Assessors Name: Assessors signature: Location of Date of Review date:

Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

03 Entanglement High Yes Yes Further to  Do not wear loose Project Site Engineer
commencement clothing. Manager
of work Supervisor
Wood  Only competent person Construction
Cutting should be allowed to Manager Foreman
Bench Saw use the machine.
operation Site Manager Charge hand
 Revolving parts to be
Cuts/severe High Yes Yes guarded. Project Carpenters
figures Engineer Medium
 Keep finger away from Helpers
cutting edges. HSE Manager

 Keep guard in place and


adjusted.

Expose to High Yes Yes Yes


wood dust  Use push sticks.

 Keep blade sharp and


set correctly.
Eye irritation High Yes Yes Yes
 Use appropriate PPE. Low

RISK RATING MATRIX 1 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09