You are on page 1of 12

PowerSTIM

Well optimization service


find theapproach
that works >>
The oil and gas industry is constantly evolving;

we are always looking for a better way to get the

job done. The best tools and methods are the

ones that fit your business needs. That is why we

develop solutions with you—not just for you.

Your local knowledge is combined with our

multidisciplinary industry expertise and the

most advanced technologies in the business.

Together, our combined team develops work-

flows that fit wherever you need them, anywhere

in the world, resulting in decisions that work for

your bottom line.

>> together
we can
PowerSTIM
Well optimization service

Turning reservoir specifics into


stimulation solutions
Need for stimulation optimization Applications
Stimulation is a major expense in many well ■ Optimizing profitability in both high-productivity
completions. Each year more than 20,000 wells conventional reservoirs and low-permeability
worldwide are hydraulically fractured. At a cost heterogeneous, layered reservoirs
exceeding $2 billion—an average of $100,000 per
■ Improving performance of marginal fields
well—the results often barely justify the expense.
It is estimated that two-thirds of these wells do ■ Overcoming completion problems or failures
not respond as expected and fail to meet objectives, ■ Reengineering completions to maintain or
and that fewer than 1% of fracturing treatments are exceed past production at economically
optimized to maximize production and recovery. justifiable costs
Instead, the tendency is to rely on acid or proppant
fracturing treatments that have always been per- Benefits
formed the same way in a particular area—the
one-size-fits-all approach—or to base treatments ■ Increased production
on estimates of average reservoir properties, which ■ Improved profitability
may result in hydraulic fractures of insufficient ■ Greater return on stimulation investment
length and width with excessive vertical height.
■ Reduced completion and production costs
Service optimizes treatments ■ Shorter learning curve over fewer wells
The PowerSTIM* well optimization service takes a ■ Greater understanding of well performance
fit-for-purpose solution-oriented approach that has ■ Access to Schlumberger experts worldwide
proved effective in a broad range of reservoir types. ■ Knowledge gained for improving future wells
Stimulation treatment design and execution are
customized to the specific conditions in the well or
Features
field, based on detailed, accurate formation evalua-
tion and modeling by a multidisciplinary team of ■ Proprietary workflow process
client and Schlumberger experts. Based on the ■ Multidisciplinary team
PowerSTIM team's analysis, treatment options such
■ Real-time monitoring and communication
as acid treatments, fracture treatments, or sand
management will be considered. The knowledge ■ Integration of best-in-class Schlumberger
gained from each stimulation treatment is used services
to improve the next, in a continuous, closed-loop ■ Value creation through collaboration
process that reduces costs, maximizes production ■ Continually updated informed decision report
and increases recovery. (IDR)
■ Basin-specific reservoir and completion models
■ Advanced software programs for stimulation
optimization
The PowerSTIM
process >>
The first step in the PowerSTIM process is forming the After collecting and analyzing all available data, the
team, which normally is made up of geoscientists, reser- team uses the information to build a customized model
voir and production engineers, and stimulation designers. that describes geology and reservoir dynamics. This
Initially, the team concentrates on a small group of model, which accurately predicts key parameters and
wells—typically three to five, depending on field and forecasts production, is used to design optimized treat-
reservoir complexity. ments for the first group of wells.

PowerSTIM elements
Treatment selection
Field data review Well analysis and completion design

