CRS-3-PU101-PR-DI-034 Rev.06
Client : OGDCL
Project Title : UCH-II Development Project “AMINE GAS SWEETENING UNIT& INCINERATOR Package”
Document Title Reference No. Doc. P&ID (PIPING AND INSTRUMENTATION DIAGRAM) N. 3-PU101-PR-DI-034
Contractor Reference No. : Transmittal No. 0226
ENAR/OGDCL Ref. No. : Transmittal No.0226
CLIENT/CONSULTANT STATUS
Document No/ COMMENTS (Piping /Civil & &REMARKS
Client/Consultant
S. No. Drawing No Structure / I&C / Process / BELLELLI RESPONSES
Response
&Section Material &Corrosion /
QA&QC
MECHANICAL COMMENTS
Page 1 of 5
CLIENT/CONSULTANT STATUS
Document No/ COMMENTS (Piping /Civil & &REMARKS
Client/Consultant
S. No. Drawing No Structure / I&C / Process / BELLELLI RESPONSES
Response
&Section Material &Corrosion /
QA&QC
is this flexible pipe? may be it Detailed characteristics will be provided in a
will deteriorate due to any
3-PU101-PR-DI- relative document.
5 human/machine interface
034 This comment is not appropriate to this
leads to pump closure. please
explain document.
Which other utility connections could be
necessary?
why did not you provide
Isolation valves are provided upstream and
3-PU101-PR-DI- valve here as for other utility
6 downstream of every regeneration reboiler
034 connections? how will one
300/310-E103A/B. Please refer to sheet 9 of
train isolate if require?
the P&ID.
Page 2 of 5
CLIENT/CONSULTANT STATUS
Document No/ COMMENTS (Piping /Civil & &REMARKS
Client/Consultant
S. No. Drawing No Structure / I&C / Process / BELLELLI RESPONSES
Response
&Section Material &Corrosion /
QA&QC
please provide
We have check with our stress analisys
reference/criteria or
3-PU101-PR-DI- department and the impact load due to BDV
11 supporting
034 operations will be considered into calculation
calculation for not
if the loads will be not negligible.
implementing this
3-PU101-PR-DI-
14 why not before approval? Added in this revision.
034
Page 3 of 5
CLIENT/CONSULTANT STATUS
Document No/ COMMENTS (Piping /Civil & &REMARKS
Client/Consultant
S. No. Drawing No Structure / I&C / Process / BELLELLI RESPONSES
Response
&Section Material &Corrosion /
QA&QC
noted. but please note that
if in 06th revision, Bellelli
can delete an item due to
3-PU101-PR-DI- The addition of a new items would result in
15 some technical reasons, than
034 extra-costs and extra time.
can be added an item due to
some technical reason. please
confirm
Detailed characteristics will be provided in a
3-PU101-PR-DI- relative document.
16 not clear?
034 This comment is not appropriate to this
document.
Detailed characteristics will be provided in a
3-PU101-PR-DI- relative document.
17 not clear?
034 This comment is not appropriate to this
document.
why out of Bellelli scope?
where we agreed that it will The battery limits are clearly indicated in the
out of Bellelli scope? P&ID sheet 19 since the first revision.
In addition, this pipeline will have to be
in the referred E-mail, ENAR placed on the main pipe rack that runs
provided the process piping between the two trains of amine sweetening
detail. now it is Bellelli unit together with other many pipes.
3-PU101-PR-DI- responsibility to provide not
18 The design and routing of the pipes in the
034 only this material but also
main pipe rack is out of bellelli scope of
pipe supports required to
supply.
support it, hydrotest drain and
vent connections (with So not having information and detail about
complete assembly), NDE the main pipe rack it is impossible to provide
examinations of these what you requested.
materials and other relevant
items necessarily required for
Page 4 of 5
CLIENT/CONSULTANT STATUS
Document No/ COMMENTS (Piping /Civil & &REMARKS
Client/Consultant
S. No. Drawing No Structure / I&C / Process / BELLELLI RESPONSES
Response
&Section Material &Corrosion /
QA&QC
its operation.
CONTRACTOR ENAR
PREPARED BY DATE SIGN REPLIED BY DATE SIGNATURE
EM/MD 27/08/2013
APPROVED BY
SV