haul trucks like this, five shovels and three loaders.

6 International Mining | JULY 2012


Introducing an almost magical drilling system

We’re not known for dabbling in make-believe. In fact, few things are more real than the benefits that
come with our new T-thread. Especially when you consider that large rods require a robust thread system.

The new T-WiZ drill string looks a lot like its predecessor, but that’s where the similarities end. We’re not
about to reveal all our tricks, but you’ll be amazed to know that T-WiZ offers up to 30% longer service life.
Which means fewer rod changes and more productivity per shift.

So test the combination of T-WiZ Speedrods with T-WiZ shank adapters – the benefits are spectacular.

Atlas Copco Secoroc AB


Box 521, SE-737 25 Fagersta, Sweden
Phone: +46 223 461 00
E-mail: secoroc@se.atlascopco.com
www.atlascopco.com
GREAT MINES

Kimberley and more

John Chadwick examines


Petra Diamonds’ other
South African operations
of Kimberley Underground,
Koffiefontein and the
Fissure mines

he company’s two large underground mines employ a slusher drift block caving Kimberley underground mines

T mines of Cullinan (May 2012, pp8-15) and


Finsch (June 2012, pp10-13) have already
been covered. Kimberley is the other very
method.
FY 2011 marked the first full year for
Kimberley Underground under Petra
content. It is anticipated that these measures
will ensure adequate fines removal and increase
emotive name in the stable. Here at the home of management, following completion of the throughput. The company has built up a ROM
diamond mining, Kimberley Underground acquisition in May 2010. There was stockpile at surface, estimated to be 0.4 Mt in
comprises three kimberlite pipe mines in close encouragement in the prices achieved for its size, which gives flexibility to make up some of
proximity: Bultfontein (10 ha at surface), production, with the average of $333/ct for the the lower recent production levels by processing
Dutoitspan (11 ha) and Wesselton (9 ha). These period considerably exceeding initial higher tonnages once the plant throughput
mines were integral to the economic expectations. issues have been overcome.
development of South Africa as their output At the new Joint Shaft plant, which services The plan for processing at Wesselton involves
effectively financed development of the nascent the Bultfontein and Dutoitspan pipes, Petra a combination of a mobile pan plant together
gold industry. They are currently mining at experienced some initial difficulties relating to with a new plant (similar to that constructed at
depths of between 845 and 995 m below surface. slimes and tailings disposal. To deal with the Joint Shaft). The new main plant at Kimberley
They have a history of producing large high percentage of fines material inherent in the remains on track for commissioning in Q4 FY
diamonds and fancy yellows, such as the Bultfontein and Dutoitspan ROM ore, Petra 2012.
Oppenheimer (253 ct rough and the Kimberley introduced a scrubber into the processing Unit costs of approximately R191/t in FY 2011
Octahedral (616 ct rough). circuit, and is also introducing an apron feeder were negatively impacted by reduced
Petra’s expansion plan at Kimberley to handle material with a high level of mud throughput. These costs were expected to
Underground envisages production rising from
about 57,000 ct in FY 2011 to some 120,000 ct/y
by FY 2013. Total resources (inclusive of
reserves) amount to 7.1 Mct, to a currently
known depth of 1,060 m. All three employ block
caving at current depths of 845 m (Bultfontein),
870 m (Dutoitspan) and 995 m (Wesselton).
Bultfontein is mined using a slusher drift block
cave mining method simultaneously with the rim
loading section. The Dutoitspan and Wesselton

De Beers' Kimberley processing plant that


continues to recover diamonds from the tailings
dumps

8 International Mining | JULY 2012


know-how performance reliability

ENERGY
E N E R G Y DISTRIBUTION
DISTRIBUTION

AUTOMATION
A U T O M AT I O N

COMMUNICATION
C O M M U N I C AT I O N

TTRANSPORTATION
R A N S P O R TAT I O N

becker.
b e c k e r. keeping
k e e p i n g your
y o u r lifeline
l i f e l i n e flowing.
flowing.
TThe
he n
new
ew B
Becker
ecker M
Mining
ining S
Systems
ystems B
Belt
elt R
Rip
ip D
Detection
etection S
System
ystem B
BRS
RS 2 h
has
as b
been
een d
developed
eveloped tto
o h
help
elp iincrease
ncrease tthe
he
productivity off cconveyor
productivity o belts
onveyor b byy d
elts b detecting belt
etecting b elt rrips ass ssoon
ips a and
oon a ass rreliable
nd a eliable aass p
possible.
ossible. TTo
ommonitor
onitor ssteel
teel ccable
able aand
nd
fibre belts,
fibre b elts, iinductive
nductive lloops need
oops n eed tto
obbe
eeembedded
mbedded iin
n tthe belt.
he b Once
elt. O nce iinstalled,
nstalled, tthe
he B
BRS
RS 2 w
will
ill ddetect
etect tthe
he lloops
oops oon
n
the
the cconveyor, define
onveyor, d and
efine a number
nd n umber tthe
he lloops and
oops a nd ccreate
reate iits own
ts o wn iimage off tthe
mage o belt
he b elt aand
nd iits
ts lloops
oops iin
n rreal
eal ttime.
ime. TThe BRS
he B RS 2
using
using iits
ts rreal
eal ttime
ime lloop diagnostics,
oop d iagnostics, ccontinuously monitors
ontinuously m onitors tthe belt’s
he b health
elt’s h ealth aand
nd iin
n tthe
he eevent
vent ooff a rrip,
ip, sstops
tops tthe
he bbelt
elt
and
a nd rreduces any
educes a ny ffurther damage
urther d and
amage a downtime.
nd d Access
owntime. A and
ccess a nd tthe monitoring
he m off tthe
onitoring o he ssystem
ystem iiss ssimple,
imple, eeither
ither llocally
ocally
with
with iits 12”TFT
ts 1 2”TF T sscreen,
creen, 5 sshortcut buttons,
hortcut b mouse
uttons, m pad
ouse p and
ad a nd vvirtual
irtual kkeypad orr rremotely
eypad o emotely vvia
ia TTCP/IP
CP/IP oorr M
Modbus. An
odbus. A n IIS
S
version off tthe
version o BRS
he B RS iiss a
also
lso a
available.
vailable.

Fo r m
For ore iinformation
more nformation p lease ccontact
please ontact BRS2@de.becker-mining.com
BRS2@de.becker-mining.com o
orr ggo
o tto
o www.becker-mining.com
www.becker-mining.com
GREAT MINES

to 6.1 Mct, to a current depth of 690 m, though


the orebody remains open-ended at depth. The
current mining method is front cave, currently at
a depth of 490 m. The mine plan is for 14 years
but the potential life could be more than 20
years.
Koffiefontein achieved an average value per
carat of $564 for FY 2011, up 40% on the
comparative period despite the overall average
being reduced to some extent by a higher
proportion of lower value tailings production in
the total sales mix. ROM production for the year
was 35,139 ct (H1 FY 2011: 27,390 ct; H2 FY
2011: 7,749 ct). Tailings production was 12,817 ct
for the period (H1 FY 2011: 7,110 ct; H2 FY 2011:
5,707 ct). Capex of $11 million for FY 2011 was
mostly spent on underground development and
mining equipment.
Waste ingress and reduced production from
Kimberley Underground – Mining overview
De Beers continues to manage its surface 52 level significantly affected the ROM grade
improve once the Wesselton plant is fully mining (tailings recovery) at Kimberley, which (3.1 ct/100 t in H2 FY 2011 as compared to 5.9
operational. operates independently of the underground ct/100 t in H1 FY 2011). As at Cullinan and
Of the $13 million capex in FY 2011, mine workings. It has a custom-built recovery Finsch, Petra’s development plan at
approximately $9.5 million was spent on plant developed to efficiently treat and to Koffiefontein will establish new production
improvements to the Joint Shaft treatment plant. recover diamonds which produces some levels where the company will eventually have
A further $3.5 million was applied to the 400,000 ct/month. De Beers expects Kimberley access to undiluted ore. Once this has been
acquisition of adjacent land, buildings and diamond recovery operations to continue achieved, Petra expects the overall ROM grade
infrastructure relating to water reticulation and through 2023. at Koffiefontein to improve to about 8 ct/100 t,
but it is expected that lower ROM grades could
Expanding Koffiefontein be reported until FY 2014.
Koffiefontein (11 ha pipe at surface) is one of the Extensive stress modelling simulations have
world’s top diamond mines by average value per indicated that the planned front cave at the 580
carat and produces exceptional white and m level be changed to a sub-level cave mining
coloured diamonds, a regular proportion of method between the 560 and 600 m elevations.
which are of between 5 and 30 ct. Underground It is expected that this plan will be executed
mining of the high value, low-grade within the original timetable and capex
Koffiefontein kimberlite pipe is supplemented forecasts, with annual production expected to
by tailings treatment from a 65 Mt tailings reach 1 Mt/y in approximately three years and
deposit and open-pit mining of the 5 ha satellite reach 1.2 Mt/y in about five years, delivering
pipe named Ebenhaezer. over 100,000 ct/y (ROM and tailings) by
Total resources (inclusive of reserves) amount FY 2017.

Koffiefontein – Mining overview

Joint Shaft plant re-crush circuit at Kimberley


Underground – a plant assistant cleaning the
crusher sizing screen

slimes handling facilities (by assuming a


rehabilitation guarantee).
Kimberley Underground has a current mine
plan of 11 years, which could be extended as
Petra more thoroughly investigates the
resources of these mines at depth and the East
Blow at surface.

10 International Mining | JULY 2012


DYNAMICALLY MINIMAL CONSISTENT
BALANCED VIBRATION G-FORCE

REDEFININGECCENTRIC
The Niagara is the definitive scalping screen; it’s classic, but far from
ordinary. The single eccentric shaft guarantees constant circular motion
and consistent G-force, even under extreme conditions.

Clean openings in sticky situations. Feed sizes up to 80” x 40” x 40”.


Process reliability for surges under load. Dynamically balanced to
minimize structural vibration.

FAR FROM ORDINARY. INGENIOUSLY ECCENTRIC. THE NIAGARA.

HAVER & BOECKER W.S. TYLER HAVER NIAGARA


LATINOAMERICANA NORTH AMERICA EUROPE, AFRICA & ASIA

+55 19-3879-9100 +1-800-325-5993 +49 25-22-300 www.havertyler.com


GREAT MINES

Open-pit mining at the satellite Helam and Sedibeng put in a strong


Ebenhaezer pipe at Koffiefontein
performance in FY 2011, with revenue for the
Fissures unit as a whole up 62% to $21.8 million
are narrower and more difficult to mine and overall production up 18% to 87,488 ct. The
and as a result, the mining cost per average value per carat achieved also increased
tonne is around seven times that of a 32% to $244. For FY 2012, Petra expects a
kimberlite pipe. This financial year similar level of combined production across the
(2012), Petra is expected to produce 2.2 fissure portfolio to FY 2011.
Mct over all its operations, an increase At Star, “where operations are challenging, a
of 100% on last year. The Fissure’s will disappointing performance was recorded for the
contribute around 5% of the total year, as reflected in the impairment charge
carats and 8% of revenue generated incurred,” Petra reported.
this year. As Petra continues to expand Unit costs for the Fissures remain flat despite
its production to just under 4 Mct by cost pressures specifically relating to electricity
2014, the Fissures contribution will and labour. The majority of the $5.2 million
drop to 3% of the total carats produced capex in FY 2011 was spent on continuing
and 4% of the revenue.” underground development across the fissure
The Sedibeng operation is an mines including a headgear installation at
amalgamation of two mines: Messina Sedibeng’s Dancarl shaft.
and Dancarl. The mines are operating Additionally, $11.0 million was spent in
at depths of between 600 and 750 m. respect of the Helam projects manufacturing
Plans to increase production from just facility for equipment under construction for
over 87,000 ct in FY 2011 to 140,000 other mines and projects within the Group.
ct/y by FY 2015 are currently being Northland Capital further reported that “the
implemented. Fissure mines have a total resource of just under
Different Fissures The strike lengths of the fissures at surface 5 Mct with an average diamond value of
The Fissure Mines consist of three mines Helam, are 6 km at Helam (depth of current mining 750 $255/ct. The large amount of maintenance
Sedibeng and Star which are unusual mines in m), 2.4 km at Sedibeng (750 m) and 4.5 km at capex spent by Petra from 2009 to 2011 has
that the diamonds are extracted from kimberlite Star (620 m). Helam and Sedibeng employ full ensured that the mines will continue to produce
dykes and not pipes. Northland Capital noted in shrinkage overhand stoping, while Star is an at their current rate with a low maintenance
its report on Petra of March 8, 2012 that “dykes open stope underhand operation. capex for years to come.” IM

RELIABLE GROUND SUPPORT

DSI has
the most
extensive
product range
available on
the market.

Innovative Solutions
DYWI® Polymer Rock Dust System
 Easy to batch and spray
 Quick troubleshooting
 One stop shop service
 Operating at low pressures
 No production interruption
 Cost effective and easy operation
Quick - Safe - Reliable www.dsiunderground.com
North America, USA South America, Chile EMEA, Austria APAC (ASEAN), Australia
www.dsiunderground.com www.dsi-chile.com www.alwag.com www.dsiminingproducts.com/au

12 International Mining | JULY 2012


OPERATION FOCUS

Karelian
gold

John Chadwick reports from one of


the cleanest gold mines in the world
in the farthest east boundary of the
EU, with expanding production likely

ndomines’ Pampalo gold mine is currently Like so many of the mines coming on stream Mucking by remote control.

E producing gold at an annualised rate of


800-900 kg. The mine is located on the 40
km-long gold-critical Karelian Gold Line, where
in Finland today, Pampalo is a former project of
Outokumpu. It was discovered in 1990 by the
Geological Survey of Finland and Outokumpu
Picture by Eija Hiltunen

gold. Outokumpu ceased activities in 1999 and


Endomines controls all currently known gold Mining undertook intensive exploration and test Pampalo was acquired by Dragon Mining.
deposits. The mine project was completed in mining. Outokumpu carried out test mining first Endomines was established in 1996 as a
December 2010, on schedule and in line with the in 1996, as an open pit. Later in 1998-1999 there private company. It was registered at
budget at €20 million. Commercial production was limited underground mining down to a Hattuvaara, Ilomantsi, and explored north from
commenced in February 2011 as scheduled. depth of some 100 m. As a result, Endomines Pampalo in 1996-2006, acquiring Pampalo in
The Pampalo deposit, which remains open at came into the fortunate position of taking on a 2006.
depth, is located in the central part of the well-developed decline to more than 250 m
Karelian Gold Line, 5 km north of the village below surface. Currently stoping is around the Developing mining skills
Hattuvaara. It is an Archean orogenic gold 220 m level and the decline today extends to Finland has an effective and somewhat unique
deposit in an intermediate pyroclastic unit, 365 m below surface, to facilitate Pampalo way of addressing skills shortages in mining,
metamorphosed to greenschist - lower- Deeps exploration. through a national training institute. In North
amphibolite facies. It lies close to the border Outokumpu hauled the ore it extracted by Karelia this is Pohjois-Karjalan aikuisopisto
with Russia in the most easterly extremity of the road 400 km to both Vammala and Pyhäsalmi for (PKKY) with colleges in Joensuu, Kitee, Lieksa,
European Union. beneficiation. A total
Plant capacity was increased from 230,000 of 114,372 t was
t/y to 270,000 t/y by debottlenecking during mined, at an average
2011. Metallurgical testing demonstrated that gold grade of 15.3 g/t,
the gold could be very efficiently extracted by producing 1,755 kg of
gravimetric separation and flotation
concentration. The best results indicated a
3D image of the three
recovery of more than 90%. As a result, this lenses of the Pampalo
mine is very clean with minimal emissions, and deposit. The section
none to the environment. Its tailings facility is viewed from
northwest. The gold
full of what is effectively potable water. mineralisation is
No cyanide or acid is used and there is shown in different
nothing harmful in the tailings. There is no Acid colours. The colours
light blue and red =
Mine Drainage (AMD). The target is for 100 % existing declines,
water recirculation. brown = open pit

JULY 2012 | International Mining 13


OPERATION FOCUS

these machines ends at


the end of 2012.
Pampalo mining plan
is a design for sublevel
bench cut-and-fill
stoping (a modified
Avoca mining method)
with 14 m stope heights
in the upper levels and
17-20 m stope heights
in the lower levels. The
lower stope height
incurs higher stoping
costs per tonne of ore
but has lower costs in
Sandvik DL430-C being used on this occasion consideration of rock reinforcement. In the
for sludge drilling and sampling to define the future, stoping will move to the deepest level to
orebody in an area where only limited core
drilling has been undertaken. minimise the losses of ore in horizontal pillars.
Picture by Eija Hiltunen The choice of method was made to minimise This Sandvik DS420-C cable bolter is a popular
the extent of hanging wall exposure during and effective rig
Niittylahti, Nurmes and Outokumpu. The latter is mining. The grade of the deposit prevents the
the country’s primary centre for learning mining use of higher cost cut-and-fill mining methods, the degree of charging in the boreholes suitable
skills. which require cemented fill. This method allows for all. It carries all the equipment needed: the
Pohjois-Karjalan aikuisopisto (see box) has simultaneous mining and filling of the stopes to detonators, ignition and emulsion needed for
been a very important contributor to the minimise the span of the hanging wall exposed, producing Kemiitti 810. When charging, the
successful development of Finland’s latest two reducing the potential for hanging wall emulsion is converted into the explosive only
mines, Pampalo and Altona Mining’s Kylylahti instability and dilution. within the borehole.
(article in the September MINExpo, issue), both The longhole drilling rig is a Sandvik DL430-C.
officially opened on that same day, May 25, a It is a narrow orebody, 4-10 m wide. Cable Green gold
year apart; Pampalo in 2011 and Kylylahti this bolting is the primary stope support method, This April, Endomines decided to proceed with
year. using a Sandvik DS420-C cable bolting rig. Janne increasing production capacity at Pampalo up to
At Pampalo PKKY is not only providing Muttonen, Resident Manager, is very happy with a maximum of 450,000 t/y. The decision was
training but also contracting services. this rig. He explained that it is used to install 6- based on the results of a recent feasibility study.
Endomines has a Sandvik DD420-S60C twin 8 m cable bolts and can easily average more A second-hand refurbished mill was acquired
boom jumbo that together with PKKY’s twin- than 100 m of cable bolting in a ten-hour shift. before the end of last year, and this will now
boom Atlas Copco Boomer E2.drills all the Stopes are mucked out by Endomines’
A Forcit MA 22 emulsion charger mounted on a
development drifts to open up the stopes. Sandvik LH 514 LHD, which load into a
Scania P340 truck chassis. Kemiitti 810 is a site
In this case, PKKY is working as a contractor contractor’s fleet of SISU and Scania trucks (20- sensitised pumpable emulsion explosive
and is also training drill operators for 30 t) capacity for the haul to surface. developed by Forcit for underground mining.
The equipment on the truck automatically
Endomines and other mining companies. A Forcit MA 22 emulsion charger mounted on
adjusts the degree of charging in the boreholes
Pampalo also has PKKY’s Sandvik’s DS410 rock a Scania P340 truck chassis. Kemiitti 810 is a suitable for all. It carries all the equipment
bolter and its Normet MC 605 DA Anfo charger site sensitised pumpable emulsion explosive needed: the detonators, ignition and emulsion
needed for producing Kemiitti 810. When
working under contract and providing training in developed by Forcit for underground mining. The
charging, the emulsion is converted into the
an active mine. At this stage the contract for equipment on the truck automatically adjusts explosive only within the borehole.

PKKY’s Normet charger. Picture by Eija Hiltunen

14 International Mining | JULY 2012


Imagine enhancing your recovery of
scarce, valuable mineral resources
Visit u
Hydro s at
proce
ss
2012
July
Santia 12-13,
go de
Chile,
Chile

EVG1127e

BASF Mining Solutions offers an extensive range of mineral processing reagents.


Our advanced chemistry, coupled with leading application expertise, provides
you with major operational, environmental and economic benefits. Discover your
possibilities with BASF.
miningchemicals@basf.com · www.basf.com/miningsolutions

Answers for the Mineral Processing Industry –


Today and Tomorrow
OPERATION FOCUS

allow for a rapid capacity increase. An The crushing section


environmental permit application for the of the operation
capacity increase was filed, and a decision is comprises one jaw
expected early next year. Preparations are crusher and two cone
underway with a view to starting test production crushers, delivering a 0-
at Rämepuro, which is likely to be the first 13 mm product to the
satellite deposit to be developed. In addition to mill. Metso designed
the second mill, more flotation cells will be the plant and provided
added. much of the equipment,
The plant expansion will allow for low grade, including a Metso TRN
currently uneconomic, open-pit mineral 3.0 x 4.8 m wet ball mill
resources to be converted to ore reserves which with grate discharge. It
can be mined and processed at Pampalo. It will is equipped with an
also ease problems with fine crushing. 800 kW ABB motor. The
The first thing that strikes you when entering ore is ground to a P80
the plant from the control room is the shaking of >75 μm. There are
Alimak raise miner in action.
tables. It is rare to see the gravimetric section of six Metso RCS20 flotation cells and one Metso Picture by Eija Hiltunen
a plant so prominent, but it is a very key part of RCS 3 cell. There is also a Metso CT SFL10 - 5
this facility. The 4,000 t/y of flotation thickener. Hannu Tahvanainen, Mill recovery without contamination problems. By
concentrate assays 100-250 g/t Au, and the rest Superintendent, finds the plant’s Numcore using 3D-imaging, the solution provides
comes from the gravity circuit, recovering 30- Flotation Watch system very effective. This is a accurate, online information on froth stiffness
60% of the gold, depending on the ore being froth flotation process control solution, recently and thickness of the froth bed. These froth
treated at any time. acquired by Outotec that simply increases properties can then be controlled by automatic
adjustment of chemicals and frothers.
New grinding mill
The first cyclone cluster comprises a Multotec
Trucking
Additonal flotation volume distributor: D3-25/3 and Multotec cyclones:
HC250-L10-1/A-A/60, fitted with a 100 mm
Crusher
vortex finder and 60 mm spigot. Another cyclone
Flotaition Mine Drainage
Feeder Water cluster comprises a Multotec D2-42/2
Classification
Flotation concentarte
Fines ~4-6 000 t/a; 100-200 g/t Au distributor and HC420-30-0/A-A/110 cyclones,
Classification fitted with a 185 mm vortex finder and 110 mm
Coarse fraction spigot. And the third has a D2-35/2 Multotec
Tailings Storage Facility
Gravimteric distributor and HC350-15-0/A-B/45 cyclones
circuit
Crusher ore stockpile Grinidng mill fitted with a 111 mm vortex finder and 45 mm
spigot. Cyclone overflow goes to flotation and
Gravimetric concentrate
the underflow to the spirals and tables.
• No cyanide or acid used Grade 30-50 % Au
The gravity spirals were supplied by Downer
• No harmful material in tailings
• No Acid Mine Drainage (AMD) The plant was designed for expansion EDI Mining - one bank of 12 Tripple-start LG7s.
• Target 100 % water recirculation from the outset There are two Deister single-deck No6 2 kW
shaking tables. One is left handed and one right
handed.
In May Endomines AB signed an agreement to
sell and deliver its gravimetric gold concentrate
production from Pampalo to precious metals
refiner K.A. Rasmussen AS, Norway. The volume
of deliveries and estimated concentrate grade
allow up to 100% of gravimetric concentrate
production to be delivered to Rasmussen. The
agreement is signed for a period of one year,
with the option of renewal for successive one
year periods.
Markus Ekberg, CEO of Endomines
commented that "commercial test deliveries
have proven to be mutually satisfactory. The
agreement provides Endomines with flexibility,
as it can balance its production between higher
value gravimetric gold concentrate and flotation
concentrate production volumes."
Pampalo is a very clean operation - water
balance for the expanded mill capacity of
450,000 t/y

16 International Mining | JULY 2012


OPERATION FOCUS

Finland’s great mining skills training facility

P
ohjois-Karjalan aikuisopisto (www.pkky.fi North Karelia Municipal Education and Training
Consortium) is the organisation whose main function is to provide qualified vocational education
in the county of North Karelia. Each year some 1,600 students, both young people and adults,
obtain a vocational qualification at its institutes. It is owned by all 14 of the county's municipalities.
One of its strengths lies in effective cooperation; intercommunication between the College, the
Adult Education Centre and the Upper Secondary Schools in the region as well as the North Karelia
Polytechnic and, in the case of mining at Outokumpu, close ties with the industry itself. National
indicators show that it is among the elite of Finnish education providers.
There are 20 educators specialising in training mining technologies attached to the Outokumpu
college. The primary mining courses cover explosives and blasting, mining technology, mine
development and mineral processing. The college also co-operates with GTK, the Geological Survey
of Finland, for rock sampling education and training.
The standard courses in after-training, retraining adults to work in mining, cover underground or
surface mining and mineral processing and most of the work is tailored to specific client mining
company needs. Maintaining and improving adult learning skills, it takes one year to qualify – half
the time being spent on theory and half practical.
In addition to the three machines at Pampalo, the college has two other Sandvik drill rigs – a DX 780 and
a CHA 560 – and two small Commando rigs. There is also a surface drill
Line of gold on one of the Deister shaking
simulator – a Sandvik DP1500i. tables
The institute intends also to buy an LHD, an emulsion charger,
Endomines is the leading partner in the
haul trucks and an underground drill simulator. The aim is always to
TEKES Green Mining Project, “Responsible
have new equipment on which operators can train, so each unit in
Gold” together with JOSEK, Outotec and GAIA-
the fleet will be replaced within five years.
consulting. Stage 1 is evaluating possibilities to
The most important types of education are vocational education
produce “traceable, responsible gold” using
and training (upper secondary level), adult education, vocational
Endomines gold as a raw material and was to be
further and supplementary education and training, labour policy
completed by August 2012. Stage 2 will develop
education, apprenticeship training, common non-vocational
a prefeasibility study and investor plan, with the
education, and summer university teaching.
final investment plan established in Stage 3.

