Topik Materi Kuliah Deskripsi
1 Introduction to Quality Management PMBOK
Based on PMBOK Concept of Quality
Management
2 Total Quality Management in Is TQM work well in
Construction Construction
3 Quality Improvement Lean concept, VSM, Six sigma,
BSC
4 Cost of Quality, Return on Quality Cost to assure conformance
product
5 Quality Plan & Assurance in How to implement QP, QA in
construction Construction
6 Quality Improvement Tools & Pareto, Ishikawa, FTA,
Techniques Statistical Process Control
3
(SPC)
Satuan Acara Perkuliahan (SAP)
Quality Management
Topik Materi Kuliah Deskripsi
7 Introduction to Risk Management PMBOK
Based on PMBOK Concept of Risk Management
8 Risk Identification & Assessment Qualitative & Quantitative
Assessment
9 Risk Mitigation & monitoring Risk monitoring & control
4
References
• PMI, (2013), A guide to project management
Guideody body of knowledge (PMBOK® Guide) Fifth
edition, Project Management Institute, Inc.
• Ujian tertulis
– Ujian menggunakan standar ujian IAMPI (Quality
Management & Risk Management)
– Bentuk soal Multile choice
– Bobot ujian tulis 40%
6
PART 1
Project Management
Standard
7
IPMA STANDARD & KNOWLEDGE
ICB IPMA
Competence Baseline
Version 3.0
8
APM STANDARD & KNOWLEDGE
Project Management
9
Body of Knowledge
Fourth Edition
PMI STANDARD & KNOWLEDGE
Project Management
Body of Knowledge
PMBOK
® Guide PORTFOLIO
MANAGEMENT
PROGRAM
MANAGEMENT
OTHER
PMBOK p. 13
STANDARDS 10
9 areas Project Management Body of
Knowledge
11
Framework
Core areas
Support
areas
The aspects of a project that need to be managed at different
stages of the project lifecycle by using the processes
PART 1
Quality Management
in PMBOK
16
PMBOK
17
QM in PM
Quality Management
in Project Phase (PMBOK)
18
QM in PM
Overview
19
QM in PM
Quality Management
QM in PM
Overview
21
QM in PM
Gavernmental Standards,
Rules & Guidelines Develop Project
Enterprise Commercial database Quality Project Management Plan Management Plan
Environmental Factors 4.3
Planning (3.2.2.1)
Quality policies, Procedures,
Quality Management Plan Approved Changes Requests
Organizational and Guidelines, lessons learned
Quality Matrics Approved Corrective Actions
Process Assets Knowledge base
Quality Checklists Approved Preventive Actions
Process Improvement plan
Quality Baseline
Project Management Plan (updates)
Scope Definition Project Scope Statement Requested Changes
5.2 Recommended Corrective Actions
(3.2.2.3) Project Management Plan (updates)
QA/QC
QM in PM
PROJECT
MANAGER
Quality Management
Concept
25
QM Concept
Customer Conformance
Satisfaction
Quality To Requirement
3 2
27
QM Concept
28
Satisfaction process
“Objective”
Expectations
quality
Perceived
quality
Positive/ Neg.
Disconfirmatio
n
Future
Satisfaction
Expectations
29
Uncertainty in expectation
Expected Likelihood
Experienced
user
Inexperienced
user
Outcome
30
QM Concept
Quality :
“the degree to which a set of inherent characteristic
fulfill requirements”
Grade :
“category assigned to products or services having the
same functional use but different technical
characteristics”
31
QM Concept
Quality Vs Grade??
32
QM Concept
33
QM Concept
QM concept in Construction
Time
Time
Quality
Proc.
Contract Cost
Cost
Quality Quality
Quality
Manag.
Scope Comm.
Scope Comm.
Quality Quality
HRD
HRD
Quality
35
PART 3
Total Quality
Management (TQM)
36
TQM
37
TQM
Purpose of TQM
• The primary purpose of TQM is to achieve
excellence in customer satisfaction
through continuous improvements of
products and processes by the total
involvement and dedication of each
individual who is in any way, a part of that
product/process (Ahmed 1993).
TQM
Principle of TQM
1
2 5
3 4
PART 4
Cost of Quality
40
TQM
Return on Quality
Loyal New Customers
Customers Comes from
Competitors
Market
Share
Go to other
competitors 41
Cost of Q
Cost of Quality
Pito Sumarno 42
Cost of Q
COQ Model
44
Cost of Q
45
PART 5
Quality Improvement
46
Q Imprv.
Quality Improvement
47
TQM
P D
A C
48
Value Stream Mapping (VSM)
Lean =
+ +
Basics
49
VSM Process
50
QM Concept
51
Seberapa besar Standard Deviasi
memenuhi spesifikasi
1s
2s
3s
4s
5s
6s
LSL USL
52
53
QM Concept
54
Balance Score Card Perspectives
55
PART 6
Quality Management
Planning
56
1
Quality Planning
57
Quality Planning
58
Critical to Quality (CTQ)
59
Quality Planning
Quality Assurance
(QA)
61
2
Quality Assurance
62
2
Quality Assurance
Applying the planned, systematic quality activities to ensure that the project
employs all processes needed to meet requirement
63
QA
QM Standard
• Manajemen Mutu adalah sutu cara untuk
mengarahkan kegiatan organisasi dilapangan
dengan tujuan untuk mencapai mutu hasil kerja
seperti yang telah ditetapkan berdasarkan:
64
QA
ISO9000: QA Pyramid
QA
Quality Audit
Independent review to determine whether project activities
comply with organizational and project policies, processes,
and procedures.
The objectives of quality audit :
• Identify all good/best practices being implemented
• Identify all gaps/shortcomings
• Share the good practices introduced or implemented in
similar projects in the organization and/or the industry
• Proactively offer assistance in a positive manner to improve
implementation of processes to help the team raise
productivity
• Highlight contributions of each audit in the lessons learned
repository of the organization
66
PART 8
Quality Control
(QC)
67
3
Quality Control
68
3
Quality Control
In PM, quality control means making sure things are done
according to the plans, specifications, and permit
requirements.
69
QC
70
Source: www.youtube.com 71
QC
72
PART 9
73
QC
74
QC
75
76