1798-INO
PACKAGE :
PROVINCE :
ACTIVITY LIST
SCOPE : The work covered shall comprise the reinstatement of pavement that has deterioted or showing evidence of
subgrade failure.
PRELIMINARIES :-
PENDAHULUAN :
1 Related Work :- 8.1.1(6)
Kerja Terkait :
Mobilization and Demobilization 1.2
Mobilisasai dan Demobilisasi
Maintenance of Traffic Flow 1.8
Pemeliharaan Arus Lalu Lintas
Field Engineering 1.9
Rekayasa Lapangan
Constructiion Schedules 1.12
Jadwal Konstruksi
Fill 3.2
Isi
Aggregate Base 5.1
Lapis Pondasi Agregat
Unsealed Road Base 5.2
Lapis Pondasi Jalan Terbuka
Prime Coat and Tack Coat 6.1
Lapis Resap pengikat dan Lapis Perekat
Hot Asphaltic Mixtures 6.3
Campuran Aspal Panas
Lasbutag Cold and Warm Mixes 6.4
Campuran Labustag dingin dan panas
Cold Asphaltic Mixtures 6.5
Campuran Aspal dingin
Dayworks 9.1
Routine Maintenance of Pavement, Shoulders,
10.1
Drainage, Road Furniture and Bridges
Pemeliharaan Rutin Perkerasan, Bahu, Drainase,
Perlengkapan Jalan dan Jembatan
6 Traffic Flow :-
Arus lalu lintas: -
The Constractor shall comply with the contract
- Verify - 8.1.1(6) X
requirements for Maintenance of Traffic Flow.
Kontraktor harus mematuhi persyaratan kontrak
untuk Pemeliharaan Arus Lalu Lintas.
CONSTRUCTION :-
KONSTRUKSI :
1
ROAD REHABILITATION SECTOR PROJECT LOAN ADB No. 1798-INO
PACKAGE :
PROVINCE :
ACTIVITY LIST
SCOPE : The work covered shall comprise the reinstatement of pavement that has deterioted or showing evidence of
subgrade failure.
2
ROAD REHABILITATION SECTOR PROJECT LOAN ADB No. 1798-INO
PACKAGE :
PROVINCE :
ACTIVITY LIST
SCOPE : The work covered shall comprise the reinstatement of pavement that has deterioted or showing evidence of
subgrade failure.
10 Rectification :-
Perbaikan: -
Areas of pavement that have been unsatisfactorily
Approval /
reinstated shall be rectified as directed by the - Check 8.1.1(8) X
Reject
Engineer.
Area perkerasan yang tidak memuaskan
dikembalikan akan diperbaiki sebagaimana
diperintahkan oleh Direksi Pekerjaan.