Assessors Name: Assessors signature: Location of Date of Review date:

Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

02 Prior to the  Only competent persons Project Site Engineer


commencement allowed replacing disk. Manager
Abrasive of the activity Supervisor
Wheels  When fixing disc, use Construction
Grinding Burst wheel correct tools. Manager Foreman
High Yes Yes Yes
or disk
 Only trained and Site Manager Charge hand
competent operatives to
use the machine. Project Workers
Engineer
 Make sure guard is not Helpers
removed while the HSE Manager
machine is operating.
Contact with
Medium
moving  All required PPE must
High Yes Yes Yes
wheels or be worn.
disc
 Ensure the guards is in
place.

 Ensure personnel in
close proximity are
using eye protection.
Low
Entanglement  Ensure area of
High Yes Yes Yes fragmentation is clear
with the
moving parts of personnel.

Flying High Yes


particles Yes

RISK RATING MATRIX 1 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09
Assessors Name: Assessors signature: Location of Date of Review date:
Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

Abrasive
Wheels
Grinding
Yes
from wheel
or disc.

Fire High Yes Yes Yes

Noise
induced
deafness
and dust High Yes Yes Yes
health
hazard

RISK RATING MATRIX 2 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09