Two industry leaders,


now
w One Sour
S
Source
rce
Ludowici and FLSmidth have e joined forces
forces to become One Source.
Source. These
Theese industry greats
greats bring together
over 150 years of experience
experience from
from Ludowici in screens,
screens, centrifuges andd complementary products
products and
130 years of experience fromm FLSmidth in process
from handling
process and material handlinng equipment. Ludowici’s
Ludowici’s legacy
of leadership in the Australian
an and global markets continues forward
Australia forward as
a FLSmidth Ludowici.

Adding to FLSmidth’s
FLSmidth’s services
es and offerings,
service offerings, Ludowici technologies allow
ow FLSmidth to provide
allo provide
complete minerals processing
processin ng and preparation
preparation plants from
from start to finish;
finish; including engineering,
process
testing, process equipment, material handling solutions, and more.
more. With
With the combined strength
strength of
Ludowici, FLSmidth now trutruly
uly becomes your One Source
Source for minerals processing
p ocessing and material handling
pr
equipment and services.
For mor
more
e information, ca
call
ll 1800 800 827 (Australia only) or visitt us at www
www.flsmidth.com
.flsmidth.com

JULY 2012 | International Mining 17


OPERATION FOCUS

Along the Gold Line main target in 2012, along with Rämepuro
Ekberg points to the similarities and the drilling, where pilot plant process testing is
analogous Archaen geology in Ilomantsi (no underway. The total 2012 drilling target is 8,000
gold mines in production in 2009) and the to 10,000 m.
Southern Cross greenstone belt in Australia. The A combination of Endomines clean credentials
latter had four mines in production in 2009, and and the otherwise generally poor employment
more than 40 had been closed over the time the opportunities in North Karelia mean the
belt has been producing: company is welcomed wherever it goes.

Parameter Ilomantsi (Karelian Gold Line) Southern Cross


Belt length 90 km 110 km
Belt width 0.5–10 km 0.5–15 km
Gold exploration since 1986 1888
Total gold produced 55,000 oz >10 Moz
Known reserves & resources 450,000 >2 Moz

At the end of May,


Endomines reported
preliminary results from its
current underground core
drilling campaign at the
Pampalo mine. Results
were received from the
first seven holes of a 15- The Karelian Gold Line
hole, 739-m, campaign,
which started in April
2012. This campaign between the currently known Pampalo and
focused on an area Pampalo East gold resources, at grades
between the Pampalo and comparable with the previously known gold
Pampalo East ore zones, lodes at Pampalo. The drilling campaign will
and yielded a number of proceed further as planned upwards, down dip
encouraging intercepts, and along strike with a view to follow the
Diamond drilling contractor Drillcon SMOY
including 6 m @ 5.9 g/t Au, 12.6 m @ 5.2 g/t, mineralised zone.”
operating a new Sandvik core drill, mounted on
a mini-excavator crawler chassis, underground and 9.8 m @ 5.0 g/t Au, in addition to the “These exploration results from the first
at Pampalo previously drilled intercepts yielding 9.2 m @ 4.1 exploration drillings in 2012 have confirmed the
g/t Au and 11.6 m @ 3.2 g/t Au. significant potential for further gold deposits in
The company says these results prove that the immediate vicinity of the Pampalo ore”, said
Endomines estimates its properties currently there is a previously unknown “mineralised zone Markus Ekberg, CEO of Endomines. IM
hold Proven and Probable ore reserves of 1.6 Mt
Gold ore reserves - Karelian Gold Line 31st Dec 2011
with an average gold grade of 3.5 g/t, with
Grade
exploration producing promising results all the Deposit Tonnes Oz kg Classification Consultant
Au g/t
time. These reserves and resources are all Pampalo 10 000 3,0 965 30 Stockpiled Endomines
662 000 3,4 72 146 2 244 Proven Outotec Oyj
located along the Karelian Gold Line - 120,000 426 000 2,7 36 748 1 143 Probable Outotec Oyj
oz in Pampalo and 60,000 oz in deposits close SubTotal 1 098 000 3,1 109 859 3 417
Pampalo East 200 000 1,5 9 645 300 Probable MAPTEK
to Pampalo – with resources open for Pampalo Reserves total 1 298 000 2,9 119 504 3 717
expansion. All satellites along the Gold Line are
Hosko 13 000 8,5 3 553 111 Proven MAPTEK
within trucking distance of the Pampalo plant. 116 000 10,0 37 295 1 160 Probable MAPTEK
The Karelian Gold Line comprises more than Hosko total 129 000 9,9 40 848 1 271

40 km of gold mineralisation with excellent Rämepuro 134 000 3,9 16 802 523 Probable MAPTEK
potential in Archean rocks. Endomines holds Muurinsuo 67 000 3,0 6 462 201 Probable MAPTEK
Grand total 1 628 000 3,5 183 616 5 711
400 km2 in claims and reservations, including
23 known gold showings. It has been granted
two mining concessions to date and five more Mineral Resources – Karelian Gold Line 31st Dec 2011
Grade
are under application. An EIA (Environmental Deposit Tonnes Oz kg Classification Consultant
Au g/t
Impact Assessment) for the entire area is Pampalo 130 000 3,5 14 629 455 Inferred Outotec Oyj
ongoing. A total of 65 new claim applications Pampalo East 21 000 1,5 1 013 32 Inferred Runge Limited
Hosko 547 000 1,8 31 656 985 Inferred Runge Limited
have been lodged and exploration is ongoing at Rämepuro 61 000 4,1 8 041 250 Inferred Runge Limited
a good pace. Muurinsuo 786 000 1,5 37 906 1 179 Inferred Runge Limited
Kuivisto East 37 000 3,2 3 807 118 Indicated 
Pampalo underground diamond drilling Kuivisto East 145 000 1,0 4 662 145 Inferred 
commenced early this year and surface diamond Kuittila 275 000 2,6 22 988 715 Inferred GSF, historical
Grand total 2 002 000 1,9 124 700 3 879
drilling there began in May. Korvilansuo is the

18 International Mining | JULY 2012


IT STARTS WITH A
SINGULAR FOCUS
At Joy Global, we’re combining resources to better
serve our customers worldwide. With a direct service
approach dedicated to one thing and only one thing:
mining performance.
OPERATION FOCUS

Whiter than white

Paul Moore visited the specialist


underground white marble mining
operations of Geomin at Hermsdorf in
eastern Germany near the Czech
The ST7, here loading Geomin
calcitic marble at Hermsdorf mine, border, to see the company’s
features high fuel efficiency and
improved safety attributes
mechanised mining fleet in action

he Hermsdorf mine is one of two mines Proterzoic metagranitoids as well as Cambrian features. In the former about 30-40 m thick reef

T operated by specialist industrial minerals


group, Geomin Erzgebirgische Kalkwerke,
the second one being Lengefeld. The company
lithologic equivalents of the Breitenbrunn
Formation (muscovite schists). Besides these
originally late Cadomian igneous rocks and their
limestones act as cores of tectonically
developed horst structures. In contrast, the k1
horizon has partly been downthrown at
also has a third mine under development, subsequent prograde metamorphism, the synsedimentary graben-like structures.
Hammerunterwiesenthal, for which it is footwall of the marble unit (quartz-rich phyllites Such deep sedimentation basins provided the
currently assessing fleet options. and hornblende-chlorite schists of the lower environment for the development of four white
The underground mine exploits calcitic Herold Formation) represents originally marble horizons (k2-k5) with changing facial
marble from a deposit located in the eastern submarine basic volcanic rocks subsequently features and varying thickness. Caused by post-
Erzgebirge (literally, Ore Mountains) to the affected by retrograde greenschist-facies metamorphic brittle tectonic deformation, the
southwest of the village of Hermsdorf. The first metamorphism. white marble horizons were divided into fault-
documented mention of marble production The deposit comprises six calcitic white bound separated blocks being tilted and
dates back to the year 1581. At that time the marble horizons (k0, k2-k5) and one grey thrusted between the horst structures.
marble was widely used as a building material horizon (k1). The marble is thought to have a The tectonic features of the deposit are of
and for decorative sculpture. The underground marine sedimentary protolith. The carbonate particular importance. The main foliation of the
activities started in 1880 in the Fiskalischer sedimentation took place under turbulent wall rocks forms a girdle fabric with axes
Bruch (Fiscal Quarry), when production was conditions. One reason for
mainly a raw material for quicklime production, this interpretation is the
which was used mainly in agriculture and in the rough surface relief of horizon
steel industry. k0 (the deepest marble
occurrence in the deposit)
Geology and formation with high variations in
The age of the marble deposit at Hermsdorf is thickness and parallel
still debated. Lithostratigraphically, the thick splitting into several marble
sequence of interlayered marble and phyllite is layers. These observations
ascribed to the Herold Formation as part of the suggest a rapid change of
Thum Group. This would correspond to a depositional conditions. The
Cambrian age of approximately 510 million k1 horizon is characterised by
years. The deposit is situated in the upper similar but more distinct
Herold Formation.
The underlying rocks of the deposit are ST7 operator at Hermsdorf,
Precambrian gneisses of the Preßnitz Group and Dirk Thiele

20 International Mining | JULY 2012


“Thanks.”
For seventy-five years, J.H. Fletcher & Co. has
dedicated itself to the improvement of operator safety
and productivity in the world’s underground mines.
For our success, we thank our employees, customers,
suppliers, family and friends.

Scan this code to visit


our website
Booth 2615 J.H. Fletcher & Co.
402 High Street
Huntington,WV 25705
304.525.7811
www.jhfletcher.com

Seventy-five years. And this is just the beginning.


2012 J.H. Fletcher & Co. All rights reserved.
OPERATION FOCUS

Older drill rig used passing the material back into the ore car
at Geomin until the behind it. Czech-made and Flotman drills were
1980s
used. At that time a shaft was used to take
material out; and the five production levels were
connected by shafts as well as steep ramps
equipped with winches.
Following the modernisation programme
beginning in the early 1990s, the mining method
was changed to LHD with underground truck;
initially with two loaders (GHH LF6 and LF7) and
Paus/GHH (MK15) trucks. Whereas formerly, the
battery locos could only handle 4% grades;
underground trucks and LHDs can cope with
grades of up to 22% making it much easier to
access the best material. The increased mine
efficiency is reflected in the workforce figures
and production rates – formerly 130 employees
and production of 120 t/d; to the current rate of
320-330 t/d with only 31 employees. This huge
striking E-W. Large SW-NE trending fault zones, adjusted to the complicated geological productivity increase is largely the result of the
which are thought to be related with Upper conditions with respect to the performance switch to LHD/truck mining techniques.
Carboniferous post-kinematic volcanic activity, characteristics of the mining equipment. Heidkamp then sold the mine in 2008 to
divide the phyllites of Hermsdorf into several Due to a lack in stability, drives in the wall Schön+Hippelein Group, a large natural stone
blocks with displacements of up to 40 m. The rocks are protected by reinforced shotcrete. The quarrying group based in Satteldorf.
central part of these blocks has been underground production is based on drilling by The current fleet has five loaders and four
downthrown as a graben and covered with electro-hydraulic drilling jumbos and by trucks. Drill rigs include older Tamrock and
rhyolites, which preserved the upper Herold conventional blasting. Diesel-powered vehicles Secoma models, with the third machine a new
Formation (including the marble deposit) from transport the blasted raw material from diesel-electric Atlas Copco Boomer 281, which is
erosion. underground to the processing plant. A more the most productive in terms of advance rates. It
The white marble from Hermsdorf dominantly than 1 km long decline serves as main mine also has an enclosed air cab, which is much
consists of calcite with variable but low contents entrance and transportation route. more comfortable for the operator. It is
of quartz and phyllosilicates. The metamorphic designed with service access in mind with easy
foliation is traced by oriented crystals of quartz, Background to modern mining access points, allowing for a short turnaround.
chlorite and white mica as well as by grain size The modern era for the mine began in 1989 after The diesel-electric system also allows for fast
variations of the calcites resulting in a banded the fall of Communism in the former East relocation from face to face, which can be as
marble structure. The marble is free of bacterial Germany (GDR), when Heitkamp, a large Ruhr much as 1 km. The 281 can drill 3 m holes in
and organic components and does not contain based industrial and construction group, bought only 50 seconds, with a 43 mm diameter. Each
any graphitic inclusions. the operation. Heidkamp set about modernising face has up to 50 holes; with the hole pattern
the operation, which had used small battery determining the blast result, with the most
Mining method summary locos and ore cars. The drills and loaders were central hole containing the most charge. The
The mining activities comprise mining of also rail-mounted machines, with the loader detonator is connected to the other hole
residual marble occurrences in older parts of the
The two ball mills used
mine and the contemporaneous exploitation of to grind the marble into
unexplored parts of the deposit. The current fillers for the paint and
underground workings are developed between plastics industries
the existing mine area and the Fiscal Quarry as
well as in the north and east of the older
workings. Marble is presently mined up to 190 m
deep.
Room widths are at a maximum of 8 m and
room heights at a maximum of 9 m, with the
pillar planes a minimum of 8 m x 8 m. The
thickness of the rock between two levels is 5 to
6 m, depending on rock characteristics, and the
thickness of the hanging wall rock some 2 to 4
m. At Hermsdorf, the mine uses a modified open
stoping technology with square pillars. The
technology is independent from conventional
mine levels and fits best with the tectonically
disrupted blocks of marble. Underground
preparation, development and mining are

22 International Mining | JULY 2012


OPERATION FOCUS

Underground truck property. Geomin has an Atlas Copco Diamec


loaded with marble after 212 exploration rig that is used for near mine
emerging from the and underground core drilling for reserve
Hermsdorf decline
extensions.

Production and quality control


Multiple working faces – as many as 30 –are
used to allow the ability to blend marble
qualities to achieve the desired final result.
Most of the final product is a ground calcium
carbonate (GCC) for the paint industry, where it
forms a filler. The waste material is a dark
phyllite slate.
The mine does not operate at night, but in
two daytime eight hour shifts – 6am to 2pm;
and 2pm to 10pm, with two blasts towards the
charges via time sets, ie millisecond delays – very fast, especially on corners. The noise levels end of the second shift. Each blast produces
the more the time sets, the smaller the resulting in the cab are much less and the air conditioning about 200 t of material with about 320-330 t of
blasted rock; up to half second time sets, which makes it very comfortable. It is also very easy to marble needed per day to feed the plant. As
would result in large blocks. load in more difficult faces using the onboard stated, the mine operates a conventional room
Explosives cartridges from EPC are used and traction control. The machine is also the only and pillar method, with 8m by 8m pillars and 6m
placed by hand, with only one central electric one to have automatic gears, meaning you can by 4.5 m drifts; and a maximum roof height of
detonator. ANFO is then pumped into the holes concentrate only on the main task of loading about 9 m if the thickness of the marble seam
using a Multicar explosives delivery truck. instead of driving.” No major repairs have been warrants it. The drifts are not horizontal as
The most advanced machine at the mine is a required on the ST7 since it started operating. development undulates to following the high
new LHD, the Atlas Copco Scooptram ST7, which The whole mining area covers 24 ha. As purity marble horizons. Any required scaling is
is the first to have been delivered to Germany in stated, there is no shaft, with a decline only, and either done manually or using the older Tamrock
June 2011, with a second machine now also all of the material trucked out via the ramp and rig. Bolting is conducted using split sets; mainly
operating at a new fluorspar operation in the no crusher located underground. The maximum using the older Secoma rig.
same region. The ST7 service intervals are haulage distance is some 1.7 km from the The blasted marble is driven out via the ramp
longer than the older LHD models; while it deepest point in the mine. This is currently 596 to the plant and unloaded onto a grizzly and a
requires fewer spare parts at the same time due m above sea level relative to the mine surface at main primary jaw crusher. Following drying and
to better wear rates on parts. The ST7 also has 713 m above sea level. This is an average of 117 subsequent sorting by an automated optical
air conditioning in the cab, lower noise levels, m depth, but it varies up to 190 m depending on control, the high fineness of the final product is
improved lighting and more efficient the surface topography across the mine realized by two one-compartment ball mills.
emergency/alarm systems. The machine also Windsifter plants and magnetic separators
has better traction control, which is easier on Room heights can further contribute to a high-quality product.
the tyres, meaning less tyre changes. But be as much as 9 m The material coming from the different faces
perhaps the most significant difference in the in the mine is constantly monitored for
current climate is in terms of fuel efficiency – the whiteness and brightness via sample taken to
ST7 achieves 10 l/h with a water-cooled 193 hp, the on-site lab. The marble is manually
6.7 l Cummins Tier 3 engine. The older LHDs inspected following the jaw crusher to
typically only achieve 20 l/h and have air cooled separate dark and light material. Some faces
Deutz engines. In power efficiency terms, the are sufficiently good quality for the material
ST7 on-board computer calculates the optimum to be used directly but many require
power needed at any one time during blending.
operations, allowing for these fuel savings and The processing plant produces calcium
lower emissions; as opposed to operating on carbonate fillers with diverse grain sizes for a
full throttle most of the time. variety of uses. The filler trademark is Saxolith.
Key safety features include spring-applied, The calcitic fillers of Hermsdorf are
hydraulically released (SAHR) brakes, automatic characterized by high fineness and a high
brake testing with diagnostics and logging and degree of whiteness. The product is sold via
an oil-free cabin environment. Safety is further associated marketing company SH Minerals –
enhanced by three emergency machine stop after the main paint filler market, others include
buttons and a system that applies the brakes, construction grouts and plastic fillers. The ball
blocks steering, and prevents bucket movement mills can reduce the product size down to as
when the cabin door is open. The ST7 has a little as 2 microns, known as the Saxolith 2HE
tramming height of 2,160 mm and a width of product.
2,280 mm. Additionally, Geomin produces marble and
IM spoke with one of the ST7 operators, Dirk other local rock gravel for external sources. It is
Thiele, who commented: “The new machine is distributed under the Saxorund brand. IM

24 International Mining | JULY 2012


SX/EW

Heaps of new organic and particulate concentrations to a level


of a few parts per million. Production capacities
increase, as does the quality of cathode

technology products.
The filters use two separate layers of media
for coalescing and for filtration. The upper
media layer provides for organic removal while
the second layer filters particulates in the
electrolyte.
Low electrical energy consumption is a cost-
saving benefit, as the adsorption filtration
technique uses low pumping pressures
compared to alternate solutions utilizing
flotation.
Automatic (PLC) control of the electrolyte
New ideas, chemicals and filtration and media cleaning steps at the end of
technologies in the heap leaching each filtration cycle ensures maximum filtration
time in subsequent cycles. Outotec says “DM
world, John Chadwick takes a look electrolyte filters are delivered as an automated
operational filtration system which can be fully
integrated to any SX-EW solution package.
n their paper at this year’s SME Annual recently acquired by Outotec, is well known for “Using lean electrolyte for backwashing and

I Meeting, the University of Utah team


commented that “with ever-increasing
demand, low-grade complex ores and strict
efficient and reliable filtration process
equipment.
New Outotec Larox DM electrolyte filters,
returning it to the After Settler after holding in a
backwash collection tank (see flow schematic)
means [these] filters do not reduce the capacity
environmental regulations, metallurgical which are specially designed for efficient of SX production. Filter flow rates as high as 275
processing options have become limited. Heap removal of entrained organic and suspended m3/h can be consistently handled by a single
leach technology provides several benefits to solids from electrolyte, using the well proven unit (5.2 m diameter), greatly simplifying the
combat these issues including low cost, dual media concept. The Outotec Larox DM filter process.
flexibility and diversified process conditions.” package can be delivered as an integral part of “Typically, multiple units are installed in
The paper1 provides an overview of heap Outotec’s SX-EW technology delivery or stand parallel for flexibility and expandability to
leaching technology with specific emphasis on alone solution to engineering companies and economically accommodate growing plant
chemical aspects. Hence, influencing factors, end users. capacity requirements.
advantages and disadvantages, testing This electrolyte filter is suitably designed to “With no moving parts, the media cleaning
approaches and some fundamentals are be backwashed using either lean electrolyte or system ensures maximum media lifetimes.
discussed. Finally, heap leach technology for water. Typically the anthracite media is replaced every
different ore types (copper, nickel, uranium and Outotec says this offers high quality filtration 24 months when combined with Outotec’s
gold) is briefly compared. because adsorption filtration using the well proven SX process technology. Garnet lifetime is
They conclude that “many factors control the proven dual media concept reduces entrained considerably longer.”
heap leaching process; however, proper heap
building, mineralogical evaluation of ore,
Outotec SX-EW flow schematic withDM electrolyte filters
efficient comminution, and the precise use of
available tests (feasibility approach) must be
undertaken to ensure a successful heap leach
operation. The advancement of heap leach
technology can be easily sensed through the
presence of technology in different ore types.
The growth in modelling studies and
fundamentals will make the heap leach
technology more adaptable to ever increasing
complex ores. Based on the aforementioned
evaluations, more heap leaching operations are
expected to come into the business. However,
many of the areas included in heap leaching
remain open to research with regard to
comminution effects, characterisation tools,
improvements in unit operations (agglomeration
and heap building) and modelling approach.”
Outotec is a leading SX/EW technology
supplier with an extensive track record in
building complete plants. Larox, which was

26 International Mining | JULY 2012


SX/EW

Paul Keyser, FLSmidth Global Product Director, SX-EW, says FLSmidth is


a relative new comer to SX-EW, but has big plans. For years, through its
legacy companies, the company has supplied both liquid/liquid and
solid/liquid separation technology to support SX-EW operations. Products
such as WEMCO Pacesetters, EIMCO OTG granular media filters, EIMCO
Precoat vacuum filters, Shriver filter presses and Krebs liquid/liquid
hydrocyclones are widely accepted “and do an exceptional job for their
respective duties for raffinate, electrolyte, loaded organic and crud and clay
treatment. In addition, FLSmidth is the leader in leaching and supply of
solid/liquid counter current decantation (CCD) circuits for production of
high quality PLS to feed SX-EW. FLSmidth offers complete SX-EW plants,
Customized
up to and including overseeing installation and start-up as well as post
commissioning support and service.”
Ion Exchange
“In addition to traditional SX-EW technologies using reverse flow mixer
settlers and standard EW facilities, FLSmidth is also investing substantially
in R&D to develop the next generation mixers, settlers and tankhouses.
Resins for
Early results are promising and point to improved and favourable droplet
formation and significant reductions in settler footprint. As mineable ores
Hydrometallurgy
become harder to find and lower in quality and grade, FLSmidth will be
there to offer solutions that make exploiting key resources possible. Highly selective ion exchange resins to improve
“Unique to the minerals industry, FLSmidth is the only company that has recovery of valuable and contaminant metal
the breadth and resources to assist customers with not only the SX-EW
plant, but to reach much farther upstream and take on project Uniform particle size (UPS) perfect for processing
responsibility starting from the mined ore, through both fully mobile and
fixed conveying, crushing, heap stacking, leaching and SX-EW. The
of clean solutions
approach reduces the time to first production. The FLSmidth Ore-to-
Cathode, complete solutions approach is what sets FLSmidth apart in the
Course particle size resins designed especially for
industry and will be a market driver for growth over the next decade and sorption from pulps (RIP)
longer.”
Effective in the remediation of tails and recycling
Agitation of mine waters
M C Process has over 20 years’ experience in tank agitator technology with
over 100 agitators installed globally. The company says it aims for “optimal Proven applications in Gold, Rhenium, Uranium,
performance, reduced wear and optimal use of power.” Its agitators are
Copper, Nickel, Mercury, Iron control and other
supplied with a bearing housing which ensures the forces generated by the
impeller are not transferred to the gearbox ensuring a more robust design base and rare earth metals.
and longer equipment life.
M C Process has developed a constant velocity impeller, which gives
constant pumping across the width of the impeller; allowing for reduced
impeller rotational speed for the required pumping rate. It says the unique
benefits include lower power consumption, reduced ‘crud’ formation,
improved mixing efficiency and adjustable head and volumetric throughput.
Need effective
Just ask Purolite.
Krebs DeOiler (FLSmidth) manifolded system for increased capacity
removal/recovery of ®

low level metals?

Download our Free Ion Exchange App. It contains


useful conversion factors, resources and more.
For more information please visit www.purolite.com,
email info@puroliteusa.com, or call +1 610 668 9090

JULY 2012 | International Mining 27


SX/EW

“Scale control in leach plants is of particular


interest to Kemira. Heap leach operations are
dependent on the effective distribution of the
leachate over the heap and scale formation can
be a serious problem blocking the wobblers or
emitter pipework. Although less common in
agitated leach plants it is often seen in the leach
pachucas and PLS lines. The most common form
is gypsum and although there are a large
number of reagents effective against gypsum
the issue is again compatibility with the SX and
reagent choice needs careful consideration.”

