SCHEDULE OF MINIMUM BASIC FEE

Part A - M i n i m u m C o m pen sa t i o n F o r C i v i l E n gi n eer a s prime


professional,

W hen the Civil Engineer assumes overall coordination including


architectural and other engineering services, the Engineer is a prime
professional

a. Group 1 - Simple structures such as lofts, warehouses, garages.


sheds, market buildings. and comparable projects of one but not
more than two stories

Project Construction Cost Minimum Basic Fees

P10 million and less 6%

Over P10 million to P20 million P 600000 plus 5.5%

Over P20 million to P30 million P1.150,000 plus 4.5%


of excess of P20 million

Over P30 million P1.600.000 plus 3.5%


of excess of P30 million

b. Group II - Buildings of 3 stories up to 14 stories, towers, tanks,


exhibition buildings, memorials, industrial buildings, simple bridges,
low dams, piers, wharves, bins and silos and comparable projects.

Project Construction cost Minimum Basic Fees

P10 million and less 7%

Over 10 million to P20 million P700.000 plus 6.5%


of excess of P10 million

Over P20 million to P30 million P1,350.000 plus 5.5%


of excess of P20 million

Over P30 million P1,900,000 plus 4.5%


in excess of P30 million

c Group III - Buildings with fifteen (15) or more floors. long span and
complex bridges, high dams. major portworks power plants and
other complex structures not covered in Groups I and II