Geologic considerations Geologic considerations Select treatment


■ Review depositional envi- ■ Review log and core data ■ Perforation optimization
ronment ■ Understand effects of ■ Matrix acid
■ Review structure and depositional, structural ■ Acid or proppant fracture
stratigraphy and stratigraphic models
■ Sand or water management
■ Review geological model
■ Well architecture
■ Develop local interpreta- Reservoir considerations
tion models ■ Apply improved reservoir
Completion design
profiles (e.g., stress, perme-
ability, oil, gas, water) ■ Recommend perforation
Reservoir considerations
interval
■ Review offset well data ■ Provide improved 3D data set
for stimulation design ■ Design DataFRAC* services
■ Understand reservoir
■ Finalize prefracture reservoir ■ Optimize casing and tubulars
performance
characterization ■ Revise performance forecast
■ Improve reservoir profiles
(e.g., stress, permeability) ■ Design and analyze pressure ■ Design production or artificial
buildup test lift systems
■ Develop Mechanical Earth
Model (MEM) ■ Analyze production data ■ Evaluate technology options
(pressure and rate)
■ Material balance
■ Make performance forecasts
After these treatments are executed according to
design, the PowerSTIM team evaluates the results and
uses them to update the model, which is then used to
optimize the next group of completions. The updated
model often is available to decision-makers within a
few hours after the evaluation is finished.
Performance
driven >>

Stimulation design
and execution Analysis and optimization

Treatment design Treatment analysis


■ Run appropriate laboratory ■ Analyze post-treatment data
tests ■ Perform post-treatment
■ Use improved reservoir profiles production data analysis
■ Use CADE software suite ■ Design and analyze post-
■ Calculate net present values treatment pressure transient
(NPVs) of design options test
■ Optimize stimulation ■ Update reservoir and
completion model
■ Use interpretation models and
expertise
Optimization
On-site execution ■ Incorporate results into next
completion design
■ Perform quality assurance and
quality control ■ Improve reservoir and
completion model accuracy
■ Ensure design criteria are met
■ Reduce cycle time and well
■ Supervise implementation of
costs
pumping schedule
■ Optimize production
■ Analyze diagnostic tests
■ Monitor job in real-time

Processed Logs - Elan, FracHITE

10400 10400

ons t
ction Soluti ion Repor
s & Produ ed Decis 10450 10450

Completion IDR - Inform


PowerSTIM
IDR
Sample
10500 10500

Company: : Any State:


Well Name All d.
justifie
Field: Jack ically
if econom
County:
GL:
Date: 10400
DF:
Well Location:
: KB:
Elevations
API Number: Name:
Contact: Email:
Phone:
the current ir model
e is to assess the reservo tivity 10450
Objectiv TIM project against conduc
PowerS ion results for fracture
e of thiseness. Productparameters
The objectiv
ion effectiv the design met.
completts indicate that are not being
forecas half length
and fracture
10500

< 0.0 md
.ft
0.0 - 165
.0 md
165.0 .ft
- 329.9
md.ft
329.9
- 494.9
md.ft
494.9
- 659.9
md.ft
659.9
- 824.8
md.ft
824.8
- 989.8
md.ft
989.8
- 1154
7 md f
Innovations
facilitate process >>
Whether viewed on paper or on
screen, the report facilitates collab-
oration. It is a tangible representa-
tion of the value inherent in the
PowerSTIM process and is usually
delivered cumulatively in three
stages:
■ well and reservoir characterization

■ design
■ execution, evaluation and summary.

Comprehensive data set


PowerSTIM optimization is based
on a comprehensive data set and
complete reservoir characteriza-
tion—not standard correlations,
averages, estimates or assumptions
about reservoir performance param-
eters. The data set, which includes
rock mechanical properties, hydro-
carbon-resource profiles and sand-
Schlumberger innovations are and supervised in real time from prediction models, is used for well-
major contributors to the timeli- remote locations, resulting in better performance forecasting, reservoir
ness, efficiency and success of the well treatments. Integration of the simulation and well-completion
PowerSTIM process. One of these InterACT system with the FracCAT* design.
innovations is the PowerSTIM “in- fracturing computer-aided treatment
time” report, or IDR, which docu- system provides a powerful platform
ments the PowerSTIM solution and for the PowerSTIM process. At any stage in the project,
provides a complete, historical
record for each well treated. Updated report the report can be viewed
Another is the InterACT* real-time The comprehensive IDR is built
monitoring and data delivery, which dynamically on a personal computer
via the InterACT system…
facilitates collaboration and allows desktop. As the project proceeds,
real-time monitoring of treatments. the PowerSTIM team continually
Basin-specific models
updates the report, which begins
InterACT system with the initial reservoir charac- The PowerSTIM team builds basin-
The InterACT system promotes terization and progresses through specific petrophysical and comple-
teamwork by providing Web-based completion design and execution tion models to predict and optimize
data delivery with secure real-time, to postjob evaluation, recommenda- the effects of stimulation treatments.
two-way communication at all stages tions and summary. These models provide key parame-
of the project—from initiation to At any stage in the project, the ters such as net pay, producible
post-job analysis. Files of all stan- report can be viewed via the InterACT fluids, permeability, porosity, fluid
dard data types and formats can be system or printed as a hard-copy saturation, magnitude and direction
exchanged and shared, and stimula- snapshot, similar to a well log, for of tectonic stresses, and other rock
tion operations can be monitored quick access to well information. mechanical properties.
Porosity Free fluid CMR permeability, mD