SX reagents
Knight Piésold works with the world’s look to source from the larger manufactures Cytec notes that “largely unchanged over the
prominent gold producers providing design and such as Kemira who can guarantee the last 30 years, the SX process employs a very
operational assistance for tailings
consistency and compatibility of their products. small number of highly specific oxime molecules
management, water management, and heap
leach facilities. Recently, the company’s work What may be acceptable as a flocculant for a which are ideally tailored for this application. As
involved designing a combined heap leach and tailings thickening application could easily a result of this extraordinary class of
tailings facility in which the heap leach ore upset the SX circuit. extractants, copper SX is the least complex
stack provides containment for all the tailings.
“Managing the interaction between process of its kind and also the most versatile.
It has been in operation for over four years and
has met or exceeded the design criteria and flocculation and SX is the key to running a Despite this there are always many ways in
provided its owner with a unique, cost and successful operation. Having both a qualitative which to optimise an SX process, particularly
space effective solution and well as a quantitative aspect to consider using the experience and toolkit of the reagent
makes the process a lot more complex than supplier. Much value can be generated by
typical tails thickening. Initially we would look optimising parameters such as i) the reagent
The company also claims to be “to date the to control the solids in the overflow with a target formulation, ii) reagent concentration iii) the
only supplier of SX plants to use vacuum somewhere between 20 and 50 mg/l but we extract O to A ratio, iv) the stage efficiency, v)
infused, fully composite mixer settler tanks also need to minimise the residual flocculant selectivity of copper over iron, vi) entrainment of
which optimise a huge number of benefits.” It effects. This means simply adding a higher dose organic in the raffinate and rich electrolyte vii)
also says its Jet Scrubber “is a paradigm shift in as you may do with other thickeners is not an entrainment of aqueous in the loaded and
attritioning technology.” The principal of the option. Minimising the residual floc in the stripped organic as well as many other aspects.
Burgen Turbine attrition scrubber is “that we overflow is influenced heavily by having a good Many of these aspects can be optimised using
need to create more attritioning zones within addition scheme such as properly designed the reagent supplier’s modelling tools that allow
the machine, akin to a jet engine or turbine, feedwell lances and effective dilution streams. one to simulate alternative operating conditions
where multiple compression vanes in a single Design and the maintenance of the make-down and select the best operating parameters for the
vessel.” and dosing equipment used with the flocs are given PLS and circuit design.
very important as poorly dissolved material will “Over the last 15 years the market has made a
Flocculation in SX/EW track through to the overflow and eventually steady shift from aldoxime-ketoxime extractants
Mick Bower of Kemira Oil & Mining commented into the SX circuit. One common problem has to modified-aldoxime and modified-aldoxime-
that “the solids/liquids separation processes in been that a lot of operators have expanded ketoxime extractants. In 2012 modified
leach/SX/EW plants are very different from most plants, increasing the flocculant dosage but extractants will make up more than 70% of the
of mining’s typical settling applications. In the have not added sufficient extra capacity to the copper extractant market. The primary benefit of
case of leach plants the value is actually make-down system thereby shortening the the presence of a modifier is the ability to tailor
contained in the liquid rather than the solid effective residence time. extractant formulations to precise strengths to
such as a concentrate. This means that although “As the technology becomes more advanced maximise copper transfer for specific feed
the equipment used is essentially similar to that it will also become less forgiving and the level of conditions whilst improving selectivity over iron
seen elsewhere on a plant operators’ understanding of the interactions is and hydrolytic stability.
(settlers/clarifiers/filters) their operation is key. The processes are becoming more like the “Finally SX refineries are being increasingly
different. The settling of solids in low pH chemical industry than a mine and a high level built that recover more than one metal by SX
solutions is actually straightforward when using of training is required. Typical reactions such as and need to capture these multiple revenue
the correct types of flocculant, such as Kemira’s increasing reagent dosages in the event of a streams to be economical. Extraction circuits for
Superfloc N100. The most important aspect for plant upset may not have the desired effect. metals other than copper are more complicated
reagent selection in these plants is the “The trend since the early plants has been to and these operations need to be optimised for
downstream compatibility with the SX process. move away from filters over to lower cost CCD more than one metal and thus are finding even
The SX stage is very sensitive to contaminants, trains and plants are now starting to be built greater need to have expert services delivered
poor selection and application of reagents can with high compression thickeners. Clarifiers are with their multiple reagents purchased.”
lead to significant problems with crud formation becoming more common and Kemira is looking Over the last few years as copper oxide ores
and excessive phase disengagement times. at chemistries for improving this further. The have become depleted, there is increased
Control over the provenance of the reagents is difficulty being that a lot of the conventionally interest in processing sulphidic ores using
often overlooked and plant operators should used reagents are incompatible with the SX. hydrometallurgical routes. This allows mine

28 International Mining | JULY 2012


SX/EW

grade above 3%. Most of the other ore that is


being processed is less than 1%. So mining
companies interested in a long term future,
need to align with companies that will be
developing these next generation reagents and
processing routes.
“Cytec’s Acorga® reagents are the most
comprehensive set of solvent extractants for
copper in the industry and our Cyanex®
Reagents are the leading technology for cobalt
nickel separations. We combine our reagents
with unmatched application knowledge as well
as modelling tools. Cytec is uniquely positioned
to offer modelling named MEUM™ Modeling
Software for more than copper. Cytec is
expanding into other metals at a pace that is
unmatched as well with SX products available
for copper, nickel, cobalt, rare earths,
Figure 1. BASF Split Circuit flowsheet
molybdenum and uranium with more to follow.
Thus Cytec has the best tools to aid companies
that are developing non-standard flow sheets or
are planning to have multiple metals extraction.
“Cytec collaborates with mining companies to
ensure that they get the most metal at the least
operating cost. We do this by providing superior
support that addresses our customer’s site
specific needs. Our on-site application
technologists ensure that our customers receive
extraordinary extraction performance.”
New products include the Acorga® NR series
and OR series of products, developed to provide
higher degradation resistance in Cu SX circuits
that have occasional or consistent exposure to
high nitration or oxidative conditions. With these
products the valuable extractant inventory is
protected.
Figure 2. Sequential Circuit flowsheet Cyanex® 600 is used to recover Mo from
moderate to high volume acidic streams which
operators to use existing SX-EW equipment to differentiator in supplier selection not only to contain low concentrations of Mo. Use of this
produce high quality copper cathode directly. get the most metal possible from a given product and Cytec’s unique process allows
Additionally, in many instances the economics of amount of ore that is already being processed economic recovery by concentrating Mo by over
the oxide ores are substantially enhanced by but also because of growing scarcity of metals 1,000 times. This allows existing Cu SX
performing separations of multiple metals. As and energy. Only in the Copperbelt of Africa is operations and other operations to get an
hydrometallurgical knowledge continues to there substantial copper oxide ore with a copper additional revenue stream from already
grow and more advanced flowsheet designs are
developed, SX to isolate other metals is BASF split circuit economics
becoming more reliable and effective than in the
past. Where is the end game many years from Conventional flowsheet Split circuit flowsheet
now? Cytec believes “eventually ore will be Operating days per year 360
primarily hydrometallurgically refined, Total cost acid+base (Σ$/t acid) 200
extracting many metals from a single ore. Once Cu price ($/lb) 2.50
all the mining, milling, grinding and leaching is
complete, the refining of lower concentration Acid to neutralisation (t/d) 167.2 107.5
metals becomes economical because the Total cost ($ million/y) 12.038 7.740
primary costs of getting to a PLS are all already Cost benefit ($ million/y) 4.298
spent. So the need for R&D spending on
reagent development, formulation and Cu in soluble loss (t/d) 6.792 5.000
application knowledge continues to grow as the Total revenue loss ($ million/y) 13.448 9.900
world’s demand for more metals from the same Revenue benefit ($ million/y) 3.548
available earth grows. As such advance Overall benefit ($ million/y) 7.846
technology and application support is a critical

30 International Mining | JULY 2012


SX/EW

Recovery of copper by solvent extraction.


Courtesy of Nord Resources

processed ore or from byproducts that contain


Mo. This breakthrough also has the potential to
make substantial additional volumes of Mo
available to the global market and thus improve
the availability and use of high performance
alloys that contain Mo.
Cytec can now model the separation of Cobalt
and Nickel via SX. This allows mines to partner
with Cytec in order to optimise the design of a
future operation or to substantially improve the
efficiency of an existing operation.

Split leach solutions


BASF’s Mining Solutions Group offers a diverse
range of mineral processing chemicals and
technologies to improve process efficiencies and
aid economic extraction. BASF's offerings
include reagents, equipment, process
technologies and knowhow, focusing on areas
such as grinding, flotation, hydrometallurgy,
solid liquid separation, tailings management
and materials handling. Stemming from its
hyrometallurgical sector, the Mining Solutions
Group has been granted US patents covering its
split circuit technology which is particularly
useful to agitation leach-SX of copper ores. The 8,700 t/d of ore are summarised in the table. this conference is to provide a forum where
split circuit configuration effectively splits the BASF has also filed for patent coverage on a BASF customers from around the world gather
leached solution into high and low grade further refinement of the Split Circuit technology to meet with experts in the field and share
streams which allows one to take maximum referred to as the
advantage of the thermodynamic behaviour of Sequential Circuit
the SX reagent by treating each stream technology (Figure 2).
separately in the SX process. It involves
The raffinate produced from the high grade incorporation of an
solution is returned to the leaching step to re- additional agitation
use the acid that has been generated. Raffinate leaching step between
produced from the low grade leach solution, the primary leach and
which is comparatively lower in concentration in the final liquid/solids
both metal species and acid than in the separation step,
conventional process, is passed to the washing resulting in a total of
activity, and a portion is ultimately bled from the three aqueous streams
circuit as the soluble loss fraction (Figure 1). being generated which
In this way, the configuration minimises are each separately
soluble losses. Other operating improvements treated by SX. The cost
are realised due to lower neutralisation costs analysis (excluding
prior to tailings disposal. additional capital cost
The economic benefits of the split circuit are and fixed costs)
clearly apparent once a detailed mass balance indicates that
of both the metal species and acid is performed. operational savings due
The relative simplicity of the concept means that to increased copper
incorporation into an existing flowsheet can be recovery and acid
done easily and with a minimum of capital recovery are potentially
outlay. double those obtained
The split circuit provides operational with the Split Circuit
flexibility and, in areas of the world where the technology.
cost of acid and neutralising agent are high, the BASF will host its LIX
operating cost benefits of the concept can be Users’ Conference in
substantial. The results of an economic case Prescott, Arizona this
study for an agitation leach plant processing year. The purpose of

JULY 2012 | International Mining 31


SX/EW

operation experiences and innovative solutions importantly demonstrated that the iron can be operating variables have been established.
unique to their plants. The attendees will separated from the vanadium by using SX, Work at Process Research Ortech (PRO)
present technical papers covering a variety of producing high grade Iron. commenced in the first quarter of 2012, and
topics including developments in plant design, This new processing route has now been significant progress has been achieved.
plant expansions, equipment, new leaching and proven to allow more than a single product to be Flowsheets to achieve the separation of
anode technology, organic recovery systems and generated and may therefore have a positive zirconium, niobium, uranium & thorium, and
new reagent technology. As usual a tour of a impact on the overall project economics. REE concentrate have been developed. Quest
commercial mining property will be included as However the anticipated lower capital and reports that bench scale work has confirmed
part of the conference. The extensive technical operating costs and the higher recovery of the these flowsheets to the extent that a zirconium
program provides each participant with the valuable products still need to be demonstrated hydroxide product and a REE+Y oxalate product
opportunity to learn something new that they in further test work. have been produced. Uranium and thorium have
can apply at their hydrometallurgical operation The process developed by TNG and METS also been extracted successfully from the circuit
to improve product quality, metal recovery utilises the combined process of acid leaching, with the intention of producing an
and/or lower costs and improve sustainability. SX and stripping to selectively recover the environmentally stable discharge product.
metals. METS Director and Principal Consulting Significant work has been carried out on
More SX ideas Engineer, Damian Connelly, said the niobium and titanium separation. It was
In March, TNG Ltd advised that the pilot plant development of the new process had the expected that this separation will be resolved in
test work program for its flagship Mount Peake potential to deliver a significant breakthrough in June, 2012.
iron-vanadium-titanium project in Australia’s the processing of vanadium ores globally, Extensive bench scale testing of a thermal
Northern Territory had commenced. The work subject to further test work. sulphation process has been completed at
program, which follows detailed and exhaustive In mid-May, TNG advised of an important step Hazen. In the process that has been developed,
bench scale and optimisation test work, focuses towards confirming the commercial potential of ROM material is crushed and ground, then
on the final stage of the process, which involves the TIVAN process after receiving outstanding mixed with sulphuric acid. The material is then
the production of the final marketable products analytical results from a recently completed heated and undergoes a thermal sulphation
from the Mount Peake deposit – iron, vanadium continuous-run pilot plant test work program. process where the sulphuric acid attacks the ore
and titanium. Importantly, recoveries of 80-90%, which are and forms the sulphates of the contained value
This phase of the proprietary TIVAN™ SX higher than previous results, were achieved for metals. The dry calcine proceeds to a water
process test work is a chemical phase which will vanadium pentoxide (V2O5), which was extracted leach where the values are dissolved into
run continuously during this test work at the to a purity of 99%. solution. The slurry is filtered and washed to
ALS-AMMTEC laboratory in Perth using modified The grade and purity of V205 have been produce a pregnant leach solution (PLS).
SX equipment. It will aim at achieving a determined by Inductively Coupled Plasma (ICP) Extensive testing of the thermal process has
definitive test of the commercial potential of the analysis. This is now being independently determined conditions at which the refractory
TIVAN process to produce a high-purity aqueous verified at the CSIRO in Sydney. Final grades of rare earth containing minerals can be attacked
vanadium solution leading to production of the Ti02 and Fe203 are currently being assessed without the use of caustic (sodium hydroxide) or
vanadium pentoxide of commercial grade. via additional analytical test work. extreme temperatures. Rare earth, zirconium,
The new hydrometallurgical process has been The final PFS is on track to be delivered by and niobium recoveries to solution of up to
jointly developed with TNG‟s representative the end of June 2012. If proven, TIVAN offers 96%, 93%, and 96%, respectively, have been
metallurgical consultants, Mineral Engineering competitive advantages over standard demonstrated.
Technical Services (METS). This new processing processing including lower capital and operating Bench scale SX test work to develop the
route has been successful in recovering the costs, higher recoveries and purity, and the separation processes is underway at PRO. The
three principal commodities – vanadium, ability to produce three product streams – PLS containing the zirconium, niobium, and rare
titanium and iron – from bulk samples of Mount vanadium pentoxide, titanium oxide, and ferric earth values is the starting point for SX testing.
Peake ore. TNG and METS have submitted a oxide. The bench scale testing involves selecting
joint Patent Application to protect the invention TNG believes it has the potential to be appropriate organic reagents and analysing
and allow commercialisation at a later date. approximately 40% cheaper than standard their ability to separate the value metals from
The Mount Peake deposit – which currently pyrometallurgical process costs. The contaminants and each other. All SX separations
contains a JORC Inferred Resource of 139 Mt commercialisation of the process underpins are achieved using commercially available
grading 0.29% (V2O5), titanium (TiO2), 23.7% TNG’s development proposition at Mount Peake. extractants.
iron (Fe), is amenable to processing using The technology also has the potential to be In the flowsheet that has been developed,
conventional pyrometallurgy and produces rolled out and applied to other vanadium zirconium and niobium are removed and
smelter acceptable concentrate grades. deposits globally. uranium and thorium recovered for final
However, TNG and METS believe that the Quest Rare Minerals is working on its Strange disposal. Following these initial separations,
hydrometallurgical route may provide an Lake B-Zone deposit, where significant oxalic acid is added to the main process stream
alternative route for improving project improvements in metal extraction have been to precipitate rare earths and yttrium. Over 97%
economics, being cheaper and less achieved at Hazen Research. Acid consumptions of the REE+Y values in solution are recovered to
environmentally challenging. of approximately 200 kg/t are being achieved the oxalate precipitate. This oxalate precipitate
Test work carried out by TNG/METS has now with REE (rare earth element) dissolutions in the will then be re-dissolved to produce a
shown the magnetic concentrate is amenable to 90-96% range, niobium dissolutions in the 93- concentrated solution of rare earths and yttrium,
hydrometallurgical processing, resulting in very 96% range, and zirconium dissolutions in the which will undergo further refining using SX to
high recoveries of vanadium (98%) and iron (83- 85-93% range. Considerable bench scale work achieve the individual separations.
99%) in the acid leaching. These results have has shown excellent reproducibility, and most Mini-pilot plant testing to confirm individual

32 International Mining | JULY 2012


SX/EW

product flowsheets established from bench technically ineffective options based on an SX-EW safety
scale testing is scheduled to begin in understanding of the material and its EW produces carcinogenic sulphuric acid mist
September, 2012. The results of these pilot behaviour. which raises health, safety, environmental,
programs will be used to finalise the flowsheet The material is low-grade and complex, with efficiency and operating cost issues. Oxygen
for the full scale pilot plant, which is expected to conventional leaching options not proving to be bubbles are released at the anode as metal is
be operational in Q1 2013. economic. Through thorough evaluation of the simultaneously deposited on the cathode. The
Will Goodall and J.C. Perkins of Aura Energy mineralogy and using that knowledge to direct bubbles rise from the anode through an acidic
note that “the development of complex low- and explain test work results, a previously un- electrolyte solution then burst at the surface,
grade mineral deposits is becoming an tested leaching option was examined and ejecting fine droplets of toxic mist.
increasingly important target. These deposits shown to transform the project both technically CSIRO says “a fundamental understanding
often present marginal economic opportunities, and economically. This step forward has opened of how bubble characteristics influence the
which are highly dependent on the development up a major uranium resource that had previously size and quantity of acid mist droplets is the
of low-cost and efficient processing strategies been considered uneconomic, potentially first step in reducing, and ultimately
and the utilisation of byproducts to become a transforming the approach to recovery of metals eliminating, the mist.” To facilitate this study,
viable development target. For exploration- from similar deposits. it has “built the largest transparent EW rig in
focused companies this presents a critical Examination of operations that treated the world, which is important because the
investment decision stage early in project similar material to the Black Shale at Häggån depth of the solution affects the size of the
development on whether to pursue potentially identified Talvivaara’s polymetallic operation in bubbles that form.
expensive resource definition or look for other Finland (IM, November 2008, pp8-16). This “Data gathered from the study can be further
targets. project effectively utilises a bacterial heap used to develop a computational fluid dynamic
“The Häggån project, Sweden has presented leaching process to recover Ni, Cu and Zn from model to simulate mist generation and
a target requiring careful technical evaluation material similar to the Häggån material but dispersion in operations.” IM
through the early development stages. The with pyrrhotite as the dominant sulphide
project represents a low-grade complex uranium mineral, rather than pyrite. Successful
resource, with significant vanadium, implementation at Talvivaara, demonstrated
molybdenum, nickel and zinc credits.” A process that bacterial leaching could be a technically
of mineralogical characterisation and multi- and commercially viable option. All the References
directional scoping metallurgical test work has preliminary indicators examined to date have 1. Dhawan N. et al, Insights into heap leach technology.
been undertaken. “Implementation of this shown that the material is ideally suited to SME Annual Meeting, February 2012, Seattle.
process has allowed the development of bacterial heap leaching, with good 2. Goodall, W.R. and Perkins J.C., Early stage
conceptual flowsheets targeted at efficient permeability and an accessible source of metallurgical evaluation of a complex low-grade
recovery of value metals and the rejection of pyrite for bacterial growth. uranium project, ALTA 2012, Perth, Australia.

your resource for


heap leach and tailings storage facilities

ENGINEERING AND ENVIRONMENTAL SERVICES


www.knightpiesold.com
www.
w.kn
n pi e l d .com
nightpieso
p

JULY 2012 | International Mining 33


MINING SOFTWARE

Brave new world


Reviewing mining software
developments in mine
design, scheduling and
management, Paul Moore
highlights the importance
of functionality across the
board, and some exciting
developments in the area
of 3D visualisation

Runge XPAC’s 3D graphics give users a unique


ooking past the hectic mergers and New system review

L
insight into the mine plan
acquisition activity in the past few years, Gemcom Software International recently
functionality is the name of the game in released GEMS 6.4, the latest version of its viewers, we can be sure that everyone can be
mining software, whether that be in orebody collaborative geology and mine planning accessing the most current data and models,”
modelling, mine design, mine planning, mine software. With a focus on data management, said Paul Jensen, Senior Geologist at the
operations scheduling or mine asset GEMS is used to quantify, model, plan, and company. “For over seven years I have enjoyed
management. Key areas in mine software schedule the extraction of mineral deposits. It the ability to customise and access GEMS data
delivery and market success today include also highlights the importance of interfacing from the Access or SQL back-ends; this
advanced 3D visualisation, large dataset between different software systems. framework makes the data much more usable
handling, real-time updating of models, the The most significant feature of GEMS 6.4 is than other formats.”
ability to interface with other datasets and its powerful new patent-pending block model In addition to the block model conversion
systems, and the global/corporate level conversion engine, which according to Gemcom engine, GEMS 6.4 provides enhancements to
managing of models and data, including across is a “world first” and the only one of its kind in existing features requested by its users. To
multiple operations. The market is moving away existence. The engine brings a new level of data further increase productivity, GEMS includes
from single mines having a myriad of different sharing flexibility to the industry by providing enhanced block modelling capabilities;
mining software packages to a more streamlined direct conversion between different block model increased line, surface, and solid import and
approach across entire organisations. formats, delivering better collaboration and export options; and two point transformation
Better visualisation helps geologists, mining improved data integrity as well as time savings. profiles to transform solids and surfaces.
engineers and surveyors to better understand Justin Meade, technical product manager for In more detail, highlights include an
their data for analysis and interpretation. This GEMS comments: “With many mining “interpolate and report” feature, which allows
flows through to the planning and design organisations facing staff shortages, it is users to work with larger datasets and use more
stages. Putting data in the context of becoming increasingly common for collaboration than 100 interpolation profiles. Geospatial
surrounding structures also opens up the design to occur between site users and outside parties filtering is also now possible through the use of
process to a wider audience and allows rapid who may be using different software products. clipping boundaries when importing points and
communication of mine plans to all Thanks to the new block model conversion lines. The packages includes enhanced
stakeholders. engine, it is possible for a user to work in one importing support for Optech 3D rings (.xyz
Mining operations support many complex software package on a task such as resource files), and Leapfrog mesh files; while ESRI
processes and often software solutions from estimation and deliver the block model in the shapefiles can now be imported as points,
one supplier do not occupy all the applications format of another software package, while also polylines, or polygons. A new two point
or processes in the mining value chain. Legacy ensuring data integrity between the two. With transformation profile can also be used to
systems regularly mean that some processes the engine, users will also benefit by being able transform the coordinates of solids and surfaces
cannot talk to each other at a site. As an to efficiently operate between multiple block from one system to another. Finally, improved
example of countering this issue, a key part of model types for evaluation and processing sorting capabilities in GEMS’ production
the mining software market is offering specialist within GEMS.” scheduler allows for more efficient scheduling.
services to integrate existing applications and “At Midas Gold we have developed a In response to the increasing remoteness of
build applications to foster streamlined continuous stream for our data – from the mine locations, Gemcom has developed
workflows, including built in import/export versatile GEMS Logger digital logging software Gemcom Hub, a secure remote collaboration
protocols built in for transferring data to other to Gemcom GEMS geological modelling, and solution which enables mining professionals to
systems. then to Whittle. With several GEMS licenses and work with and more easily share data regardless

34 International Mining | JULY 2012


MINING SOFTWARE

of where they are located. It does this by kind in existence. The block model conversion Gemcom Surpac 6.3. A key feature of this
overcoming the challenges posed by poor engine brings a new level of data sharing version is its innovative new solids repair
quality, intermittent network connections with flexibility to the industry by providing direct functionality, which reduces manual solids
patent-pending technology that detects and conversion between different block model validation time. New auto correction repairs
transmits only the particular elements of the file formats, delivering better collaboration and invalid solids, while manual repair allows for a
that changed. Whereas traditional transfer improved data integrity while saving users a detailed examination of each problem area
methods require an entire file to be transferred, great deal of time.” within spatial context.
perhaps a block model that is gigabytes in size, What makes the block model converter A major focus for CAE Mining over the past
Hub does not, sending the data which has unique, says Gemcom, is its ability to open and year has been the development of CAE Studio
changed, which can be only kilobytes instead. work with one type of block model and then 5D Planner. Based on the premise of Mine2-4D
This means that the frustrations and often save it out to a model type from an unrelated version 12 coupled with the mining production
impossibilities of sending data from remote product. The block model converter understands focus of EPS, Studio 5D planner is a tightly
sites to head offices are overcome. all types of block models at once; including sub- integrated solution. Whilst maintaining the
Different software systems supporting blocked, superblocked and free block models, popular design and functionality, the company
geology and mine planning processes are often and converts them internally into a regular says it has made vast enhancements in the
used in conjunction with one another. This may model before bringing them into GEMS. areas of usability, interface and data
occur due to user training on specific software, The block model converter application can management with the release of CAE Studio 5D
history of individual departments using a also convert a block model to any supported Planner. The new package has been available
particular software application, or because the format; for example, a sub-blocked model can since January 2012.
site works with external consultants who may be converted into a regular model of any Some of the most significant enhancements
employ a variety of different packages. For dimension using the optional reblocking are the result of upgrading the platform from
example, it is not uncommon to find some capability before it is brought into GEMS. Studio 2 to Studio 3. In the geological modelling
systems used in planning and different ones in Reblocking is a process that allows the user to world, the transition from Studio 2 to Studio 3
geology. Jose Santos, Product Line Manager for redefine the structure of an existing block represents a major step forward in the
Gemcom GEMS and Gemcom Surpac comments: model, typically by changing the size of the progression of Datamine Studio. The company
“To address this, Gemcom has developed a blocks in the model. Reblocking is often states that the jump to CAE Studio 5D Planner
patent-pending block model conversion engine, performed to reduce the amount of data in an will be the equivalent of that for the
now available with the latest version of its existing block model by increasing the size of underground mine planning and scheduling
collaborative geology and mine planning the blocks, or to change the structure of the world. CAE Studio 5D Planner makes use of
solution, the recently released Gemcom GEMS block model for operational purposes. several Studio 3 enhancements, including the
6.4. This is a world first and the only one of its Another recent Gemcom software release is advanced 3D visualisation provided by the VR

Software | Consulting | Training | Simulators

Integrated modelling and simulation solutions


cae.com/mining
across the mining value chain
Australia | Brasil | Canada | Chile | India | Kazakhstan | Peru | South Africa | United Kingdom | United States

