BOQ - SEWER PUMP STATION EXAMPLE

THE INSTALLATION OF CIVIL ENGINEERING SERVICES DATE:


PROJECT NAME, TOWN
TENDER No
ItemNo Description Unit Cert Qty Rate Amount R
SECTION 1: PRELIMINARY AND GENERAL
PRELIMINARY AND GENERAL
FIXED-CHARGE ITEMS
1.1 Contractual Requirements Sum 1
Establish Facilities on site:
a) Facilities for Engineer
1.2 Nameboads Sum 1
b) Facilities for the Contractor
1.3 Office and storage sheds Sum 1
1.4 Ablution and latrine facilites Sum 1

1.5
Water supplies, elelctric power and communications Sum 1
1.6 Tools and equipment Sum 1
1.7 Dealing with water (Subclause 5.5) Sum 1
1.8 Access (Subclause 5.8) Sum 1
1.9 Other fixed-charge obligations Sum 1

1.1
Remove Contractor's site establishment on completion Sum 1
TIME-RELATED ITEMS
1.11 Contractual Requirements Sum 1.9
"Operate and maintain facilitieson the site:"
a) Facilities for Engineer
1.12 Telephone & fax PC Sum 1.9
b) Facilities for Contractor for duration of construction except
where otherwise stated
1.13 Offices, storage sheds, workships laboratories etc Sum 1.9
1.14 Services Sum 1.9
1.15 Tools and equipment Sum 1.9
1.16 " Dealing with water (Subclause 5.5)" Sum 1.9
1.17 Access (Subclause 5.8) Sum 1.9
1.18 Supervision Sum 1.9
1.19 Company and head office overhead costs Sum 1.9
1.2 Other time-related obligations Sum 1
ANCILLARY ITEMS
1.21 Cost of survey in terms of land surveying act PC Sum 0
Operating and Maintenance Manuals and Compliance
1.22
Certification Sum 1
Dewatering and Handling of inflows of Pump Station structures
1.23 (Sump/Valve Chamber) prior to and during Mechanical and
Electrical Works. Sum 1
Proivisional Sum for Pump Spares required during servicing of
1.24
pumps PC Sum 0
ENVIRONMENTAL

1.25
Comply with all aspects of the environmental management plan Sum 1.9
THE INSTALLATION OF CIVIL ENGINEERING SERVICES DATE:
PROJECT NAME, TOWN
TENDER No
ItemNo Description Unit Cert Qty Rate Amount R
HEALTH AND SAFETY
1.3 Health and Safety requirements Sum 1
1.31 Health and Safety plan Sum 1.9
1.32 Health and Safety file Sum 1.9

Panalties for non-compliance on Enviromental Health & Safety


1.33 a) Fixed Penalty per occurance No. 0
1.34 b) Time Related Penalty hours 0
DAYWORKS
Supply labour including on cost charges
1.35 a) Foremen h 10
1.36 b) Artisan h 0
1.37 c) Labourer h 10
MATERIALS (PROVISIONAL)
1.38 Supply materials PC Sum 0.2
1.39 Contractors markup % 6000
PLANT
Supply plant including, operator, fuel, maintenance and pertinent
cost
1.4 a) Digger Loader h 0
1.41 b) Flat bed truck h 0
1.42 c) Compressor h 0
1.43 d) 100 Kva Generator h 0
1.44 e) Jetting Vacuum Truck h 0
PUMP STATION MECHANICALS
PUMP STATION 1:
Pump Station Mechanicals:
Supply and install submersible raw sewage pump (Robot DWP 42-
2..1
30DO (7.5kW) or similiar approved) No 2

Remove, transport and service the existing pumps (pumps to be


2..2 removed one by one) and delivered to Municipal Yard after
pumps has been serviced. Contractor to provide the Engineer
with service report before installation of the pumps. (6kW) No 2
Removal of existing piping, valves, pumps, etc. and delivery to
2..3
Municipal store Sum 1
Pump Chamber:

2..4
Removal of existing top slab and deliver to Municipal store No 2
Supply and install Hot Dipped 150mm diam. Galvanised pipework
2..5
to suit site dimensions Sum 1

Supply and install new Top Slab complete as per detail drawing
2..6 1. Sump No 1
2..7 2. Valve Chamber No 1
Valve Chamber:

Supply and install valves complete including all required H.D.G.


nuts and bolts and rubber insertion packages
THE INSTALLATION OF CIVIL ENGINEERING SERVICES DATE:
PROJECT NAME, TOWN
TENDER No
ItemNo Description Unit Cert Qty Rate Amount R
2..8
(a) 150mm diam. Flanged cast iron Resilient Seat Gate Valve No 2
2..9 (b) 150mm diam. Flanged cast iron Ball Reflux Valve No 2
2..10 (c) VJ Flange Adaptor 150mm diam. No 2
(d) Replace duckfoot pedestals (Robot V150) complete to suit
2..11
pump No 2
Supply and install Hot Dipped 150mm diam. Galvanised pipework
2..12
to suit site dimensions Sum 1
Supply and install st/st guide rails with all brackets and all st/st
2..13
chains for pumps and floats No 2
Control Panel:

2..14 Supply and install control panel for 2 x 7.5kW pumps as per
project specifications including 5 float switches No 1
PUMP STATION 2:
Pump Station Mechanicals:

Remove, transport and service the existing pumps (pumps to be


2..15 removed one by one) and re-install after pumps has been
serviced in the pumpstation. Contractor to provide the Engineer
with service report before installation of the pumps. (22kW) No 2
Supply and install float switches with st/st 316 chain and float
2..16
weight complete. No 4
Valves:
Supply and install st/st guide rail brackets ( Top and Bottom) and
2..17
all st/st chains for pumps and floats No 2

2..18 Supply and install Hot Dipped 150mm diam. Galvanised pipework
to suit site dimensions complete with HDG Bolts and Nuts. Sum 1
Control Panel:
Supply and install main cicuit breaker 250A Hager as per
2..19
specification. No 1
PUMP STATION 3:
Pump Station Mechanicals:
Supply and install submersible raw sewage pump (Robot RW 62-
2..20
32JL (48kW) or similiar approved) No 1

Remove, transport and recondition the existing pumps (pumps to


2..21 be removed one by one) and re-install after pumps has been
reconditioned in the pumpstation. Contractor to provide the
Engineer with full report before installation of the pumps. (48kW)
Reconditioning to include, but are not limited to: No 3
1. Replace Impellers (243mm)
2. Replace Mechanical Seals
3. Revarnish and bake windings
4. Hydraulic Test Report on Duty Point
Removal of existing piping, valves, pumps, etc. and delivery to
2..22
Municipal store Sum 1
THE INSTALLATION OF CIVIL ENGINEERING SERVICES DATE:
PROJECT NAME, TOWN
TENDER No
ItemNo Description Unit Cert Qty Rate Amount R
2..24 Remove grid and penstock at inflow grid sump Sum 1

2..25
Supply and Install new inflow grid complete as per existing. No 1

2..26
Supply and Install new penstock complete as per existing No 1
2..27 Valves:
Replace 150mm diam. Flanged AVK RSV Gate Valve No 4
2..28 Replace 150mm diam. Flanged AVK Ball Check Valve No 4
2..29 Replace 150mm diam. Rubber Bellows No 4

2..30
Replace duckfoot pedestals (Robot V100) complete to suit pump No 4
Supply and install Hot Dipped 150mm diam. Galvanised pipework
2..31
to suit site dimensions No 4
Supply and install st/st guide rails with all brackets and all st/st
2..32
chains for pumps and floats No 4
2..33 Control Panel:

Supply and install 3CR12 indoor control panel (4 x 48kW pumps)


as per project specifications including 5 float switches No 1
Supply and Install Float Switches with st\st 316 chain and float
2..34
weight complete. No 6
2..35 Repair Terminal Box as per specification Sum
2..36 Pump House:
Replace bolts, nuts and washers on gantry Sum 1
2..37 Replace existing willy bird with similar and install No
2..38 Replace all 9E covers and frames No
Supply and Install mechanical door closing arm on MCC room
2..39
door No 1
2..40 PUMP STATION 4:
Pump Station Mechanicals:
Supply and install vertically staged, Self Priming Centrifugal Pump
(Ultra V Basic Pump, Model VS4A60-B, Size 6" x 4") or similiar
approved) complete with motor, base plate, and all other
requirements No 2