Neutron porosity
0.3 vol/vol 0.0
Sidewall-cores corrected for
Density porosity Density porosity net overburden
0.3 vol/vol 0.0 0.3 vol/vol 0.0
Total CMR porosity CMR bound fluid Lobo-specific
0.3 vol/vol 0.0 0.3 vol/vol 0.0 0.002 Timur-Coates equation 20.0

Crossover CMR free fluid


Standard interval, tubular optimization and
0.002 Timur-Coates equation 20.0 stimulation treatment. Integration
Porosity and permeability do not correlate of all available basin, field, reservoir
and well data for better evaluation
High of formation characteristics facili-
porosity tates optimization of fracturing
fluids, proppants and volumes.

Stimulation design technology


High The stimulation design is optimized
porosity using advanced software programs.
Petrophysical data are distributed
into reservoir layers for fracture
modeling with a zone-by-zone layer-
Low ing program or FracCADE* fractur-
porosity
ing design and evaluation software.
FracCADE software also predicts
fracture geometry, using formation
Accurate and reliable permeability log profiles are key to production optimization. A Timur-Coates parameters such as shear modulus,
equation modified specifically for the Lobo formation provides a better core-log correlation in this
example. It provides an improved permeability profile for stimulation design in the Lobo formation. Young’s modulus, Poisson’s ratio,
permeability, overburden stress
and pressure.
Initially, the models are developed and permeability measurements Visualization software provides
from local knowledge, data from from a CMR-Plus* Combinable a “picture” of fracture geometry,
previous completions in offset wells Magnetic Resonance logging tool orientation and barriers. In-situ
and existing reservoir models. The with high-logging-speed capability, tests, including minifracture treat-
models are updated with new infor- along with mechanical properties ments using the DataFRAC fracture
mation as it becomes available, and from DSI* Dipole Shear Sonic data determination service, provide
additional data required to ensure Imager logs, are used to improve correlations to complement and
model accuracy are acquired by log- stimulation candidate selection. verify empirically derived values.
ging, testing or sidewall coring of Permeability derived from
the candidate wells. CMR-Plus measurements also can
be used to determine leakoff and The PowerSTIM team
Geological model for planning design fracture stimulations, and
Petrophysical and mechanical DSI compressional and shear data designs a customized
properties are usually merged in a are used to derive Young’s modulus
geological model, which is used to and Poisson’s ratio. The CHFR* completion based on
plan initial strategies for the com- Cased Hole Formation Resistivity
pletion design. ELANPlus* software tool can identify fluid saturations all available well data.
for elemental log analysis is used to in cased wells, and FMI* Fullbore
develop this model, and some para- Formation MicroImager micro-
meters may be calibrated against resistivity images help identify fault The Production Data Fracture
existing core data or sidewall cores. planes and preferred fracture plane Interpretation Tool determines
Analyses from offset wells also are orientation. fracture half-length and conductivity
used in finalizing the geological and the effective permeability of
characterization. Completion and treatment design stimulated formations. Production
The PowerSTIM team designs a is correctly allocated to each com-
Formation evaluation technology customized completion based on pleted interval using production
all available well data. This design log data, and NODAL* production
The PowerSTIM team uses a wide
is focused on maximizing produc- system analysis evaluates well pro-
range of technology to collect data
tion for the lowest cost and includes ductivity, taking the completion
needed to quantify reservoir parame-
recommendations on perforation design into account.
ters and improve models. Porosity
Actual production is compared
with the forecast made prior to
treatment. If there is a gap, all
available mechanical and petro-
physical data are used to refine
the fracture designs and update
models to improve results from
the next treatment.