JULY 2012 | International Mining 35


MINING SOFTWARE

Vulcan 64-bit from Maptek combines the Short Term Planner tool has been improved to
advantages of a superior 3D modelling allow mine engineers to analyse more options.
environment with the power of modern
Mill constraints can be incorporated into the
64-bit technology
automated scheduling plan, with improved
stockpiling usage. Vulcan’s Short Term Planner
works directly from the block model allowing for
better utilisation of the resource model.
Vulcan users already have the innovative
HARP methodology which produces more
accurate stratigraphic models. A Run of Mine
(ROM) version introduced in the latest version,
Vulcan 8.1.4, allows users to incorporate
operational parameters in the geological block
model. This way the mine model can take full
advantage of the stratigraphic block models.
window, an enhanced user interface and a A standalone version running on CAE Mining’s Solid modelling from polygons is now faster
completely revamped, object-oriented data InTouch visualiser will also be available and will using a new combination of Vulcan’s powerful
management system. Users will no longer be provide sequence animation viewer capabilities block models and improved surface extraction
required to use filters to separate different through the free InTouchGo viewer. tools. Models with geology attributes are built
design type strings since they will be loaded as Another notable change is that the Design in a fraction of the time compared with
separate objects. Manager is being replaced by the Project traditional solid building and the results are
Studio 5D Planner includes a new Control Manager, which uses CAE Mining’s MineTrust already stored in the block model.
Panel with smart workflow, where the vertical functionality. This provides a CAE Studio 5D Vulcan 64-bit also makes it possible to work
control panel has been completely redesigned Planner specific view of Projects, delivering all with large datasets, such as larger dynamic
with a clearer, cleaner interface. The new panel of the file management functions of Design block models or triangulations. The 64-bit
facilitates a ‘smart workflow’ concept that shows Manager as well as a number of others, program is the first step toward providing
users what functions are expected at which including a “3D thumbnail” view of files within customers with large data set support, with
point in the process, removing any reliance on the current project. It also allows for enhanced plans to provide enhancements to
warning messages to inform users that they’ve data security and integrity “far beyond what was triangulations, grids and design data which will
forgotten to do something. Commands are also provided by the Mine2-4D version 12 Userlist”, allow customers to support even larger data
now organised into more intuitive groupings. If including making use of Windows account sets for those types. Future priorities include
there is any uncertainty, an in-panel context credentials to control access permissions. estimation, block manipulation, block model
help displays a message for any item selected in Project Manager is also designed to be scalable: display and simulation. Leveraging multiple
the Control Panel system. although users can easily use the features of the cores on hardware and graphics processing
The Project Setup panel has been greatly Project Manager on their own computer units on modern graphics cards are other Vulcan
simplified and reorganised. For example, EPS immediately, the full MineTrust client developments that are underway.
project configuration options, which are now application is available for those who wish to Resource models must be constantly updated
handled by a new, enhanced, EPS Template make use of the additional database as new information becomes available during
process, are no longer duplicated. As a result management facilities, such as to create mining. These models can be very complex and
the Project Setup panel is now laid out in a multiple, local databases or to perform a quite time consuming to develop. Vulcan
clean and intuitive manner, which CAE argues is database-wide spatial search; or multi-user automatically updates just that portion of the
less imposing to new users. sites can make use of the enterprise user and model that has new data, and carries the
Automatic and manual dependency generation data management features of MineTrust Server. changes through all related levels with a
and editing is now housed within a single Maptek released Vulcan 64-bit to global repeatable, auditable process was first released
Dependency Editor dialog. New features include mining customers in April 2012. Vulcan 64-bit in 2001. Now that Maptek also manufactures
enhanced virtual reality (VR) sequence animation combines the advantages of a superior 3D scanning hardware, the company has added
playback and improved dependency layer control. modelling environment with the power of more power and useful tools to the software as
In addition, the sequence export process in modern 64-bit technology to make it possible to part of the integration development. The
CAE Studio 5D Planner has been modified and work with larger datasets, such as larger company told IM; “In the ten years since its
now accepts EPS Template (.ewst) files and dynamic block models or triangulations. The 64- release, I-Site Studio has evolved from a
preserves all template settings, including bit support covers the entire software offering, powerful cruncher of massive point cloud
number formats and global constants. allowing all Vulcan users access to the platform. datasets to a feature-laden product containing
Three-dimensional visualisation of the EPS The company told IM: “Benchmarking open pit model update, contour and label
schedule has now been integrated into CAE conducted in-house shows massive step-wise elevations, automatic toe and crest detection,
Studio 5D Planner itself, making use of the improvements in loading large data sets and measuring volume displacement tools that
powerful VR window. Creating a synchronised, compared to 32-bit. Vulcan 64-bit will use all surveyors use every day.”
real-time link between the EPS Gantt chart and available RAM on a system when needed. The latest release of I-Site Studio 3.5 in
the 3D mine model, users are able to produce Customers on current maintenance receive this August 2011 included the launch of a dedicated
schedule-driven animations, create new Vulcan 64-bit as part of the standard Maptek geotechnical module, with extensive tools for
dependencies and use the EPS task filtering upgrade and enhancement program.” easily monitoring changes in surfaces such as
functions to instantly visualise a subset of data. In the open pit mine planning area, the Vulcan walls, batters and faces. Stereonet plots allow

36 International Mining | JULY 2012


MINING SOFTWARE

users to plot slope and slope limited by the computing power you
direction onto a two-dimensional give it. Our largest clients are
graph, helping to identify handling models that exceeded 60
discontinuity sets and analyse the million sub-blocks. XPAC can
stability of rock slopes. Contours complete detailed scheduling
can be added for pinpointing data scenarios on typical models with
of interest. Rose diagrams reveal datasets of 100,000 individual
the frequency of data versus the records, not aggregated benches,
direction of the data for identifying within minutes. XPAC can also
directional trends. Colouring automate dump scheduling as well.
surfaces by the dip or strike values Including an extra 50,000 dump
of the individual facets helps to records to take the total to 150,000
highlight discontinuities and planar areas, Runge’s Haulnet product adds to the picture records in a typical dataset makes little
making it easy to see fractures. when used with XPAC, one operation is difference to the processing time.”
successfully scheduling up to 1,400 km of
Overlapping surfaces that have been scanned underground roadways using Haulnet XPAC integration allows for the update of
at different times can be compared to reveal scheduling models as new geological data
extent and rate of movement, for example to The powerful 3D visualisation capability of becomes available. XPAC propagates updates
identify a slow moving failure in an open pit Maptek’s alpha-stage Eureka exploration across all scheduling horizons, given users
mine. Surfaces can be coloured based on software “provides the essential link for greater control of the future scheduling
changes from a previous surface and data can geologists to apply their specialist knowledge to scenarios, based on current knowledge. Runge
be exported to measure distances from previous come to better understand a deposit” according scheduling software also integrates with most
and base surface measurements. to the group. It brings together large geospatial modern mining systems and is being used with
I-Site Studio 3.5 includes general datasets for viewing, as well as modelling and just about every geological modelling and mine
enhancements in performance and usability. analysis. Viewing the data in the same context design tool available, says the group. XPAC and
Filtering can now be done based on point as the seismic and drilling data provides XACT allow for data compatibility with modern
selection, rather than the entire scan dataset. additional information to correlate the models financial modelling systems and automated
When used in conjunction with the new for the resource. It allows visualisation of integration with corporate enterprise solutions
freehand or polygonal lasso selection tools, it seismic sections alongside drillholes, and uses such as SAP and SharePoint. XACT also
reduces the time required to remove stray points the drillhole information to convert the seismic integrates with most fleet management
caused by dust or other transient objects. Many time data into depth. This can then be systems.
of I-Site Studio’s existing tools have been incorporated into horizon models. Mintec continues to improve its flagship
tweaked with more options for quickly Mining engineers have been using Runge’s product, MineSight 3D (MS3D). Version 7
comparing as-builts against design models to XPAC since 1980 to model reserves, generate released late last year removes the limits on
highlight variations or non-conformance. production schedules and evaluate alternative block model sizes. “Geologists and engineers
The ability to quickly create a 3D PDF, also scenarios. All Runge scheduling products use using block models to make mine plans and
delivered with the latest Vulcan release, means advanced 3D graphics rendering, combined with production schedules can now create models
that rotatable models can be shared with people detailed spatial data, to accurately represent the without constraint. They can produce a more
who don’t have specialised viewing software. I- complex shapes of the mine. Large dataset detailed block model, while maintaining the
Site Studio 3.5 users can also export to a handling is another key attribute. Alun Phillips, original block model extents. All related
Universal 3D file, meaning that the valuable Product Manager, Scheduling at Runge told IM: MineSight programs and procedures have been
information can be shared with decision makers “Where other packages place limits on your modified to work with no model limits”, says the
at all levels immediately. ability to model large projects, XPAC is only company.

JULY 2012 | International Mining 37


MINING SOFTWARE

Mintec breakdown of mining production key MS3D is increasingly


cycle time and Loading components, as well as
payload histogram to compare the effect of being used by operators
fragmentation versus performance for its Large Gridded
Objects tool, a capable
Detailed Mintec summary of fragmentation plan
Subsequent updates include the introduction instrument for managing large surfaces quickly. versus design displaying key metrics within a
of some highly effective plug-ins. The Auto Cut It provides a variety of different options for completely interactive GUI
Generation plug-in is used for creating polygon displaying and managing surfaces.
or solid cuts in MS3D. The resultant cuts can MSAxis manages, tracks, and reports drill and benchmark geostatistical software solution.
then be used to create a medium- to short-term blast data. Blasthole geometry is stored in the Isatis 2012 enables resource engineers,
mining schedule with utilities such as MineSight MineSight Torque Database where it can be geomodellers or any geoscientist involved with
Interactive Planner (MSIP) and MineSight attributed with explosive, drilling, mining cut, estimation or geological modelling to set up
Schedule Optimizer (MSSO). and as-drilled information. The data can then be efficient automatic estimation workflows using
The Digline Generator plugin is used to assign used to model surfaces and block models. models adjusted at best with the new automatic
a mining sequence for cuts on every individual Russell Owen at Freeport-McMoRan’s Morenci variogram fitting tool for increased productivity,
bench of each phase. This information is then operation comments: “We’ve caught more as well as compute high-precision geological
used by MSSO to create a practical mining things in less time than ever before. We’re no models of fluvial hydrocarbon reservoirs with
schedule. The Digline Generator functions with longer breaking teeth on shovels, we’re being meandering channels for improved flow tests.
both polygonal and solid cuts. To use the Digline proactive. With MineSight Axis Drill&Blast, Users can get metal quantity, tonnage and grade
Generator, the short-term mine planner should Morenci can monitor, report, and respond to panel distributions directly from block
determine, on a per phase and bench (level) these new technologies in near-real-time.” The simulations computed on Selective Mining Units
basis, where to begin mining and in what company invested in imaging and drill fleet or on panel grids for fast results as well as
direction mining should progress. management technologies, and used MineSight benefit from a standard licence management
Kirkham Geosystems used MineSight to to help manage and analyse the data. In three system for a safer and a more flexible
assemble almost a century’s worth of data from years, it saved more than $120 million on management of licenses.
the Yellowknife Gold Camp – some of it written horizontal accuracy, according to Mintec. ThreeDify has developed ThreeDify
on paper and linen – into a comprehensive 3D The next major product launch will be the GeoModeler, a high performance orebody
GIS model. Kirkham’s Garth Kirkham comments: unveiling of MineSight Performance Manager modeller based on ThreeDify's state-of-the-art
“The strength of the MineSight system is in its (MSPM) later this year. Mintec told IM: “A 64 bit Linear Octree modelling kernel.
3D modeling capabilities. This allows the streamlined display, exceptional data "ThreeDify GeoModeler is the result of a
‘linking’ of the 2D shapes into a 3D solid for integration tools, and a focus on analytics are at persistent research and development conducted
visualisation and for volumetric analysis. The the core of MSPM, MineSight’s solution to the by the ThreeDify R&D team. GeoModeler
result was an accurate representation of the countless staff hours spent on detailed mine represents a paradigm shift in orebody
mineralised structures along with a complete reports and charts. In response to the question modelling: instead of using conventional block
picture of the mine workings.” of how a mine design is performing, MSPM models that are severely confined by the size of
The complexities of drillhole and blasthole quickly answers by clearly presenting data that the deposit being modelled, a linear-octree
data are simplified with Mintec’s database can be correlated, analysed, and reconciled in a based orebody modeller is capable of modelling
manager, MineSight Torque. Using a Microsoft way that spreadsheets never will. Respecting and visualising ore deposits of any size, shape
SQL Server database, MSTorque lets the user the unique problems miners must solve, MSPM and complexity. With GeoModeler, geologists no
manage drillhole, blasthole, and other sample goes beyond the ‘what’ and gives the ‘why’ of longer need to compromise precision due to the
data. It includes built-in compositing tools, and mining analytics, and business analytics.” size of their deposit." said Yaohong Jiang, the
fully integrates with other MineSight products Mintec will also be unveiling more advances in CTO of ThreeDify.
for coding, spearing, interpolation, statistics, its short-term scheduling tools, including a new The software enables large and complex
and display. Version 2.2 released earlier this activity-based tool – MineSight Atlas; plus multi-body ore deposits to be handled in a
year allows composites to be imported into enhanced modelling tools with new implicit single session. ThreeDify states: “GeoModeler is
MSTorque from all supported data sources – solids modelling. an ideal tool for preparing accurate reserve
ODBC, CSV and SQL. Imported composites are In the arena of geostatistical modelling, estimates as input to subsequent mine design
saved as composite sets. Appending to existing Geovariances has announced the release of optimisations as well as for field geologists to
imported composite sets is supported as well. Isatis 2012, the latest version of its industry create wireframes based on their drilling data.

38 International Mining | JULY 2012


MINING SOFTWARE

GeoModeler provides true 3D volumetric speeds of loading or processing data. Micromine to specifying a radius to restrict the positioning
modelling, geostatistical analysis and 2011 has also introduced a number of CAD of pivot points in the drives, it is now possible to
interactive visualisation to help geologists design tools to further help engineering clients. specify a user-defined rig shape. This is
integrate and transform multiple data sources Tasks in a Micromine 2011 mine schedule may achieved by using the string editing tools in the
into the best ore reserve estimates. be filtered on-the-fly to exclude unnecessary application to draw the shape, saving it as a
GeoModeler’s modern and componentised detail. Real-time Reporting window allows the String file and then using it as the rig outline.
design also encourages gradual adaptation on a user to generate a report based upon the date If necessary, multiple (rather than one) user-
module-by-module basis.” GeoModeler provides range and the selected attributes. defined shape can be used to define a custom
true visual WYSIWYG 3D block modeling, Significant enhancements to the Pit rig shape; one shape for the carousel (rotatable)
geostatistical analysis and interactive Optimisation module include 64-bit support, and one or more shapes for the rig itself
visualisation to help geologists integrate and allowing it to process very large block models, (stable). This is achieved by reading the rig
transform multiple data sources into the best and reporting with ease. In particular, a new shape for all polygons in the String file. While
ore reserve estimates. Creating a block model of Input Parameters Report gathers all Pit they all become part of the rig shape, only the
grades simply involves specifying a block Optimiser settings into one place. first polygon encountered in the file can be
dimension and selecting an arbitrary mesh. Finally, an enhancement has been made for rotated - the others are static. This allows for
GeoModeler will voxelise the mesh and the setup of a user-defined drill rig restriction in the design of a more complicated rig shape,
interpolate the grades of the blocks falling into the Ring Design options form. As an alternative with as many static parts as required.
the mesh with the resulting block model will be
auto-clipped to topography.
MICROMINE’s namesake flagship software
solution Micromine, has powerful 3D design
($)$)".*!/2- .*'0/$*).
tools to create and visualise the optimum Planning, Engineering, or Automating
resource and pit design. In August 2011, the
company released the latest major update of
Micromine with Micromine 2011. The 3D
-'.*)($)$)"
Powerful Features & Ease of Use
geological modelling and mine design product
benefits from number of new features focussing With Carlson Software, you’ll have turned to Carlson
reduce idle time and increase Software Mining Modules:
on intuitive usability, enhanced and shortened I
production rates. This equals Geology
workflows and more logical processes. lowered costs & increased I Surface Mining
Combined with faster processing speeds, efficiency. Join the more than I Underground Mining
flexible import and export functions and 90% of U.S. coal mines that I Basic Mining
compatibility with third-party applications, gains
in productivity remain at the core of the offering Carlson Mining 2013 is HERE!
development, according to the company.
Significant updates include a new user
interface from Micromine 2010 incorporating Get the Tools
fresh visual themes and a simplified Contact You Need
Support function for faster access to software I Data Collection
support. Micromine 2011 is compatible with I Geological Modeling
I Production Monitoring
many new CAD/GIS vector (line work) and raster
I Fleet Management
(grid or image) file formats. This compatibility
I Drilling
makes Micromine more flexible in its ability to
I Civil Engineering
handle external data. As stated, very few I Machine Control
people work with one software application so I Underground/Surface
this is a benefit for improving workflows across Planning/Scheduling
multiple applications. Enhancing file format I Reclamation
compatibility simplifies the exchange of data
between these tools and saves time and resources.
Micromine 2011 is also now compatible with
Google KML files, allowing an interface with
Google Earth. The ever increasing quality and For more information or for
accuracy of Google Earth’s imagery makes it an a Carlson Mining expert, call or visit:
excellent data source for traditional air-photo
606-564-5028 • 800-989-5028
interpretation and Micromine can now exploit mining@carlsonsw.com
that feature. New Export formats include ESRI www.carlsonsw.com/mining Free Technical Support
By Phone, Email, and Web
Shapefile, Mapinfo Table/Interchange, AutoCAD
DXF, Microstation DGN, Google Earth (KML) and Authorized ®
®

GPS Exchange (GPX). IntelliCAD


Technology
Binary field types introduced in Micromine Consortium
Member ...The Mining Solution
2011 improve numerical accuracy, can reduce file
© Copyright 2012 Carlson Software, Inc. All rights reserved. Carlson Software is a registered trademark of Carlson Software, Inc. All other product names or trademarks belong to their respective holders.
sizes and produce a noticeable increase in

JULY 2012 | International Mining 39


MINING SOFTWARE

Micromine pit design and ground geophysical


profile

breakthroughs that will impact on how the


industry looks at underground mine production
control systems. Technological advances include
the development of cost effective and easy-to-
implement underground wireless systems,
automated underground mining and automated
production control. The company says it is also
tracking developments in handling underground
laser scanning data for the benefit of improved
mine design and control.
MineRP says it has made significant inroads
with its enterprise mining technical solutions in
the past year. Adopting a fresh approach of
seeking partnerships with traditional
competitors in the mining technical software
Many other ring design enhancements prevention of overloading and under-loading; a (MTS) space, the company is positioning its
improve workflow and quality of design. These material security system that ensures no ore SpatialDB solution as the industry’s “data
enhancements were suggested by mine users. gets dumped to waste dump and no waste finds management and exchange platform of choice.”
Kinross’ Kupol mine, where ring design tools are its way to ore stock piles or ore passes; a fuel Developed as a standards-based database,
used in day-to-day operations, was one of the management system managing optimum SpatialDB already has the ability to connect to
most active participants in scoping the refuelling schedules; and real-time tracking of most industry standard expert mining packages,
suggestions and real life testing of the production KPIs. such as MineRP’s own Mine2-4D, as well as
developed items. There have been several releases of the Surpac, Vulcan, XPAC, and CAE Studio.
Since the release of Micromine 2011, Pitram product, which caters to both the The company states: “Adding mining-specific
MICROMINE has issued three further interim underground and open pit market. Features logic and database extensions, MineRP’s
releases that continue to add value to the include ruggedised Pitram Mobile computers SpatialDB allows mines to continue
solution. The latest, Service Pack 4, provides installed on underground mining equipment, implementing expert geology, planning and
enhancements to Vizex, Micromine’s 2D/3D collecting production data and feeding the survey solutions of their choice, and then brings
viewing and editing environment. Additional information in real-time to the mine’s control to the table integrated analysis and
enhancements have also been made to the room. The fleet dispatching/optimisation visualisation capabilities previously
Wireframe and Scheduling modules. algorithm has received many enhancements as unthinkable. Using SpatialDash and
MICROMINE releases a major new version of its has the shift planning tool embedded in our SpatialAnalyzer, MineRP’s web-based
Micromine software every 12-18 months, and the Pitram product. visualisation and analysis applications,
next release is scheduled for autumn 2013. The The Shift Planner is a tool used by the shift operational information from any mining
company told IM: “MICROMINE invests 30% of crew to plan out their shift and then track the technical source can be displayed in three
its annual revenue into R&D to ensure that its progress in real time. From the production dimensions, compared and overlaid with
technology continues to lead the industry. This planning perspective this is as short-term as it information from other sources, and
process ensures that we can maintain a gets. It is now possible to see a live progress interrogated in a myriad of ways.”
constant stream of updates and improvements bar inside the Gantt chart, letting the user know Mine2-4D 2012, one of the expert mine
with updates released quarterly. Our products how far they are from completing a task. planning solutions developed by MineRP, is also
are constantly evolving to take advantage of Reflecting the level of automony activity in due for Beta release. As developers of and
new research and technological advancements. mining, MICROMINE’s R&D program includes owners of the Mine2-4D brand, MineRP has
This encompasses the resources sector itself, development designed to integrate with the invested heavily in the total re-design of Mine2-
computer hardware technologies and autonomous mining equipment to retrieve 4D, opting for a period of intense market
improvements in communications technologies. production data from these systems and research and user-based workgroups around the
Most importantly, these need to accommodate integrate it with the rest of the production data. globe before releasing the latest version of the
the occasional paradigm shifts in software This will then provide a single point of reference product, as Mine2-4D 2012.
engineering practices.” to interpret production figures. Sporting a newly designed MS SQL database,
MICROMINE’s mine control and management The company told IM: “Even with Mine2-4D 2012 will not only be SpatialDB
solution, Pitram, is concerned with safety and autonomous fleets, not all mine operations are Exchange Ready (a term used for those expert
production optimisation. Production automated. When a production data integration mining solutions with MineRP SpatialDB
optimisation is achieved through increased layer, like Pitram and our mine production connectors), but also has a range of
utilisation of existing equipment through management system Dome are absent, then the improvements that MineRP believes will confirm
automated equipment dispatching; increased data captured by the autonomous systems end its status as the “premier solution for
utilisation of mining face; real-time tracking of up living inside another silo or spreadsheet in underground mine design and scheduling.”
production against short and long term plans; the mine’s database.” The introduction of smart ribbon bars in
real-time tracking of consumables used to Additional Pitram R&D is also currently combination with the layer tree offers additional
develop mine and maintain production; underway to take advantage of technological intelligence. As an example, activating any

40 International Mining | JULY 2012


Minerals Report
3/2012

1 2

Fig. 1 View inside a POLYCOM® high-pressure grinding roll for copper ore grinding.
Fig. 2 Copper ore grinding plant with ball mills.

New grinding equipment for the extension


of a copper mine in South America
ThyssenKrupp Polysius has been awarded a contract shows once again that the minerals industry highly
to supply the complete key grinding equipment for appreciates POLYCOM® grinding rolls and ball mills
the extension of a copper mine in South America. designed by ThyssenKrupp Polysius.

The present contract is the second of ThyssenKrupp For the erection of such large ball mills we have
Polysius for this copper mine.This follow up order developed POLWELD®, an intelligent welding method
that allows welding of mill bodies directly on site.

tk Polysius AG
Graf-Galen-Str. 17 · 59269 Beckum · Germany
Tel.: +49-2525-99-0 · Fax: +49-2525-99-2100 tk Polysius
polysius@thyssenkrupp.com · www.polysius.com
MINING SOFTWARE

allowing the user to and ore quality/quantity properties is available


visualise these search to the user at any time. It is also possible to
conditions in the Search view animations depicting what each machine is
Geometry interface. These doing at any one time. In addition, the mine
geometries can also be supervisor can visualise all data related to
visualised in 3D and production, locations, teams and equipment
super-imposed onto the through a mobile tablet device when performing
search origins on the fieldwork.
design. Another added Guilherme Bastos, Devex CEO, believes that
feature is the ability to the new 3D technology will enable the virtual
define an Automatic system to better react to changes in the real
Dependency Rule by environment: "The idea, for example, is to
drawing it. MineRP states: detect the presence of fog or snow without
Devex recently finalised the implementation of “This is a giant leap forward in making the having to interrupt the activities of the mining
SmartMine at Vale Carajas sequencing of a mine design simpler and work area. The system aims, under these
faster.” conditions, to remotely operate a belt tractor in
dependency layer automatically changes the Interfacing with EPS is made more interactive an area with up to 80 cm of snow, virtually
ribbon to show the tools required for with the ability to communicate directly through visualising the terrain and any imperfections,
sequencing. These 'intelligent' ribbons simplify the Object Model. This does not exclude those and for the snow to be quickly removed." He
toolbar navigation, especially for users who are users that wish to use EPS ‘stand-alone’. emphasises that communication between the
unfamiliar with Mine2-4D. However the interface between EPS and Mine2- virtual and real environments and the remotely
Other improvements include the 4D has been streamlined with the recognition of operated equipment will allow new systems to
simplification of the block model evaluation tasks that have changed rather than a complete better aggregate autonomous mining equipment
setup with user friendly interfaces that can be re-export of the whole database. without any human intervention. "The increase
accessed without having to return to "Project in the utilisation of 3D models and virtual reality
Setup". Users are able to set up the evaluation 3D mining operations in the coming years, including in our products, is
rules, specify and define filters and legends, The whole area of virtual mines and associated a natural tendency. The goal is to meet the most
choose dilution settings and toggle on/off 3D modelling is advancing rapidly, through work imminent necessities of the mining sector, which
whether the results should be shown on done not just by software companies but also are safety, remote operation, environmental
completion. All of this can be done without the equipment and technology OEMs and by mines management and productivity gains.”
need to close the window. The block model itself themselves. Brazil’s Devex, up to now best Carlson Mining 2012, released in 2011, is the
is converted to a Generic Block Model (gbm) known as a leading player in high precision GPS latest offering from Carlson Software, and gives
format to allow for the importing of various systems for mining fleets, has developed two users improved 3D abilities within its bench pit
block model types which can be displayed as a new systems that it believes are pioneers in the design, added options for colour settings for
dynamic slice. global market of mine automation. enhanced visual feedback in underground
One of the most time-consuming processes in Devex made use of virtual reality and timing sequencing, new haul truck cycle
previous versions of Mine2-4D, the sequencing computer graphics in the development of part of analysis routines, new spoil placement timing,
of design elements, has now been redesigned to its two new systems: Extreme (for open pit and the ability to produce customised, more
enable users to complete the task much more mines) and SmartMine.UG (for underground professional reports among its many upgrades.
efficiently. Dependency layers are shown in the mines) have operation interfaces based on 3D The package provides support for AutoCAD 2012
Layer Tree and have default settings for delay and Multi-touch technology, making the and comes with IntelliCAD 7.0 built-in. This is in
type, unit and amount. Internal dependencies execution of operations more intuitive and addition to working on AutoCAD versions 2000
are now shown graphically and so have their efficient. and up. Carlson Mining 2013 is shortly to be
own layer. Simply selecting a layer adopts these Computational systems for geological launched and will include further improvements
defaults and all dependencies drawn will have modelling, planning and design in mines are and functionality.
the desired delays, while switching layers while derived from CAD/CAE (Computer-Aided Design “Carlson’s 3D pit design is improved by
drawing a dependency will change the defaults, and Computer-Aided Engineering) which were enhancements in the Design Bench Pit
with no need to edit the dependency string largely introduced into the mining sector during command,” says Grant Wenker of Carlson’s
afterwards. the 1990s. Until recently, however, Devex argues Mining Division. “Multiple slope groups are now
Duplicate dependencies are also no longer an that the 3D models were restricted to the needs easy to define for all pit blocks globally with
issue in Mine2-4D 2012 – as soon as they are of decisions regarding the advancement of the symbols for different slope and bench templates
detected, the user is alerted and the mine, with weekly updates. on different sides. Adding the ramps is now part
dependency cannot be completed. In addition, With SmartMine.UG, the 3D technology of this command for automatic ramp building,
the improved graphical interaction does not allows for a complete 3D view of the mine, cutting through the benches whether working
allow for single point dependencies to be including information in real time about active from the top down or the bottom up.”
created. This automatic error-checking levels, tunnels, work areas and equipment New commands added for haul truck cycle
functionality increases efficiency by removing locations. In the surface mine Extreme system, analysis can now calculate cycle time, fleet size
the need for manual checks and corrections. the operation control for the open pit mine is and production rates. Plus, this release has a
The creation of Automatic Dependency Rules also visualised in real time in a 3D and intuitive new set of commands for spoil and dump timing
has been vastly improved with the ability to not way, focusing on the major points of the mine. for sizing and sequencing spoil placement, both
only set up complex search geometries but Information such as the location of equipment in-pit and out.