Remove, transport and service the existing pumps (pumps to be


removed one by one) and re-install after pumps has been
2..41 serviced in the pumpstation, including the correct installation of
the air release valves, as indicated in attached detail. Contractor
to provide the Engineer with service report before installation of
the pumps. (55kW) No 2
2..42 Valve Chamber:
Supply and install H.D.G. pipework for new pumps complete as
per detail drawing Sum 1
2..43 Valves:

Supply and Install 150mm diam. Flanged AVK RSV Gate Valve No. 2

2..44
Supply and Install 150mm diam. Flanged AVK Ball Check Valve No. 2
Supply and Install Hot Dipped Galvanised pipework as per
2..45
drawing, to suit site dimensions Sum 1
THE INSTALLATION OF CIVIL ENGINEERING SERVICES DATE:
PROJECT NAME, TOWN
TENDER No
ItemNo Description Unit Cert Qty Rate Amount R
2..48
Interface existing 2 No. VSD's with New Control Panel Sum 1

2..49
Supply, Install & Interface 2 No. New VSD with New Control Panel Sum 1

2..50 Relay electrical cabling, connect and make good to suite the
renovations and alterations of the pump station Sum 1
Reconfigure and connect telemetry cabling as required, connect
2.51 and make good to suite the renovations and alterations of the
pump station Sum 1
Sewer Pump StaIons - Building Works
2.52

Extensions and Alterations:


PUMP STATION 1:
Balancing Sump:
Supply and install new Balancing Sump complete, including
balancing pipe, top slab, cover and frame, etc. as per detail
drawing Sum 1
3.1 PUMP STATION 2:
Pump House:
Construct New Extension to the existing Building as per detailed
drawing. Sum 1

3.2
Install New Airconditioning Unit as per detailed drawing Sum 1
3.3 Segmented Paving:
Earthworks, subgrade and subbase
Treatment of Road-Bed
Road-bed preparation and compaction of material
Compact to 93 % mod. AASHTO max. density(100% for sand)
150mm insitu layer
a) All roadways m³ 0
3.4 Earthworks
Cut to fill within the site boundary or on surrounding erven
compacted to 93% mod. AASHTO max. density (100% for sand)
including for sidewalks
a) Cut to fill within road reserve m³ 0
3.5 Basecoarse

Construct base with material from commercial sources

Type C4 crushed stone base (5% Cement for Tender Purpose)


a) 125 mm to roads compacted to 98% MOD AASHTO maximum
density m³ 0
3.6 Provide edge restraints as shown on drawing for

a) Figure 12 Kerb (PROVIDE KERB DETAIL & QUANTITIES) m 0


3.7 Exstra over for cut units to fit edge restraints m 0

3.8 Construct precast concrete segmented paving complete on Areas


1 as shown on drawing, in herringbone 90 degrees pattern
a) on Area 1, Type Interlocking Concrete Pavers (Tan) m² 0
THE INSTALLATION OF CIVIL ENGINEERING SERVICES DATE:
PROJECT NAME, TOWN
TENDER No
ItemNo Description Unit Cert Qty Rate Amount R
Additional rolling for loads exceeding 30 kN if ordered
3.9
(Provisional)
a) Area 1 m² 0
3.1 Fencing and Gates
Supply all materials and construct ClearVu fencing complete to
drawing (3m panels x 1.8m high) m
Extra-over on Item 3.11 for Entrance Gate (4m x 1.8m high sliding
3.11
gate) No.

ALL VARIATION ORDERS SHOULD BE LISTED AND DETAILS,


QUANTITIES AND AMOUNTS OF THE VARIOUS
COMPONENTS SPECIFIED
411840.00
Total Carried Forward To Summary
Upgrading of Sewer Reticulation Langebaan: Phase 6
Part C2: Pricing Data 111

Upgrading of Sewer Reticulation Langebaan: Phase 6


Saldanha Bay Municipality
SUMMARY OF SECTIONS
Bill of Quantities
Description Amount R
Prelimanary & General 247926.00

Sewer Pump Stations - Mechanical 2965988.00

Sewer Pump Stations - Building Works 507361.00

Foul Sewer Reticulation - Network Alterations 411840.00

SUBTOTAL 4133115.00

Add 14% VAT 578636.10


4711751.10
Upgrading of Sewer Reticulation Langebaan: Phase 6
Part C2: Pricing Data 112