Closing the loop


The last step of the PowerSTIM
process is closing the optimization
The OrientXact* perforating system is an important component of the perforation optimization
part of the PowerSTIM process. loop by presenting a complete job
summary, which is documented
in the IDR. This summary includes
Perforation strategy fracture placement instead of prop- recommendations and a go-forward
pant transport. Oriented perfora- plan for future wells.
The PowerSTIM team devises a per-
foration strategy that helps achieve tions minimize the risk that near-
wellbore complexities or tortuosity Collaboration creates value
the desired fracture properties. This
strategy may include using high-per- will cause premature screenout. In the PowerSTIM process, client
formance UltraJet* deep penetrating reservoir knowledge and field expe-
shaped charges to increase forma- Stimulation execution and evaluation rience and Schlumberger technology
tion penetration and orienting the PowerSTIM treatments are executed and expertise work together to cre-
perforations to encourage hydraulic with an emphasis on diagnosis, qual- ate value. This close collaboration
fractures to follow the direction ity assurance and quality control, and reduces engineering cycle time by
of natural stresses. Orienting the reducing cycle time. Following the expediting the learning process and
perforating guns with the Wireline treatments, production logs, temper- results in selection and application
Oriented Perforating Tool allows ature logs, tracer logs and other of the best stimulation technologies
fracture design to be focused on data are acquired and analyzed. and completion solutions.

Processed Logs - Elan, FracHITE


permeability porosity lithology rock propoerties net stress

Reservoir
467 1
4.93 0.839 0.31 467 2.8

Completions & Production Solutions 10400 10400


4.45 0.826 0.30
467 4.6
467 6.4
467 8.2
468 0

PowerSTIM IDR - Informed Decision Report 4.92

4.90
0.714

0.797
0.26

0.29
468 1.8
468 3.6
468 5.4
468 7.2
468 9
469 0.8
4.31 0.742 0.28 469 2.6
469 4.4
469 6.2
4.66 0.646 0.23
469 8

Company: Sample IDR 10450 10450 4.66 0.646 0.23


469 9.8
470 1.6
470 3.4
470 5.2

Well Name: Any


4.66 0.646 0.23 470 7
470 8.8
471 0.6
4.37 0.695 0.26 471 2.4
471 4.2

Field: All 4.35

4.47
0.779

0.809
0.28

0.30
471 6
471 7.8
471 9.6
472 1.4

County: Jack State: Texas

snapshot >>
472 3.2
10500 10500 472 5
4.58 0.758 0.28 472 6.8
472 8.6
473 0.4
4.07 0.842 0.31 4732.2

Date:
Well Location:
Raw Logs -Triple Combo
Elevations: KB: DF: GL: correlation resistivity porosity
API Number:
Contact: Name: Mike Donovan
Email: donovan1@slb.com
Phone: 281-285-1916 10400

Objective

The objective of this PowerSTIM project is to assess the current


completion effectiveness. Production results against the reservoir model
forecasts indicate that the design parameters for fracture conductivity
and fracture half length are not being met. 10450

The PowerSTIM IDR is a presentation of logs and graphics


that depicts a total picture of the process of gathering and
interpreting the data, generating an appropriate solution, 10500

implementing the solution and evaluating the results. The


optimization loop is closed by presenting a complete job
summary including recommendations and a go-forward
plan for future wells.
Transforming data to decisions
XX200
The PowerSTIM service helps
improve well-by-well financial per-
formance by capturing and taking
advantage of all the downhole infor-
mation already being collected. XX300