42 International Mining | JULY 2012


REGISTRATION & H
REGISTRATION HOUSING
OUSING
NOW
N OW O
OPEN!
PEN!
DON’T MISS
MINING’S
CORE
EVENT.
SEPTEMBER 24-26, 2012
Bigger than ever before, it’s the industry’s
most important innovation showcase with
over 700,000 sq. ft. of new products and
services. Join 38,000+ mining professionals
at the center of the mining world to see,
learn from experts and experience this
one-of-a-kind, once every 4 year event.

September 24-26, 2012


Las Vegas Convention Center
Las Vegas, Nevada USA

Visit MINExpo.com
for the latest information.

Sponsored by
National Mining Association
MINING SOFTWARE

Tuder, said the exploration opportunities.”


company’s first In June 2012, Leapfrog started offering
Pitram sale in Spain fundamentals training to the Australian market.
continued the The two day course will train both existing and
momentum of recent prospective customers in the fundamentals of
expansion across the Leapfrog Mining. The training is conducted by a
Europe, Middle East team of Technical Services Representatives led
and Africa (EMEA) by experienced trainers from the New Zealand
market: “Pitram’s based Research & Development Centre. The
powerful reporting company says that the fundamentals training
platform will be will be beneficial to both new and existing users
relied upon for who want the chance to appreciate the full
analysing trends in power of Leapfrog.
Micromine open pit and underground mine operational data, accurate and real-time shift Richard Lane, Product Director at ARANZ Geo
design reporting, monitoring team and individual said: “We’re looking forward to meeting
performances, improving personnel and Australian geologists and helping them model
Also released at the same time was Carlson equipment efficiencies, and ore parcel and their geology using Leapfrog. Although we’ve
Natural Regrade, which can be used to reclaim grade control management.” been involved in training for larger customers
any disturbed land and has been recommended MATSA has seven stockpiles comprised of this is the first time we’ve mounted open
by the US Department of the Interior's Office of different ore types. Pitram’s Grade Control training courses in Australia. For us it’s always
Surface Mining (OSM) for mine reclamation. module will increase control over material interesting to find out the problems users are
With this release, a new Vegetation Scene tool movements by ensuring they are closely facing, and the personal contact is something
places 3D symbols for selected vegetation tracked. The module will also enable real-time we find very valuable. For the course attendees
based on slope and azimuth parameters for 3D management of stockpiles and improved it’s a great opportunity to understand how
visualisation of the reclaimed site. Three tonnages and grades. Pitram users can visualise Leapfrog works and can add value.”
dimensional trees and shrubs can be placed into and manage all mine site operations as they
the model to show what the reclamation will occur. Through the introduction of the Shift Asset management systems
look like at various growth stages. Planner module, MATSA can implement Honeywell recently announced the global launch
production plans within a real-time of Intuition Executive, the flagship product of its
New contracts environment, and use short-interval control new Intuition software portfolio. Intuition
MICROMINE has finalised its first Pitram mine methods to manage daily activities. Executive delivers enterprise-wide information
control system contract in Spain. The contract ARANZ Geo Ltd, the developer of 3D management, decision support and
with privately-owned commodity trading group geological modelling software Leapfrog Mining, collaboration tools “to help companies achieve
Trafigura to supply and install Pitram Control at recently announced the signing a new Software operational excellence”, says the group. The
the Minas de Aguas Tenidas SAU (MATSA) License Agreement with gold mining major launch comes some two years after Honeywell
copper mine in Huelva Province was finalised Barrick. Leapfrog Mining software is a dynamic, acquired Matrikon along with its Mobile
following an in-depth market review by MATSA. 3D geological modelling technology with Equipment Monitoring and Mine to Port
“After carefully reviewing various mine control innovative workflows that ARANZ Geo believes offerings, and incorporates these solutions but
systems, we elected to introduce Micromine’s enables the best possible understanding of the as part of a much wider data analysis and
Pitram Control alongside Pitram Optimum’s Shift geology. Leapfrog offers accurate and consistent integration package.
Planner module,” MATSA Mine Manager Joao visualisation of data providing confidence in the The group states: “Companies in the process
Nunes said in a statement. “Pitram’s powerful interpretation and modelling of that data from industries often use dozens of applications and
control and reporting functionalities will deliver early exploration to mine remediation. Multiple hundreds of spreadsheets to manage complex
real-time production data and decision-making hypotheses can be explored, new data added production operations, monitor processes and
tools, providing personnel and management and course corrections made easily as the make operating decisions. These systems are
greater control over the MATSA operation. We project proceeds. usually either completely isolated or are
believe that Pitram will drive increased Barrick has been using Leapfrog since 2005 connected with complex, custom-designed
productivity, improve health and safety, and and the signing of the agreement reflects interfaces that make it difficult to use the data
optimise operational efficiencies, therefore increased usage of Leapfrog across the Barrick effectively and maintain data integrity. With its
playing a vital role in achieving our long-term Group. Leapfrog Mining is used by Barrick sophisticated data processing and analytics
strategic objectives.” MATSA is planning to geologists in Canada, the United States, capabilities, Intuition Executive solves this critical
expand the 2.2 Mt/y underground mine and Tanzania, Chile, Dominican Republic, Australia, challenge. The software anticipates problems
processing plant capacity by 30%. and Peru. In addition to the use of Leapfrog for and identifies opportunities. Its collaboration
Pitram Control provides a mine operator with modelling exploration data for gold deposits, tools highlight and capture expert knowledge,
an overall view of the status of the mine, Leapfrog is also used for project evaluation by share information and help users to make more
recording, managing and processing site data in Barrick geologists and senior management. agile decisions and take action in order to drive
real-time. Control is one of four elements of the Rob Krcmarov, Senior Vice President, Global intelligent operations and solve key
Pitram product suite, which offers an entry level Exploration at Barrick said: “My exploration challenges.” For the mining industry, Honeywell
path via Pitram Report, up to the fully team makes extensive use of Leapfrog. I believes that this can result in increased
automated Pitram Optimum. personally review Leapfrog models as a means efficiency and ability to manage and respond to
MICROMINE Regional Manager in the UK, Tim of assessing potential Barrick investment and volatile energy costs, complex regulatory

44 International Mining | JULY 2012


MINING SOFTWARE

changes, and real-world safety challenges. data streams.” Intuition Executive is part of a mine planning retain their critical place in
“Data integration and visualisation is a must growing family of Intuition solutions that solve successful execution of a mining operation, but
have for our customers today,” said Ian Brown, key industry needs such as operations to deliver the increased coordination and
Vice President & General Manager, Advanced monitoring, alarm management, asset automation the industry is demanding these
Solutions, Honeywell Process Solutions. “The management, remote operation centres, and processes must be much better integrated into
ability to see, understand and act on the business process optimisation. Powered by the operation as a whole.” MineScape, ABB
relationships within critical data is key to Matrikon, Intuition Executive is vendor neutral Ventyx’s flagship mine planning platform, has
creating competitive advantage, and this can and will connect to any control system or been progressively achieving road map
only be achieved when all applications and underlying data source. milestones for Version 5 providing
underlying data are amalgamated. Once you do ABB has advanced its position as a world- comprehensive mine planning capability on an
this, you can identify and take advantage of leading supplier of enterprise asset open architecture platform and promoting
opportunities earlier, mitigate potentially management (EAM) software, according to integration with third party solutions as well as
damaging plant events and make confident newly released findings from ARC Advisory other Ventyx solutions. Releases later this year
business decisions.” Group, a leading research and advisory firm. The will provide integration with best-of-breed 3D
Intuition Executive is developed on and results are part of ARC’s annual market and geostatistics and pit optimisation, as well as
extends the functionality of Microsoft technology analysis, titled “Enterprise Asset provide a new Software Developer’s Kit (SDK) to
technologies such as Microsoft SharePoint 2010, Management and Field Service Management further open up the platform, enabling
SQL Server and StreamInsight to meet the Worldwide Outlook.” customers, value added resellers as well as
requirements of industrial operations. According to the report, ABB is now the Ventyx, to provide deeply integrated and
“Monitoring and analysing data in motion leads second-largest supplier of EAM software streamlined solutions.
to earlier event detection and faster decision worldwide. Regionally, ABB remains the leading Ensuring sales commitments are met relies on
making. Combining business intelligence and EAM supplier in Asia and Latin America, and was good mine planning but also requires high
analytics tools with existing workflows ranked second in North America. The company quality inventory management, logistics
empowers organisations with the ability to take was also ranked the leading global EAM planning and contract management. Ventyx
immediate action and stay ahead in today’s supplier to the mining and minerals, electric MineMarket has also seen some major
highly competitive industrial marketplace,” said power generation, and electric transmission and improvements over the last 6 months, including
Caglayan Arkan, general manager, Worldwide distribution sectors. an overhaul to the 3D stockpile modelling
Manufacturing and Resources Sector, Microsoft. ABB believes that the industry is moving engine and major improvements to supply chain
“Combined with Microsoft technologies, towards dramatically increased automation and planning. Supplementing the existing general
Intuition Executive is positioned to take better coordination from the mine planning right commodity sales and marketing capability, there
advantage of computing power and complex through to delivery to the customer. The is new support for specialist metals contracts
event processing technology to analyse large company states: “Geological modelling and such as toll-treatment. Upcoming releases will

JULY 2012 | International Mining 45


In-Pit Crushing & Conveying
Grand Hyatt Bali Hotel • Bali • Indonesia
24 – 26 October 2012
Join us at the only global IPCC conference
Presentation update – new keynote session!
The following shows 12 of the confirmed papers, with Please also contact us with offers of papers to IM
a number of others also being finalised. It includes a Events Director, Paul Moore at paul@im-mining.com.
keynote session, in which we have two leading figures For those accepted, registration fees are waived for
from the Indonesian coal mining industry, who will be speakers. For those accepted, registration fees are
giving the audience an overview of mining in the waived for speakers. News of the planned Workshop
country along with aspects of the industry structure, and Field Trip will be updated on our website,
rate of growth and the new Mining Law. http://corporate.im-mining.com/imevents/

KEYNOTE SESSION:
 Jeffrey Mulyono, President Director of PKN Coal  Mangantar Sabungan Marpaung, Mining Strategist
and former Chairman, Indonesian Coal Mining and former Director, Indonesia Energy and
Association (ICMA) Mining Ministry
 Bob McCarthy, General Manager, Snowden:  Rico Neumann, Senior Mining Engineer, Takraf:
Developing a coding system to better classify fully Reviewing 20 years of IPCC system development,
mobile IPCC layouts and systems practice and study work
 Christian Dirscherl, Drive Technologies Division,  Ruediger Durchholz, Managing Director
Siemens and Peter Sehl, General Manager, Engineering, RWE Power International:
ThyssenKrupp Robins: Latest Developments in Determination of performance and utilisation of
Gearless Conveyor Drives IPCC systems – the key role of the conveyor
 Doug Turnbull, Principal Mining Engineer, Sandvik  Ian Gibbs, General Manager, RCR Mining: Mobile
Mining & Construction Materials Handling: Real mining units – innovative solutions
mine case study of a new IPCC concept
 Stephen Kou, IPCC Business Development Director,
 Marcilio Cenisio, Project Coordinator - Planning and FLSmidth: Innovative New Technologies for IPCC
Development Department, Vale: An application
study of IPCC technology on a developing project –
Registering
Moatize case study The rate for full attendance at the event is $1,600, which
will include the evening Welcome Reception on 24th
 Lynn Peterson, Product Sales Manager, FLSmidth:
Economic evaluation of next generation IPCC October, two full days attendance at the event, as well as
systems two lunches. The easiest way to register is online at
http://corporate.im-mining.com/imevents.asp though we can
 Mario Dilefeld, Chief Engineer Conveyor Systems, also accept bank transfers and other forms of payment;
Takraf: Gearless drive solutions for IPCC systems
please contact Paul Moore for more details.

I N D U S T R Y S P O N S O R S M E D I A P A R T N E R S

To register visit http://corporate.im-mining.com/imevents.asp


MINING SOFTWARE

focus on standardised interfaces to simplify Following the deal


integration with fleet management systems, announcement, Peter
process control systems, laboratories and Armstrong, President
transport schedules and will also deliver much and CEO at Triple Point
deeper integration between mine planning, Technology
sales planning and logistics planning to provide commented: "Our
integrated sales and operations planning. product strategy is to
In pit to port software solutions, Triple Point provide the deepest
Technology, a leading global provider of functionality, from
software to manage commodities and enterprise upstream to
risk, acquired QMASTOR in November 2011, a downstream, in each
major provider of mining software solutions to commodity class. Given
manage the tonnage, quality, and value of coal the importance of coal
and mineral supply chains from pit to the point to future global
of export, import, or consumption. QMASTOR’s economic growth, the
mining supply chain solutions are used to addition of QMASTOR
manage over 1 billion tonnes of coal and mineral to the Triple Point
movements per year. The company, portfolio is extremely compelling. QMASTOR Honeywell Intuition Executive is software for
headquartered in Newcastle, Australia, supports solutions are a perfect addition to the Triple enterprise-wide information integration and
real-time visualisation. It moves beyond simple
its global client base through regional offices Point portfolio in that they supply all the data access and display to providing context.
located in Africa, South America, and North functionality to optimise an end-to-end coal and Data is harnessed from everywhere and
America. QMASTOR’s clients include BHP mineral supply chain, while at the same time delivered it to everyone, promoting
collaboration across business units
Billiton, Rio Tinto, Vale, Anglo American, Xstrata, being completely complementary to the rest of
and Peabody Energy. the Triple Point product set.” IM

ADVERTISEMENT FEATURE

INTERNATIONAL MINING PROFILES

Metal Innovations seeks global agents seeking worldwide, initially non-exclusive,


agents with contacts and a track record in the

for its cutting-edge technology industry to take the company’s operations to the
next level.
Metal Innovations was named by a business
Metal Innovations is a highly innovative engineering and mining magazine as ‘one of Wales’ most forward-
company which designs and manufactures the unique Celtic Miner® thinking companies’. The company has a
machines which can transform the efficiency of mining and tunnelling sophisticated in-house design studio and
operations, particularly in restricted working conditions. highly-skilled workshop team which, in close
liaison with clients, turns out imaginative,
eltic Miners® combine compact size, specifically modified to suit the customer’s precision-made products to precise

C power, reliability and, most importantly,


versatility. Machines that have been
delivered to international construction and
exacting requirements.
Metal Innovations also provides a
comprehensive consultancy service to assist
specifications, whatever the challenge.
Leading the Celtic Miner® range is the
flagship CM4500, highly-praised by industry
engineering group Costain, Solid Energy New mine owners and operators with all aspects of experts at its launch for offering a new
Zealand and UK Coal, for instance, have all been their undertaking, from planning and logistics to dimension to mining. Its baby brother, the
specifying and CM1500, is just half a metre high yet packs a
supplying the most real punch. The machines are complemented by
efficient above and a whole array of bespoke support equipment
below-ground including conveyors, power packs, material
machinery and transporters, crushers and surge bunkers.
equipment. Managing Director Gareth Thomas said “We
Following a are now well-placed to exploit the capabilities of
successful launch and the Celtic Miner range and are looking for
product development agents to assist us with overseas markets. It is
period, UK-based Metal an exciting time for the company.”
Innovations is now
Metal Innovations
A CM4500 on its way Tel: +44 1446 774846
to Solid Energy
New Zealand www.metalinnovations.co.uk

JULY 2012 | International Mining 47


MINING CHEMICALS

Mining
chemicals

John Chadwick looks at new


products and trends in a sector of
growing importance
Kemira's Espoo R&D Centre

ccording to new report by Global Industry value chain is likely to grow in coming years as “Frameworks exist to increase social

A Analysts (GIA), “the world market for


mining chemicals is projected to surpass
$25.7 billion by the year 2017. Growth in the
the industry strives for efficient recoveries from
ever lower grade ores. It could be also that
mining chemicals come to have greater
responsibility in mining, but despite
advancements in exploration, extraction,
production and reclamation technology, the
future will be driven largely by revival of a large influence on the profitability of mining industry has struggled to present itself as
number of feasibility studies that were stalled operation. GIA also suggests that “increased having grown beyond the mining days of old,”
by mining companies during the heat of the R&D and investments in developing and says Dallas Kachan, Executive Director of the
recession and waxing demand for mineral commercialising newer, more sophisticated alliance. “The Clean Mining Alliance exists to
resources from developing countries to fuel their chemicals will gradually push currently cheaper help promote new and emerging technology
rapidly growing economies.” yet less efficient and environmentally hazardous developments that are making mining more
Mining chemicals play a vital role in alternatives out of the market.” environmentally responsible.”
enhancing the productivity and efficiency of The Clean Mining Alliance announced its birth It is an international non-profit organisation
mining processes such as the recovery and in mid-May and is sure to have some influence based in Vancouver, British Columbia, Canada. It
extraction of minerals and target materials from in mining chemicals. This new industry was introduced during British Columbia Mining
ore. “Presently,” GIA reports, Asia-Pacific and association is aimed at supporting and week, a time when the province celebrates the
the USA dominate the world mining chemicals advocating technological advancements to make contributions the mining industry brings to the
market. Explosives & drilling application [to be the mining industry cleaner and more province, its communities and businesses.
examined in detail in September’s environmentally responsible. Members include companies on the forefront
Fragmentation article] represents the largest of innovative breakthroughs in the mining
and fastest growing market for mining chemicals industry, as well as leading research
worldwide, with impetus for the segment organisations. “We’re thrilled to be able to
expected to be provided primarily by the coal showcase case studies from industry, and world-
industry, which is presently the largest end user leading research members like CERM³ (The
of explosives. On the other hand, market for University of British Columbia’s Centre for
mineral processing is expected to be dominated Environmental Research in Minerals, Metals and
by precious metals (sic) industry such as copper, Materials), which has proven through its work at
due to the importance of leaching and flotation the local Britannia mine site that innovation can
in these markets. In upcoming years, legal and vastly improve mine reclamation. It’s these types
regulatory laws regarding environment and of innovations that are leading towards a
Kemetco: “many modern mines use a de-
safety concerns are expected to propel toxification process that converts cyanide into a cleaner mining industry.”
investments in developing chemicals which are less toxic cyanate before mixing it into the Founding members of the Clean Mining
safer and environmentally friendly.” tailings, along with increased tailings facility Alliance include American Manganese, CERM3,
containment measures. Nevertheless, the risk
The importance of mining chemical in the of contamination to the outside environment Kemetco Research and Nevada Clean
remains.”

48 International Mining | JULY 2012


The right partner.
The right chemical technologies.
At just the right time.
Being a partner to your mining operation is not just our profession, it’s our passion. We deliver leading
chemical technology in Alumina Refining, Mineral Processing and Solvent Extraction—innovations
powered by a rich history of efficiency and value. We provide onsite support, where our experienced team
works right alongside you to resolve challenges with robust solutions. As a recognized global leader, we
can offer you peace of mind through our commitment to steady, reliable product supply. Combined,
working with us provides you an opportunity and a partnership you won’t find anywhere else.
To learn more, please visit cytec.com/miningleaders

Alumina Refining | Mineral Processing | Solvent Extraction


custinfo@cytec.com | cytec.com/miningleaders

US Toll Free: 800.652.6013 | Tel: 973.357.3193


© 2012 Cytec Industries Inc. All Rights Reserved.
MINING CHEMICALS

University to develop new Products and Mineral Processing. It offers


measurement techniques technologies that can: decrease the cost of
and sensors for measuring operations, provide better recovery and
gas dispersion selectivity, help better manage hard to process
parameters, many ores, prevent or limit employee’s exposure to
companies and hazards, optimise the use of natural resources,
universities are conducting and minimise waste.”
work on developing more Rafael Mier, Global Marketing Manager for
specific sensors for direct Cytec’s Mineral Processing business notes “the
measurement of the necessity for the development of novel mineral
operating variables for the processing reagents capable of enhancing value
flotation cell. Specifically, metal recoveries. Flotation requires new,
new robust industrial stronger, more selective and versatile flotation
strength systems are collectors like MAXGOLD™ and XD5002®.
required to generate on These chemistries were created using its
Cytec’s newly acquired Nagpur, India facility line real time measurement of pulp parameters proprietary Flotation Matrix 100™ process for
such as gas hold up, superficial gas velocity and mineral flotation.” This is an approach that
Magnesium. Each one is introducing new bubble size. But this information alone does combines an expert system, proprietary blends
processes or technologies aimed at making not give a complete picture of what is needed to and expertise to customise a tailored solution.
mining safer, cleaner and less expensive. Clean provide control of flotation. Measurement of MAXGOLD is a novel family of collectors
technologies, or “cleantech,” employed by froth parameters are also required. Sensors do designed for the flotation recovery of precious
member organisations include membrane-based exist for providing measurement of froth speed and base metals from primary and secondary
water filtration, hydrometallurgical processes, and level, but sensors that can provide water ores. MAXGOLD chemistry is a sustainable
biologic remediation, carbon capture, near-zero content, density and froth loading would also be alternative to the traditionally used sulphide
emissions processes, closed-loop systems and extremely valuable in understanding and collectors such as xanthates that are more
other innovation. More information on each controlling the mass and water flows in a effective and reduce the safety, health and
company and the technologies it is employing at system.” environmental concerns. This new chemistry is
http://www.cleanmining.org. Over the last few years, Flottec and McGill offered under the AERO® MX series which
Kemetco Research, for example, is developing have done extensive research on how reagents contains mineral specific formulations for
a means of recovering gold without the use of can affect flotation cell hydrodynamics. This has improved flotation recovery of:
cyanide leaching, as well as treating acid rock resulted in a new appreciation of how significant ■ Gold values from primary gold ores (free
drainage (ARD) with biologically safe materials. reagents such as frother can affect the gold, auriferous pyrite, auriferous
It is developing a cyanide-free extraction performance of the cell at different air rates and arsenopyrite and other gold-bearing
method that would remove the harmful chemical cell levels. More importantly, these sulphides)
compound from gold processing, thereby developments have lead to a better ■ Gold and copper values from copper/gold
creating a safer and more environmentally understanding of how flotation cells and circuit ores
friendly process for gold extraction and operation could be optimised using different ■ Nickel values from massive sulphides and
processing. Kemetco Research is also reagents and mass removal strategies. In order ultramafic ores and PGM values from a variety
developing anaerobic biological processes to take advantage of this knowledge, what is of ores.
relying on the activity of sulphate reducing lacking in industry is the sensor technology to In addition, AERO XD 5002 promoter was
bacteria for the treatment of ARD and other provide dependable real time on line recently developed to improve the safety, health
heavy metal containing effluents. This biological measurement of the hydrodynamics of the cell. and environmental (SHE) characteristics of the
process aims to be an environmentally viable Flottec continues to support the work of industry while enhancing metallurgical results
option for current and past mine sites for the universities such as McGill and University of for Cu and Mo in lower pH flotation
treatment of ARD. Chile and companies such as Cidra to develop
the new sensor technologies that are needed to Gold flotation at the Pampalo gold mine in
Sensing reagent efficacy take full advantage of all the available chemical Karelia, Finland. Picture by Eija Hiltunen
Frank Cappuccitti, Flottec’s President always has technology for the
interesting, insightful contributions for articles optimisation of
on reagents and flotation. His opinion is that flotation.”
“we have a lot of new information on reagents
and we know how we can use it to operate Reagent
flotation. But we don’t have the available developments
sensor technology that will allow us to measure Cytec Industries says it
certain paramaters in the cell so that we can “has become the
control it. There is lots of work being done in largest specialty
this area and more needs to be done. But this reagent supplier to the
is what needs to be done to provide the next big mining industry with
step in improving flotation from an operational three businesses:
perspective. Alumina Processing,
“Based on the continuing work done at McGill Metal Extractant

