MAJLIS BANDARAYA KUCHING SELATAN

ENGINEERING DIVISION
THE PRIVATE DEVELOPMENT CHECKLIST (WHAT ACTION SHOULD BE TAKEN?)

Please tick / if complied.


Submission of Commencement of Application for Refund of
A B D E
Engineering Plan Engineering Works Certificate of Completion Construction Waste Deposit

1. Four (4) sets of engineering plan originally 1. One (1) copy of Notice of 1. Letter of clearance from Land & 1. Write-in for the refund of the deposit
endorsed by Professional Engineer Commencement of Engineering Works Survey Department on the payment of after the issued of Certificate of
registered with B.E.M. & Clients, PA, etc. at completely filled and endorsed by the the 30% Land Premium. Completion with the original receipt
every pages with topographical plan same Professional Engineer enclosed.
endorsed by registered Qualified Surveyor submitting approved engineering 2 One (1) copy of Application for the
enclosed. plans, at least seven (7) days before issue of Certificate of Completion
the commencement of work. completely filled and endorsed by the
Request for
2. One (1) copy of approval letter and same Professional Engineer F
Taking Over Maintenance
coloured approved SPA plan/draft submitting the approved engineering
subdivision plan. plans.
1. Write-in to hand over the maintenance
3. One (1) copy of Certificate of Engineering 3. One (1) copy of Notice of Completion of the site after twelve months
Plan completely filled and endorsed by of Engineering Works completely filled maintenance period or the roads are
Professional Engineer registered with and endorsed by the Clients, P.A. etc. used by public whichever is latter.
B.E.M.
4. Cheque for Road Maintenance
4. Two (2) sets of structural design Deposit amounting to 10% of
Refund of Maintenance
calculations for the infrastructure works. construction cost & Landscaping G
Deposit
Maintenance Deposit after complying
5. Two (2) sets of drainage calculations with with the requirements from the joint
sketch plan showing the catchment area. inspection. 1. Write in for refund after the letter of
taking over maintenance of the site
6. One (1) copy of breakdown estimate cost 5. One (1) copy of printed SESCO has been issued by the Council and to
for the infrastructure works. receipt for installation of street lighting. surrender the original receipt as well.

7. Cheque for Construction Waste Deposit,


amounting to 1% of the construction cost
but not less than RM 500. "BERSATU BERUSAHA BERBAKTI"
"BERKHIDMAT UNTUK MASYARAKAT"
"AN HONOUR TO SERVE"

JALAN PADUNGAN, 93675 KUCHING. SARAWAK. Tel: 082 - 242311 Etx. 139, Fax: 082-243824