…client reservoir knowledge and


XX400
field experience and Schlumberger
technology and expertise work
together to create value. XX500

Instant Web-based access to cross-


disciplinary expertise and world-
XX600
wide data exchange gives decision-
makers the timely information they
need to balance improved well per- MD GR Total Sand

formance against treatment cost. ft Pass 2 Scandium concentration Formation Formation


API 0 lbm/ft2 6 Scandium Scandium Scandium Iridium
0 200
Cased- Total
Fracture Iridium Iridium
hole Iridium
width, in.
GR

PowerSTIM teams often have to evaluate multiple zone scenarios to determine


which strategy results in maximum production for the lowest cost. This radio-
active survey indicates successful placement of two separate fractures less
than 100 ft apart.

Samson Lone Star LTD


FracCADE* Price #9
Taylor
ACL Fracture Profile and Conductivity 12-18-200 0
Summary
10300

Samson Lone Star LTD ProCADE* The use of PSPLitr, ProFIT, ProCADE, proved extremely valuable in
FracCADE* Treatin g Pressure - psi Price #9
Ta ylor
Single Layer Forecast: Rates vs Time
Pressure, Rate, Concentration
Slurr y Rate - bbl/min
Pro p Conc - PPA
12-18-2000
2000 qo (STB/D)
successfully modeling production behaviour in comingled,
10400
5000 60 6 qg (Mscf/D)
qw (STB/D)
multi-stage wells.
qo Data (STB/D)
qg D ata (Mscf/D)
50 5 qw Data (STB/D )
4500 1500
Once a production match was achieved on multiple wells, the
model was verified. Confidence in the model and hydraulic fracture
Well D ep th - ft

40 4
Slurry Rate - bbl/min

Prop Conc - PPA

10500 4000
K=0.0031 md characterization allowed the modeling of improved design consider-
Treating Pressure - psi

Rate

1000
< 0.0 md.ft 30 3
Xf = 476 ft. ations, one of those being the addition of breakers to improve
0.0 - 165.0 md.ft
165.0 - 329.9 md.ft
3500
Conductivity = 33.6 md-ft fracture conductivity.
329.9 - 494.9 md.ft 20 2

494.9 - 659.9 md.ft 500


10600
659.9 - 824.8 md.ft
824.8 - 989.8 md.ft
3000
10 1 Further improvements to the existing design(s) are being explored
989.8 - 1154.7 md.ft and will be suggested if economically justified.
1154.7 - 1319.7 md.ft 0
2500 0 0
> 1319.7 md.ft 60 80 100 120 140 160 180 20 0 0 100 200 300 400 500 600 700
Treatment Time - mi n
10700
Time (days)
6500 7500 8500 950 0 -0.3 -0.2 -0.1 -0 0.1 0.2 0.3 0 500 1000 1500 2000 2500
Stress - psi ACL Width at Wellbore - in Fracture Half-Length - ft