50 International Mining | JULY 2012


MINING CHEMICALS

Cytec Industries has also been active in Neptune Chemical Pump designed its 500-D phosphoric acid. These reagents are added to
Series (Duplex) diaphragm metering pumps for
developing technologies beyond the collector frother applications in coal mine prep plants. the process streams to minimise or even
business, addressing needs in electrostatic The EZE-CLEAN™ valve cartridges can be eliminate scale in inter-stage piping and
separation, magnetic separation and scale removed from the pump heads without having evaporators. Benefits of using these products
to disturb the pump’s piping. Neptune’s
control in phosphoric acid production. These Variable Oil By-pass™ stroke adjustment include increased production, increased energy
bolt-on technologies are aimed at providing a provides better valve performance than efficiency, and process stability.
means to improve overall unit operations variable-linkage designs, the company says. Steve Paulson, Lead Marketing Manager – N.
Other standard features of Neptune pumps
without the need for large amounts of capital include double ball-check valves, internal relief & S. America with Nalco’s Global Mining &
investment. valve, and a hydraulically balanced Teflon Mineral Processing Group explains that “for
Several issues in electrostatic separation, diaphragm for extended life. Optional features many applications, the site-specific ore
available are automatic flow rate adjustment
such as finer particles and contaminant surface using an electronic stroke controller and composition and the chemistry of the process
coating can cause issues with separation variable frequency drives solution will have a very strong influence on the
efficiency resulting in lower production rates type of product used. Subtle differences in
and product purity issues. Cytec has process. mineralogy or water chemistry can have a very
developed AERO™ EZ 1000 and EZ The AERO® NSK significant impact on product selection and
2000 for electrostatic separation of product line was performance. For example, a flotation collector
differing minerals that have increased developed to that works very well at Plant A may not work at
separation efficacy by 8-11% improve magnetic all at Plant B – even though both plants are
compared to a control, especially at separation, and floating copper sulphide minerals. For this
first pass. In addition, there are application of reason, product selection frequently involves
substantial energy savings as the these products ore-specific and/or site-specific testing of
separation process can now be conducted at has numerous products and perhaps customisation
ambient temperature. An added benefit is the demonstrated the of products in order to implement the most
reduced capital expenditure due to the bolt-on capability to obtain effective program for that specific operation.
nature of the electrostatic process. Application higher purity finished While some products do have applications over
of these products can lead to the ability to products, process mineral slurries of a wider a wide range of conditions (such as some
produce comparable product in quality with cost particle size range, and even separate two non flocculants and handling aids), it is usually not a
effectiveness compared to incumbent magnetic materials. case that ‘one size fits all.’
technologies, separation of minerals over wide The Phosflow® series of anti scalants is novel “There are some classes of chemicals that
size range, reducing the recirculation load and scale inhibition technology developed to have been used for many years in mineral
providing an overall more efficient and robust address scaling issues in the production of processing applications. These include

JULY 2012 | International Mining 51


MINING CHEMICALS

flocculants, coagulants, sulfhydryl collectors, in a process application. With specialty am very glad to move forward in this direction;”
surfactants, and chelants. However our, R&D chemicals, the customer is paying for an end said Steffen Kudis, Head of the Global Oilfield
efforts have resulted in numerous modifications result, and it is our job to ensure that we have and Mining Solutions business.
and improvements to these existing materials the best total program (chemical + feed system The Regional Mining Solutions organisations
over the past several years. Innovation is a key + monitoring program + on-site service) to will be strengthened by shifting business
part of our customers’ success and our growth, deliver that result.” responsibilities into the strongest regional and
so we are continuously searching for: Axis House has successfully developed local markets. Regional Business Management
■ New chemistries which will deliver improved copper oxide flotation chemistries that use Asia Pacific will move from Hong Kong, China to
performance and value for our customers combinations of patented hydroxamates and Melbourne, Australia, while those Santiago,
■ Modifications to existing products to enhance modified fatty acid amines in conjunction with Chile; Houston, Texas and Ludwigshafen,
performance in the customer’s process traditional sulphidisation chemicals. The Germany will remain located where they are
■ Completely new applications for existing reagent suites are now successfully being used today.
products across the globe – and can be found on plants in BASF Mining Solutions offers an extensive
■ New chemistries that reduce or eliminate the DRC, Namibia, Botswana, Morocco, Russia range of mineral processing reagents. It is a
environmental impacts. and Canada. The roll-out of this technology has global business and currently the strengths are
“Among the main areas of progress and been sped up by the availability of the Axis in solid/liquid separation and solvent
innovation that Nalco has focused on in mineral House Flotation Laboratory, where specially extraction; however it also offers reagents for
processing are: trained chemists and metallurgists work with flotation, dispersing, agglomerating and others.
■ Coal flotation collectors – At the end of last year, BASF signed a
alternatives to diesel fuel that long-term agreement with the
reduce environmental impacts; Commonwealth Scientific and Industrial
NALFLOTE® collectors increase fine Research Organisation (CSIRO) to lease
coal recovery laboratory and office space at the
■ Scale inhibitors – improved Australian Minerals Research Centre in
performance on sulphate scale Perth. There BASF is establishing a
control global R&D and technology centre,
■ Automation systems – monitoring employing six researchers and
system performance and chemical developers by the end of 2012.
program control In first projects, scientists will be
■ Sulphide flotation collectors – improved client ore and are able to formulate optimal studying mineral processing specific innovation
selectivity against Fe minerals and increased solutions very quickly (concentrate sample needs such as advanced rheology modifiers for
molybdenum recovery; Pinnacle® sulphide analysis is in-house). the improvement of the thickening process for
flotation collectors – improved Cu and Mo After the successful industrial implementation valuables and tailings or modification of the
recoveries and better selectivity of the Axis House hydroxamates and fatty acids crystallisation process in alumina production.
■ Flocculant technology – products that in copper flotation plants around the globe, the The company also agreed to sponsor research
enhance the settling of red mud and products company has expanded the application base of undertaken by the Parker Centre starting from
that invert more rapidly; POL-E-Z® liquid these reagents to include rare earth oxides July 2012. For five years, BASF will make a
flocculants–quick inverting flocculant (REOs) and industrial minerals flotation substantial financial contribution to participate
technology, and RRA® (Rigid Rod (fluorspar and phosphate). in collaborative research in the areas of
Architecture) flocculants – increased red mud REOs have successfully been floated at lab breakthrough technologies and process
underflow densities, improved overflow liquor scale and (project dependent) possible plant fundamentals primarily focused on alumina,
filterability and reduced scaling.” trials can be expected. Reagents targeting base metals (particularly cobalt, copper, nickel
Paulson also points out that a key industrial mineral flotation and specific gangue and zinc), gold and uranium.
consideration for specialty chemical programs depression (talc/carbonates) have recently been The Parker Centre is a collaborative research
“is what will deliver the lowest total cost of trialled, which resulted in the first industrial organization focused on hydrometallurgy R&D,
operation (TCO). This involves the cost scale orders being placed. involving three research institutions (CSIRO,
performance for the entire program, and not just Curtin University and Murdoch University) and
the chemical cost. This includes the consultative Global shifts strongly supported by 20 mineral processing
evaluation by the service engineer to A recent trend in this sector has seen more companies.
understand the process and objectives of the companies reorganising their global “Our vision is to become the leading chemical
customer, and then to select the right product, organisations for mining chemicals. BASF, for solutions provider to the mining industry by
apply it at the best location(s) at the right instance, will, it says, “align its Mining Solutions investing in existing and innovative technologies
dosage, and then monitor the program on a business even more strongly with customer for mineral processing and metal production of
regular basis to ensure that it is operating at needs. There are two industry platforms for ores. To be successful, we are increasing our
optimum performance and that customers ‘hold mining and oilfield “whose strategies are based R&D spending and strengthening our market
the gains’. on strong growth and adding value through focused organisation. The agreement with
“As ore characteristics or process conditions innovation and customised solutions.” CSIRO is an important step towards building
change, it may be necessary to modify the “A more focused and industry-specific set-up technology and innovation leadership and
dosage or even change to a different product. is required to successfully implement our demonstrates our global commitment to the
It’s a common mistake to assume that all strategies. I see this as investment and strong mining industry,” said Kudis.
products are equivalent and function the same commitment to our customer industries and I With the participation at the Parker Centre in

52 International Mining | JULY 2012


MINING CHEMICALS

Perth and the agreement with CSIRO, standards, including the installation of
BASF intends to strengthen its R&D a fume hood and dust control to foster
capabilities in proximity to industrial a safe work environment for
research centres and key customers. employees. The lab contains all
This creates the opportunity to equipment necessary to perform
connect BASF technologies and flotation trials, and will be further
research and development platforms equipped with mineral analytical
with opinion leaders in academia and capability through planned new
industry and thereby jointly address equipment installation later in 2012.
new developments for mineral The lab will also process mineral ores
processing. “Our research will greatly and coal samples to optimise
benefit from the intellectual property recoveries and grade for Clariant
generated from the Parker Centre and Mining customers.
from our interactions with the Also in April, AkzoNobel Surface
participant research groups,” explained Gregor In this way we want to continue to provide major Chemistry, a leading supplier of collectors and
Brodt, Global Development, Oilfield and Mining operational, environmental and economic mineral coating agents for the industry,
Chemicals. benefits for the mining industry.” announced plans to invest in the growth and
“Mining has become a central focus for BASF In April Clariant Mining Solutions celebrated continued operational excellence of its fatty
globally, and particularly in Australia and New the opening of a new, state-of-the-art mineral amines manufacturing plant in Saskatoon,
Zealand,” said Neil Fitzmaurice, Head of the processing lab at its location in Guangzhou, Saskatchewan, Canada. This investment is being
recently established Asia Pacific Industry Target China. "The new Guangzhou mineral processing made to support the substantial growth by its
Group Mining. “We have built relationships with lab is further tangible evidence of Clariant's potash-producing customers. AkzoNobel’s fatty
leading mining houses and industry-recognised commitment to mining business development in amines and derivatives are used for the flotation
academia, a sound market understanding, an north Asia," said Jason Wang, head of BL of potash ores and anticaking of potash
attractive portfolio and the capability to Mining, region North Asia Pacific. "The lab's minerals during manufacturing.
translate market needs into chemical solutions. location will allow Clariant to share its global “Our Saskatoon plant is ideally suited to
Our Asia Pacific Industry Target Group Mining expertise with regional customers in China and service the potash industry, particularly in the
looks to develop an even more comprehensive will enhance our ability to provide excellent, Saskatchewan basin, one of the largest permit
offering with the overall portfolio of BASF, also customisable solutions to meet our customers' areas for potash exploration in the world,” says
for market segments beyond mineral needs." Gerry Labelle, Business Director for Performance
processing, metal production and construction. The lab meets Clariant's rigorous safety Applications at AkzoNobel Surface Chemistry.

S AT
VISIT U
-27
Sep 24 E 2012
50, IM P
2 0
Stand e Ind
lh i ia
New D
-26 2012
Sep 24 RNATIONAL
IN T E
INExpo A
1066, M as Vegas US
Stand L

JULY 2012 | International Mining 53


MINING CHEMICALS

Kemira, “Water scarcity increases accident risk and may increase the
and mining in arid areas detrimental effects present in the work
will continue to be environment. Quaker Chemical notes that local
challenges for the communities along with regulatory agencies
industry and the have put increased pressure on companies to
regulatory environment improve methods of dust suppression. In the
will keep the industry US, “the Mine Safety and Health Administration
under increased pressure (MSHA) has required mine operators to increase
to reuse, conserve and the total incombustible content of the combined
treat water.” coal dust, rock dust and other dust; and has
Kemira is developing reduced the concentration limits for coal mine
new products and dust. Whereas, the Environmental Protection
solutions to meet new Agency (EPA) has mandated that facilities that
challenges that the generate dust minimise or mitigate the
industry is facing. The production of dust in their operation.
A couple of months ago BioteQ Environmental mining industry faces the dual challenge of To alleviate industry-related issues and
Technologies commenced the 2012 operating declining ore quality and the need to save and address MSHA and EPA concerns, Quaker
season at the Minto mine in the Yukon, Canada,
providing water treatment services. BioteQ’s recycle more water. This is changing the nature Chemical has developed Dustgrip™, a dust
operations staff commissioned the water of many process circuits and is creating scaling suppression product line for various
treatment system on site. This is a fee-based conditions in mineral operations that had not applications, including crushers and conveyor
contract where BioteQ earns revenue for labour
provided and water treatment fees for volume previously experienced this kind of problem. systems, rail cars, stockpiles, unpaved haul
of water treated. The company expects to treat Mineral scaling is prevalent in water systems roads, pits and quarries, mine tailings and
some 500,000 m3 of water in the 2012 season, that are saturated with ionic constituents. screening operations.
though that can vary with precipitation and
snow melt at the site. BioteQ is an innovative Calcium carbonate or calcium sulphate fouling is It says Dustgrip “not only suppresses dust
clean technology leader in global industrial often associated with leaching processes. but offers solutions for managing company
water treatment. The company’s proven Kemira's comprehensive line of KemGuard resources and addressing environmental
technologies have been applied at sites around
the world to recover dissolved metals and scale control products can help. These allow concerns such as:
remove sulphate, producing clean water and selection from a wide range of options to ■ Improving work environment and safety by
eliminating residual waste address specific and the most difficult mineral increasing visibility and improving air quality
deposition problems. In recommending a ■ Creating a cumulative effect thereby, reducing
Canada is the top potash-producing country in product, Kemira looks at the system as a whole water consumption
the world, followed by Russia, Belarus, Germany and understands that chemical addition ■ Reducing labour and equipment costs
and the United States. “The new investment in upstream can have major effects on downstream ■ Ability to use with existing spray equipment,
our plant is part of our long-term commitment to operations. Scale control is an essential tool in and does not require post application rinsing
support our customers’ growing development managing water quality. Kemira has an active of equipment
needs with the capabilities they have long relied R&D program to develop the KemGuard product ■ Non-corrosive
upon: our consistent quality, responsiveness line to solve scaling problems where solutions ■ Ongoing field support from experienced and
and on-time deliveries,” says Bob Margevich, may not have yet been identified. respected Quaker associates.
Managing Director for AkzoNobel Surface Mines’ ability to effectively deal with It is a liquid that absorbs moisture from the
Chemistry business unit. “We will maintain our contaminants such as arsenic and selenium in air and allows small dust particles to combine
leadership as a supplier to the potash industry waste waters will be key to ensure optimal and and increase in size, making them less prone to
by continuing to fulfil and exceed our customers’ uninterrupted production. become airborne. Dustgrip Turbo, Quaker says,
expectations.” AkzoNobel’s fatty amines product Narciso adds, “We understand the important “changes the wetting characteristics of water
lines include: Armeen®, Armoflote®, Atrac®, role technology and water treatment play in making it excellent at penetrating and knocking
Berol®, Ethomeen® and Lilaflot®. production efficiency and environmental down dust particles. It can be used on
compliance. stockpiles to seal surfaces, prevent the erosion
Cleaning up “Kemira's unique position in offering both of valuable minerals, and stop air penetration.
Kemira says water is the connection in organic and inorganic coagulants means that “Dustgrip 007 dries to form a thin, flexible,
everything it does. “We use our chemistry and the optimum program for wastewater treatment continuous seal that that effectively suppresses
applications expertise to provide both in- can be developed. Proven treatment regimens dust for an extended period. It is effective on
process and effluent solutions for a wide range are used for arsenic, selenium and heavy metals stockpiles, soil stabilisation, erosion control and
of water treatment issues found in mineral ore removal.” suppression of dust caused by wind, vehicle and
processing. Mine water treatment products from Nalco heavy equipment traffic.”
“Superfloc polymers are a cornerstone of our aim at more efficient and selective removal of Nalco’s recent developments include
mining business. This brand has been trusted by heavy metals. There is also OreBind® Tailings DustFoam Plus and DustBind Plus
the mining industry for over 50 years to meet Management Technology – increased water technologies for in-plant and in-transit
tight performance requirements for multiple recovery. fugitive dust control. IM
end-use applications from water clarification As noted in the emissions management
and filtration to thickening and tails article in the February issue, dust suppression is References
management.” a continuous and costly activity because it Mining Chemicals: A Global Strategic Business Report,
Joseph Narciso, VP of Minerals & Metals at impacts operational efficiency, impairs visibility, Global Industry Analysts.

54 International Mining | JULY 2012


MINEXPO 2012
www.im-mining.com JANUARY 2011

Las Vegas, September 24-26


Informed and in-depth editorial on the world mining industry

MINEXPO, the mining industry’s biggest technology


and services event is less than a year away.
NEWMONT AT 90

Gear up to maximise on that marketing potential THE MOST


MODERN SHAFTS

through the pages of International Mining


CENTRAL RAND GOLD

SOUTH AFRICAN
OFFERINGS

www.im-mining.com FEBRUARY 2011

The mining industries 1st choice read – International Mining (IM) is the magazine of choice for the
mining companies and contractors of the world – many have sponsored the front cover – including
Thiess, Redpath, Newmont, Gold Fields, Dundee Precious Metals and Lundin Mining Informed and in-depth editorial on the world mining industry

NEWMONT NORTH AMERICA SOUTH DEEP


– innovation and growth – 78 Moz and
Readers’ comments include: MINERAL SANDS MINING
counting

Dundee Precious Metals finds International Mining to be the best technical journal available for
our industry. It is extremely well written, is very informative, and covers ALL aspects of our
business with something for each discipline to read and learn from EVERY month. The electronic
version is widely distributed across our organisation before the hard copy catches up with each of
our operating sites. Simon Meik Vice President Processing, DPM – Chelopech Mining, Bulgaria
EXPLORATION
EXCELLENCE
WORLDWIDE

AUTOMATED MINERALOGY
Paul thank you a lot for you Focus on OKD. We read it very thoroughly and think that it is really – growing apace

professional work from your side. Our CEO [Dr.Ing. Klaus-Dieter Beck] told me that “it is written www.im-mining.com MARCH 2011

very diligently“ – so it is compliment for your work, competences and abilities.


Mgr. Marek Síbrt, Advisor for Public Relations, OKD
Informed and in-depth editorial on the world mining industry

BODDINGTON, BATU HIJAU: POLAND’S BOGDANKA:


and more Newmont mechanised coal leader
in Australasia

Have downloaded the article with the MTT included and it looks ANATOMY OF
A GREAT MINING
INDUSTRY - INDIA
great. Thank you for allowing us the opportunity to be featured and
the article has helped pave the way for the product to be designed
into a project here in Western Australia and also in Chile.
Adam Blakiston, Project Manager, Australian Turntable Co

Thanks John, Really good article on Simulators. Your articles provide


great coverage and depth on each topic. Greg Shapland, CAE Mining
SURFACE DRILLING,
LOADING AND HAULING

John: your article is one of the best blasting updates www.im-mining.com APRIL 2011

I've seen in years! Jack Eloranta, Eloranta & Associates

I’ve been a reader of IM for many years and enjoy receiving each Informed and in-depth editorial on the world mining industry

PASTE SUPPLEMENT

month’s edition as it’s always full of interesting information and


articles. Jason Nitz, Mining Systems Strategist, Newcrest Mining

Your work is very meaningful in the mining world. Your articles and all
your magazine reflect the interest that the team that do IM. I consider
that the reading of IM is mandatory because the information about new
technologies and the knowing of the knowhow of the great mining OYU TOLGOI: Copper giant

SOUTH AMERICA’S
companies and suppliers are appearing in the diverse places of the world. BIGGEST GOLD MINE: Yanacocha

Ing. Lorenzo Zamora Araiza, BATSA del Centro CANADIAN CAPABILITY

SLURRY PIPELINES:
green transport system

IM is also the 1st choice for equipment suppliers’ advertising.


IM carries more vendor messages than any other industry related global publication.

IM was the only global mining publication that had


the support to publish 12 issues in 2011.

With a significant increase in readers in 2011, particularly in Asia,


IM has upped its total global circulation for 2012 by 15%.

Although the circulation has increased, our advertising rates have not.
Please contact us for a quote to advertise in the September Minexpo issue.
HIGH PROFILE

Mining empowerment
A: As indicated, our involvement in the different
stages of a mine depends very much on the
particular need, but our delivery of optimal
service is never compromised. When the Bisha
Paul Moore spoke with Andy Walker, Head of Business Mining Share Company (BMSC) was looking to
Development for Mining and Cement at global temporary start drilling on an isolated site in Eritrea,
located 300 km from the sea, a fast and reliable
power specialist Aggreko; about mining as an industry focus power solution was urgently needed. The only
for the company barrier blocking the work on a site that had
been analysed and tested for over 10 years was
Q: Of the work Aggreko conducts with mines customers in British Columbia, Alberta, proving to investors that the miners had a stable
and mining related operations, can you give Saskatchewan, the Northwest Territories, Yukon, power supply. Through its reputation of world
some idea of the proportion of work that goes to Manitoba, Ontario and Quebec. As an example, class delivery of solutions regardless of the
providing temporary power for advanced we were contacted in June 2011 by Grand Cache issues, Aggreko was called upon to design and
exploration or early in-development projects, Coal in western Alberta with a temporary power implement a power package solution for 20 MW.
and what proportion goes to existing mine need. The mine was undergoing an expansion The power package became the mine’s only
applications, such as refrigeration/ventilation which included a new underground coal mine, source of operational power, with Aggreko
power; back up/emergency power; machine the No. 12 South B2 operation. The customer technicians manning the site 24 hours a day.
moves etc? faced a couple of significant challenges that The project was extended and is still running.
were prohibiting their production timeline:
A: Aggreko’s solutions support a number of limited availability to power from the grid and Q: Back-up power for Escondida was one of your
applications. The amount of work that goes to the newly built transmission lines had not yet largest projects to-date. Can you provide any
providing power during the different stages of a been energised. In order to meet set quotas the other examples of similar projects where you
mine, from pre-feasibility to full operation and mine elected to utilise temporary power to limit have been brought in as a strategic secondary
beyond, very much depends on the particular downtime and drive forward operations. power source?
needs of the client. These needs will be shaped Aggreko mobilised 5 MW of generator power to
by a set of variables which may be related to A: Mines that use grid support are often at the
environment, location, political movements and mercy of the reliability of the third party source.
regulation. Weather, political movements, natural disasters
What is unique about Aggreko is that we and other factors can and do often affect the
specialise in what we do – power rental and flow of energy. In more recent times, the
temperature control – and have gained a wealth significant boom in certain economies has
of experience from having partnered with the meant that grid systems are often over
sectors we have supported over the past 50 capacitated and prone to load-shedding. Mines
years, including of course, mining. Aside from running expensive projects cannot afford not to
the legacy of experience, we work all over the have a back-up solution. Even those with their
world, including expansion throughout Canada. own principal power supply need to put in place
Our people are exposed to the many different a contingency emergency plan. Aggreko is often
scenarios and challenges miners face, and are called in to provide a back-up power package, as
on hand to offer quick and flexible solutions. was the case with the Siguiri gold mine in
One challenge miners often face is sourcing Guinea. Operated by AngloGold Ashanti, the
power for remote sites where grid support is mine’s onsite generators broke down. Aggreko
unavailable. With smaller mines looking to was quick to respond and sent the needed 2.5
maximise profits and minimise costs, the option MW power package by air, just three days from
of installing their own power line is more often run the customer’s electric mining equipment, receiving the customer’s initial distress call.
than not too expensive. Power was required for drills, conveyor, offices and shops. The
one such mine in Ghana, the Damang gold mine, temporary power enabled the mine to quickly go Q: With ever more uncertainty with grid power
owned by Abosso Goldfields. Aggreko’s into production allowing the company to meet due to many countries being pushed to the limit
capability to deliver power solutions in remote previously-made customer commitments. in terms of capacity and frequent rolling
areas was well known to the customer. Within Further, any interruptions in power meant large blackouts etc, does this represent a boost to
three weeks of signing the contract, the necessary production revenue losses for the customer so potential mining applications for Aggreko?
equipment was mobilised, transported, installed Aggreko technicians were deployed 12 hours per
and commissioned on site. day for six months to monitor and maintain a A: In fact we are finding that more and more,
reliable power source. Once the transmission miners are having to explore in remote locations
Q: You mentioned expansion in Canada’s mining lines were energised, the mine transitioned to where there is little if any infrastructure in place.
market, can you provide some detail on your utility grid power for remaining production This trend is driving more exploration mining
presence in Canada plus any recent mining efforts. companies to consider rental power as an initial
specific activity there? energy solution, at least until they are up and
Q: For the principal mining power solution running and can look into the option of setting
A: Aggreko has delivered temporary power applications mentioned above, can you provide up their own power stations. There is certainly
generation services and solutions to mining examples from the past year to 18 months? truth in the observation that many markets are

56 International Mining | JULY 2012


HIGH PROFILE

Q: To what extent do you work closely with the A: Aggreko continually evaluates the viability
companies that provide the mine-wide power of potential power generation solutions, and
transmission network/infrastructure , such as introduces the latest technological
Siemens, ABB and others? innovations where appropriate – to meet
environmental considerations and where
A: While we do not work directly with Siemens, there is a sound business case for our
ABB and others, we do regularly connect to customers, such as in our natural gas
their systems on mine sites so that they can run generators. Where other new technologies
their equipment effectively. Our experts are meet our clients' needs, we will be in a
well versed with the technologies of other position to support them, too. We have an
providers. exceptional record meeting and often
exceeding environmental regulations around
Q: Are areas such as solar power, gas powered the world, and in developing existing
engines, fuel cells etc a potential threat to technology to operate in the most
Aggreko? As a company are you involved in environmentally friendly ways possible. IM
research towards future power solutions?

IInfoMine
nfoMine
f
Aggreko Canada has been seeing increased
demand for temporary power solutions, such as
this 5 MW solution for Grand Cache Coal
Mining Intelligence
I & Technology
Te
echnology
experiencing a misbalance of energy demand
versus supply, due to growth in economies. In www.InfoMine.com
ww
ww
w..InfoMine.com
these situations, Aggreko is often called in by
local utility suppliers to support in
supplementary power, while the infrastructure is
put into place to address any shortages.

