ROAD REHABILITATION SECTOR PROJECT LOAN ADB No.

1798-INO
PACKAGE :
PROVINCE :

ACTIVITY LIST

DIVISION : 8. REINSTATEMENT AND MINOR WORKS

SECTION : 8.1 Reinstatement of Existing Pavement

SCOPE : The work covered shall comprise the reinstatement of pavement that has deterioted or showing evidence of
subgrade failure.

Activity Description of Activity Action Specification Level of Approval


No. Contractor Engineer Output Clause 1 2 3

PRELIMINARIES :-
PENDAHULUAN :
1 Related Work :- 8.1.1(6)
Kerja Terkait :
Mobilization and Demobilization 1.2
Mobilisasai dan Demobilisasi
Maintenance of Traffic Flow 1.8
Pemeliharaan Arus Lalu Lintas
Field Engineering 1.9
Rekayasa Lapangan
Constructiion Schedules 1.12
Jadwal Konstruksi
Fill 3.2
Isi
Aggregate Base 5.1
Lapis Pondasi Agregat
Unsealed Road Base 5.2
Lapis Pondasi Jalan Terbuka
Prime Coat and Tack Coat 6.1
Lapis Resap pengikat dan Lapis Perekat
Hot Asphaltic Mixtures 6.3
Campuran Aspal Panas
Lasbutag Cold and Warm Mixes 6.4
Campuran Labustag dingin dan panas
Cold Asphaltic Mixtures 6.5
Campuran Aspal dingin
Dayworks 9.1
Routine Maintenance of Pavement, Shoulders,
10.1
Drainage, Road Furniture and Bridges
Pemeliharaan Rutin Perkerasan, Bahu, Drainase,
Perlengkapan Jalan dan Jembatan

2 Ensure that the Contractor has all the relevant data


- Verify Issue - X
and drawings available at Contract start-up.
Pastikan bahwa Kontraktor memiliki semua data
yang relevan dan gambar yang tersedia pada
Kontrak awal.

3 Determine areas to be reinstated and carry out


- Design Issue 8.1.1(4) X
design based on field survey and visual observations.
Tentukan area yang akan dipulihkan dan
melaksanakan desain berdasarkan survei
lapangan dan pengamatan visual.

4 Issue reinstatement works construction details to


- Issue Drawings 8.1.1(4) X
Contractor.
Isu pemulihan detail konstruksi kerja untuk
kontraktor.

5 Submit materials to be used in the construction for Approval /


Submission Check 8.1.2 X
approval. Where required provide test certificates. Reject
Kirim bahan yang akan digunakan dalam
pembangunan untuk persetujuan. Jika diperlukan
berikan sertifikat uji.

6 Traffic Flow :-
Arus lalu lintas: -
The Constractor shall comply with the contract
- Verify - 8.1.1(6) X
requirements for Maintenance of Traffic Flow.
Kontraktor harus mematuhi persyaratan kontrak
untuk Pemeliharaan Arus Lalu Lintas.

CONSTRUCTION :-
KONSTRUKSI :

Preliminary activities shall be completed before


construction starts. Where construction is carried out
in stages the same shall apply to each stage.
Kegiatan awal harus diselesaikan sebelum
konstruksi dimulai. Dimana pembangunan
dilakukan secara bertahap yang sama berlaku
untuk setiap tahap.

1
ROAD REHABILITATION SECTOR PROJECT LOAN ADB No. 1798-INO
PACKAGE :
PROVINCE :

ACTIVITY LIST

DIVISION : 8. REINSTATEMENT AND MINOR WORKS

SECTION : 8.1 Reinstatement of Existing Pavement

SCOPE : The work covered shall comprise the reinstatement of pavement that has deterioted or showing evidence of
subgrade failure.