*Mark of Schlumberger *Mark of Schlumberger

Recommendations

Results A n alys is T y pe
R es ults T abl e Bilinear Flow Formation Linear Flow There are still several areas to examine in the process of
Sectio n 2: We llbor e C onf igur at io n Cumulative Rate Average Cumulative Rate Average
k, (md) 0.0378 0.038 5 0. 0381 0.0049 0.0049 0. 0049
production and stimulation optimization. One such opportunity is to
Samson Resources Well: Price #9
Deviat ed Hole NO x f, (ft)
Well PERFORMance Analysis © 2001
Loc:
Desc:
4920' FEL & 2400' FSL of the E.C. Young Survey; A-879
Breaker added - Taylor completion only
Type:
Analysis:
Node:
Gas Well
System Analysis
Bottomhol e
Tr eat Down CASING
k x f2 , (md-ft 2 )
179.49
1.22E+03
174.35
1.17E+03
176. 92
1. 19E +0 3
395.59
772.10
397.06
772.07
396. 32
772. 08
reduce the degradation of fracture conductivity due to multi-phase
System Graph File: PRIC9_FR.pf3 Date: 02-14-2001 Fl ush Volume to 10438.0 ft 162. 2 bbl
Case 1 Input Data
k fb f, (md-ft) 1.17E+01 1.16E+01 1. 17E +0 1 6.61 6.50 6. 55 flow. This may be especially true in the Upper Cotton Valley interval.
4000 Fluid No Tubing. k(k fb f) 2 , (md 3 -ft2 ) 5.22 5.19 5. 20 0.22 0.21 0. 21
Water Cut
Oil Grav
10.0000 %
40.0 ˚API l , (md/cp) 1.76E+00 1.79E+00 1. 77E +0 0 0.229 0.227 0. 228
Improved reservoir characterization is the key to properly
SG Ga s 0.650 Casing Da ta
l x f2 , (md-ft 2 /cp)
GOR/Yield
SG Water
0.0001 bbl/MMcf
1.070 OD We ig ht ID De pt h
l (k fb f) 2 , (md 3 -ft2 /cp)
5.66E+04
242.4
5.43E+04
240.9
5. 54E +0 4
241. 7
35858.3
10.0
35856.7
9.6
35857. 5
9. 8
addressing this issue.
3000 Resv - Fractured Well
Resv BHP 3500. 0 psia
(in) (lb/ft) (in) (ft)
Resv Temp 250 ˚F 4. 500 11. 6 4 .000 10800. 0 k fb f/x f (md-ft/ft) 0.065 0.067 0. 066 0.017 0.016 0. 017
Resv Perm 0.0200 md
Fc d 1.73 1.73 1. 73 3.39 3.34 3. 36
Porosity 7.5000 %
The performance of the well will be monitored for 6-12 months.
Pressure, psig

Resv Thick 85 ft
C o ns is te nc y C h ecks
Resv Ra d 1000 ft Pe rf or ation Da ta
2000 Tot Compr 3.0300e-004
Prod Time
Frac 1/2 Ln
24.000
800
1/psia
hrs
ft
To p To p Bo tto m Bo tto m Shot Nu mb er Di ameter
Estimated: Perm, (md) 0. 0049 x f, (ft) 396. 32 F cd 3. 36 Several different and independent types of analysis will be used to
MD TV D MD TV D De ns it y Theoretical tstart (days) 100.87 100.8 7
Frac Perm
Frac Widt h
Compl- Open Hol
3000.0000