Q: Whereas Aggreko may have previously been


brought in as a reactive move to power
problems/shortages, are you now being
factored into an operation more at the
planning/development stages by EPC/EPCM
companies and the like? Connect to a World
A: Within the industry, Aggreko is considered to
of Mining Information
be the leading expert in the field of rental power
and temperature control solutions, and its
y News
reputation for above standard health and safety y Mining Intelligence
practices is second to none. With over 4,500
y Careers
people operating in 165 locations, including the
development of its presence in Canada, Aggreko y Ed
Education
is perfectly positioned to offer in-depth support y S
Suppliers
at every stage of a mine’s lifecycle, including
early phase planning stages. Our people have y Mine Cost Estimating
been called upon for expert consulting for many
years now, and are well aware of the various
requirements EPC/EPCM companies have.
Having said that, we still find ourselves solving
new, never seen before mining applications
which can sometimes be challenging. This is
where Aggreko believes that it adds real client
value. Taking best practice a step further,
Aggreko implemented the Orange Excellence
programme over two years ago, where training
in QHSE and optimised management models
ensure that the promise of highest safety and
service standards are incorporated in each and
every project.

JULY 2012 | International Mining 57


POTASH MINING

Booming pink gold

Paul Moore looks at the ongoing hive of activity in


the potash market, from both majors and juniors,
that is proving highly prospective for the key shaft
sinking groups, EPCMs and continuous mining
machine manufacturers

he potash market continues to boom, capacity, will increase Uralkali’s potash Sandvik MF320 borer miner operating at

T through established expansions to major


existing operations owned by PotashCorp,
Uralkali, Belaruskali, Mosaic, Israel Chemicals
production by 5.3 Mt. The launch of new
projects will make up for the gradually depleting
ore reserves of the Berezniki-2 mine as well as
Uralkali

and will be performed through the Russian


and others to new greenfield projects such as increase potash production capacity. In total, as subsidiary Deilmann-Haniel Schachtostroj. The
K+S Potash Canada’s Legacy and BHP Billiton’s a result of the large-scale investment program, construction period is approximately 5.5 years.
Jansen in Saskatchewan; to Vale’s Rio Colorado Uralkali will increase its production capacities PotashCorp has teamed up with joint venture
in Argentina. There are also a whole host of over ten years to 19 Mt/y of potash as KCl. The partners, Redpath and Thyssen Mining, who
juniors looking to get into the sector, not only in expansion project envisages replacement of old together form Associated Mining Construction
Canada and the US but globally, including South hoist machines which will allow the company to (AMC) for the first new potash mine shaft in
Boulder Mines with its Colluli project in Eritrea increase the capacity of Berezniki-4 mine from Saskatchewan, Canada, in over forty years – the
to MagIndustries Mengo in the Republic of 14.5 to 20 Mt/y of potash ore. The Ust-Yayvinsky Scissors Creek project. The statement said:
Congo. The issue with potash mines is that they project focuses on construction of a new mine ”AMC draws upon the experience of both parent
generally require major shaft development as with two shafts of 8 m in diameter and the companies and their subsidiaries to provide
well as extensive lateral underground capacity for 11 Mt/y of potash. Potash ore solutions to what have proven to be some of the
development, that involves huge initial costs – extracted from the Ust-Yayvinsky block will be most complex shaft sinking projects in the
usually several billion dollars – and as much as processed at Berezniki-3 plant . The mine will world. Due to the nature of the deposit, the
8 to 10 years before the owner sees any positive produce its first ore in 2020. PotashCorp Scissors Creek shaft must be sunk
cashflow. This is one of the reasons why the through layers of unconsolidated water bearing
market is controlled by a relatively small A core technology market strata. Therefore specialised ground freezing
number of players as to develop a new potash From an equipment technology standpoint, techniques are utilised, along with complex high
mine is a long and expensive process. As a bulk potash, sometimes referred to as “pink gold”, pressure shaft liners.” Other key players in
material it also means getting access to represents the most important market for potash shaft sinking include the UK’s Alan Auld
transport infrastructure – generally a freight rail continuous mining machines after coal by some Engineering, DMS Mining Services in Canada,
line. Unfortunately this also means that many of margin. As such the use of longwalls, Shaft Sinkers in South Africa, CDM Smith and
the projects being advanced by juniors will continuous miners, roadheaders and borer others. The scale, scope and cost of the potash
never reach production. miners tends to be overshadowed by the coal projects means it is also attractive to EPCM
Russia’s Uralkali now vies for top position industry, as does the importance of potash companies such as AMEC, Hatch and SNC-
with PotashCorp in potash reserves and annual mining to shaft sinking specialists, especially as Lavalin.
production capacity; and the group has major it often involves specialist ground freezing
expansion plans. Expansion and modernisation techniques. Deilmann-Haniel Shaft Sinking Key machinery suppliers
of its existing production facilities will add 4.5 GmbH (DHSS), now part of the Redpath Group, Longwall mining of potash is conducted in a
Mt of potash production capacity to Uralkali’s concluded a contract to sink two freeze shafts similar manner to coal mining with longwall
total. Further to this, the Ust-Yayvinsky and for the new Ust-Jaiwa mine for Russian potash equipment, though there is the advantage that
Polovodovsky projects include the construction producer Uralkali in late December 2011. The there are not the same hazards found in coal
of two new mines which, when they reach full contract is worth approximately €215 million mining such as rock bursts and methane

58 International Mining | JULY 2012


POTASH MINING

Manufacturer of
the leading Ural
10R and 20R
range of potash
mining machines,
Russia’s Kopeysk
celebrated its
70th anniversary
in 2011

concentration. However, dust tends to be more A new product from Famur is its mining geometry to prevent material accumulation and
of an issue and is one of the main challenges system for thin coal seams, known as FL 13/19. to ease transition to and from steep grades; a
that the equipment manufacturers have to face It includes the longwall shearer FS200, powered modular design to comply with mine-site
in the potash industry. Traditional water cooling roof supports, armoured face conveyor and restrictions for hoist capacity and shaft
systems cannot be used in potash mines beam stage loader with a lump crusher. With dimensions; non-XP electrics and enclosures;
therefore cooling systems tend to have to work adjustments, the company believes the system and a 4,160 v input voltage to replace the
in closed circuit. Because of the faster advance is also very applicable to potash mining. standard 995 v supply.
of the longwall, the canopies and other Caterpillar, through its purchase of Bucyrus is There are also other equipment suppliers for
elements of roof supports undergo significant now a major supplier of equipment for potash which potash is an important market. Salzgitter
attrition, therefore the materials used must be mining, including continuous miners and Maschinenbau AG (SMAG) manufactures and
very robust. Perhaps unexpectedly, there is no longwall systems. The successful operation of a sells automated specialist drilling vehicles
problem of corrosion with potash – as the salt first 30M4-NP continuous miner (Caterpillar specifically made for potash and salt mining, but
coats and therefore to some extent protects the CM345 N) delivered in 2004 to Agrium’s Vanscoy increasingly used in oil shale extraction. Its
equipment. potash operation, led to an order for a further products include the GB 280 S large-bore
Companies in Poland’s Famur Group three units, which were delivered by August drilling vehicle. The GB 280 has three
specialise in manufacturing equipment for hard 2010. Extensive modifications were incorporated independent drilling drives, which in each case
coal longwall mining but in their long history the by a team of engineers working closely with the propel a drill rod with a diameter of 280 mm.
companies have been also producing and customer for over two years. The maximum drilling depth is 7,500 mm. Even
delivering machines for potash mines. Since One of the major challenges was to convert on rough surfaces a movable rod guidance
1992, Famur shearer loaders and Fazos roof the cooling system from a glycol to oil system to system in the front area of the machine provides
supports have formed a major part of the allow operation of the miners in very hot optimal rod guidance. Extendable crossbeams
equipment fleet at Belaruskali’s mines in conditions. The cooling system also had to be make it possible to drill 6 horizontal holes in
Belarus. Fazos alone delivered over 2,300 roof redesigned to fit within the same footprint, parallel positions. With the optional vertical
supports. Belaruskali also uses longwall while at the same time easing the transition level control system installed it is possible to
equipment from Caterpillar and Eickhoff. from flat ground to a grade during uphill mining drill 12 holes in one drill set up. A central chain
The machines produced for Belaruskali were to avoid ground contact, as all three continuous drive is used to feed the drilling drives and an
customised for those operations. The hardness miners will be cutting extensively on grades of electronic feed
of the ore required greater installed power in up to 20°. Other changes include voltage- control system prevents the drill drives from
the cutting arms of the shearers, while the segregated electrical enclosures, a new control overloading and/or deadlocking the drill rods.
cutter motors’ planetary gearboxes were system, modifications to the frame, new cover Rock pressure can reduce the lifetime of
equipped with additional cooling systems. The layouts, and a new layout of the operator’s cab. tunnelled sections particularly in potash and
cutting drums also had a special arrangement of The customer requested an electrical control salt mines. Paus has recently designed the Slot
the pick system. The shearers were also system that operators were familiar with and Cutter PLS 10, a rubber-tyred and all-wheel-
equipped with dust reduction systems, that would facilitate operator access to driven loader designed to minimise floor
consisting of fans and dust sucking units, and individual components. With a modular design, convergence and track construction
the sensitive elements of the shearer were the control system also allows growth to underground. With its cutter, users have the
additionally covered for enhanced protection. accommodate future functionality. A completely option of cutting tension relief slots into the roof
In total, Famur delivered eight longwall new cover package was implemented for the with a continuous nominal depth of 1.8 m and a
shearer loaders (types: KGS-570/2B/Sol, KGS- continuous miners to accommodate the new thickness of 0.15 m. This process is a major
570/KGS-800S/2BP, KGU-310/Sol) to the potash electrical and cooling systems. contributor to improving roof and impact safety.
mines in Soligorsk. Fazos delivered 2,387 roof The custom machines weigh in at 74.84 t and The machine can be used in tunnels up to 2.8 m
supports (types: FAZOS-09/15,5-Oz , FAZOS- can mine seams of 1.8 to 4.63 m. Caterpillar wide with a maximum height of between 2.4 and
15/31-Oz-SOL, FAZOS- 16/24-Oz, FAZOS- 08/13- states that other features that contribute to the 3.2 m. The vehicle is also fitted with a shield to
POz, FAZOS-09/15- POz, FAZOS-16/24-POz, success of the machine include ncreased brake push fallen rock to the side in the same process.
FAZOS-13/20-POz, FAZOS-23/36-Pp, FAZOS- capacity with faster set and release times to The cutter is equipped with a 69 kW Deutz
35/43-Pp, FAZOS-22/34-Pop). facilitate operation on steep grades; improved diesel engine. Power is transmitted from the

JULY 2012 | International Mining 59


POTASH MINING

offers longwall systems for industrial minerals


operations. Joy’s latest innovation in this area is
its Advanced Shearer Automation (ASA) system,
which results in the optimisation of longwall
production cycles and mining safety, according
to coal customers in the US, Australia, and
China. Joy Global states; “These operational
gains, which also contribute to lower operating
costs per tonne, stem from new shearer steering
technologies which allow the programming of
fully-automated cutting sequences, including
gate-end turnarounds. End user benefits include
controlling the shearing machine with a single
operator, positioned upwind with less dust and
noise exposure; achieving consistent extraction
heights and cutting methods between shifts;
and allowing the ability to manage shearer
speed while easily accessing valuable system
Uralkali is looking to produce its production
capacity for potash to 19 Mt/y increase is due to higher capacity equipment, performance data at the mine surface.” Joy ASA
increased power, high voltage, increased productivity features, such as gate-end
reliability and utilisation coupled with better turnarounds, are the result of very specific
cutting chain to the boom by means of the infrastructure, improved mine planning and software enhancements, new sensor
hydrostatic drive. A dual rotary mechanism layouts and better roof control. Potash mines technologies, and the sharing of data between
ensures slots can be cut at any position across using Joy continuous miners include ICL’s the shearer, powered roof supports, and face
the cross-section of rock. During cutting, the Boulby mine in the UK and Intrepid Potash in conveyor sub systems. The initial cutting
vehicle is moved by a 30 kW engine, which New Mexico. profiles and extraction heights are defined by
enables users to make very precise adjustments For the industrial minerals market, Joy offers the use of a software utility called the Graphical
from the cabin. The cutting speed is 1 metre per the 12HM (hard rock miner) series continuous Offline Planner. With this configuration, the
minute. A 76 kW engine and torque converter miner. Within the series is the 12HM36, the shearer automatically replicates the face profile
with a Clark powershift transmission is also largest and most powerful drum type continuous until seam conditions change – at which time,
used for transport within the mine. The machine miner manufactured. Utilising common the operator has the ability to override control of
is also equipped with a motor cable reel with continuous miner components, but designed to the roof drum which records the changing roof
some 300 m of cable, giving the vehicle meet specific applications, the 12HM continuous horizon. By utilising this new roof horizon data,
maximum freedom of movement. miners are successfully operating in trona, the remainder of the cutting sequence is fully
The driver's cabin on the Paus Slot Cutter is gypsum, potash and salt mines around the automated per the predefined extraction
fitted with a protective floor and roll-bar. world. The basic elements of each continuous heights. This advanced level of automation
Maximum sight is ensured by a 180º rotatable miner are similar in design, following field enables the most efficient cycle times possible,
driver's seat and double driving platform when proven philosophies perfected by Joy over the while providing day-to-day consistency.
moving forward and reversing. There is now no years. Each machine employs Joy’s multi-motor Joy’s licence with CSIRO has enabled Joy to
need for turning manoeuvres in narrow mines concept with outboard access to motors, gear integrate CSIRO’s Landmark Face Alignment
and tunnels, as the driver can turn the driver's cases, controllers and other major components. System into Joy’s longwall automation platform,
seat towards the opposite driving platform and The philosophy calls
exit the tunnel in reverse. The monitoring for the isolation of
equipment for both directions enhances driving major components
safety. The all-wheel-driven vehicle has a sturdy for easier
modular framework construction and troubleshooting and
hydraulically-supported articulated steering. maintenance. The
Joy Global estimates that it has delivered over continuous miners
70 machines to potash mining operations, use individual
including continuous miners, battery motors with direct
haulers/shuttle cars, feeder breakers and drive transmissions
flexible conveyor trains (FCTs). Continuous to power the cutter,
miners have been used in potash operations for traction, gathering
many years, however, Joy argues that in recent and hydraulic
years their size, weight and motor power has systems. This
enabled them to consistently produce at high permits service or
enough rates to make them consistently more repair quickly and
economic when compared to more traditional easily, thus reducing
drill and blast methods. The company estimates downtime and
The Paus PLS 10
that the productivity of continuous miners has maintenance costs. Slot Cutter
more than tripled in the last ten years. This The group also

60 International Mining | JULY 2012


POTASH MINING

further boosting performance capacities by away from the face and additional track powerful machines for mining trona, potash, and
automatically maintaining alignment of the AFC installed. Successful use of these machines in salt. In 1959, the first non-coal Marietta Miner
with the coal seam, a production advantage that coal led to their ultimate application into trona was delivered to a trona mine in Green River,
minimizes downtime by eliminating the need to and potash in the 1960s. The interest in this Wyoming. In 1965, machine specifications were
manually straighten the face. This alignment is type of machine among the US coal miners introduced for Canadian potash mines. Since
achieved through the use of an inertial became ever greater. The Clarkson Division of then, many miners have been delivered ranging
navigation system (INS), which is located in the National Mine Service purchased the rights to in profile dimensions of 2.1 m high by 3.6 to 4 m
shearer controller, and is used to track the manufacture the Marietta Borer and improved wide; to 3.3 m high by 5.5 m and 6 m wide. The
position of the shearer as it traverses the face, the design by increasing the installed power. In largest machine was the Marietta Borer type
measuring the face straightness. This 1969, legislation in the US stopped the Marietta 780AW-4, a four-rotor machine that cut a profile
information is transmitted to a server where the Miner from being used in underground coal 2.5 m high by 7.8 m wide. These miners range in
data is compared to a predetermined model of mines, due to the fact that many of the new roof weight from 68 t to 225 t and have a total
the seam. The server then issues recommended control and ventilation requirements could not installed power of 560 to 1,400 kW.
corrections to the powered roof supports, be met with Marietta machines. National Mine Sandvik bought the rights to the Marietta
instructing the system how far to advance on Service started with designing and Borer and set about updating the design for
subsequent cycles, which allows proper manufacturing larger, heavier, and more production at its Zeltweg, Austria location. This
alignment with the coal seam. Joy shearers
equipped with the Landmark Face Alignment
System are currently available in the US and International Mining Editor Paul Moore and Publisher
Australia.
Caterpillar has also announced its next
John Chadwick go the extra mile to report on real mines
generation EL3000 longwall shearer, which and mining projects globally, in addition to the major
features a state-of-the-art communication
system for advanced automation and
tradeshows and exhibitions. So far from 2011 to early
monitoring. The Caterpillar longwall system May 2012 alone, visits have included the following:
includes personnel proximity detection and
underground cameras that can be linked to a
surface monitoring centre. In underground Country Operations reported on
rubber tyred equipment, new additions include
the new AD60 underground truck, with 60 t BRAZIL Samarco (iron ore)
capacity, and the new R3000H underground
Anglo American Barro Alto (nickel)
loader, with a 20 t capacity.
BULGARIA Chelopech (gold)

Borer miners CANADA IAMGOLD Westwood (gold)


Borer miner machines in trona or potash are CHILE Anglo American Los Bronces (copper)
typically used to drive entries up to a total CHINA SD-Mining Sanshandao (gold)
length of 1,500 m in a number of passes, using
SD-Mining Xincheng (gold)
an extensible belt conveyor arrangement. The
resulting room width can be as large as 22 m. Xinjulong Jonggu (coal)
The height, depending on the seam conditions, CZECH REPUBLIC OKD CSA (coal)
can also be mined in multi-pass operation. A FINLAND Northland Resources Kaunisvaara (iron ore)
typical application in higher seams sees the
Dragon Mining Orivesi (gold)
machine advanced through the panel on the first
GERMANY GEOMIN Erzgebirgische Kalkwerke (marble)
pass and operated with a bridge conveyor on
the second pass. This application repeats the IRELAND Boliden Tara (zinc)
sequence a second time by taking two POLAND NWR Debiensko (coal)
additional passes at a lower level. The average RUSSIA KRU Taldinski (coal)
result is a room height of approximately 4.5-5
SOUTH AFRICA Frontier Zandkopsdrift (rare earths)
m, depending upon ground conditions and seam
SPAIN Iberpotash Cabanasas (potash)
thickness. Finally, there are also applications
where cascading mobile-bridge-conveyor UK Galantas (gold)
concepts are used. These are particularly USA Stillwater Mining (platinum/palladium)
suitable for the 3 m and higher seam heights. Peabody Energy NARM (coal)
The development of boring-type continuous
Peabody Energy Rawhide (coal)
miners began in the 1950s. Two machines were
built by the Marietta Manufacturing in West
Virginia. The Marietta Miner, as this machine
was called, was mounted on tracks and fully
mobile. The original machines were rail-
mounted and could only cut a short distance
before the machine would have to be backed

JULY 2012 | International Mining 61


POTASH MINING

An Eickhoff SL500 longwall shearer at


Belaruskali

deposits with an inclination of 20 to 60° is that


the dip is often too steep for the conventional
use of mobile equipment or regular belt
conveyors on the one hand; while on the other
hand they are not sufficiently steep enough for
gravity flow. To use mobile equipment involves
the challenge is to find a suitable mine design
and reduce the inclination in mine roadways to
an acceptable level. In order to do so, different
alternative mine designs were developed and
discussed.
Drilling and blasting is still the most widely
applied extraction method in German potash
mining, but applications of cutting technology
come increasingly into focus due to
technological advancements and consequently
project ultimately saw the development of the project. The project located near Saskatoon, increases in productivity. The development of a
MF420 Sandvik Borer Miner, which was based Saskatchewan Canada will employ Sandvik continuous mining system for semi-steep
on the design of the well proven Marietta Borer Borer Miners designed and developed under the potash seams is part of a strategic research
Miner 1012. It was presented to potential agreement. This has led to the development of project, which currently is being conducted by
customers in early 2010. The MF420 has a total the Borer Miner MF460, a design upgrade of the the Institute of Mining Engineering I (BBK I) at
weight of 250 t and a total installed power of MF420 with an extended range in cutting height RWTH Aachen University in cooperation with salt
1,630 kW. The cutting unit is driven by two 448 for following the seam variation at the Jansen and potash mining group, K+S AG.
kW motors for the rotors and three 160 kW project. The proposed Sandvik Borer Miner One theoretical example of a panel layout in a
motors for the top and bottom cutting drum, design originates from the well proven EIMCO semi-steep deposit was presented with an
providing the power to continuously produce 24 1012 operating at th eLanigan mine, which has average inclination of 25°. The general mining
t of potash ore per minute. When developed, the also operated at the former Potacan mine.The direction is downwards and access to the panel
machine was the world’s largest self-propelled emphasis of this new development is the is provided by an entry drift, with an inclination
underground mobile mining machine. With the integration of well proven technology into a of the roadway of 13.5°. At the end of this entry
high cutting power it is also the most powerful machine which eliminates the bench cut in a drift the actual panel layout starts. Within the
and most productive machine on the market. variable seam and incorporates an intelligent panel the inclination of the main production drift
TheMF420 Borer Miner is. Several of these control system to steer the machine in seam (mains) is reduced to 8.5°. For layout purposes
machines have been in operation for decades in with the target to automate the cutting process. and in order to stay within the panel, the
a number of Canadian Potash mines. Smart diagnostics will assist in improving direction of the mains changes every 500 m.
The Borer Miner MF420 is a boring type, reliability as well as machine utilisation. The Fully-loaded standard mobile haulage
variable height and width-machine which cuts MF460 consists of two main function equipment can operate economically up to this
and delivers material to auxiliary haulage assemblies, the cutting and conveying system dip of the mains. The main extraction takes
equipment in a truly continuous operation. The and the tramming unit. The cutting and place in horizontal rooms/stopes with a length
machine may be used to drive entries, mine conveying system is connected to the tramming of some 500 m, starting from the mains. The
rooms and extract pillars as rapidly as haulage unit with the thrust posts and the trim cylinders, development of the mains and the mineral
equipment can remove material to the main enabling the cutting and conveying unit to be extraction in the horizontal rooms/stopes are
haulage way. The instantaneous advance rate of adjusted in height as well as in tilt and roll. The carried out simultaneously. The mineral is
the machine can be as high as 0.5 m per minute. tractor frame supports the entire weight of the extracted by means of a continuous miner and is
The addition of cutter drums to the cutting machine and transfers this weight to the crawler then transported to a feeder breaker by means
concept is one aspect of the new generation of chains through bogie wheels. The weight of the of underground trucks.
Borer Miners, and provides a number of rotor drive gear case, conveyor assembly and An alternative option to mineral transport
advantages, including the ability to make a main frame is supported by the tractor frame within the potash seam would be the
sharp corner between roof and rib; reducing the through the front and rear trim cylinders. The development of a separate horizontal haulage
major cause for breakdown and wear on cutting forces are transferred from the cutting level underneath the deposit, thus necessitating
standard machines (the trim chain); less power elements through the thrust posts into the the integration of ore passes between the seam
requirement and higher penetration rates; tramming unit. and the haulage level. However, the roadways
reduced fines; and increased manoeuverability required would most probably have to be
to follow the seam as well as negotiating New mining approaches developed in surrounding rock, which usually
gradient changes better. A paper at the 2012 MassMin conference would be uneconomical.
In August 2011, Sandvik Mining and authored by RWTH Aachen University and K+S It was also ultimately recommended for cost
Construction entered into an agreement with AG attended by IM discussed the development reasons to use drilling and blasting technology
BHP Billiton for the conceptual design of a of mining concepts for cutting technology in for the development of the mains and cutting
mechanical cutting system for use at the Jansen semi-steep deposits. The major problem in technology for extraction in the rooms/stopes. IM

62 International Mining | JULY 2012


FROM: WWW.IM-MINING.COM

Mining technology updates the vehicle makes for a much lighter machine as well
as an increased pay load capacity- the machine is