Activity Description of Activity Action Specification Level of Approval


No. Contractor Engineer Output Clause 1 2 3

7 In general all basic setting out and extent of works


- Check Instruction - X
should be checked.
Secara umum semua dasar pengaturan dan
tingkat pekerjaan harus diperiksa.
Contractor shall mark out the areas accordingly.
Paint markings shall be used for sealed pavements - Verify - 8.1.3(1) X
and offset pegs for unsealed areas.
Kontraktor harus menandai daerah yang sesuai.
Tanda cat harus digunakan untuk perkerasan
tertutup dan mengimbangi pasak untuk daerah
terbuka.

8 The Contractor shall carry out method of execution


conforming to the provisions set out in the
Specifications or as instructed by the Engineer on
any of the following type of reinstatement work
defined:
Kontraktor harus melaksanakan metode eksekusi
sesuai dengan ketentuan yang ditetapkan dalam
Spesifikasi atau seperti yang diperintahkan oleh
Engineer pada salah satu jenis pekerjaan berikut
pemulihan didefinisikan:
Pavement patching of sealed and unsealed
- Verify - 8.1.3(1) X
pavement (excavation and reconstruction)
Perkerasan patching tertutup dan perkerasan
terbuka(penggalian dan rekonstruksi)
Pothole repair of sealed and unsealed pavement - Verify - 8.1.3(2) X
Perbaikan lubang tertutup dan perkerasan
terbuka
Sealing of cracks in sealed pavements - Verify - 8.3.3(3) X
Penyegelan retakan pada perkerasan tertutup
Spot levelling of sealed pavements - Verify - 8.3.3(4) X
Spot leveling dari perkerasan tertutup
Spot overlay of unsealed pavements - Verify - 8.3.3(5) X
Spot overlay perkerasan terbuka
Mechanical stabilization of unsealed road base - Verify - 8.3.3(6) X
Stabilisasi mekanik dasar lapis pondasi jalan
terbuka
Heavy grading of unsealed roads - Verify - 8.3.3(7) X
Gradasi berat jalan terbuka
Edge correction of sealed pavements - Verify - 8.3.3(8) X
Koreksi ujung pada perkerasan tertutup

2
ROAD REHABILITATION SECTOR PROJECT LOAN ADB No. 1798-INO
PACKAGE :
PROVINCE :

ACTIVITY LIST

DIVISION : 8. REINSTATEMENT AND MINOR WORKS

SECTION : 8.1 Reinstatement of Existing Pavement

SCOPE : The work covered shall comprise the reinstatement of pavement that has deterioted or showing evidence of
subgrade failure.

Activity Description of Activity Action Specification Level of Approval


No. Contractor Engineer Output Clause 1 2 3

9 All works shall be inspected for tolerances. The


finished levels of reinstatement shall be the same as Approval /
- Check 8.1.3 X
the adjacent sound areas of existing pavement or Reject
shoulder.
Semua pekerjaan harus diperiksa untuk toleransi.
Perbaikan tingkat akhir harus sama dengan
daerah yang berdekatan dengan suara dari
perkerasan atau bahu yang ada.

10 Rectification :-
Perbaikan: -
Areas of pavement that have been unsatisfactorily
Approval /
reinstated shall be rectified as directed by the - Check 8.1.1(8) X
Reject
Engineer.
Area perkerasan yang tidak memuaskan
dikembalikan akan diperbaiki sebagaimana
diperintahkan oleh Direksi Pekerjaan.

MEASUREMENT AND PAYMENT :-


PENGUKURAN DAN PEMBAYARAN: -
Measurement shall be in accordance with
requirements of the Specifications.
Pengukuran harus sesuai dengan persyaratan
Spesifikasi.

11 A full survey shall be carried out of the completed


and accepted works. The quantities will be calculated Survey Verify Record - X
using this survey.
Sebuah survei penuh harus dilakukan dari
pekerjaan yang telah selesai dan diterima.
Kuantitas akan dihitung menggunakan survei ini

12 Quantities shall be calculated by the Contractor and


Submission Verify Agreement 1.6 X
checked by the Engineer.
Kuantitas dihitung oleh Kontraktor dan diperiksa
oleh Direksi Pekerjaan.