e
0.100
md
in
(ft) (ft) (ft) (ft) (shot/f t) () (in) Graphical tstart (days) 108.00 108.00 assess the impact of implementing the encapsulated breaker design.
A 10438. 0 10438. 0 10445. 0 10445. 0 1 .1 4 8 0. 30 Theoretical tend (days) 46.84 46.84 173.51 173.51
1000
Tbg - Cullender & Smith (1956)
WH Press 800. 0 psig 10450. 0 10450. 0 10464. 0 10464. 0 1 .0 7 15 0 .3 0 Graphical tend (days) 19.25 19.25 177.59 177.59
One robust form of analysis includes the continued use of ProFIT
Perf To p 1040 0 ft
10472. 0 10472. 0 10478. 0 10478. 0 1 .1 7 7 0. 30
Csg ID
Tbg ID
4.000 in
1.995 in
10528. 0 10528. 0 10532. 0 10532. 0 1 .2 5 5 0. 30
and ProCADE.
Flowln - None Calculated
1 2 3 4 WB Heat - Linear Gradient
10536. 0 10536. 0 10540. 0 10540. 0 1 .2 5 5 0. 30
0 WH Temp 80 ˚F 10544. 0 10544. 0 10548. 0 10548. 0 1 .2 5 5 0. 30
0 500 1000 1500 2000
Gas Rate, Mscf/D Inflow
10558. 0 10558. 0 10562. 0 10562. 0 1 .2 5 5 0. 30
Inflow @ Sandface (1)
Not Used
Inflow (1) (1) 3000.0000 10575. 0 10575. 0 10579. 0 10579. 0 1 .2 5 5 0. 30
Outflow (A) Inflow
Case 2 (2)
Case 2 (B) (2) 4000.0000 10598. 0 10598. 0 10604. 0 10604. 0 1 .1 7 7 0. 30
Case 3 (3) Fracture Perm, md
Case 3 (C) (3) 5000.0000 10616. 0 10616. 0 10620. 0 10620. 0 1 .2 5 5 0. 30
Case 4 (4)
Case 4 (D) (4) 6000.0000
Not Used
Not Used
Cond Unloading Rate
Water Unloading Rate Reg: Authorized User - Dowell Schlumberger
Max Erosional Rate
Transform data
to decisions >>
IDR FracCADE and StimCADE software
1
The hard copy of the IDR is made up of 8 ⁄2-in. FracCADE and StimCADE* software allows evalua-
by 14-in. pages that fold out. Well location and tion of different strategies to better understand how
relevant background data are shown on the they will impact fracture geometry. Issues such as
cover. Inside, a section of mud log or openhole connectivity to the perforations, height growth, frac-
log, core analysis and other test data identify ture length, bridging and conductivity are considered
pertinent zones. A wellbore configuration shows in this evaluation.
the completion design and perforation record. Schlumberger visualization software allows the
The execution section documents the stimu- PowerSTIM team to “see” the impact of fracture
lation design and implementation and often geometry and its relation to reservoir size and orien-
includes prefracture diagnostics plots and the tation. This visualization is useful in building a strat-
three-parameter plot of the treatment. Additional egy to optimize the completion and overall
sections present stimulation designs, productivity production.
analyses, production forecasts and logs, and
actual production data.
FracCADE LG Zones module
A unique zone-by-zone layering routine identifies
Reservoir profiles and evaluates individual zones in a layered formation.
Nuclear magnetic resonance (NMR) technology This analysis tool is a critical link between formation
is used in the CMR-Plus tool, which excites evaluation data and the FracCADE program.
hydrogen nuclei in formations by setting up
a magnetic moment, relaxing it and measuring
the time it takes atoms to realign. This NMR ProFIT* software
relaxation time is dependent on pore size and Production-data analysis using the Production Data
porosity, which is related to permeability. Fracture Interpretation Tool program determines
fracture half-length and conductivity and the effective
permeability of stimulated formations without shut-
Stress profiles ting wells in for analysis. Schlumberger is the only
The DSI sonic tool excites formations with company that provides this evaluation service.
acoustic waves and measures the resulting
compressional and shear transit times. Transit
times are converted into rock properties such Production allocation program
as shear modulus, Young’s modulus and Production log data are used as input to correctly
Poisson’s ratio. allocate production to each completed interval in
Shear modulus is an elastic material constant commingled, multilayer reservoirs. This allocation
that is the ratio of shear stress to shear strain. program allows determination of maximum perme-
Young’s modulus is an elastic material constant ability, minimum fracture length and conductivity
that is the ratio of longitudinal stress to longitu- for each zone.
dinal strain. Poisson’s ratio is an elastic constant
that is the ratio of latitudinal to longitudinal
strain, or a measure of material compressibility NODAL analysis
perpendicular to applied stress, that can be NODAL analysis is used to evaluate well productivity,
expressed in terms of measured properties, taking perforations, tubulars and surface facilities
including compressional- and shear-wave into consideration. Each pressure interface is treated
velocities. as a node with several variables.
To learn more about stimulation solutions
and PowerSTIM well optimization services,
visit www.slb.com/oilfield and select
Stimulation or e-mail powerstim@slb.com.

POCKET
PowerSTIM
Well optimization service

To learn more about stimulation solutions


and PowerSTIM well optimization services,
visit www.slb.com/oilfield and select
Stimulation or e-mail powerstim@slb.com.

www.slb.com/oilfield

ST_03_005_0 ©Schlumberger
October 2003 *Mark of Schlumberger

You might also like