Every month IM posts around crawler drive, capable of carrying loads of up to 5 t. The highly
discharge manoeuvrable and agile crawler carrier is controlled by
100 news items to its website, conveyor, transfer remote control (manual and umbilical back up) and is

mainly technology related. conveyor and self loading/ unloading with a demountable load bed
feeder drive which comes in either a standard length of 3 m or
Here are some recent highlights destined for an open cast mine in China. A total of five extended at 3.6 m. The compact design of the machine
assorted Siemens Mechanical Drives gear units will be allows it to fit into a standard shipping container The
CommodasUltrasort, the mining brand of TOMRA travelling to Shouzhou City, in China’s Shanxi Province, Mule also comes with various track options including
Sorting Solutions, has after manufacture in the UK. These include two 400 kW steel and rubber tracks. Dando have already supplied
been made a member of Planurex bevel helical planetary units supplying the one of the carriers to a drilling contractor for use in
the international crawler drive (size P2KB30, weighing 11.4 t each), one Africa and have an order lined up for a further two to be
AngloGold Ashanti 350kW P2KA22 Planurex driving the apron feeder, and sent to East Asia.
Technology Innovation two Flender FZG B3SH size 14 (350 kW) and size 12
Consortium. The (275 kW) bevel helical units with integral backstops for Natural gas powered
consortium, based in the discharge conveyor and transfer conveyor. The unit high horsepower
South Africa, was established in 2011 by AngloGold for the apron feeder features an external cooling and engine specialist GFS
Ashanti and, including CommodasUltrasort, comprises lubrication system, plus an integral motor mounting Corp has brought its
46 industrial companies, eight universities and platform. first major commerical
research institutions all of which regarded as offering to the open-pit mining sector. The company’s
innovators in their field. ContiTech has EVO-MT 7930 System is specifically designed for the
The aim of the consortium is to create new ways of strengthened its Caterpillar 793 series of mine haul trucks. The company
thinking and new opportunities for deep level mining. industrial business in states that the EVO-MT system allows mining
Mike MacFarlane, Senior Vice President Technical specialised conveyor companies to substantially reduce operating costs
Development at AngloGold Ashanti says: “The belts by purchasing without major modification of either the chassis or
consortium facilitates solutions by bringing the world´s Specialised Belting drive engine of the Caterpillar 793 haul truck. The EVO-
leading innovators to solve mining´s toughest Supplies. This British MT 7930 system has been designed to maintain the
problems. Next generation mining requires company has been in the proven reliability and performance of the Caterpillar
collaborative breakthroughs.” CommodasUltrasort, has market since 1984 and, 793. In the event of a fault condition or low LNG fuel
provided state-of-the-art sensor-based sorting with 50 employees, produces primarily steep-angle level, the system seamlessly switches the truck to
technology for dry material separation in various conveyor belts for the transport of bulk materials 100% diesel operation regardless of operating mode.
minerals and ore applications since 1988. It was including ore, coal or gravel. “The purchase of this Truck haul capacity is maintained after the EVO-MT
chosen as an expert partner for sensor-based solutions profitable and established company is strategically system is installed and engine power and torque
for gold ore sorting. important and opens additional opportunities for us in output is maintained to OEM specifications.
the growing worldwide market of steep inclined and
Xstrata Technology has recently signed an Albion vertical conveying,” said Hans-Jürgen Duensing, ABB’s Minerals/Underground Mining
Process technology Business Unit Manager of the ContiTech Conveyor Belt business unit and Atlas Copco
licence agreement Group. “We are not just taking over the business Underground Rock Excavation
with GeoProMining operations, but the production as well and want to have developed an
Gold, a 100% owned further expand it. We also have for the future the new innovative mobile
subsidiary of production technology to produce particularly integration system
GeoProMining Ltd. temperature resistant corrugated sidewall belts.” between ABB’s process
The agreement allows GeoProMining Gold to use control System 800xA and Atlas Copco mining
Xstrata’s proprietary fine grind and oxidative leach Dando Drilling International, the supplier of drilling rigs machines. The solution is currently installed at the
technology for the recovery of gold and silver from and equipment for the mineral exploration, Atlas Copco test mine in Kvarntorp, Sweden. ABB says
sulphide concentrates at their GPM Gold Project in geotechnical, water well and geothermal sectors has “it will offer future mine operators unrivalled process
Armenia The agreement was signed after the recently launched a brand new type of machine- the control opportunity and information.” It will provide
successful completion of a BFS in 2011 that included Dando Mule ATV5-RC. The Dando Mule, a tracked load machine tracking for greater mining efficiency. Today,
batch and continuous pilot plant testwork on samples carrying vehicle, was designed by Dando for solving the sensors and automated data processing systems
from the GPM Gold mine in Armenia. The feasibility provide mine operators with essential information on-
study demonstrated that the Albion Process can line for each product and process control. Future
achieve high gold and silver recoveries from the GPM mining will require a high degree of integration in
sulphide concentrates on a cost competitive basis. product and process optimization, maintenance
GeoProMining Gold LLC has engaged Xstrata planning, environmental control from one single control
Technology to provide the Albion Process plant as a centre in order to get the best overall performance from
lump sum design and supply package, and to complete problem of transporting to and on-site heavy drilling mining machines underground, as well as increase
detailed design of the existing flotation plant upgrade. equipment and tooling across very rough terrain. The productivity and lower energy consumption.
design of the machine allows the Mule to be operated
International supplier of mineral sizing systems, MMD, from a distance by remote control thus keeping the To keep up with this news in detail,
has specified Siemens gear units and couplings for a operator safe. The removal of the operator from within go to www.im-mining.com

JULY 2012 | International Mining 63


ADVERTISER INDEX ADVERTISING SALES REPRESENTATIVES
Aggreko FC UK, Europe, South Africa, US East Coast & Canada
www.aggreko-always-on.com Contact: Phil Playle or David Lansdowne, Lansdowne Media Services Ltd
Atlas Copco Secoroc AB 7 Tel: +44 (0)1442 877 777, Fax: +44 (0)1442 870 617
www.atlascopco.com phil@im-mining.com or david@im-mining.com
BASF 15
www.basf.com/miningsolutions Eastern Europe & CIS US Mid-West, Cent & Mt South America
Becker Mining Systems 9 Contact: Piotr Gaber Contact: Kevin Lapham Contact: Ricardo Cortés
www.becker-mining.com Media4M J.P. Media Inc Editec S.A.
CAE Mining 35 Tel: +48 12 394 58 48 Tel: +1 (630) 420 9752 Tel: +56 2 757 4200
www.cae.com/mining Fax: +48 12 383 23 94 Fax: +1 (630) 420 9763 Fax: +56 2 757 4201
Carlson Software 39 mail@media4m.pl lapham@jpmediainc.com rcortes@editec.cl
www.carlsonsw.com/mining
Western USA Australia and New Zealand Brazil:
Clayton Equipment IBC
Contact: George Roman Contact: George Roman Contact: Joseph Young
www.claytonequipment.com
Roy McDonald Associates, Inc Roy McDonald Associates, Inc Magazine Minerios & Minerales
CSA Global IBC
Tel: +1 (702) 515 7247 Tel: +1 (702) 515 7247 Tel & Fax: +55-11-3788 5500
www.csaglobal.com Fax: +1 (702) 515 7248 Fax: +1 (702) 515 7248 josephyoung@terra.com.br
Cytec Industries Inc 49 george@roymcdonald.com george@roymcdonald.com
www.cytec.com/miningleaders
3D Laser Mapping IBC
www.3dlasermapping.com Japan: Contact: Akiyoshi Ojima China India: Contact: Deven Singh
Devico IBC Japan Advertising Contact: Huang Bldg No 4, B/201 - 202, Gokul
www.devico.com Communications, Inc Shusheng(黄术升) Aangan, Krishna Township
DSI 12 Tel: 81-3-3261-4591 Tel:+86-10-13901065576 Vasai West Dist Thane - 401202
www.dsimining.com Fax: 81-3-3261-6126 Fax:+86-10-81573510 Cell:- +91 9867313001
Flottec 51 ojima@media-jac.co.jp huang_shusheng@hotmail.com devksingh2009@gmail.com
www.flottec.com
FLSmidth 17
www.flsmidth.com/tailingsmanagement
www.flsmidth.com FORTHCOMING EVENTS
Haver Tyler 11
www.havertyler.com July 2012 18-19: Eighth AusIMM Open Pit Operators’ Conference
Infomine 57 10-12: Life-of-Mine 2012, Brisbane, Queensland, 2012, Automation, Maximising Throughput & Return,
www.infomine.com Australia. www.ausimm.com.au/lifeofmine2012 Perth, Western Australia.
IPCC 2012 46 www.ausimm.com.au/openpit2012
http://corporate.im- 12-13: 4th International Seminar on Process
mining.com/imevents.asp
Hydrometallurgy, Santiago, Chile. www.hydroprocess.cl 24-26: MINExpo INTERNATIONAL 2012, the world’s
Ishigaki 45
largest and most comprehensive exposition for the
www.ishigaki.co.jp
18-19: Australian Uranium Conference 2012, Fremantle, mining industry, Las Vegas Convention Center, Nevada,
J H Fletcher 21
www.jhfletcher.com
Western Australia. www.verticalevents.com.au USA, www.minexpo.com
Knight Piesold 33
www.knightpiesold.com 23-24: Mine Site Automation & Communication Africa 24-28: XXVI International Mineral Processing Congress -
Komatsu 25 2012, Sandton, South Africa. IMPC 2012, New Delhi, India.
www.komatsu.com www.miningiq.com/events/ www.impc2012.org/
Leiblein GmbH IBC
www.leiblein.de 24-26: Queensland Mining & Engineering Exhibition, 25-27: Seventh International Conference on Mine
Major Wire Industries Ltd 23 Mackay, Queensland. www.reedminingevents.com.au Closure, Brisbane, Australia.
www.flexmat.com www.mineclosure2012.com/
McLanahan Corp 29, IBC August 2012
www.mclanahan.com 5-10: 34th International Geological Congress, Brisbane, October 2012
Metal Innovations 47 Queensland. www.34igc.org 2-3: The AusIMM New Leaders' Conference 2012,
www.metalinnovations.co.uk Ballarat, Victoria. www.ausimm.com.au
Metso IFC 6-8: Diggers & Dealers 2012, Kalgoorlie, Western
www.metso.com Australia. www.diggersndealers.com.au
Micon International IBC
www.micon-international.com is a media sponsor for
21-22: Sampling 2012, Perth, Western Australia.
MINExpo 2012 43
www.ausimm.com.au/sampling2012 these forthcoming events
www.MINExpo.com in 2012:
MineSight – Software Solutions from Mintec Inc 37
www.minesight.com
28-30: Mining & Engineering New South Wales, September 10-14:
P&H Mining Equipment 19
Newcastle, New South Wales. Electra Mining Africa 2012
www.reedminingevents.com.au
www.minepro.com www.phmining.com Johannesburg, South Africa
Purolite 27 www.electramining.co.za
www.purolite.com September 2012
Sandvik 5, OBC 5-7: 9th International Mining Plant Maintenance
www.sandvik.com/thisway Meeting, Santiago, Chile. www.mapla.cl September 24-26:
Senet 31 MINExpo INTERNATIONAL
www.senet.co.za 5-7: 7th International Mine Equipment Maintenance 2012
SRK Consulting IBC Meeting, Santiago, Chile, www.mantemin.cl Las Vegas, Nevada, USA
www.srk.com www.minexpo.com
ThyssenKrupp Polysius AG 41 10-12: 2nd International Seminar on Energy
www.polysius.com Management in the Mining Industry, Salvador, Bahía,
Weihai Haiwang Hydrocyclone Co., Ltd 53
September 25-27:
Brazil, www.enermin2012.com
www.wh-hw.com Seventh International
Weir Minerals 2 10-14: Electra Mining Africa 2010, Johannesburg, Conference on Mine
www.weirminerals.com
South Africa. www.electramining.co.za Closure, Brisbane, QLD
www.mineclosure2012.com

64 International Mining | JULY 2012


World Leading
Locomotives
CLASSIFIED
CLASSIFIED
& Haulage
emma@im-mining.com
emma@im-mining.com
Solutions …

…for Mining, World Leading


Tunnelling Locomotives
& Surface & Haulage
Transport Solutions …
Clayton Equipment Ltd
www.claytonequipment.com …for Mining,
Tel +44 (0) 870 112 9191
Tunnelling
& Surface
Transport

Suppliers of Clayton Equipment Ltd


laser scanning www.claytonequipment.com
Tel +44 (0) 870 112 9191
technology
for continuous
slope
monitoring
and volume Mining business in
measurements.
the Philippines?
+44 (0)870 4429 400 3dlasermapping.com
The Philippine Mining Club (PMC)
Join/become a sponsor

INTERNATIONAL MINING
Directional Core Drilling
& Borehole Surveying Instruments

Follow
s
s
our daily news postssrk
SURVEYING INSTRUMENTS
BOREHOLE DESIGN
consulting
s www.im-mining.com
BOREHOLE SOFTWARE
s DIRECTIONAL CORE DRILLING

Consulting services from exploration


D EVI CO@D EVI CO.N
CO . N O s W W W.D
W .D EVI CO.CO
CO
O.CO M
through to mine closure
PMC is proudly affiliated with
www.srk.com
the globally-recognised
Melbourne Mining Club
and supported by the
Philippine Mineral Exploration
Association (PMEA)
www.srk.com and International Mining
P.O. Box No 3258
Consulting services from exploration Makati Central Post Office
1272 Makati City
through to mine closure
R esou rc e Industry Consultant s

info@philippinemingclub.com
www.philippinemingclub.com

A Solid Past,
INVEST IN
An Exciting Future! PROJECT NEWS
INTERVIEW OPPORTUNITIES–
COME SEE US AT BOOTH 4245!
1

Published
SALES every two weeks, IM Project Beyond that, we look at projects in So, to keep up with projects getting News
from tho
se pro
Contact

Pro
emma@
PROJEC im-mining.com
T NEW
1

A collect jects ma ject New


king pro s (21) Jun S

News is incrammed withandvaluable development, publishing regular updates close to completion and learn about
ion
project of recent gress tow e 10, 200

Experience the aggregate mineral processing


s around starts ards pro 7
A colle
ction of the glo and progre duction
be like
ly to bess reports from
likely to recent – more
starts
PREFEAbe in the mar and in the
every
two wee
SIBILITY ket for equiprogress repo marke around the
MEXICO .............. pme rts from Contact ks
.............. nt and serv emmt a@ for equ world

industries PAPUA - Tyle around - update


New
r Reso .............. ices. .............. PtheRO world im- ipment and
PERU NEW
GUINEA
s from
urces
COP ....... ....... - upda mining.com service s on

information incorporating the latest news as they get closer to production. key project personnel, subscribe now
-
SLOVAKStrikeA Resource - Harmony pro
-tho
sePER/GO .............. Pro .......
ject
.......JEC
.............. tes on
T .......
N projects s.
jectLD.. .............. .......New
s ma .............. EW
collect s (21 ..............
S arou
ZAMBIA IA - Tourniga s - IRO Gold
ion ofN ORE - COPPER kin g....... ....... .......
) Jun.............. ..............nd the globe
COLUM - Africanpro n Gold rec .............. /GOLDpro
- GOL ent sta
gre .......
..............ss .......
e 10, ....... .......
ject
Eagle s aro D........... rts .............. tow.......ard....... 200 7......... ..............1
.......
USA - BIA A - Grey
collection Resourceund
the ....... and....... pro .......
.............. s pro.......duc
.............. ....... .......
..............
....2
globe .............. gre.......

PROCESS ENGINEERS
Galw star Reso of urce s - COPPER ss....... tion
.............. .......
CANADA aylikel to be in rece
y urce likely....... rep....... – mo ..............
GOL and .....................
nt- start
Reso
AUSTRA - Geo PRE FEA s - MO theLYB s
market sD/SI to.......
be....... orts ..............
.............. from .......
.............. re eve2 ry

to IM Project News.
dex SIBI DEN LVE
progress
R............ ....... .......in the aro ....... ....... ..3 two wee
ARGENT LIA - Hero MEX
Mine ralsLITY .......
TUNGST
for
UM equi
/TU
reports
.......from ..............ma.......rke....... und .......
the.............. ks
ICO -- Tyle for.......

on projects within that fortnight. We also detail expansion projects at


pme
AUSTRA INA - Mine PAP
n Reso .......
EN/ NGS
.............. nt and
TENserv around ..............t.......
.............. equ .............. wor .3 -
ld
urces r
ResourceMO ....... .......ices. ....... .......the
.......worl ipment
.............. ...........4 update
LIA - Inde ra UA NEW - NIC KEL s LYB DEN............................ .............. .......d....... ..............and ser s on
............................
Andes
RUS PER GUI NEA -.......- .......
COPPER UM/CO - upda
FEASIBI SIA – Poly SLO pend - Strik- eCOP
Uence PER Harm .............. /GOLD.. PPER....... ..............
....... .......tes
.......
on....... ..4 vices.
LITY meta VAKIA p - GOL
Grou Reso ....... ....... ....... .............. ..............
..............
.............. ..............
proj .......
ects
l - GOL ony ....... Gold ....... .............. ..4around the
..............

Wet processing experience in the aggregate and ..............


urces
BURKIN STAGE ZAM D - IRON .......
D-....... - COP
....... ............................ .............. ...........5
BIA - .......Tour
.............. .......niga .......ORE .......PER ......./GO ............................ ..............
..............
.............. glob
USA - A FASO COL - GoldUM .......Afric .......an
.......n.......
Gold -
.......GOL
..............
.............. .......LD .............. ............................ ..............
..............
.............. e
....... ....... D........... ..............
.............. .............. .............. .5 ................ .......1
USA -beltBIA
Grea Eagle
AUSTRA t Basin Gold Reso - Grey ....... urces ..............
..............
Reso
.............. ..............
.............. ..............
.............. ..............
.......6 ....... ...........2
Galway urcesstar - COP ....... ..............
.............. ..............
CHINA LIA - Moly CAN - GOL
D/SI - GOL Resource
D ....... - GOL
....... .......PER ..............
.............. .............. ..............
.............. .............. .......
.....6.............. ..............2

FOR A FREE TRIAL!


..............
.............. ..............

existing mines.
Resource
ADA - GeoLVE ..............
AUSTRA- Golden Chin s - MO s.......
R..... ..............
..............
Mine s - MO .......D/SI ..............
.............. ..............
.............. ..............

mineral processing industries


AUSTRA dex Mine ....... LYBDEN .......LVE
a Reso LIA LYB DENUM. ....... .............. .......R..... ..............
.............. ..............
.............. .....6.............. ..3
CANADALIA - Gold ARG urces- Hero rals -
TUN
....... UM /TU
....... ..............
.............. ..............
.............. .........6 .............. ...............3
starENT ResoINA - GOL GST
....... NGS
....... ..............
.............. ................
AUSTRA - Western
nD TEN .......
AUS -
Reso
.......urce
....... .......EN/
.......MO ....... .............. ....... ....... ..............
....7.............. ...........4
TRA urces Mine
- GOL s NIC
....... .......LYB .......
..................... ....... .......
..............
SOUTH LIA - Mino
- ..............
RUS
Copper LIA
- Inde
ra And
D....es KEL
....... .............. .......DEN.......UM .............. ..............
.......
- COP
.............. ......7.....................
..............
Corp’s
taurSIA - GOL ..............
PER....... .............. ......./CO ..4
USA - AFRICA FEASIBI Expl–orati .............. .......PPE

It is specifically about projects


pendence
Polymeta D/SILVE ..............
....... .............. .......R ............................ ......7 ....... .......
American - EastLITY STAGE
on/ l
Helix - GOL
Group
R .......GOL
- ....... .............. ....... .......
.............. ............................ .......
.............. ....... .............. .............. ..4
BUR ern Plati ResoD .......D
.............. ....... ....... .............. ..................... ....... .8.............. ...........5
Corp .......
– LIG ite KINA num - .......
Lign .......
CHILE NITE…… USA Ener gy/FAS PGM ....... urce s - GOL
.............. ....... ....... .....................
....... ....... .............. .............. ..............

DESIGN ENGINEERS
- Great HeadOwate s ....... D/SI.............. ..............
…… - Goldbelt .............. LVER....... ....... .....................
....... ....... .............. ..8 .............. .5
USA - - Freeport-McM AUSTRA ………… Basin rs
Gold Energy Resource
..............
..............
.............. .............. ..............
.............. ..................... ..........8 .............. ..............6
Futu
CANADA reGen Allia oRan LIA
CHINA Cop
……
- Moly …… - GOL Serv s - GOL .......
/ Grea D .....................
............................ .............. .............. ....... .......
....... .............. ...................6
D/SILVE ............................
ices
nce - - Goldper & Gold Mines ………… t R iver ....... ....... ..............
.............. .....9
MEXICO - AtlanticAUSTRA COAL..... / CodMO
- …… R..... .............. .......
.............. .............. ....... .............. ..............
.............. .......
Ener
en Chin
.......a....... elcoLYBDEN …… …… ....... gy/ The ..................9..................... .....6
GREENL - Baja Mini Resource - COP .......
Gold - LIA
GOLD- Gold UM.
CAN s - GOLPER .............. ……....... ............9
.............. Nort
……....... ....... ....... .......
- COP- Wes..............
ng ADA h Amer
CANADAAND - True
star Reso
D ....... ..............
.............. …… .............. ....... .............. ....................... ..6

(not speculative exploration reports)


ican

At any one time there can be 8,000 Contact: emma@im-mining.com


AUSTRA PER tern Cop....... ....... .............. ..............
.............. ………… .............. Coal
....7
Nort LIA /CO .............. .....................
urces
.......- .......
GOLD.... .............. ..............
MONGO - North Ame SOUTHh Gem - MinoBALper T/ZI .............. .............. ……….1

Experience in the design NC/’s - GOL....... .............. .............. .............. ......7


Corp
rican AFR s - RUBtaur ....... .............. .............. 0 ..............
ALGERI LIA - WesUSA TungICA Explorati MA
Y ....... NGA D/SILVE ............................ ..............
.............. ..............
.10.............. .............7
..............
- American sten -Corp Eastern ....... on/ Helix NES
....... ....... .............. ..............
INDONEA - Terramin R .......
.............. ..............
tern Pros E .......
Platinum ....... ..............
Corp pect Lign
– LIG or Grou
- TUN
GSTEN .......
- PGM .......
Resource
s - GOL..............
..............
....... .............. ..10.............. ...............8
..............
COTE SIA - Find raliaNITE……ite ....... .............. ..............
Aust
D’IVOIR
CHI
ersLE ZINC/LE URAgy/
p - Ener
NIU ..............
s .............. .............. D/SILVE ..............
.............. .......10.............. ................8
- Free- port …… AD.…… M....
Headwate
rs Ener .............. .............. ....... .....................
.....................
SAUDI ....... .......R....... ......11 ....... .................8
Reso
E -USA - Futuurce s - -McMoRan .......…… ....... …… ....... gy Serv .............. ....... .....................
reGen GOLD/C

and manufacture of mineral BRAZILARABIA -CAN ....... ....... ..............


Etruscan
ADV ADA Reso Alliance OPP Copper ..............
ER..
…………
.......
.......ices
......./ .......
Great
....... .......
....... .......
....... .......
.......12 .................................9
PERU - urce
p/- Atlan s - GOL - COA .......
& ……
....... ....... ....... ....... .......
Codelco .......…… .......
belaMEX Grou Gold Rive

and aggregate processing embarking on scoping


featuring operations drilling projects underway, 1,500 reserve- +44 1442 87 08 29
Mira
D ....... L..... ......./ ....... ..............
………… .......
r Ener
.......gy/ ..............
...12 .......
- ICO .............. ....9
Bariqtic Gold
AUSTRAMonterrico GRE
Nickel
- NIC - Baja Mining - GOL .....................
- GOL D ....... .......
..............
- COP ..............
…… .......
The.......
ENL KELMini D/COPP .............. PER .......
....... ……
.......
Nort....12 .....9
CANADALIA - Gind
Metals
COPAND .......
ng - COP
....... ....... ..............
.............. .............. ....... ……
.......
h Am erica
CAN -
ADA PER- True ..............
PER/CO ER.. ....... ....... .............. .............. .......……
....... .13 ……
n Coal
albie
Meta-ls/Nort /MONort ....... ....... ..............
.............. ....... .......
- Cana MO
h Ame LYB hDENGem s .............. BALT/ZI ....... .......
....... .............. ..............
....... .............. ……….1
ALL dolla NGOLIA
dian Roya Ansh UM - RUB ..............
NC/MA ....... ..............
.............. ..13.............. 0
content rs are US
unless ALGERIlties - -NIC
an rican
WesternIron & Tung .......Y.......
.............. ....... NGA ....... .......
....... ....... .............. .............. ...............10
other is copyright otherwise A - Terr KEL Stee sten ....... ....... .............. NESE ....... ....... .......
....... .......
....13
INDONE amin /COPPE
Prospect l GrouCorp - TUN .............. .............. ....... .............. ....... ....... .......
or Group - IRO .............. ....... 13.............. .........10
form.
Intranet. IM Proje stated, Australia R/PG N GSTEN ....... ..............
SIA and all units p - URA ORE ....... ....... ..............
..............
- ZIN M ....... ...14............................10
ct
COTNews
subscriptio should- Find
E D’IV .......NIU ..............
....... ..............
..............
n detai
OIR not be ers Reso are etric C/LEAD. .......M....
.............. ..............
.............. ..............
.............. .......
SAUDI passed m .............. ......14.......

studies or those further advanced to definition studies, 800 feasibility studies Annual subscription is only
E able .............. ..............
.............. .............. ......11
equipment
ls are .
- Etru onurce s -TheGOL .....................
BRAZILARABIA - ADVfrom
avail subscriptio
scan to other
s, eitheD/COPP n to IM .............. .............. ..............
..............
emm Resource
r as forw ER.. Project .............. ....... .............. 15 .............. .......12
PERU - Mirabela Nick Group/ Bari -min ..............
a@im s
GOL arde .............. .............. ..............
.16 .............. ..........12
-ing.c
omD ....... d em ails,
News
- ....... is perso
as phot....... nal and ..............
AUSTRAMonterrico Meta el - NICKEL Mining - GOL .....................
q
ocop....... .............. .............. ...........12
LIA ....... D/C ....... ies, or the
CANADA - COP
PER/MO..................... OPPER......... ..............copie s in..................... ...............13
- Gind ls
- Cana albie Metals/ LYBDEN .............. .............. ..............any .......
ALL dolla dian Roya Ansh UM ....... .............. .............. ..................... .........13
NICKEL & Steel Grou .............. ..................... ..................... ...........13
content rs are US an Iron

£260, $410 or €315


unless lties -
other is copyright .............. ....... .......
otherwise /COPPE .............. ..................... .......13
R/PGM - IRON ORE

prefeasibility and feasibility. and 400 mines under construction.


form.
Intranet. IM Project state p
subscriptio News shoud, and all units .............. ....... ....... .......
n detai ld not
be are m etric .............. ..................... ..................... ...14
ls are
availablepassed on to . The subsc .............. ....... ......1

TO ADVERTISE HERE CONTACT


from emm others, eithe ription to .............. ..................... 4
a@im-min r as forw IM Proje .............. 15
ct News ........16

PLEASE APPLY ONLINE AT mclanahan.com


ing.com arded is perso
em ails, as nal
photocop and the
ies, or
copies
in any

emma@im-mining.com
HOW CAN YOU
INCREASE BOTH
SAFETY AND YOUR
PRODUCTION RATE?
THIS WAY!
If you are in the mining business, you know that an improved safety
record means a lot to your employees and your entire company.
This safety mind-set is part of everything we do – from research
and product development to on-site service.

Join the movement towards The Future of Mining.


It´s This Way: sandvik.com/thisway

You might also like